FWC 21.22-82 A#3 QA Final.pdf
PDF 184 KB Posted
- Solicitation number
- RFP-01178
- Issued by
- Florida
About this file
This document is Addendum #3 to the Request for Proposals (RFP) issued by the Florida Fish and Wildlife Conservation Commission (FWC) for the mechanical removal of aquatic plants and associated organic sediments within the state of Florida. The RFP, numbered FWC 20/21-82, seeks qualified contractors to provide these services on a purchase order basis, with multiple awards anticipated. The addendum includes corrections to the previous scope of work as well as responses to questions from prospective contractors. Key details include that FWC anticipates a budget of $12 million for this project in fiscal year 2022-2023, and that Lake Istokpoga is currently the only approved site for the AHRE funding program under this RFP. FWC does not have a wish list of future project sites, as they are developed on a year-to-year basis.
The addendum also clarifies that contractors will be responsible for providing and maintaining turbidity control devices at their own expense, and that FWC did not contract directly with the South Florida Water Management District under the previous RFP 15/16-131, though they may have utilized the awarded contractors. FWC is unaware of any other state, local, or federal agencies that have used the previous RFP.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FWC 21.22-82 A#1 Revised Calendar.pdf | ||
| FWC 21.22-82 - Final RFP.pdf | ||
| FWC 21.22-82 A#2 Changes to Scope.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners
Rodney Barreto
Chairman Coral Gables
Michael W. Sole Vice Chairman Sebastian
Steven Hudson Fort Lauderdale
Gary Lester Oxford
Gary Nicklaus Jupiter
Sonya Rood St. Augustine
Robert A. Spottswood
Key West
Office of the
Executive Director
Eric Sutton Executive Director
Thomas H. Eason, Ph.D.
Assistant Executive Director
Jennifer Fitzwater
Chief of Staff
850-487-3796
850-921-5786 FAX
Mana gin g fish and wildlife resourc e s for their long-te rm well-b ei n g and the benefi t of peopl e .
620 South Meridian Street
Tallahassee, Florida 32399-1600 Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T)
800 955-8770 (V)
MyFWC.com
Finance and Budget Office
(850) 488-6551
DATE: JUNE 9, 2022
ADDENDUM NO.: 3
BID NO.: FWC 20/21-82
BID TITLE: MECHANICAL REMOVAL OF AQUATIC PLANTS AND
ASSOCIATED ORGANIC SEDIMENTS
UPDATE: CORRECTION AND QUESTIONS & ANSWERS
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s
(FWC) Solicitation No. FWC 20/21-82, “Mechanical Removal of Aquatic Plants and Associated Organic Sediments”.
All responses to the subject solicitation must be received no later than 2:00
PM (ET) on Tuesday, June 21, 2022.
A response received after the exact time specified will not be considered.
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in
Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875
Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Ruth Heggen
FWC Procurement Manager
FWC 21/22-82, Addendum #3, Page 1 of 2
BEGIN ADDENDUM #3
Item #1 – Correction to Previous Change
Section II. OVERVIEW is hereby corrected to read as follows:
II. OVERVIEW
The intent of this RFP is to award responsible, responsive contractors based on their qualifications and competitive cost for all aspects of the mechanical removal of non-mobile aquatic vegetation and associated organic sediments within the State of Florida, per the specifications contained herein. Prospective contractors are not required to provide responses for all regions but must provide responses for all services within a region.
The Commission, at its sole discretion, may stipulate what type of removal equipment is to be used to conduct the project. Services will be provided by the selected contractor(s) on a
Purchase Order basis. It is anticipated that multiple awards will result from this Request for Proposals. An award under this Request for Proposals is not a guarantee of work. No minimum quantity of work is guaranteed.
Item #2: Questions and Answers
Question #1: What was the total funding spent during the last similar bid FWC RFP 15/16-
131? For each year and total?
Answer #1:
Question #2: What is the approved budget for harvesting under the new RFP 21/22-82 in FY
22/23?
Answer #2: The Commission has an estimated budget for this project of $12,000,000.00
(See ESTIMATED BUDGET section on page 4 of 83.)
Question #3: Could you please provide the approved AHRES lakes work list for all lakes that might be worked on under RFP 21/22-82 during FY22/23?
Answer #3: Currently Lake Istokpoga is the only lake approved for AHRE funding that we intend to work under RFP 20/21-82.
Total Fiscal Year
$331,934.00
$141,249.42
$1,853,947.00
$426,898.05
$168,000.00
$460,000.00
OVERALL TOTAL
$3,382,028.47
FY20/21
FY21/22
FY16/17
FY17/18
FY18/19
FY19/20
FWC 21/22-82, Addendum #3, Page 2 of 2
Question #4: If there is a wish list for future FWC projects during the duration of this RFP could you please send a copy of that list also?
Answer #4: No wish list exists. Projects for waterbodies on which removal of non-mobile aquatic plants and associated sediments is proposed are developed on a year-to-year basis.
Question #5: Just to be clear - The Contractors are going to be held responsible if working in a project area and a floating tussock blows into the work area that it is the
Contractor's responsibility to remove it without extra payment?
Answer #5: Yes. Per Section X DEPLOYMENT AND MAINTENANCE OF
APPROPRIATE TURBIDITY CONTROL DEVICES on page 21 of 83, “the contractor, at his or her expense, shall be responsible for providing, deploying, and maintaining turbidity control devices in a manner that shall effectively isolate each of the project sites from the surrounding area for the duration of the project”.
Question #6: SFWMD staff have worked for FWC under the last RFP 15/16-131, how many contractors has SFWMD staff used, what were their names and what was the total spent for each contractor? What was the total funding SFWMD was issued from FWC to perform these duties under RFP 15/16-131?
Answer #6: FWC did not contract with SFWMD as a result of FWC 15/16-131. SFWMD may use the contractors that FWC awarded under that RFP but as they are not required to inform FWC project managers when they used them, FWC does not know when they were used, who they have used, or how much they have spent.
Question #7: Has FWC used the original FWC 15/16-131 with any other State, Local or
Federal Agencies besides SFWMD? If so, what Agencies have used this contract in the past and what were the total funds spent?
Answer #7: As other agencies are not required to inform FWC project managers when they used RFP 15/16-131, FWC does not know when other agencies have used the
RFP or who they have used.
END ADDENDUM #3