This document is an Invitation to Bid (ITB) from the Florida Fish and Wildlife Conservation Commission (FWC) for a Debris Removal Service on the Florida Keys Wildlife and Environmental Area (FKWEA). The ITB seeks competitive pricing for debris removal services within the FKWEA, which consists of approximately 5,835 acres of land managed by FWC across Monroe County, Florida. The project areas can be accessed by foot only, and no boat access is required. FWC will provide detailed maps and coordinates to assist bidders in identifying the project area boundaries. Bids are due by April 23, 2024 at 4:00 PM ET, and a mandatory pre-bid conference/site visit will be held on April 9, 2024. FWC plans to award the contract on April 26, 2024.
The ITB outlines the contractor's responsibilities, including supplying all labor, materials, equipment, and transportation necessary to systematically traverse and remove 100% of the targeted debris from the designated project areas. Debris may include construction materials, household items, metal objects, and yard waste. The contractor must properly dispose of all collected debris at licensed facilities. FWC encourages participation from certified minority-owned, woman-owned, and service-disabled veteran business enterprises. The contract will be effective for one year upon issuance of the purchase order, with potential extensions if justified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1 Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION
1875 ORANGE AVE E
TALLAHASSEE, FL 32311-6160
(850) 488-6551
INVITATION TO BID
FWC FY-23/24-103
DEBRIS REMOVAL SERVICE ON THE FLORIDA KEYS WILDIFE AND ENVIRONMENTAL AREA
ITB BIDDER ACKNOWLEDGEMENT FORM
Purpose: The intent of this bid is to obtain competitive pricing for a debris removal service to be used in identified project areas within the Florida Keys WEA,, per the specifications contained herein. Only responsive and responsible
Contractors will be considered for award of this Invitation to Bid (ITB).
Responsive: To be responsive, a bid must constitute a definite, firm, unqualified and unconditional offer to meet all of the material terms of this ITB. Material terms are those that could affect the price, quantity, quality, or delivery. Also included as material terms are those which are clearly identified in this ITB and which, for reasons of policy, must be complied with at risk of bid rejection for non-responsiveness.
Non-Responsive: Any submission that does not comply with this ITB in any way, does not contain all the properly signed forms, supplements or deviates from the Bid requirements or has an incomplete Price Sheet may be considered nonresponsive at the discretion of the Procurement Manager.
Responsible Companies: The Commission shall only consider responsible companies. Responsible companies are those that have, in the sole judgment of the Commission, the financial ability, experience, resources, skills, capability, reliability and business integrity necessary to perform the requirements of the contract. The Commission may also consider references and quality to determine the responsibility of the bid. The Commission reserves the right to use any information, whether supplied through the Bidder’s submission or otherwise obtained, in determining responsibility.
Rejection of Bids: The Commission reserves the right to reject any and all bids and to waive any minor irregularity in the submissions received in response to this ITB. The Commission reserves the right to consider all information, whether submitted or otherwise, to determine responsiveness and responsibility and to reject bids accordingly.
Name of Business: ____________________________________________________________________________________________________
Contact Person Name: _________________________________________________________________________________________________
Business Address: ____________________________________________________________________________________________________
City: ____________________________ State: _____________________________ Zip code: ______________________________________
Phone: ___________________________ Fax: _______________________________ Email: ______________________________________
Federal Employer Identification Number: ____________________
The undersigned attest to the following:
“We understand all of the terms, conditions and the specifications contained herein and agree to abide by all of the terms, conditions and the specifications in their entirety. We have examined the site in reference to the specifications contained within this ITB and have familiarized ourselves with the entire site and have examined carefully the extent of the work that is needed.”
Authorized Signature (Manual): ________________________________________________________________________________________
Authorized Signature Name (Typed) and Title: __________________________________________________________________________
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 2 of 54
CALENDAR OF EVENTS
FWC FY-23/24-103
SCHEDULE DUE DATE METHOD
Bid Advertised April 2, 2024 Posted on the Vendor Information Portal
(VIP)
MANDATORY Pre-Bid
Conference
April 9, 2024
@ 9:00 AM ET
See Pre-Bid Conference Clause
Deadline for Questions
Must be received
PRIOR to:
April 12, 2024
@ 5:00 PM ET
See Deadline for Questions Clause
Anticipated date for Responses to Written Questions April 16, 2024 Posted on the Vendor Information Portal
SEALED BIDS DUE
(REMEMBER: The bid number should be clearly marked on envelope)
Must be received
PRIOR to:
April 23, 2024
@ 4:00 PM ET
Mailing Address:
Florida Fish & Wildlife Conservation
Commission
Attn: Purchasing
1875 Orange Ave E
Tallahassee, Florida 32311-6160
Submissions are due BEFORE the date and time of the public opening.
Public Bid Opening April 23, 2024
@ 4:00 PM ET
Public Opening Options for Attendance:
-In Person-
1875 Orange Ave E
Tallahassee, FL 32311-6160
-Teleconference-
Conference call phone number:
1.888.585.9008
Conference room number: 218-721-199
Anticipated Date of Intended
Award April 26, 2024 Posted on the Vendor Information Portal https://vendor.myfloridamarketplace.com/
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 3 of 54
GENERAL CONDITIONS
FWC FY-23/24-103
The Florida Fish and Wildlife Conservation Commission’s (FWC or Commission) mission is to manage fish and wildlife resources for their long-term well-being and the benefit of people. The Commission administers six (6) major programs including habitat and species conservation, freshwater fisheries management, law enforcement, marine fisheries management, hunting and game management and fish and wildlife research.
A Bidder submitting a bid shall be registered in the MyFloridaMarketPlace (MFMP) system and where required, the Sunbiz system prior to the bid opening. Business entities which must be on file with Sunbiz include the following foreign and domestic entities: Corporations for and not for profit, Limited Liability
Companies (LLC), Limited Partnerships (LP) including Limited Liability Limited Partnerships (LLLP), and organizations doing business under a fictitious name (DBA). A Bidder may not be considered for an award, if not registered in the MFMP and Sunbiz system. The Bidder’s registration address and federal employer identification (FEID) number should match the Bidder’s address and FEID number listed on the
Bidder Acknowledgment form (page 1).
Certified Minority-owned, Woman-owned and Service-Disabled Veteran Business Enterprises, as certified by the State of Florida Office of Supplier Diversity, are encouraged by the Commission to participate in the bidding process.
Bids from Bidders shall include all necessary equipment to complete the job. The bidder is required to supply all specified documentation when submitting a bid for this project.
Please note:
• The terms “Contract,” “Agreement” and “Purchase Order” are used interchangeably in the document.
• The terms “Commodities” and “Goods” are used interchangeably in the document.
TERMS AND CONDITIONS
PUR 1000 and PUR1001 are hereby incorporated by reference. PUR1000 and PUR1001 can be found at the
Department of Management Services website at the following link:
https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purc hasing_pur_forms
The following terms and conditions take precedence over the PUR1001 and PUR1000 forms where applicable. The Commission objects to and shall not consider any additional terms or conditions submitted by a Bidder or Contractor, including any appearing in documents attached as part of a Bidder’s response.
In signing and submitting its bid, a Bidder agrees that any additional terms or conditions, whether submitted intentionally or inadvertently, shall have no force or effect. Failure to comply with terms and conditions, including those specifying information that must be submitted with a bid, shall be grounds for rejecting a bid.
The terms and conditions of Attachment A, Purchase Order Terms and Conditions, are hereby incorporated into this solicitation. Any contract resulting from this solicitation will include the terms and conditions of this solicitation and the terms and conditions contained in Attachment A.
https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purchasing_pur_forms https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purchasing_pur_forms
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 4 of 54
PROCUREMENT MANAGER
Matthew Carroll
Matthew.Carroll@MyFWC.com
TERM
The contract will be effective one year upon issuance of Purchase Order.
If circumstances constituting Force Majeure have occurred, or if anything occurs beyond the Contractor’s control, the Contractor shall submit an extension request in writing. The Project Manager and Contract
Manager will review the extension request and if they determine it is justified, will forward to the Bid
Request Inbox (bidrequest@myfwc.com) for procurement review and approval/disapproval.
SUBCONTRACTS
Subcontracting IS NOT permitted pursuant to the Terms and Conditions of the Purchase Order.
DIVERSITY
The Commission is committed to supporting Florida’s diverse business industry and population through ensuring participation by minority, women, and veteran-owned business enterprises in the economic life of the state. The State of Florida Mentor Protégé Program connects minority, women, and veteran-owned business enterprises with private corporations for business development mentoring. We strongly encourage contractors doing business with the State of Florida to consider this initiative. For more information on the
Mentor Protégé Program, please contact the Office of Supplier Diversity at (850) 487-0915 or osdinfo@dms.myflorida.com.
FWC encourages diversity in its procurement program and requests that all subcontracting opportunities afforded by this solicitation enthusiastically embrace diversity. The award of subcontracts should reflect the vast array of citizens in the State of Florida. Bidders can visit the Office of Supplier Diversity website for information on certified business enterprises that may be considered for subcontracting opportunities.
MANDATORY PRE-BID CONFERENCE/SITE VISIT MEETING
A mandatory pre-bid conference/site visit meeting will be held at 24.6192, -81.5362 (24°37'09"N 81°32'10"W) on the date and time specified in the Calendar of Events (Page 2). The purpose of the pre-bid conference/site visit meeting is to discuss the contents of this ITB and to accept verbal questions from Bidders concerning the project. Vendors must attend this pre-bid conference site meeting as a requirement of bid responsiveness. Failure to attend the entire conference meeting, from the time it is called to order to the time it is adjourned, shall disqualify a potential respondent. The Commission will make a reasonable effort to answer verbal questions asked at the pre-bid conference/site visit, however, Bidders should clearly understand that verbal discussions held at the pre-bid conference/site visit shall not be binding on the
Commission, and the Commission will only issue an official written response to verbal questions subsequently submitted in writing in accordance with the Deadline for Questions clause below.
mailto:bidrequest@myfwc.com?subject=Extension%20Request https://www.dms.myflorida.com/agency_administration/office_of_supplier_diversity_osd/mentor_protege_program mailto:osdinfo@dms.myflorida.com https://www.dms.myflorida.com/agency_administration/office_of_supplier_diversity_osd/mentor_protege_program
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 5 of 54
24.6192, -81.5362 (24°37'09"N 81°32'10"W)
VERBAL INSTRUCTION PROCEDURE
Bidders may not consider any verbal instructions as binding upon the Commission. No negotiations, discussions, or actions shall be initiated or executed by the Bidder as a result of any discussion with any
Commission employee. Only those communications from the Commission that are in writing, may be considered as a duly authorized expression on behalf of the Commission.
SOLICITATION QUESTIONS
Any questions from Bidders that require an official FWC answer concerning this project shall be submitted in writing to the Procurement Manager. This includes specification inquiries, such as questions or requests for additional or altered terms and conditions. Questions to the Procurement Manager shall not constitute formal protest of the specifications or of the solicitation. Questions must be received no later than the date and time specified in the Calendar of Events (Page 2). Questions may be sent via email with the solicitation number in the subject line. It is the responsibility of the bidder to confirm receipt of questions if needed.
If questions are received, an addendum will be issued and shall be posted on the Vendor Information Portal
(https://vendor.myfloridamarketplace.com).
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 6 of 54
LIMITATION ON BIDDER CONTACT DURING SOLICITATION PERIOD
Bidders to this solicitation or persons acting on their behalf may not contact, between the release of the solicitation and the end of the 72-hour period following the Commission posting the notice of intended award, (i.e., the 72-hour posting period excludes Saturdays, Sundays, and state holidays) any employee or officer of the executive or legislative branch concerning any aspect of this solicitation, except in writing to the Procurement Manager or as provided in the solicitation documents. Violation of this provision may be grounds for rejecting a response.
BIDDER SPECIFICATION CHALLENGE
Any protest concerning the specifications of this solicitation shall be made in accordance with PUR1001, paragraph 20, “Protests”. A notice of protest of the solicitation documents shall be made within seventy-two hours after the posting of the solicitation. Failure to file a protest within the time prescribed in Section
120.57(3)(b), F.S., shall constitute a waiver of proceedings under Chapter 120, F.S.
ADDENDUMS
If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents or answer any Bidder questions during the ITB period an addendum shall be posted on the
Vendor Information Portal internet site. Each Bidder is responsible for monitoring the Vendor Information
Portal website (https://vendor.myfloridamarketplace.com) for new or changing information relative to this procurement. The Commission bears no responsibility for any delays, or resulting impacts, associated with a
Bidder’s failure to obtain the information made available through the Vendor Information Portal.
BIDDER ACKNOWLEDGMENT
In order for this bid to be valid, the bid must be completed in its entirety, signed by the Bidder and returned, as part of the bid or the bid will be rejected. By affixing your signature to the ITB Bidder Acknowledgement
Form (page 1), the Bidder hereby states that the Bidder has read all bid specifications and conditions and agrees to all terms, conditions, provisions, specifications, and is currently licensed to do business within the
State of Florida, if required by State or Federal Law, for the services or commodities the Bidder will provide the Commission under these bid specifications.
REFERENCES
Each prospective Bidder shall provide a minimum of three (3) references for similar projects completed.
Current contact names and phone numbers shall be included with the bid package. See the attached references form for more detail.
IDENTICAL TIE BIDS
Preference shall be given to businesses with drug-free workplace programs. If two (2) or more bids which are equal with respect to price, quality, and service are received by the State or by any political subdivision for the procurement of commodities or contractual services, a bid received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process.
Contractors must complete the Identical Tie Bid / Drug Free Workplace form (Attachment B) provided and return it with their bid.
SUPPORTING/SUPPLEMENTAL INFORMATION
The Commission requires that bidders submit all required technical, specification, and other supporting information with their bid, so that a detailed analysis and determination can be made, by the Contract
Manager that the product/service offered meets this ITB’s specifications and that other requirements of
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 7 of 54 this ITB have been met. However, provided a bid meets the requirements for a definite, firm, unqualified, and unconditional offer, the Commission reserves the right to request supplemental information from the bidder after the bids have been opened to ensure that the products/services offered completely meet this
ITB’s requirements. The requirement for such supplemental information will be at the reasonable discretion of the Commission and may include the requirement that a bidder will provide a sample product(s) so that the Commission can make a first-hand examination and determination.
A bidder's failure to provide this supplemental information or the product sample(s), within the time set by the Commission, will cause the Commission to consider the Contractor non-responsive and reject the
Contractor’s bid.
CONFIDENTIALITY/PUBLIC RECORDS LAW
Bidders are cautioned that Florida law generously defines what constitutes a public record and grants broad rights of public access to those records; see, for example, section 119.07, F.S. If a Bidder believes that its response contains information that is confidential or exempt from disclosure under Florida Law, the Bidder shall clearly segregate and mark that information (for example, stamp each page "Confidential" and place it in an envelope marked "Confidential") and briefly describe in writing the grounds and specific legal citations for claiming exemption from the public records law. If after the notice of intended decision or thirty
(30) days after bid opening, whichever is earlier, the Commission receives a public record request related to the solicitation, the Commission will provide copies of public records that are not exempt to the requester.
The Commission will endeavor to provide notice to the Bidder of all public records requests received related to documents provided by the Bidder that were marked pursuant to this paragraph. In no event shall the
Bidder hold the Commission or any of its employees or agents liable for disclosing, or otherwise failing to protect the confidentiality of, information submitted in response to this solicitation.
MAILING INSTRUCTIONS
All bids shall be submitted in a SEALED ENVELOPE addressed to:
Florida Fish and Wildlife Conservation Commission
Attn: Purchasing
1875 Orange Ave E
Tallahassee, Florida 32311-6160.
The envelope shall be plainly marked on the outside with: BID NUMBER, DATE AND TIME OF THE BID
OPENING.
THE COMMISSION IS NOT RESPONSIBLE FOR THE OPENING OF ANY ENVELOPES THAT ARE NOT PROPERLY
MARKED.
PLEASE NOTE: The Commission’s official business hours of operation are 8:00 AM–5:00 PM ET, exclusive of Saturdays, Sundays and state holidays. Selecting delivery services, such as next day first delivery, may result in attempted delivery prior to opening or closing, and the Commission will not be available to accept those deliveries. THE COMMISSION IS NOT RESPONSIBLE FOR LATE SUBMISSIONS DUE TO COMPLICATIONS
RELATED TO SELECTED DELIVERY SERVICES.
SOLICITATION PUBLIC OPENING
The public opening of this bid will be conducted at the date, time and method specified on the Calendar of
Events (Page 2). BIDS RECEIVED AFTER THE SPECIFIED DATE AND TIME WILL BE REJECTED.
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 8 of 54
Any person with a qualified disability shall not be denied equal access and effective communication regarding any bid/proposal documents or the attendance at any related meeting or bid/proposal opening. If accommodations are needed because of a disability, please contact the Purchasing Section at (850) 488-6551 at least three (3) workdays prior to the opening.
AWARDED BID/INSPECTION
The Commission will award the bid to the responsive, responsible bidder who submits the lowest bid price.
If deemed necessary, an interview with the bidder by the Contract Manager may be required before the bid is awarded.
The Commission reserves the right to inspect the prospective Contractor’s materials and background record prior to making an award of the Contract. If the Contract Manager determines the lowest bidder does not have sufficient experience, equipment, etc. to meet the specifications of this ITB, the Commission reserves the right to reject the bidder and evaluate the next lowest bidder.
POSTING OF BID TABS
Bid Tabulations with Contractors identified as awarded bidders will be posted electronically as Agency
Decisions on the Department of Management Services Vendor Information Portal as a Public Notice. The
Agency Decision may be viewed at https://vendor.myfloridamarketplace.com, and will remain posted for a period of 72 hours. Failure to file a protest within the time prescribed in Section 120.57(3)(b), F.S., shall constitute a waiver of proceedings under Chapter 120, F.S.
Awarded Bidders are instructed not to proceed until a Purchase Order, Formal Written Contract, Lease, Notice to Proceed, or some other form of written notice is given to the Contractor by the Commission. A company or person who proceeds prior to receiving a Purchase Order, Formal Written Contract, Lease, Notice to Proceed, or some other form of written notice from the Commission does so without a contract and at their own risk.
Sealed bids, proposals, or replies received by an agency pursuant to a competitive solicitation are exempt from s. 119.07(1) and s. 24(a), Art. I of the State Constitution until such time as the agency provides notice of an intended decision or until thirty (30) days after opening the bids, proposals, or final replies, whichever is earlier.
SCOPE CHANGES AFTER CONTRACT EXECUTION
The Commission shall provide written notice to the successful bidder thirty (30) days in advance of any
Commission required changes to the technical specifications and/or scope of service that affect the successful bidder’s ability to provide the service as specified herein. Any changes that are other than purely administrative changes will require a change order.
FWC CONTRACT MANAGER
The FWC employee identified as the Contract Manager shall perform the following on behalf of the FWC:
• review, verify, and approve receipt of services/deliverables from the Contractor;
• submit requests for change orders/amendments/renewals, if applicable;
• review, verify, and approve invoices from the Contractor; and, if applicable, complete the
Certificate of Contract Completion form; and https://vendor.myfloridamarketplace.com/ http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0100-0199/0119/Sections/0119.07.html
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 9 of 54
• maintain an official record of all correspondence between the Commission and the Contractor and forward the original correspondence to the Procurement Manager for the official file.
DELIVERABLES
The following services or service tasks are identified as deliverables for the purposes of the subsequent
Contract:
a. Performance of all services set forth in the Scope of Work.
b. Submission of all invoicing, supporting documentation, Corrective Action Plans and reports.
LIQUIDATED DAMAGES
If the Contractor fails to complete the work or the conditions of the Purchase Order and/or Change Orders by the completion date, the Commission shall have the right to deduct liquidated damages from any amount due and payable to the Contractor. Liquidated damages shall be assessed in the amount of $100 per calendar day of delay. Exceptions to this provision may be made if a delay is attributable to circumstances that are clearly beyond the control of the Contractor. The burden of proof of unavoidable delay shall rest with the Contractor and shall be supplied in a written form and submitted to the Contract Manager.
AUTHORIZED COMPENSATION
It is understood and agreed that all compensation under this ITB is specifically limited to the Contractor’s bid price accepted by the Commission, and to the specific procedure for payment established in this ITB and the Purchase Order executed pursuant to it. The Commission is not liable for any costs, fees, expenses or any other compensation whatsoever incurred or charged by the Contractor, other than the bid price paid for the work specifically described in the Scope of Work, which work is actually accomplished and invoiced by the Contractor subsequent to the Commission’s notice to proceed (or other notice to begin work). Thus, the Commission is not liable for any costs incurred or charged by the Contractor in anticipation of responding to, or performing work described in, this ITB including, but not limited to, equipment or personnel procured by the Contractor in anticipation of such work. The Commission is not responsible to the Contractor for any loss or damages resulting from circumstances unforeseen at the time of publication of this ITB including, but not limited to, those resulting from a “force majeure”.
ADDITIONAL LEGAL REQUIREMENT
All corporations seeking to do business with the State shall, at the time of submitting a bid, be on file with the Department of State in accordance with provisions of Chapter 607, F.S.; similarly, partnerships seeking to do business with the State shall, at the time of submitting such bid, have complied with the applicable provisions of Chapter 620, F.S. For further information on required filing and forms, please go to the following sites: http://sunbiz.org or http://dos.myflorida.com.
USE OF CONTRACT BY OTHER STATE AGENCIES AND ELIGIBLE USERS
As provided in Chapter 60A-1.045, Florida Administrative Code (F.A.C.), and Section 287.042(16), F.S., other State of Florida agencies may purchase from the resulting contract of this ITB, provided that the
Department of Management Services has determined the contract’s use is cost effective and in the best interest of the State, and with the Contractor’s consent.
Other State of Florida governmental entities and eligible users may also request of the Contractor to be able to use this contract. If the Contractor agrees to other entities to utilize this ITB contract, such agencies shall coordinate their use of this contract with the Florida Fish and Wildlife Conservation Commission in order to reduce scheduling conflicts.
http://www.sunbiz.org/ http://dos.myflorida.com/
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 10 of 54
CONDITIONS AND SPECIFICATIONS
The bidder is required to examine carefully the conditions and specifications of this bid and to be thoroughly informed regarding any and all requirements of the conditions and specifications.
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 11 of 54
SCOPE OF WORK
FWC FY-23/24-103
DEBRIS REMOVAL SERVICE ON THE FLORIDA KEYS WILDIFE AND ENVIRONMENTAL AREA
OVERVIEW
Located in Monroe County, the Florida Keys Wildlife and Environmental Area (FKWEA) consists of approximately 5,835 acres of noncontiguous parcels of land that are managed by the Florida Fish and
Wildlife Conservation Commission (FWC). These parcels are spread out over 80 miles across Monroe
County (from Key Largo to just northeast of Key West) and range in size from one acre to over 1000 acres.
Restoration and management activities on the FKWEA include debris removal. Debris within the FKWEA is primarily a result of major storm events, king tides, public littering, and illegal dumping. Depending on tide height and storm surge, debris can build up on more inland communities (rockland hammock), in addition to the lower elevation areas (mangrove marsh). This accumulated debris, depending on tidal fluctuations and storm events, has the potential to be washed into the ocean, posing a threat to marine wildlife. It also damages native vegetation by creating disturbed areas that can inhibit growth (facilitating the spread of invasive nonnative plants). Items like glass and plastic pose a threat to humans and wildlife and reduce the aesthetics and recreational value of the area. Removing debris from the landscape will reduce threats to wildlife, threats to wildlife habitat, and improve recreational activities for the public within the FKWEA.
1. PERFORMANCE STANDARDS
1.1. Debris is defined as any material that is manufactured or processed and directly or indirectly, intentionally or unintentionally, disposed of or abandoned into the environment. This includes but is not limited to: construction and demolition debris (concrete blocks, lumber, roofing materials, carpeting, glass, metal, etc.), utility system debris (wiring, conduit, etc.), household furnishings and personal effects (mattresses, furniture, clothing, toys, tools, etc.), household garbage (bagged trash, diapers, plastics, papers, bottles, cans, etc.), metal debris (fencing material, water pipes, roofing materials, automobile parts, other ferrous materials, etc.), white goods (washing machines, freezers, refrigerators, other household appliances, etc.), electronic waste (televisions, cell phones, batteries, computer monitors, etc.), and household hazardous waste/materials (fluorescent/CFL light bulbs, fertilizer, paints, solvents, oil, gasoline, propane, batteries, etc.). Other examples of debris items that may be found within the FKWEA are tires, rubber, pallets, derelict fishing supplies, etc.
1.2. The Contractor may also be asked to remove piled yard waste/green waste (tree branches, palms fronds, leaves, etc.).
1.3. The Contractor is not required to remove derelict vessels, abandoned vehicles, or microplastics.
Microplastics are defined as fragments of any type of plastic less than 5 mm (0.2 in) in length.
1.4. The Contractor is responsible for knowing and complying with federal, state, and local guidelines for the operation of a private business and the proper disposal of all types of debris, waste, and other materials.
1.5. The Contractor must identify, load, and transport all targeted debris materials within the designated project areas to a properly licensed recycling, salvage, or waste facility.
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 12 of 54
1.6. The Contractor is responsible for separating certain types of debris items in a way that it can be available for inspection and sorting (e.g., whole tires, batteries, electronic waste, dangerous substances, or other hazardous materials that may be incompatible with a transfer station or landfill).
1.7. Please note that types of debris (and amount) will vary greatly within different project areas. Debris will also vary in size and weight.
1.8. Manual removal techniques are preferred (hand-picking or the use of hand tools). Larger debris items can be dismantled or cut into smaller, manageable sizes. The use of heavy equipment for debris recovery is not anticipated.
1.9. Project areas are accessible by foot only. Motorized vehicles are not allowed. Vehicles and equipment can usually be parked adjacent to project areas.
1.10. There are a total of 20 historical sites recorded in the Florida Department of State’s Division of
Historical Resources (DHR) Master Site File that are located within the boundary of the FKWEA.
All recorded sites will be flagged by FKWEA staff and are to be avoided by the Contractor. No items shall be removed from these designated sites.
1.11. Any historic and precontact-era artifacts of any type (e.g., pot shards, arrowheads, ship timbers, and bottles) should not be collected and should be reported to the FWC Project Manager (must provide coordinates in decimal degrees).
2. SITE LOCATIONS
2.1. Approximately 50% of this project shall be conducted in the Lower Keys (see Figures 1-6), and approximately 50% in the Upper Keys (see Figures 7-9).
2.2. No boat access is required. All project areas can be accessed from the roadside and debris will be removed from upland edges.
2.3. Following award, The FWC Project Manager will provide detailed maps, shapefiles, and/or other documents to assist with identifying the project area boundaries.
2.4. The FWC reserves the right to decide which area or areas will be chosen for this project as budget and conditions allow.
3. GENERAL SPECIFICATIONS
3.1. The intent of this bid request is to procure specific quotes for a debris identification and removal project on the Florida Keys Wildlife and Environmental Area.
3.2. The FWC reserves the right to increase or decrease the size of the project based on budgetary constraints and received bids.
4. CONTRACTOR RESPONSIBILITIES
4.1. The Contractor shall supply all labor, materials, supplies, tools, transportation, equipment, disposal fees, hauling, and anything else otherwise necessary for the completion of this project.
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 13 of 54
4.2. The Contractor shall traverse the project areas in a systematic manner to ensure that 100% of target debris is found and removed (Figures 1-2 and Figures 4-9).
4.3. In addition to systematic traversing, the Contractor will also remove piled debris from specified areas that have already been identified by FWC staff (Figure 3).
4.4. The Contractor shall report any observed derelict or abandoned vessels and abandoned vehicles within the project areas and report the location information (must provide coordinates in decimal degrees) to the FWC Project Manager.
4.5. The Contractor shall immediately report any observed homeless encampments within the FKWEA boundary (must provide coordinates in decimal degrees). No items shall be removed from any active homeless encampments until approval has been given by the FWC Project Manager.
4.6. The Contractor must remove all debris found at the surface from the designated project areas and minimize unnecessary disturbance or removal of natural sediment, organic material, and vegetation not required to access the man-made debris items. Any partially buried debris will be handled on a case-by-case basis after discussions with the FWC Project Manager. If any excavation is required to access or remove partially buried debris, the excavated area should be returned to its original contour and topography.
4.7. Trampling of marsh soils and vegetation can damage wetland soils and vegetation. The Contractor shall take all necessary precautions to minimize impact to native vegetation and minimize foot traffic in wetlands. Operations should be conducted from dry upland edges when applicable.
4.8. Removal operations in some areas may require specific restrictions on timing to avoid impacts to sensitive species, such as nesting birds.
4.9. The Contractor shall be able to provide FWC copies of disposal tickets upon request. Failure to provide FWC with such copies shall constitute breach of this Contract.
4.10. The Contractor will be responsible for the security of work areas by closing and locking gates behind them.
4.11. Any damage to existing state, federal, or county property (e.g., roads, culverts, gates, signs, or natural resources) caused by the Contractor and not within the scope of the project work will be the responsibility of the Contractor. The Contractor shall be responsible for the conduct of hired personnel at all times while within the project area.
4.12. All equipment must be thoroughly cleaned of dirt and vegetative debris before entering or re-entering the FKWEA boundary to reduce the introduction or spread of invasive species. FWC staff reserve the right to inspect equipment prior to its use on the area to ensure that it is free of invasive species contamination.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 14 of 54
5. FIGURES
Figure 1
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 15 of 54
Figure 2
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 16 of 54
Figure 3
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 17 of 54
Figure 4
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 18 of 54
Figure 5
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 19 of 54
Figure 6
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 20 of 54
Figure 7
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 21 of 54
Figure 8
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 22 of 54
Figure 9
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 23 of 54
PRICE SHEET
FWC FY-23/24-103
CONTRACTOR SHALL NOT ALTER THE PRICE SHEET IN ANY WAY.
Price quoted shall not contain any Federal or State sales or use taxes. The bidder recognizes that the State of Florida, by virtue of its sovereignty, is not required to pay taxes on services, goods and/or equipment purchased incident to such service. Quoted price shall include all necessary items to complete the project.
ALL ITEMS SHALL BE BID OR THE BID WILL BE REJECTED. THE BID WILL BE AWARDED TO
THE RESPONSIVE, RESPONSIBLE BIDDER THAT SUBMITS THE LOWEST TOTAL PRICE.
Sugarloaf Key East (9 acres) $ _____________________________________
Sugarloaf Key West (5 acres) $ _____________________________________
Johnson Tract Unit #1 $ _____________________________________
Johnson Tract Unit #2 $ _____________________________________
Johnson Tract Unit #3 $ _____________________________________
Cudjoe Key South (2 acres) $ _____________________________________
Cudjoe key North (18 acres) $ _____________________________________
Little Torch Key (1 acre) $ _____________________________________
Dove Creek East (2 acres) $ _____________________________________
Dove Creek West (5 acres) $ _____________________________________
Winn Dixie (5 acres) $ _____________________________________
Snake Creek (27 acres) $ _____________________________________
TOTAL BID PRICE (Sum of all 12 sites) = $ _____________________________________
BY SIGNING BELOW, I ATTEST THAT I HAVE READ THE ENTIRE BID AND AGREE TO FURNISH
THE SERVICE AT THE PRICE QUOTED ABOVE. I HEREBY AFFIRM I HAVE NOT BEEN IN ANY
AGREEMENT OR COLLUSION AMONG BIDDERS IN RESTRAINT OF FREEDOM OF COMPETITION.
Contractor: ___________________________
Address: _____________________________
Signed: _______________________________
Print Name: __________________________
Title: ________________________________
Fax: _________________________________
City/State/Zip: ________________________
Telephone: ___________________________
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 24 of 54
REFERENCES
FWC FY-23/24-103
A minimum of three (3) references from persons or firms for whom the bidder has performed similar jobs as per the specifications in this bid must be supplied with the bid. The firms and/or contact persons should be available between the hours of 8:00 AM and 5:00 PM, Eastern Time, Monday through Friday. If any reference is not available as stated above, this may be cause for rejection of the Bidder’s bid. Provide a description (scope of work) of each job.
NAME OF COMPANY: ___________________________________________________________________________
CONTACT PERSON: _____________________________________________________________________________
ADDRESS: ______________________________________________________________________________________
CITY/STATE/ZIP: ________________________________________________________________________________
TELEPHONE NUMBER: ________________________ EMAIL ADDRESS: _____________________________
JOB DATE: _____________________________________________________________________________________
DESCRIPTION (SCOPE OF WORK): ______________________________________________________________
NAME OF COMPANY: ___________________________________________________________________________
CONTACT PERSON: _____________________________________________________________________________
ADDRESS: ______________________________________________________________________________________
CITY/STATE/ZIP: ________________________________________________________________________________
TELEPHONE NUMBER: ________________________ EMAIL ADDRESS: _____________________________
JOB DATE: _____________________________________________________________________________________
DESCRIPTION (SCOPE OF WORK): ______________________________________________________________
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 25 of 54
NAME OF COMPANY: ___________________________________________________________________________
CONTACT PERSON: _____________________________________________________________________________
ADDRESS: ______________________________________________________________________________________
CITY/STATE/ZIP: ________________________________________________________________________________
TELEPHONE NUMBER: ________________________ EMAIL ADDRESS: _____________________________
JOB DATE: _____________________________________________________________________________________
DESCRIPTION (SCOPE OF WORK): ______________________________________________________________
CONTRACTOR NAME
AUTHORIZED SIGNATURE
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 26 of 54
ATTACHMENT A
FWC FY-23/24-103
FLORIDA FISH & WILDLIFE CONSERVATION COMMISSION
PURCHASE ORDER TERMS & CONDITIONS
Last Updated: May 9, 2023
Section 1. PURCHASE ORDER.
A. Composition and Priority.
The Contractor agrees to provide commodities or contractual services to the Commission within the manner and at the location specified in the Purchase Order, and any attachments to the Purchase
Order. These Purchase Order Terms and Conditions, whether generic or specific, shall take precedence over any inconsistent or conflicting provision in the State of Florida, General Contract
Conditions, PUR 1000. Additionally, the terms of the Purchase Order supersede the terms of any and all prior agreements with respect to this purchase.
B. Initial Term.
Unless otherwise specified, the Purchase Order begins on the date of issuance. Contractual services or commodities to be provided by the Contractor shall be completed by the date specified on the
Purchase Order end date.
Section 2. PERFORMANCE.
A. Performance Standards.
The Contractor agrees to perform all tasks and provide deliverables as set forth in the Statement of
Work and attachments to the Purchase Order. The Commission shall be entitled at all times, upon request, to be advised as to the status of work being done by the Contractor and of the details thereof.
Coordination shall be maintained by the Contractor with representatives of the Commission, or of other agencies involved in the project on behalf of the Commission.
B. Performance Deficiency.
If the Commission determines that the performance of the Contractor is unsatisfactory, the
Commission may notify the Contractor of the deficiency to be corrected, which correction shall be made within a timeframe specified by the Commission. The Contractor shall provide the Commission with a corrective action plan describing how the Contractor will address all issues of Purchase Order non‐performance, unacceptable performance, and failure to meet the minimum performance levels, deliverable deficiencies, or Purchase Order non‐compliance. If the corrective action plan is unacceptable to the Commission, the Contractor will be assessed a non‐performance retainage equivalent to ten (10) percent of the total invoice amount or as specified in the contractual documents.
The retainage will be applied to the invoice for the then‐current billing period. The retainage will be withheld until the Contractor resolves the deficiency. If the deficiency is subsequently resolved, the
Contractor may invoice the Commission for the retained amount during the next billing period. If the
Contractor is unable to resolve the deficiency, the funds retained will be forfeited.
C. Contractor Responsibilities.
The Contractor agrees that all Contractor employees, subcontractors, or agents performing work under the Purchase Order shall be properly trained technicians who meet or exceed any specified training qualifications. Upon request, the Contractor shall furnish a copy of technical certification or other proof of qualification. All employees, subcontractors, or agents performing work under the
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 27 of 54
Purchase Order must comply with all security and administrative requirements of the Commission.
The Commission may conduct, and the Contractor shall cooperate in, a security background check or otherwise assess any employee, subcontractor, or agent furnished by the Contractor. The Commission may refuse access to, or require replacement of, any personnel for cause, including, but not limited to, technical or training qualifications, quality of work, change in security status, or non-compliance with the Commission’s security or other requirements. Such refusal shall not relieve the Contractor of its obligation to perform all work in compliance with the Purchase Order. The Commission may reject and bar from any facility for cause any of the Contractor’s employees, subcontractors, or agents.
D. Assignment.
The Contractor shall not sell, assign or transfer any of its rights, duties or obligations under the
Purchase Order without the prior written consent of the Commission. In the event of any assignment, the Contractor remains secondarily liable for performance of the Purchase Order, unless the
Commission expressly waives such secondary liability. The Commission may assign the Purchase
Order with prior written notice to the Contractor.
E. Damages to State Property.
Any damages to state property (e.g., structures, roads, culverts, fences, trees, or other natural resources) caused by the Contractor while working on this project shall be the responsibility of the
Contractor to remedy, as determined by the Commission. The Contractor shall be responsible for the conduct of all Contractor personnel at all times while on the job site.
Should any historical or cultural artifacts be uncovered, the Contractor shall immediately halt work and notify the Commission’s Contract Manager. Please note: The State Archaeologist has the power to halt work if he or she has reason to believe artifacts are being disturbed.
F. Subcontractor Minority Status Report.
Contractor shall provide a Subcontractor Minority Status Report to the Commission’s Contract
Manager, summarizing the participation of certified and non-certified woman-, veteran- and/or minority-owned business enterprise subcontractors/material suppliers for this Contract. The report shall be completed in its entirety and submitted with each invoice. The Contractor shall indicate “N/A” if the project does not utilize subcontractors. The Office of Supplier Diversity can assist in furnishing names of qualified woman-, veteran- and/or minority-owned business enterprises. Contact the
Commission’s Minority Coordinator at (850) 488-6551 with any questions.
G. Independent Contractor.
The Contractor shall perform as an independent contractor and not as an agent, representative, or employee of the Commission. The Contractor covenants that it presently has no interest and shall not acquire any interest that would conflict in any manner or degree with the performance of services required. Each party hereto covenants that there is no conflict of interest or any other prohibited relationship between the Contractor and the Commission. The Contractor agrees to include this provision in all its subcontracts under the Purchase Order.
H. Commission Rights to Undertake or Award Supplemental Contracts.
The Contractor agrees that the Commission may undertake or award supplemental contracts for work related to the Purchase Order. The Contractor and its subcontractors shall cooperate with such other contractors and the Commission in all such cases.
https://www.dms.myflorida.com/agency_administration/office_of_supplier_diversity_osd
Ch. 287 Invitation to Bid – Revised 2.15.2024 FWC FY-23/24-103, Page 28 of 54
Section 3. PAYMENT AND FEES.
A. Payment.
The Contractor will be paid upon submission of properly certified invoice(s) to the Commission after delivery and acceptance of commodities or contractual services is confirmed in writing by the
Commission.
B. Invoicing.
Invoices may be submitted electronically to the Commission’s designated Contract Manager, as identified in this Purchase Order. The Contractor acknowledges that the Commission’s Contract
Manager shall reject invoices lacking documentation necessary to justify invoiced expenses.
C. Invoices, Continued.
All invoices shall be processed in accordance with Section. 215.422, Florida Statutes (F.S.), and Rule
69I-24, Florida Administrative Code (F.A.C.), upon receipt of a proper invoice and approval and inspection of goods or services. The Commission shall record the date of receipt of an invoice on the date on which a proper invoice is first received at the place designated by the Commission. Approval and inspection of goods or services shall take no longer than five (5) working days unless the bid specifications, purchase order, or contract specifies otherwise. Invoices must be legible and shall contain the items below in detail sufficient for a proper audit.
• The invoice number
• The date of the invoice
• “Bill To” information, including address
• The vendor’s name and payment remittance address
• The purchase order number
• The Contractor’s Federal Employer Identification Number (FEIN) or Social Security Number
(SSN)
• Date(s) of service (beginning date – ending date)
• Invoices for commodities must provide a clear description of the item(s), number of units and cost per unit. Numerical code descriptions alone will not be accepted.
• Invoices for services must provide a clear description of the specific deliverables that must be provided and accepted prior to payment.
• Invoices for fixed unit rate agreements must show the number of units and cost per unit.
• Invoices for agreements paid out on a reimbursement basis or a fixed rate for a specific time period (e.g., quarterly, monthly, etc.) must identify the deliverables provided.
D. Payment Timeframe.
Section 215.422, F.S. provides that agencies have five (5) working days to inspect and approve…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .