About this file
This is a landscape maintenance requirements document for the Freeport Regional Water Authority (FRWA) Intake site located at 7760 Freeport Boulevard in California, prepared in support of the Sacramento County Water Agency's comprehensive landscaping services solicitation. The contractor shall perform weekly maintenance activities across the 7760 Freeport Boulevard facility, including litter and pet waste removal in all mapped areas including the public levee. Site-specific requirements include maintenance of approximately 44,200 square feet of Fescue turf along the levee, which shall not be mowed but requires weekly edge trimming at roadway boundaries and four annual applications of 16-6-8 fertilizer at five pounds per 1,000 square feet. Additional maintenance obligations encompass the Poetry Wall planter area (4,150 square feet) with seasonal pruning of Aloe Striata and Yucca Whipplei after blooming, cleaning of seating areas, care of 16 decorative pot planters with Ginko trees and Mexican Feather Grass including December fertilizer applications of 16 ounces of Osmocote per pot, and weed control in a fenced gravel yard area totaling approximately 78,000 square feet after deducting buildings, basins, roads, tanks, substations, and parking facilities.
The document specifies that all weed control in the Fescue turf shall be performed manually through hand removal for weeds reaching four inches or greater in height, with chemical spraying prohibited for weeds exceeding this threshold. Weeds in other landscaped and paved areas shall be controlled in accordance with specified maintenance bid items. Pre-emergent spray treatments of gravel and rock areas are required at least twice annually. Safety requirements include mandatory wear of safety glasses during seasonal pruning work to prevent eye injury. The requirements are based on a revised version dated August 11, 2021, and support broader Water Agency operations across multiple site types throughout Sacramento County.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sacramento_County_Water_Agency_Landscaping_Services_(Addendum_#2_Revision).pdf | ||
| Task_Frequency_Sheet_-_Area_1_-_9-23-2026.xlsx | XLSX spreadsheet | |
| SCWA_Site_List_-_Area_2_-_09-23-2026.xls | XLS spreadsheet | |
| SCWA_Site_List_-_Area_1_-_09-23-2026.xls | XLS spreadsheet | |
| Site_Key_Plan_VSWTP_Final_5-26-2021.pdf | ||
| FRWA_Color_Coded_Landscape_Exhibit_map_-_REVISED_8-11-21.pdf | ||
| County_Standards_-_Section_20_Landscaping.pdf | ||
| Task_Frequency_Sheet_-_Area_2_-_8-26-2026.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 7 - Landscape Requirements at Freeport Intake site (FRWA) 7760 Freeport Blvd.
(See Color MAP with Instructions)
The contractor is responsible for weekly maintenance of Freeport Regional Water Authority (FRWA) Intake site at 7760 Freeport Blvd. Freeport Intake site has the following site specific requirements that are described below, and shown on Attachment 8 – FRWA Color Coded Landscape Map.
Site-specific requirements for Freeport Intake:
All areas shown on map including the public levee:
· Litter and pet waste removal weekly according to the requirements for Maintenance Bid Item 13. Litter Removal in Landscaped Area, and Maintenance Bid Item 14. Litter Removal in Paved, Decomposed Granite, Rock areas
Map Location 7A - Fescue Turf along Levee
· The Fescue turf at this site shall NOT be mowed. Trim edge of the fescue turf weekly at roadway edges. Approximate area of Fescue Turf = 44,200 Square Feet.
· Four (4) times per year, apply BEST TURF SUPREME or equal 16-6-8 fertilizer at a rate of FIVE (5) pounds per 1,000 square feet, according to the Maintenance Bid Item 2. Turf Fertilization
· Control weeds in the Fescue turf weekly according to the Maintenance Bid Item 3. Turf Weed Control which states: Weeds that reach a height of 4 inches or more shall be manually removed or hand pulled. Chemical spraying shall not be permitted for weeds exceeding 4" in height. All weed debris shall be removed from the area.
Map Location 7B - Poetry Wall planter
· Control weeds in the Poetry Wall planter according to the Maintenance Bid Item 9 Weed Control in Landscaped Areas. Approximate area = 4,150 Square Feet
· Seasonal Pruning – After seasonal bloom, trim and remove dead flower stalks from Aloe Striata, (Aloe) and Yucca Whipplei (Our Lords Candle). Safety glasses must be worn to prevent eye injury.
· Clean Seating areas including the masonry Poetry Wall planter, and the seating area on both sides of the curved gate at the public levee according to requirements in the Maintenance Bid Item 20 – Furniture Maintenance
Map Location 7C – 16 Quantity Decorative Pot Planters with Ginko trees and Mexican Feather Grass.
· Control Weeds and maintain irrigation in accordance with the requirements of this contract
· Apply 16 ounces per pot of Osmocote fertilizer or Slow Release Fertilizer in December every year.
Map Location 7D - Fenced Gravel Yard area, and along roads, ramp and basins including both sides of perimeter fence and gravel area near entrance gate (No Work in Water BASINS!):
· Control weeds in these locations in accordance with Maintenance Bid Item 15 – Weed Control in Paved, Decomposed Granite, and rock blanket areas
· Approximate area of gravel yard after deducting buildings, basins, roads, tanks, substation and parking lot = 78,000 Square feet
· Requires Pre-emergent spray of gravel and rock areas at least twice a year.
REVISED for bidding 2021 - Landscape Requirements at Freeport Intake site 7760 Freeport Blvd.