This is an Invitation to Bid (ITB) document from the Florida Fish and Wildlife Conservation Commission (FWC) for road maintenance services at Chassahowitzka Wildlife Management Area in Hernando County, Florida. The FWC seeks competitive pricing to maintain approximately 29 miles of roads within the management area, with priority given to primary roads if budget constraints limit project scope. The contractor must provide all labor, equipment, materials, and mobilization costs necessary to grade roads, apply herbicide treatment, fill rutted areas and potholes, add 3-4 inches of DOT-certified lime rock material, and compact surfaces using vibratory rollers to create smooth, two-wheel-drive-accessible roads. A mandatory pre-bid conference and site visit will be held on July 28, 2026, at 10:00 AM ET at 13243 Commercial Way, Weeki Wachee, Florida. Written questions must be submitted by August 4, 2026, at 5:00 PM ET. Sealed bids are due by August 14, 2026, at 2:30 PM ET, with a public opening scheduled for the same date and time. The FWC anticipates announcing the intended award by August 19, 2026. The contract term is one year from the issuance of the Purchase Order, with work to be completed by June 1, 2027, during the March-May timeframe, excluding specified spring turkey hunting quota periods.

The FWC has established an estimated budget of $180,000.00 for this project. Bidders must submit prices per 0.5 mile of road maintenance, and the contract will be awarded to the responsive, responsible bidder offering the lowest total bid price. Contractors must be registered with MyFloridaMarketPlace and SunBiz prior to bid opening and maintain workers' compensation insurance, general liability insurance, and commercial general liability coverage throughout the contract term. Minimum equipment requirements include a Caterpillar 120 Motor Grader or equivalent, a Caterpillar CCS7 Smooth Drum Vibratory Combination Compactor or equivalent, a water truck with sprayer capability, and a tractor/loader with dump truck. Contractors must demonstrate a minimum of five years' experience in roadwork and equipment operation. Payment is made upon satisfactory completion and inspection by the FWC Project Manager. The contractor must provide a minimum of three references from similar projects and is responsible for all equipment, materials, safety compliance, environmental protection, and liability related to the work. Subcontracting is not permitted.

View the file

Other files

File Type Posted
Addendum No. 1.pdf PDF
Addendum No. 2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION

1875 ORANGE AVE E

TALLAHASSEE, FL 32311-6160

(850) 488-6551

Chassahowitzka WMA Road Maintenance

FWC 25/26-106

INVITATION TO BID

ITB BIDDER ACKNOWLEDGEMENT FORM

Purpose: The intent of this bid is to obtain competitive pricing for maintaining roads within Chassahowitzka Wildlife

Management Area., per the specifications contained herein. Only responsive and responsible Contractors will be considered for award of this Invitation to Bid (ITB).

Responsive: To be responsive, a bid must constitute a definite, firm, unqualified and unconditional offer to meet all of the material terms of this ITB. Material terms are those that could affect the price, quantity, quality, or delivery. Also included as material terms are those which are clearly identified in this ITB and which, for reasons of policy, must be complied with at risk of bid rejection for non-responsiveness.

Non-Responsive: Any submission that does not comply with this ITB in any way, does not contain all the properly signed forms, supplements or deviates from the Bid requirements or has an incomplete Price Sheet may be considered nonresponsive at the discretion of the Procurement Manager.

Responsible Vendors: The Commission shall only consider responsible vendors. Responsible vendors are those that have, in the sole judgment of the Commission, the financial ability, experience, resources, skills, capability, reliability and business integrity necessary to perform the requirements of the contract. The Commission may also consider references and quality to determine the responsibility of the bid. The Commission reserves the right to use any information, whether supplied through the Bidder’s submission or otherwise obtained, in determining responsibility.

Sealed Bid: In response to an Invitation to Bid (ITB), a sealed bid is the final submission of a bid from a vendor prior to the bid deadline, after which no further submissions will be considered.

Rejection of Bids: The Commission reserves the right to reject any and all bids and to waive any minor irregularity in the submissions received in response to this ITB. The Commission reserves the right to consider all information, whether submitted or otherwise, to determine responsiveness and responsibility and to reject bids accordingly.

Name of Business: ____________________________________________________________________________________________________

Contact Person Name: _________________________________________________________________________________________________

Business Address: ____________________________________________________________________________________________________

City: ____________________________ State: _____________________________ Zip code: ______________________________________

Phone: ___________________________ Fax: _______________________________ Email: ______________________________________

Federal Employer Identification Number: ____________________

The undersigned attest to the following:

“We understand all of the terms, conditions and the specifications contained herein and agree to abide by all of the terms, conditions and the specifications in their entirety.

Authorized Signature (Manual): ________________________________________________________________________________________

Authorized Signature Name (Typed) and Title: __________________________________________________________________________

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 3 of 69

CALENDAR OF EVENTS

FWC 25/26-106

SCHEDULE DUE DATE METHOD

Bid Advertised July 21, 2026 Posted on the Vendor Information Portal

(VIP)

MANDATORY Pre-Bid

Conference

July 28, 2026

@ 10:00 AM ET

See Pre-Bid Conference Clause

Deadline for Questions

Must be received

PRIOR to:

August 4, 2026

@ 5:00 PM ET

See Solicitation Questions Clause

Anticipated date for Responses to Written Questions August 7, 2026 Posted on the Vendor Information Portal

SEALED BIDS DUE

(REMEMBER: The bid number should be clearly marked on envelope)

Must be received

PRIOR to:

August 14, 2026

@ 2:30 PM ET

Mailing Address:

Florida Fish & Wildlife Conservation

Commission

Attn: Purchasing

1875 Orange Ave E

Tallahassee, Florida 32311-6160

Submissions are due BEFORE the date and time of the public opening.

Public Bid Opening August 14, 2026

@ 2:30 PM ET

Public Opening Options for Attendance:

-In Person-

1875 Orange Ave E

Tallahassee, FL 32311-6160

-Teleconference-

Conference call phone number:

1.888.585.9008

Conference room number: 218-721-199

Anticipated Date of Intended

Award August 19, 2026 Posted on the Vendor Information Portal https://vendor.myfloridamarketplace.com/

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 4 of 69

GENERAL CONDITIONS

FWC 25/26-106

The Florida Fish and Wildlife Conservation Commission’s (FWC or Commission) mission is to manage fish and wildlife resources for their long-term well-being and the benefit of people. The Commission administers six (6) major programs including habitat and species conservation, freshwater fisheries management, law enforcement, marine fisheries management, hunting and game management and fish and wildlife research.

A Bidder submitting a bid shall be registered in the MyFloridaMarketPlace (MFMP) system and where required, the Sunbiz system prior to the bid opening. Business entities which must be on file with Sunbiz include the following foreign and domestic entities: Corporations for and not for profit, Limited Liability

Companies (LLC), Limited Partnerships (LP) including Limited Liability Limited Partnerships (LLLP), and organizations doing business under a fictitious name (DBA). A Bidder may not be considered for an award, if not registered in the MFMP and Sunbiz system. The Bidder’s registration address and federal employer identification (FEID) number should match the Bidder’s address and FEID number listed on the

Bidder Acknowledgment form (Page 2).

Certified Minority-owned, Woman-owned and Service-Disabled Veteran Business Enterprises, as certified by the State of Florida Office of Supplier Development, are encouraged by the Commission to participate in the bidding process.

Bids from Bidders shall include all necessary equipment to complete the job. The bidder is required to supply all specified documentation when submitting a bid for this project.

Please note:

• The terms “Contract,” “Agreement” and “Purchase Order” are used interchangeably in the document.

• The terms “Commodities” and “Goods” are used interchangeably in the document.

TERMS AND CONDITIONS

PUR 1000 and PUR1001 are hereby incorporated by reference. PUR1000 and PUR1001 can be found at the

Department of Management Services website at the following link:

https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purc hasing_pur_forms

The following terms and conditions take precedence over the PUR1001 and PUR1000 forms where applicable. The Commission objects to and shall not consider any additional terms or conditions submitted by a Bidder or Contractor, including any appearing in documents attached as part of a Bidder’s response.

In signing and submitting its bid, a Bidder agrees that any additional terms or conditions, whether submitted intentionally or inadvertently, shall have no force or effect. Failure to comply with terms and conditions, including those specifying information that must be submitted with a bid, shall be grounds for rejecting a bid.

The terms and conditions of Attachment A, Purchase Order Terms and Conditions, are hereby incorporated into this solicitation. Any contract resulting from this solicitation will include the terms and conditions of this solicitation and the terms and conditions contained in Attachment A.

https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purchasing_pur_forms https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purchasing_pur_forms

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 5 of 69

PROCUREMENT MANAGER

Xavier Wilson xavier.wilson@myfwc.com

ESTIMATED BUDGET

The Commission has an estimated budget for this project of $180,000.00.

TERM

The contract will be effective one year upon issuance of Purchase Order.

If circumstances constituting Force Majeure have occurred, or if anything occurs beyond the Contractor’s control, the Contractor shall submit an extension request in writing. The Project Manager and Contract

Manager will review the extension request and if they determine it is justified, will forward to the Bid

Request Inbox (bidrequest@myfwc.com) for procurement review and approval/disapproval.

SUBCONTRACTS

Subcontracting IS NOT permitted pursuant to the Terms and Conditions of the Purchase Order.The

Subcontractor Minority Status Report (Attachment C) shall be submitted with each invoice for payment.

DIVERSITY

The Commission is committed to supporting Florida’s diverse business industry and population through ensuring participation by minority, women, and veteran-owned business enterprises in the economic life of the state. The State of Florida Mentor Protégé Program connects minority, women, and veteran-owned business enterprises with private corporations for business development mentoring. We strongly encourage contractors doing business with the State of Florida to consider this initiative. For more information on the

Mentor Protégé Program, please contact the Office of Supplier Development at (850) 487-0915 or osdinfo@dms.myflorida.com.

FWC encourages diversity in its procurement program and requests that all subcontracting opportunities afforded by this solicitation enthusiastically embrace diversity. The award of subcontracts should reflect the vast array of citizens in the State of Florida. Bidders can visit the Office of Supplier Development website for information on certified business enterprises that may be considered for subcontracting opportunities. However, pursuant to Section 287.05701 F.S., the Commission may not request documentation of or consider a vendor’s social, political, or ideological interests when determining if the vendor is a responsible vendor, nor give preference to a vendor based on the vendor’s social, political, or ideological interests.

MANDATORY PRE-BID CONFERENCE/ SITE VISIT MEETING

A pre-bid conference/Site Visit Meeting will be held at 13243 Commercial Way, Weeki Wachee, FL 34614

/ 28.617721, -82.552645 on the date and time specified in the Calendar of Events (Page 3). The purpose of the pre-bid conference/Site Visit Meeting is to discuss the contents of this ITB and to accept verbal questions from Bidders concerning the project. Vendors must attend this pre-bid conference site meeting as a requirement of bid responsiveness. Failure to attend the entire conference meeting, from the time it is called to order to the time it is adjourned, shall disqualify a potential respondent. The Commission will make a reasonable effort to answer verbal questions asked at the pre-bid conference/Site Visit, however, Bidders should clearly understand that verbal discussions held at the pre-bid conference/Site Visit shall not be binding on the Commission, and the Commission will only issue an official written response to verbal questions subsequently submitted in writing in accordance with the Deadline for Questions clause below.

mailto:bidrequest@myfwc.com?subject=Extension%20Request https://www.dms.myflorida.com/agency_administration/office_of_supplier_diversity_osd/mentor_protege_program mailto:osdinfo@dms.myflorida.com https://www.dms.myflorida.com/agency_administration/office_of_supplier_diversity_osd/mentor_protege_program https://www.dms.myflorida.com/agency_administration/office_of_supplier_diversity_osd/mentor_protege_program

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 6 of 69

Main Entrance: 13243 Commercial Way, Weeki Wachee, FL 34614

Coordinates: 28.617721, -82.552645

VERBAL INSTRUCTION PROCEDURE

Bidders may not consider any verbal instructions as binding upon the Commission. No negotiations, discussions, or actions shall be initiated or executed by the Bidder as a result of any discussion with any

Commission employee. Only those communications from the Commission that are in writing, may be considered as a duly authorized expression on behalf of the Commission.

SOLICITATION QUESTIONS

Any questions from Bidders that require an official FWC answer concerning this project shall be submitted in writing to the Procurement Manager. This includes specification inquiries, such as questions or requests for additional or altered terms and conditions. Questions to the Procurement Manager shall not constitute formal protest of the specifications or of the solicitation. Questions must be received no later than the date and time specified in the Calendar of Events (Page 3). Questions may be sent via email with the solicitation number in the subject line. It is the responsibility of the bidder to confirm receipt of questions if needed.

If questions are received, an addendum will be issued and shall be posted on the Vendor Information Portal

(https://vendor.myfloridamarketplace.com).

LIMITATION ON BIDDER CONTACT DURING SOLICITATION PERIOD

Bidders to this solicitation or persons acting on their behalf may not contact, between the release of the solicitation and the end of the 72-hour period following the Commission posting the notice of intended award, (i.e., the 72-hour posting period excludes Saturdays, Sundays, and state holidays) any employee or officer of the executive or legislative branch concerning any aspect of this solicitation, except in writing to the Procurement Manager or as provided in the solicitation documents. Violation of this provision may be grounds for rejecting a response.

BIDDER SPECIFICATION CHALLENGE

Any protest concerning the specifications of this solicitation shall be made in accordance with PUR1001, paragraph 20, “Protests”. A notice of protest of the solicitation documents shall be made within seventy-two hours after the posting of the solicitation. Failure to file a protest within the time prescribed in Section

120.57(3)(b), F.S., shall constitute a waiver of proceedings under Chapter 120, F.S.

ADDENDUMS

If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents or answer any Bidder questions during the ITB period an addendum shall be posted on the

Vendor Information Portal internet site. Each Bidder is responsible for monitoring the Vendor Information

Portal website (https://vendor.myfloridamarketplace.com) for new or changing information relative to this procurement. The Commission bears no responsibility for any delays, or resulting impacts, associated with a

Bidder’s failure to obtain the information made available through the Vendor Information Portal.

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 7 of 69

BIDDER ACKNOWLEDGMENT

In order for this bid to be valid, the bid must be completed in its entirety, signed by the Bidder and returned, as part of the bid or the bid will be rejected. By affixing your signature to the ITB Bidder Acknowledgement

Form (page 2), the Bidder hereby states that the Bidder has read all bid specifications and conditions and agrees to all terms, conditions, provisions, specifications, and is currently licensed to do business within the

State of Florida, if required by State or Federal Law, for the services or commodities the Bidder will provide the Commission under these bid specifications.

MANDATORY RESPONSIVE REQUIREMENTS

The Commission will not review Bids from Bidders who do not meet the mandatory responsive requirements listed in Attachment B, Mandatory Responsive Requirements. Note: The Commission will perform an initial responsiveness check. Bids found to be non-responsive will not be considered for award.

The Commission reserves the right to act upon information discovered during and after the initial responsiveness check impacting the responsibility or responsiveness of the Bid or Bidders.

REFERENCES

Each prospective Bidder shall provide a minimum of three (3) references for similar projects completed.

Current contact names and phone numbers shall be included with the bid package. See the attached references form for reference requirements.

EQUAL BIDS

In the event that there is no multiple award contemplated in the ITB, and the Commission receives equal bids eligible for award, the Commission will comply with the following, as applicable: sections 287.057(12), 287.082, 287.087,287.092, 295.187(4)(a), and 295.187(4)(b), F.S. In order to clarify the Bidders’ status with regard to the applicable statutory preference requirements, the Commission may request information from

Bidders with equal bids. A Bidder will not be permitted to amend or supplement its Bid in response to such request for clarification. If the tie has not been broken by application of the aforementioned statutes, the

Commission will proceed with a random selection to decide the award.

SUPPORTING/SUPPLEMENTAL INFORMATION

The Commission requires that bidders submit all required technical, specification, and other supporting information with their bid, so that a detailed analysis and determination can be made, by the Contract

Manager that the product/service offered meets this ITB’s specifications and that other requirements of this ITB have been met. However, provided a bid meets the requirements for a definite, firm, unqualified, and unconditional offer, the Commission reserves the right to request supplemental information from the bidder after the bids have been opened to ensure that the products/services offered completely meet this

ITB’s requirements. The requirement for such supplemental information will be at the reasonable discretion of the Commission and may include the requirement that a bidder will provide a sample product(s) so that the Commission can make a first-hand examination and determination.

A bidder's failure to provide this supplemental information or the product sample(s), within the time set by the Commission, will cause the Commission to consider the Contractor non-responsive and reject the

Contractor’s bid.

CONFIDENTIALITY/PUBLIC RECORDS LAW

Bidders are cautioned that Florida law generously defines what constitutes a public record and grants broad rights of public access to those records; see, for example, section 119.07, F.S. If a Bidder believes that its response contains information that is confidential or exempt from disclosure under Florida Law, the Bidder

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 8 of 69 shall clearly segregate and mark that information (for example, stamp each page "Confidential" and place it in an envelope marked "Confidential") and briefly describe in writing the grounds and specific legal citations for claiming exemption from the public records law. If after the notice of intended decision or thirty

(30) days after bid opening, whichever is earlier, the Commission receives a public record request related to the solicitation, the Commission will provide copies of public records that are not exempt to the requester.

The Commission will endeavor to provide notice to the Bidder of all public records requests received related to documents provided by the Bidder that were marked pursuant to this paragraph. In no event shall the

Bidder hold the Commission or any of its employees or agents liable for disclosing, or otherwise failing to protect the confidentiality of, information submitted in response to this solicitation.

MAILING INSTRUCTIONS

All bids shall be submitted in a SEALED ENVELOPE addressed to:

Florida Fish and Wildlife Conservation Commission

Attn: Purchasing

1875 Orange Ave E

Tallahassee, Florida 32311-6160.

The envelope shall be plainly marked on the outside with: BID NUMBER, DATE AND TIME OF THE BID

OPENING.

THE COMMISSION IS NOT RESPONSIBLE FOR THE OPENING OF ANY ENVELOPES THAT ARE NOT PROPERLY

MARKED.

PLEASE NOTE: The Commission’s official business hours of operation are 8:00 AM–5:00 PM ET, exclusive of Saturdays, Sundays and state holidays. Selecting delivery services, such as next day first delivery, may result in attempted delivery prior to opening or closing, and the Commission will not be available to accept those deliveries. THE COMMISSION IS NOT RESPONSIBLE FOR LATE SUBMISSIONS DUE TO COMPLICATIONS

RELATED TO SELECTED DELIVERY SERVICES. DIGITAL SUBMISSIONS SHALL BE DEEMED NON-RESPONSIVE

AND SHALL NOT BE ACCEPTED.

SOLICITATION PUBLIC OPENING

The public opening of this bid will be conducted at the date, time and method specified on the Calendar of

Events (Page 3). BIDS RECEIVED AFTER THE SPECIFIED DATE AND TIME WILL BE REJECTED.

Any person with a qualified disability shall not be denied equal access and effective communication regarding any bid/proposal documents or the attendance at any related meeting or bid/proposal opening. If accommodations are needed because of a disability, please contact the Purchasing Section at (850) 488-6551 at least three (3) workdays prior to the opening.

AWARDED BID/INSPECTION

The Commission will award the bid to the responsive, responsible bidder who submits the lowest bid price.

If deemed necessary, an interview with the bidder by the Contract Manager may be required before the bid is awarded.

The Commission reserves the right to inspect the prospective Contractor’s materials and background record prior to making an award of the Contract. If the Contract Manager determines the lowest bidder does not have sufficient experience, equipment, etc. to meet the specifications of this ITB, the Commission reserves the right to reject the bidder and evaluate the next lowest bidder.

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 9 of 69

POSTING OF BID TABS

Bid Tabulations with Contractors identified as awarded bidders will be posted electronically as Agency

Decisions on the Department of Management Services Vendor Information Portal as a Public Notice. The

Agency Decision may be viewed at https://vendor.myfloridamarketplace.com, and will remain posted for a period of 72 hours. Failure to file a protest within the time prescribed in Section 120.57(3)(b), F.S., shall constitute a waiver of proceedings under Chapter 120, F.S.

Awarded Bidders are instructed not to proceed until a Purchase Order, Formal Written Contract, Lease, Notice to Proceed, or some other form of written notice is given to the Contractor by the Commission. A company or person who proceeds prior to receiving a Purchase Order, Formal Written Contract, Lease, Notice to Proceed, or some other form of written notice from the Commission does so without a contract and at their own risk.

Sealed bids, proposals, or replies received by an agency pursuant to a competitive solicitation are exempt from s. 119.07(1) and s. 24(a), Art. I of the State Constitution until such time as the agency provides notice of an intended decision or until thirty (30) days after opening the bids, proposals, or final replies, whichever is earlier.

SCOPE CHANGES AFTER CONTRACT EXECUTION

The Commission shall provide written notice to the successful bidder thirty (30) days in advance of any

Commission required changes to the technical specifications and/or scope of service that affect the successful bidder’s ability to provide the service as specified herein. Any changes that are other than purely administrative changes will require a change order.

FWC CONTRACT MANAGER

The FWC employee identified as the Contract Manager shall perform the following on behalf of the FWC:

• review, verify, and approve receipt of services/deliverables from the Contractor;

• submit requests for change orders/amendments/renewals, if applicable;

• review, verify, and approve invoices from the Contractor; and, if applicable, complete the

Certificate of Contract Completion form; and

• maintain an official record of all correspondence between the Commission and the Contractor and forward the original correspondence to the Procurement Manager for the official file.

DELIVERABLES

The following services or service tasks are identified as deliverables for the purposes of the subsequent

Contract:

a. Performance of all services set forth in the Scope of Work.

b. Submission of all invoicing, supporting documentation, Corrective Action Plans and reports.

NOTICE TO PROCEED

The awarded Bidder shall not initiate work under this contract until the required Insurance documentation has been received by the Commission. The Contractor may begin work once it has received an official written Notice to Proceed (Attachment D) from the Contract Manager.

https://vendor.myfloridamarketplace.com/ http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0100-0199/0119/Sections/0119.07.html

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 10 of 69

CERTIFICATE OF CONTRACT COMPLETION

The Contract Manager shall conduct a final inspection of the work to determine if completion has occurred.

Upon satisfactory completion of the work, the Contractor shall send the Contract Manager a notarized

Certificate of Contract Completion (Attachment E) and the contract shall be deemed completed upon the issuance date of such Certificate.

LIQUIDATED DAMAGES

If the Contractor fails to complete the work or the conditions of the Purchase Order and/or Change Orders by the completion date, the Commission shall have the right to deduct liquidated damages from any amount due and payable to the Contractor. Liquidated damages shall be assessed in the amount of $200 per calendar day of delay. Exceptions to this provision may be made if a delay is attributable to circumstances that are clearly beyond the control of the Contractor. The burden of proof of unavoidable delay shall rest with the Contractor and shall be supplied in a written form and submitted to the Contract Manager.

WARRANTIES/DAMAGED ITEMS/DELIVERY

The Contractor shall assume full responsibility for providing or ensuring warranty coverage and/or warranty service on any and all items including goods, materials, or equipment provided to the Commission.

If Contractor is not the Manufacturer, all Manufacturer warranties must be passed through to the

Commission.

Delivery shall be made no later than the specified Delivery Date. The Contractor shall pay all costs associated with delivery and shall assume full responsibility for all item(s) damaged prior to the F.O.B.

destination delivery and agree to hold harmless the Commission of all responsibility for prosecuting damage claims.

The Contractor shall assume full responsibility for replacement of all defective or damaged goods within thirty (30) days of notice by the Commission of such defect or damage.

GUARANTEE

If products do not comply with the specifications contained herein, the Contractor shall replace the product(s), or the purchase price shall be refunded. The refund or the delivery of the replacement product(s) shall be made within thirty (30) days following the Contract Manager’s notification to the Contractor that the original product(s) was non-compliant. Costs of returning the original product(s) will be the sole responsibility of the Contractor.

MATERIAL AND EQUIPMENT ON COMMISSION PROPERTY

If the Commission allows the Contractor to have project materials or equipment delivered to and/or stored upon the Commission-managed or owned property before, during, or after the term of the project, the

Contractor will be fully and solely responsible for all expenses and liability incurred as a result of the delivery or storage. Should the Commission, in its sole discretion, determine that any project materials or equipment stored on its property must be moved in response to an emergency, the Contractor shall hold harmless, indemnify, defend, and may be responsible for costs of any reasonably necessary actions taken by the Commission.

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 11 of 69

AUTHORIZED COMPENSATION

It is understood and agreed that all compensation under this ITB is specifically limited to the Contractor’s bid price accepted by the Commission, and to the specific procedure for payment established in this ITB and the Purchase Order executed pursuant to it. The Commission is not liable for any costs, fees, expenses or any other compensation whatsoever incurred or charged by the Contractor, other than the bid price paid for the work specifically described in the Scope of Work, which work is actually accomplished and invoiced by the Contractor subsequent to the Commission’s notice to proceed (or other notice to begin work). Thus, the Commission is not liable for any costs incurred or charged by the Contractor in anticipation of responding to, or performing work described in, this ITB including, but not limited to, equipment or personnel procured by the Contractor in anticipation of such work. The Commission is not responsible to the Contractor for any loss or damages resulting from circumstances unforeseen at the time of publication of this ITB including, but not limited to, those resulting from a “force majeure”.

ADDITIONAL LEGAL REQUIREMENT

All corporations seeking to do business with the State shall, at the time of submitting a bid, be on file with the Department of State in accordance with provisions of Chapter 607, F.S.; similarly, partnerships seeking to do business with the State shall, at the time of submitting such bid, have complied with the applicable provisions of Chapter 620, F.S. For further information on required filing and forms, please go to the following sites: http://sunbiz.org or http://dos.myflorida.com.

USE OF CONTRACT BY OTHER STATE AGENCIES AND ELIGIBLE USERS

As provided in Chapter 60A-1.045, Florida Administrative Code (F.A.C.), and Section 287.042(16), F.S., other State of Florida agencies may purchase from the resulting contract of this ITB, provided that the

Department of Management Services has determined the contract’s use is cost effective and in the best interest of the State, and with the Contractor’s consent.

Other State of Florida governmental entities and eligible users may also request of the Contractor to be able to use this contract. If the Contractor agrees to other entities to utilize this ITB contract, such agencies shall coordinate their use of this contract with the Florida Fish and Wildlife Conservation Commission in order to reduce scheduling conflicts.

CONDITIONS AND SPECIFICATIONS

The bidder is required to examine carefully the conditions and specifications of this bid and to be thoroughly informed regarding any and all requirements of the conditions and specifications.

http://www.sunbiz.org/ http://dos.myflorida.com/

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 12 of 69

SCOPE OF WORK

FWC 25/26-106

CHASSAHOWITZKA WMA ROAD MAINTENANCE

PURPOSE

The intent of this Invitation to Bid is to obtain bids for maintaining roads within Chassahowitzka Wildlife

Management Area (Figure 1). The awarded Bidder (Contractor) shall provide the road material, equipment, and labor. The Contractor shall add road material, grade, and compact, within each state fiscal year (see Schedule and Payment section below), in accordance with the procedures outlined in this

Invitation to Bid.

SERVICE PERIOD

Service will not begin until the issuance of a Notice to Proceed and must be completed by June 1, 2027.

1. GENERAL CONTRACT RESPONSIBILITIES

1.1. The Contractor shall provide all labor, services, equipment, materials, tools, mobilization/demobilization costs and insurance necessary to complete the work as outlined herein.

The project consists of approximately 29 miles of road. If the available budget limits the extent of the project, the top priority will be the primary roads (Figure 1). No labor or equipment shall be furnished by the FWC.

1.2. All maintenance activities shall be limited to the Chassahowitzka WMA on the roads designated in Figure 1.

1.3. All maintenance activities shall be scheduled with the FWC Project Manager to ensure public access is being maintained. Roads to be maintained are open to the public 7 days a week and maintenance activities should not inhibit public use of these roads. Should a major maintenance activity be required that would preclude public use of the site, the Contractor shall notify the FWC

Project Manager. In addition, the FWC Project Manager shall share with the Contractor information about hunting, logging, work projects, and other activities that may be taking place on the area during maintenance events.

1.4. The Contractor shall use every precaution necessary to prevent pollution of lakes and streams by fuel, oils, chemicals, or other harmful materials. All waterways will be kept free of Contractor-generated debris.

1.5. The Contractor shall remove all extraneous materials, equipment, and litter associated with the maintenance activities from the area before partial or final payment is made.

1.6. Equipment shall be thoroughly cleaned of all vegetative debris before entering or reentering the area to reduce the spread of non- nat i ve invasive vegetation. The FWC reserves the right to inspect equipment prior to its use on the area.

1.7. Stop Work Clause – The FWC Contract Manager or their designated representative has the right to stop work if the work is not being completed as specified; if the Contractor damages existing state or county property (i.e., roads, culverts, low water crossings, fences, gates, signs, trees or other

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 13 of 69 natural resources); if the Contractor generates numerous public complaints; or if the Contractor does not maintain adequate communication with FWC Contract Manager or designated representative. Work shall not resume until the deficiencies are corrected. Ongoing problems with

Contractor performance could result in cancellation of the contract.

2. PROJECT SPECIFICATIONS FOR ROAD MAINTENANCE

2.1. The entire roadway (15 to 20 ft.in width) will be graded to smooth the surface and crowned with a 2%-4% slope with all existing depressions filled and grass and debris removed. The crown should be offset from center on curves in the grade. The Contractor will obtain instructions from the FWC Project Manager on where to deposit excess material, if any.

2.2. Prior to grading, vegetation within the roadway shall be chemically treated with the appropriate herbicide to prevent regrowth. The vendor will supply the appropriate herbicide and applications shall be consistent with herbicide labels.

2.3. Prior to grading roadways, areas that are rutted or have potholes, mud holes, or washouts, will be smoothed and leveled.

2.4. Work is expected to occur during a 3-month period: March to May (see section 6.1). The time of year this activity will be conducted tends to be dry. A water truck will be required to be on site and used in order to reduce dust and achieve a high-quality compaction of road material. FWC will provide access to water wells on the WMA property to fill trucks if contractor desires.

2.5. The Contractor will use DOT certified lime rock road base to patch rutted roadways, potholes, washouts, and mud holes and material shall be spread, contoured, and blended into the finished grade of the roadbed.

2.6. Washouts, potholes or mud holes that are holding water will be drained by cutting weeps in the roadbed to drain water off the roadway prior to repairs.

2.7. The Contractor shall add approximately 3 to 4 inches of DOT certified lime rock to all road surfaces.

2.8. All crushed lime rock will be used to cap and maintain the WMA roads as lime rock roads, not as a base to be covered with pavement. Flat tires due to boulders or shards of flint rock within the road material have been a problem in the past. To maintain a safe experience for visitors and WMA equipment integrity, the road material specifications described herein are extremely important.

Crushed lime rock must be Florida Department of Transportation (DOT) certified. Contractor must provide a copy of DOT certification upon, or prior to, the first delivery. The material shall not contain flint rock, boulders, lumps of clay, organic matter, cherty or other extremely hard materials of such nature or in sufficient quantity to prevent the Commission from obtaining a smooth road surface free from pits, pockets, and sharp objects. Material that does not meet specifications will not be accepted and may be cause for purchase order cancellation.

2.9. The Contractor will not be responsible for adding any road material to low water crossings. The

Contractor shall only place limerock road base up to the edges of the low water crossings. The

FWC Project Manager will work with the Contractor to delineate the low water crossings prior the start of work.

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 14 of 69

2.10. The final roadways will be finish– graded and compacted using a vibratory roller. The vibratory feature shall be used to achieve a high-quality compaction of road material. All work should result in a smooth road surface free of ruts, grass, and potholes and suitable for passage by two-wheel drive vehicles.

3. GENERAL REQUIREMENTS

3.1. The Contractor shall be responsible for actions and damages caused by their personnel while on state-owned land. The Contractor shall also be responsible for damage or destruction to state or county property or equipment caused by the Contractor’s employees or subcontractors and not within the scope of this project. This shall include damage to existing roads, culverts, fences, gates, signs, trees, and other natural resources.

3.2. Any portion of a public roadway that sustains excessive construction-related damage, in the opinion of applicable agencies or county, shall be repaired at the Contractor’s expense in a manner specified by that particular agency.

3.3. The Contractor, or any employee of the contractor, must have a minimum of 5 years’ experience completing roadwork to specifications and a minimum of 5 years’ experience operating the equipment (or similar equipment) that will be used to complete this project. The Contractor and/or his/her employee(s) must provide completed Attachment I to show that he/she has successfully met this requirement.

3.4. The safeguarding of all Contractor equipment left at the job sites (overnight or weekends) shall be the sole responsibility of the Contractor, including theft of supplies or equipment and damages.

The FWC does not take any responsibility for damage to the Contractor’s equipment left at job sites.

3.5. The Contractor shall not provide access to parties other than those performing activities associated with this project.

4. QUALITY CONTROL

4.1. Maintenance activities within this Scope of Work shall be completed as determined by the FWC

Project Manager.

4.2. The Contractor shall advise the FWC Project Manager when each mile of roadway is ready for inspection. The FWC Project Manager will inspect the road to ensure road specifications have been met.

5. MINIMUM EQUIPMENT REQUIRED

5.1. At a minimum, a Caterpillar 120 Motor Grader (or other brand with equivalent power) with a

10- f oo t blade is required for grading. A Caterpillar CCS7 Smooth Drum Vibratory Combination

Compactor (or other brand with equivalent power, single front drum, and rubber rear tires) and water truck equipped with a 16-foot boom sprayer or larger, is required for each maintenance event. A tractor/loader with a bucket and a dump truck is required to move the material needed during each maintenance event.

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 15 of 69

5.2. Equipment used in the performance of the work shall be of the proper type and size, and in good mechanical condition to accomplish the required work outlined herein. All equipment used shall be in good repair, and be in compliance with all federal, state, and local regulations. All equipment shall meet all safety standards as established for that piece of equipment. All equipment shall be equipped with all appropriate safety guards, as specified by the manufacturer. Bidders must have the capability to provide replacement equipment within 48 hours in the event of equipment breakdowns. The FWC reserves the right to request replacement of equipment if deemed to be unsafe or operating in an unsafe manner.

5.3. All equipment shall be operated and maintained in accordance with the manufacturer’s recommendations. The FWC reserves the right to request replacement of personnel if on-site workers are deemed to be unsafe or operating in an unsafe manner.

6. SCHEDULE AND PAYMENT

6.1. Work is expected to occur during a 3-month period: March to May. The FWC may, at its sole discretion, modify starting and completion dates within the term of the purchase order.

6.2. Road maintenance cannot occur during the quota periods for Spring Turkey. The 26/27 FY hunt quota period dates are March 12-15, 26-28, and April 9-11, 23-25.

6.3. Payment may be made upon satisfactory completion of the maintenance event and inspection/approval by the FWC Project Manager.

6.4. Maintenance activities within this Scope of Work shall be completed as determined by the FWC

Project Manager.

7. FINANCIAL CONSEQUENCES

7.1. If the maintenance services are not completed per the terms of the purchase order and this ITB or are not completed to the satisfaction of the FWC, payment will be withheld until the services are satisfactorily completed as specified in this Scope of Work.

8. BID AWARD

8.1. The Bidder shall provide prices per 0.5 mile of road in accordance with the specifications contained herein. The contract will be awarded to the responsive, responsible Bidder with the lowest total bid price. The FWC reserves the right to increase or decrease the size of the project based on budgetary constraints and bids received. The FWC reserves the right to decide which sections of road will be chosen for maintenance.

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 16 of 69

9. FIGURE 1:

9.1. Location of roads and access gates for road maintenance project Chassahowitzka WMA, H e r n a n d o County, FY 26-27.

a. 28.6795, -82.5661 – North Entrance (Retriever Rd.)

b. 28.6580, -82.5526 – Hernando Sportsman Club Entrance

c. 28.5919, -82.5567 – Atlanta SUV Road Entrance

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 17 of 69

PRICE SHEET

FWC 25/26-106

CONTRACTOR SHALL NOT ALTER THE PRICE SHEET IN ANY WAY.

Price quoted shall not contain any Federal or State sales or use taxes. The bidder recognizes that the State of Florida, by virtue of its sovereignty, is not required to pay taxes on services, goods and/or equipment purchased incident to such service. Quoted price shall include all necessary items to complete the project.

ALL ITEMS SHALL BE BID OR THE BID WILL BE REJECTED. THE BID WILL BE AWARDED TO

THE RESPONSIVE, RESPONSIBLE BIDDER THAT SUBMITS THE LOWEST TOTAL PRICE.

PRICE PER 0.5 MILES OF ROAD MAINTENANCE: $ ______________

TOTAL BID PRICE: $ ________________________________

BY SIGNING BELOW, I ATTEST THAT I HAVE READ THE ENTIRE BID AND AGREE TO FURNISH

THE SERVICE AT THE PRICE QUOTED ABOVE. I HEREBY AFFIRM I HAVE NOT BEEN IN ANY

AGREEMENT OR COLLUSION AMONG BIDDERS IN RESTRAINT OF FREEDOM OF COMPETITION.

Contractor: _______________________________

Address: _________________________________

Signed: ___________________________________

Print Name: ______________________________

Title: ____________________________________

City/State/Zip: ____________________________

Phone: ___________________________________

Fax: _____________________________________

REFERENCES

A minimum of three (3) separate and verifiable references, from persons or firms for whom the bidder has performed similar jobs as per the bid specifications shall be supplied with the bid. No more than one (1) of the submitted references shall be related to a past project where staff necessary for the current project were unaffiliated with the bidder and/or employed by a different company. If providing an unaffiliated reference, enter the information in Reference 4 - Collective Experience. The firms and/or contact persons should be available between the hours of 8:00 AM and 5:00 PM, Eastern Time, Monday through Friday. FWC staff will attempt to contact each selected reference by phone up to three (3) times. If any reference is not available as stated above, this may be cause for rejection of the Bidder’s bid. Provide a description (scope of work) of each job.

REFERENCE #1

Name: __________________________________________________________________________________________

Address: ________________________________________________________________________________________

Contact Person: ____________________________________ Telephone Number: _________________________

Project Dates for Work Performed (MM/YYYY): _________________________ to _________________________

Project Location: _________________________________________________________________________________

Brief description of the services performed for the project:

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 19 of 69

REFERENCE #2

Name: __________________________________________________________________________________________

Address: ________________________________________________________________________________________

Contact Person: ____________________________________ Telephone Number: _________________________

Project Dates for Work Performed (MM/YYYY): _________________________ to _________________________

Project Location: _________________________________________________________________________________

Brief description of the services performed for the project:

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 20 of 69

REFERENCE #3

Name: __________________________________________________________________________________________

Address: ________________________________________________________________________________________

Contact Person: ____________________________________ Telephone Number: _________________________

Project Dates for Work Performed (MM/YYYY): _________________________ to _________________________

Project Location: _________________________________________________________________________________

Brief description of the services performed for the project:

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 21 of 69

REFERENCE #4 – COLLECTIVE EXPERIENCE

Name: __________________________________________________________________________________________

Address: ________________________________________________________________________________________

Contact Person: ____________________________________ Telephone Number: _________________________

Collective Experience Employee

First Name: __________________________________ Last Name: ___________________________________

Previous Employer’s Name: _______________________________________________________________________

Previous Position Title: ___________________________________________________________________________

Project Dates for Work Performed (MM/YYYY): _________________________ to _________________________

Project Location: _________________________________________________________________________________

Brief description of the services performed for the project:

SAMPLE REFERENCE QUESTIONNAIRE

REFERENCE:

Reference Organization Name: ___________________________________________

Reference Contact: ______________________________________________________

Reference Phone Number: _______________________________________________

For Agency use ONLY, to be completed following the bid opening:

The following questions will be asked of the client reference, as chosen at the discretion of the Agency.

1. Did the vendor stay within the approved timeline/budget?

Excellent Above Satisfactory Satisfactory Fair Poor

Comments:

2. Did the vendor maintain clear communication?

3. How satisfied was your organization with the vendor's skill, knowledge, cooperativeness, and professional manner?

4. How satisfied was your organization with the timeliness of the vendor’s delivery of products or performance of services under the contract?

5. How satisfied was the organization with the vendor's overall responsiveness and effectiveness in resolving issues encountered during the performance of the contract?

FWC Staff Signature: __________________________________

Date: ___________________

Ch. 287 Invitation to Bid – Revised 02.11.2026 FWC 25/26-106, Page 23 of 69

ATTACHMENT A

FWC 25/26-106

FLORIDA FISH & WILDLIFE CONSERVATION COMMISSION

PURCHASE ORDER TERMS & CONDITIONS

Last Updated: April 29, 2025

Section 1. PURCHASE ORDER

A. Composition and Priority The Contractor agrees to provide commodities or contractual services to the Commission within the manner and at the location specified in the Purchase Order, and any attachments to the Purchase

Order. These Purchase Order Terms and Conditions, whether generic or specific, shall take precedence over any inconsistent or conflicting provision in the State of Florida, General Contract Conditions, PUR

1000. Additionally, the terms of the Purchase Order supersede the terms of any and all prior agreements with respect to this purchase.

B. Initial Term Unless otherwise specified, the Purchase Order begins on the date of issuance. Contractual services or commodities to be provided by the Contractor shall be completed by the date specified on the

Purchase Order end date.

Section 2. PERFORMANCE

A. Performance Standards The Contractor agrees to perform all tasks and provide deliverables as set forth in the Statement of

Work and attachments to the Purchase Order. The Commission shall be entitled at all times, upon request, to be advised as to the status of work being done by the Contractor and of the details thereof.

Coordination shall be maintained by the Contractor with representatives of the Commission, or of other agencies involved in the project on behalf of the Commission.

B. Performance Deficiency If the Commission determines that the performance of the Contractor is unsatisfactory, the Commission may notify the Contractor of the deficiency to be corrected, which…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .