FWC 23.24-41 A#2 Q&A.pdf
PDF 204 KB Posted
- Attached to
- Florida Bass Conservation Center Calcium Scaling
- Solicitation number
- RFP-07319
- Issued by
- Seminole County, Florida
About this file
This document is an addendum to a Request for Proposals (RFP) issued by the Florida Fish and Wildlife Conservation Commission (FWC) for the Florida Bass Conservation Center Calcium Scaling project. The addendum provides answers to questions submitted by a prospective respondent regarding the pipe diameters and estimated gallons per minute (GPM) for the main cold-water supply in the pump room. The RFP seeks competitive proposals to mitigate and abate an ongoing calcium scaling issue at the Florida Bass Conservation Center in Sumter County. The responses to the RFP are due by 2:00 PM (ET) on Wednesday, January 10, 2024.
The main cold-water supply pipes have diameters of 18 inches for the pipe from the head tank to the main building after filtration, and 12 inches for the reuse pipe from the head tank to the fish tanks. The maximum GPM for these pipes is 1,000, with an average of 600 GPM.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FWC 23.24-41 A#1 Final.pdf | ||
| FWC 23.24-41 RFP Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners Rodney Barreto Chairman Coral Gables
Steven Hudson Vice Chairman Fort Lauderdale
Gary Lester Oxford
Albert Maury Coral Gables
Gary Nicklaus Jupiter
Sonya Rood St. Augustine
Robert A. Spottswood Key West
Office of the Executive Director Dr. Thomas H. Eason Acting Executive Director
Jessica Crawford Chief of Staff
850-487-3796
850-921-5786 FAX
Finance and Budget Office
(850) 488-6551
Mana gin g fish and wildlife resourc e s for their long-te rm well-b ei n g and the benefi t of peopl e .
620 South Meridian Street Tallahassee, Florida 32399-1600 Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T) 800 955-8770 (V)
MyFWC.com
DATE: JANUARY 5, 2024
ADDENDUM NO.: 2
RFP NO.: FWC 23/24-41
RFP TITLE: FLORIDA BASS CONSERVATION CENTER CALCIUM SCALING
UPDATE: QUESTIONS & ANSWERS
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s (FWC) Solicitation No. FWC 23/24-41, “ Florida Bass Conservation Center Calcium Scaling”.
All responses to the subject solicitation must be received no later than 2:00 PM (ET) on Wednesday, January 10, 2024.
A response received after the exact time specified will not be considered.
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875 Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Ruth Heggen FWC Procurement Manager
FWC 23/24-41 ADDENDUM #2 2
BEGIN ADDENDUM #2
Item #1 –Questions and Answers Question #1: Do you know the pipe diameters of the main cold-water supply in the pump room?
Answer #1: The pipe diameters are as follows:
o 18” for the photo labeled “pipe from head tank to main building after filtration.”
o 12” for the photo labeled “Reuse pipe from head tank to fish tanks”.
Question #2: Do you know the estimated GPM?
Answer #2: The max GPM for these pipes is 1,000 and the average is 600.
END ADDENDUM #2
File details come from the government source that posted it. Updated .