SOURCES SOUGHT FOR FULL RATE PRODUCTION (FRP) MULTIPLE AWARD CONTRACT (MAC) ON-RAMPING EVENT FOR NAVAL AIR WARFARE CENTER AIRCRAFT DIVISION
Solicitation number
N00421-24-RFPREQ-54000MA-0420
Issued by

About this file

This is a Performance Work Statement (PWS) for a Multiple Award Contract (MAC) issued by the Naval Air Warfare Center Aircraft Division (NAWCAD) for prototyping, production, and installation of Mission System Avionics, aircraft upgrade/modification kits, and components. The contract is divided into three lots: Lot I (unrestricted) for Mission System Avionics development and production; Lot II (unrestricted) for complex aircraft components, systems, and modifications; and Lot III (small business set-aside) for less complex aircraft components and modifications.

The PWS outlines requirements for supporting Science & Technology, prototyping, test, limited production, and full rate production across military fixed-wing, rotary-wing, unmanned aircraft, and lighter-than-air vehicles. Key deliverables include mission computers, displays, communications systems, sensors, navigation equipment, and other avionics components. Contractors must maintain AS9100D certification and provide facilities capable of supporting aircraft modifications up to the Secret level. Work will primarily be performed at contractor facilities for Lots I and II, while Lot III production work will be at contractor facilities with modifications/installations at government facilities. The contract supports requirements for the U.S. Navy, Marine Corps, Foreign Military Sales, and other DOD/Government agencies.

View the file

Other files

File Type Posted
RFI_13Jan25.xlsx XLSX spreadsheet
FRP MAC Sources Sought_08JAN2025.docx DOCX document
FRP MAC Sources Sought_17DEC2024.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C - Descriptions and Specifications

SECTION C

PERFORMANCE WORK STATEMENT (PWS)

1. BACKGROUND

NAWCAD has a requirement for prototyping, production and installation of Mission System Avionics, aircraft upgrade/modification kits and components. This requirement is for a broad spectrum of supplies and services to improve fleet readiness, aircraft capabilities, and reduce acquisition time-lines by utilizing a streamlined IDIQ per FAR Part 16.505 procedures. This contract will be centrally managed by NAWCAD FRP Acquisition Coordination Team (FRP Team). Requirement owners include the U.S. Navy, U.S. Marine Corps, Foreign Military Sales and other Department of Defense (DoD) and Government Agencies. Requirements are expected to cover all type/model/series aircraft and systems within the DoD inventory, as well as commercial derivative platforms. This will be inclusive of Naval Science & Technology (S&T) prototyping and developmental requirements through, collaborative joint Government and Contractor teams; or Contractor team only, working from a Government developed requirement, with Government oversight, inspection and support. Scale shall include one-off demonstrations, production of limited quantities for maturing technical data packages to a productionized state, or full rate production. Production requirements will be the result of Government developmental efforts or Contractor developed products for which the Government will consider the appropriate data and rights suitable for third party full rate production.

The products and services delivered under this contract include prototyping activities, demonstration of technologies, advancement of aircraft capabilities, spiral development, limited and full rate production quantities of avionics systems, mechanical and electrical components, mission systems and components, kits, obsolescence engineering services, ancillary services, upgraded airframes or aircraft modifications. The size and scope of these efforts may vary significantly, ranging from a replacement tray for an avionics unit to the integration of a complete mission capability, inclusive of numerous systems of systems.

This Multiple Award Contract (MAC) has three distinct lots, each with established vendor pools in support of the different requirements. Lot I (unrestricted) will contain requirements for the development, test and full rate production of Mission System Avionics (MSA). Lot II (unrestricted) will contain requirements for the development, test and full rate production of other aircraft components, modification kits, and aircraft installations to be performed at Contractor and/or Government facilities. Lot III (small business set aside) will contain requirements for the development, test and full rate production of other aircraft components, modification kits, and installations performed at Contractor and/or Government facilities. The lot determination between Lots II and III will be made prior to initiation of each Delivery Order/Task Order (DO/TO) and will be based upon the scope, scale, and complexity of the requirement.

2. DOCUMENTS

Applicable documents to ensure compliance with applicable DoD specifications and standards, and industry standards:

Technical ReferencesTitle
COMNAVAIRFORINST 4790.2 seriesNaval Aviation Maintenance Program (NAMP)
DCMA INST 8210-1DContractors Flight and Ground Operations
SAE AS9100Quality Management Systems - Requirements for Aviation, Space and Defense Organizations
SAE AS9102First Article Inspection Standard
DOD 1330.17-RArmed Services Commissary Regulations, Enclosure 2
DOD 4160.21-MDefense Materiel Disposition Manual
DOD 5000.02Operation of the Defense Acquisition System
DOD 5220.22-RIndustrial Security Regulation
DOD 5220.22-MNational Industrial Security Program (NISP)
DODI 1000.13Identification (ID) Cards for Members of the Uniformed Services, Their Dependents, and Other Eligible Individuals
DODI 1330.21Armed Services Exchange Regulations, Enclosure 6
DOD 5000.02Operation of the Defense Acquisition System
DODI 5200.46DOD Investigative and Adjudication Guidance for Issuing the Common Access Card
DODI 5220.22RIndustrial Security Regulations
DODI 5230.24Distribution Statements on Technical Documents, Change 3, 15 Oct 2018
DODI 5525.19DOD Identity Matching Engine for Security and Analysis (IMESA) Access to Criminal Justice Information (CJI) and Terrorist Screening Databases (TSDB)
DODM 4140.01-Vol 3DoD Supply Chain Materiel Management Procedures: Materiel Sourcing, Enclosure 3; Section 6
DODM 4500.36-RManagement, Acquisition, and Use of Motor Vehicles
DODM 5000.04-M-1Cost and Software Data Reporting (CSDR) Manual
DODM 5205.02MDOD Operations Security (OPSEC) Program
DODM 5400.07Freedom of Information Act (FOIA) Program, 25 Jan2017
DSSRDepartment of State Standardized Regulations (DSSR)
SECNAVINST 5510.30BDepartment of Navy Personnel Security Program Manual
OPNAVINST 3750.6SNaval Aviation Safety Management System
NAVAIRINST 4200.57Contract Administration and Use Of Contracting Officer's

Representatives NAVAIRINST 4790.35 Diminishing Manufacturing Sources and Material Shortages

NAWCADINST 13050.1D Aircraft Mod and CM Policy

NAVAIR 01-1A-505Technical Manual: Installation Practices, Aircraft Electric and Electronic Wiring
Public Law 91-596Occupational Safety Health Act (OSHA)
FAA 14 CFR Part 21Certification Procedures for Products and Articles
FAA 14 CFR Part 91General Operating and Flight Rules
FAA 14 CFR Part 43Maintenance, Preventive Maintenance, Rebuilding, and Alteration
FAA 14 CFR Part 145Repair Stations
EASA Part 145Approved Maintenance Organization (may be used as an acceptable equivalent to FAA 14 CFR Part 145)
SD-22DoD Diminishing Manufacturing Sources and Material Shortages (DMSMS) Guidebook
AFI 21-101Aircraft and Equipment Maintenance Management
AFI 21-102Depot Maintenance Management
AF HandbookMaintenance Metrics U.S. Air Force Handbook
AR 70-62Airworthiness Qualification of Aircraft Systems
AR 95-1Flight Regulations
AR 385-10The Army Safety Program
AR 750-6Army Equipment Safety and Maintenance Notification System
JTRJoint Travel Regulations
AWS D17.1Specification for Fusion Welding for Aerospace Applications
IPC-J-STD-001FRequirements for Soldered Electrical and Electronic Assemblies
IPC-A-610FAcceptability of Electronic Assemblies
IPC/WHMA-A-620CRequirements and Acceptance for Cable and Wire Harness Assemblies
IPC-7111/7721CRework, Modification, and Repair of Electronic Assemblies
SAE-AS-50881DWiring, Aerospace Vehicle
NFPA 409Standards on Aircraft Hangars
NFPA 410Standards for Aircraft Maintenance

Due to frequent changes to Documents and Directives, it is expected and required that the most current version at the time of DO/TO award will be used. Links to frequently used directives are: http://quicksearch.dla.mil/; https://directives.navair.navy.mil/.

3. SCOPE

The scope of this PWS is to support S&T, prototyping, test, limited production and full rate production requirements. This includes, but is not limited to installation of mission systems, avionics, aircraft components, systems, modification kits, upgraded airframes, and improved aircraft performance. Requirements shall support aviation platforms operated under Military, Military/Commercial, and/or Federal Aviation Administration (FAA) rules and regulations which include: fixed-wing (airplanes: propeller and jet), rotary-wing (helicopters), unmanned aircraft vehicles (UAV), lighter than air vehicles (airships), as well as related mission and weapon systems. This shall include but is not limited to Military (MILAIR), Commercial Derivative Military Aircraft (CDMA), and Government Owned Commercial Aircraft (GOCA).

DESCRIPTION OF LOT I, LOT II, AND LOT III

The requirements supported by this contract will be assigned either a LOT I, LOT II, or LOT III designation.

LOT I – Mission System Avionics (MSA) Production. This lot is UNRESTRICTED. This lot is reserved for DO/TOs associated with the development and production of, and ancillary services for, avionics and MSA deliverables.

LOT II –Aircraft Components, Systems, Kit Production, and Installation. This lot is UNRESTRICTED. This lot is reserved for highly complex development, installations, higher rates and scale of production, and higher number of concurrent installations at the Contractor and Government sites.

LOT III –Aircraft Components, Systems, Kit Production, and Installation. This lot is a Small Business Set Aside. This lot is reserved for less complex development, installations, lower rates and scale of production, and lower number of concurrent installations at the Contractor and Government sites.

Any requirements for the development and production of Mission System Avionics shall be a LOT I requirement. Assignment of requirements to LOT II as unrestricted or LOT III small business set-aside is at the discretion of the DO/TO Contracting Officer. In making this determination, the Government will consider any combination of elements from the following list that is relevant to the requirement, as well as any other factors relevant to the specific requirement, in determining solicitation of the DO/TO between LOT II unrestricted or LOT III small business set-aside:

a. Degree of complexity

b. System functional verification requirements inclusive of flight activities

c. Component or system airworthiness certification

d. Number of concurrent installations

e. Scale of production requirements

f. Contractor facility capability/capacity requirements

g. Installation or design impacts to flight critical/safety systems

h. Performance, cost, and/or schedule risks

4. REQUIREMENTS

Requirements not otherwise defined at the basic level of this contract will be defined at the issuance of individual DO/TOs.

4.1 CONTRACT MANAGEMENT

4.1.1 The Contractor shall provide a management and corporate structure that enables effective execution of DO/TO pre-award competitive processes and post award execution of the requirements.

4.1.2 The Contractor shall integrate and coordinate all activities needed to execute the individual DO/TO requirements. The Contractor shall manage the timeliness, completeness, and quality of the work and execute a problem identification process. The Contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors and vendors.

4.1.3 The Contractor shall perform program management, program protection, avionics and mission system component production line qualification, unit testing and support services such as documentation, data configuration management, quality assurance, and procurement and/or material handling.

4.1.4 The Contractor shall employ the latest versions of instructions, drawings, specifications, inspection or test instructions, and other documents necessary to satisfy S&T, prototyping, production, inspection, and testing, as specified in the individual DO/TOs. The Contractor shall maintain records as specified in the individual DO/TOs and in accordance with (IAW) their corporate quality management systems.

4.1.5 The Contractor shall maintain the capability to prepare documents and software packages compatible with the Government IT environment through the security classification of unclassified. The current operating environment required for this contract includes:

· Microsoft Windows (Latest Version)

· Microsoft Project 2021

· Microsoft Office Professional Plus 2021

· Microsoft SharePoint

· Adobe Acrobat Pro

· Internet access

The Contractor shall maintain the ability to interface with and transfer data to and from requiring office software applications and their upgraded versions. For contract administrative or indirect functions performed at the Contractor site, the Contractor shall ensure that all media delivered to the Government are virus free when delivered. Contractor personnel shall be capable of maintaining real-time communications, both voice and data transfer capabilities, with NAWCAD during working hours whether at Contractor work site or on travel.

4.1.6 When applicable in the individual DO/TOs, the Contractor shall maintain and work a close liaison with the associate contractors and have a written Associate Contractor Agreement (ACA) with each of the proposed associate contractors. No substitution of associate contractors is permitted unless approved by the DO/TO Contracting Officer or otherwise specified by the individual DO/TO.

4.1.7 The Contractor shall comply with all laws and regulations regarding export-controlled information and technology and shall not use, distribute, transfer, or transmit technology (even if incorporated in products, software, or other information) except in compliance with such laws and regulations. The Contractor shall plan for, obtain, and maintain any export licensing as required to perform requirements of the individual DO/TOs.

4.1.8 Specific Lots Quality System Requirements

4.1.8.1 LOT I: MISSION SYSTEMS AVIONICS REQUIREMENTS (UNRESTRICTED)

The Contractor shall have a quality management system that complies with Society of Automotive Engineers (SAE), AS9100D Quality Management Systems - Aerospace – with sufficient scope for the Manufacture of Aircraft Parts and Components. Exclusions for Design will be allowable and assessed at the DO/TO level. Independent certification is required under the Aerospace Industry controlled AS9104 process. The Contractor shall be subject to formal critical supplier assessments and subject to surveillance audits by the NAWCAD FRP Team. Contractors that obtain AS9100D certification and subsequently change CRB, or have any change in their certification status including but not limited to: recertification, lose their registration status, or are put on notice of losing their registration status, shall notify the Contracting Officer and Contracting Officer Representative (COR) or Technical Point of Contact (TPOC) within three (3) days of the change, the loss of certification, or receipt of notice from the Contractor’s CRB. Loss of registration status will result in exclusion from DO/TO competitions until such time that registration is restored. Repeated loss of or sustained loss of registration for a period of greater than six (6) months will result in off ramping in accordance with Clause H-4. The Prime Contractor is responsible for the flow down of AS9100 quality requirements to their applicable subcontractors and vendors at the DO/TO level. AS9100 certification is only required of the Prime Contractor and will not be required for their subcontractors or vendors.

4.1.8.2 LOT II: SCOPE OF WORK (UNRESTRICTED)

The Contractor shall have a quality management system that complies with Society of Automotive Engineers (SAE), AS9100D Quality Management Systems - Aerospace – with sufficient scope for the Manufacture and Installation of Aircraft Parts and Components. Exclusions for Design will be allowable and assessed at the DO/TO level. Independent certification is required under the Aerospace Industry controlled AS9104 process. The Contractor shall be subject to formal critical supplier assessments and subject to surveillance audits by the NAWCAD FRP Team. Contractors that obtain AS9100D certification and subsequently change CRB, or have any change in their certification status including but not limited to: recertification, lose their registration status, or are put on notice of losing their registration status, shall notify the Contracting Officer, and COR/TPOC within three (3) days of the change, the loss of certification, or receipt of notice from the Contractor’s CRB. Loss of registration status will result in exclusion from DO/TO competitions until such time that registration is restored. Repeated loss of or sustained loss of registration for a period of greater than six (6) months will result in off ramping in accordance with Clause H-4. The Prime Contractor is responsible for the flow down of AS9100 quality requirements to their applicable subcontractors and vendors at the DO/TO level. AS9100 certification is only required of the Prime Contractor and will not be required for their subcontractors or vendors.

4.1.8.3 LOT III: SCOPE OF WORK (SMALL BUSINESS SET ASIDE)

The Contractor shall have a quality management system that complies with Society of Automotive Engineers (SAE), AS9100D Quality Management Systems - Aerospace – with sufficient scope for the Manufacture and Installation of Aircraft Parts and Components. Exclusions for Design will be allowable and assessed at the DO/TO level. Independent certification is required under the Aerospace Industry controlled AS9104 process. The Contractor shall be subject to formal critical supplier assessments and subject to surveillance audits by the NAWCAD FRP Team. Contractors that obtain AS9100D certification and subsequently change CRB, or have any change in their certification status including but not limited to: recertification, lose their registration status, or are put on notice of losing their registration status, shall notify the Contracting Officer, and COR/TPOC within three (3) days of the change, the loss of certification, or receipt of notice from the Contractor’s CRB. Loss of registration status will result in exclusion from DO/TO competitions until such time that registration is restored. Repeated loss of or sustained loss of registration for a period of greater than six (6) months will result in off ramping in accordance with Clause H-4. The Prime Contractor is responsible for the flow down of AS9100 quality requirements to their applicable subcontractors and vendors at the DO/TO level. AS9100 certification is only required of the Prime Contractor and will not be required for their subcontractors or vendors.

4.2 MEETINGS AND CONFERENCES

4.2.1 The Contractors shall attend the Basic FRP MAC post award conference to be held at Naval Air Station (NAS) Patuxent River or virtually. The purpose is to allow the contractors and the Government to establish lines of communication, review contract objective, processes, templates, and procedures. Any Contractor costs associated with the basic post award conference shall be at no direct cost to the Government.

4.2.2 The Contractors may attend, in-person or virtually, the Basic FRP MAC status conference to be held at NAS Patuxent River on an as-needed basis not to exceed twice a year. The purpose is to allow the contractors and the Government to review contract objectives, review upcoming DO/TOs, provide feedback and input on contract processes, templates, and procedures and to address any concerns of the Contractors or Government. Any Contractor costs associated with the status conferences shall be at no direct cost to the Government.

4.2.3 The Contractors shall attend other meetings and conferences to be defined at the DO/TO level.

4.3 LOT I: MISSION SYSTEMS AVIONICS REQUIREMENTS (UNRESTRICTED)

4.3.1 The Contractor shall provide/deliver personnel, material, facilities inclusive of production facilities, equipment, software, and other supplies and services necessary for prototyping, limited production and full rate production of mission systems avionics deliverables. Requirements are expected to include, but are not limited to the following portfolio or product lines:

1. Mission Computers and/or Processors

2. Displays

3. Communications Systems (satcom suites, radios, antenna units, etc.)

4. Sensors

5. Navigation and/or Guidance Equipment

6. Other avionics components not otherwise defined (power and signal distribution equipment, avionics test equipment, etc.)

4.3.2 The Contractor shall perform non-recurring analysis, engineering, documentation, implementation, and qualification activity requirements as defined at the individual DO/TO level in support of:

· Item obsolescence and reverse engineering

· Diminishing manufacturing sources of supply

· Value-added engineering change proposals addressing manufacturability, supportability, maintainability and performance enhancements

· Experimentation and Proof of Concept

· Prototyping and Spiral Development

· Validation and Verification of developed systems

· Full Rate Production

4.3.3 The Contractor shall perform non-recurring analysis, engineering, documentation, implementation, qualification and recurring production activities for commercial item conversion to meet military environmental requirements as defined at the individual DO/TO level.

4.3.4 The Contractor shall perform ground based functional system testing and performance validation of production systems to meet line qualification requirements as defined at the DO/TO level.

4.3.5 The Contractor shall provide inventory control, property management, storage, and distribution of materials, kits, and components in support of production and installation activities. Specific requirements shall be defined at the individual DO/TO level.

4.4 LOT II: SCOPE OF WORK (UNRESTRICTED)

4.4.1 The Contractor shall perform program management, program protection, aircraft modification/ component electrical and mechanical production, and support services such as documentation, data configuration management, quality assurance, and procurement and/or material handling.

4.4.2 The Contractor shall perform non-recurring analysis, engineering, documentation, implementation, test, and qualification activity requirements as defined at the individual DO/TO level in support of:

· Item obsolescence and large-scale reverse engineering

· Diminishing manufacturing sources of supply

· Value-added engineering change proposals addressing manufacturability, supportability, maintainability and performance enhancements

· Airframe and aircraft structure improvements and upgrades

· Integration and advancement of aircraft materials, systems, technologies, and capabilities

· Experimentation and Proof of Concept

· Prototyping and Spiral Development

· Validation and Verification of developed systems

· Full Rate Production

4.4.3 The Contractor shall fabricate electrical and mechanical components, assemblies, systems, installation, and modification kits at prototyping, limited production and full rate production levels in accordance with various Navy specifications and standards. Representative electrical manufacturing requirements include, but are not limited to, wireless components, multiple conductors, coaxial and fiber optic avionics wiring harnesses, signal and power distribution boxes, and control panels. Representative mechanical fabrication requirements include, but are not limited to, the manufacture of aircraft components from raw materials including composites, metal cutting, bending, and sheet metal fabrication and machining. Unless otherwise defined at the DO/TO level, the Contractor shall perform all electrical fabrication and installation activities in accordance with SAE AS50881 Wiring, Aerospace Vehicle and NAVAIR 01 1A 505 Installation Practices, Aircraft Electric and Electronic Wiring.

The Contractor shall perform system and platform modifications and installations at Government and/or Contractor facilities. Typical assets will be military fixed wing and rotary wing platforms but may include commercial derivative platforms and ground-based mission systems, laboratories, support equipment systems, and test equipment systems.

4.4.4 Individual DO/TO requirements may include scheduled or unscheduled modifications and alterations, including engineering change proposals (ECP), technical directives (TD), time compliance technical orders (TCTO), service bulletins (SB), airworthiness directives (AD), and configuration management.

4.4.5 Individual DO/TO requirements may include preventive, scheduled, or unscheduled aircraft maintenance, including preventive maintenance inspections (PMI), aircraft condition inspections, organizational (O), intermediate (I), and depot (D) level maintenance in performance of aircraft installation and modification activities.

4.4.6 The contractor may be required to use one or a combination of the aerospace, aviation maintenance, or industry standards or maintenance programs listed below in the performance of individual DO/TOs:

a. For Navy and Marine Corps customers

(1) COMNAVAIRFORINST 4790.2 series - Naval Aviation Maintenance Program (NAMP); or

(2) DCMA INST 8210-1D - Contractor’s Flight and Ground Operations

b. For Air Force customers

(1) AFI 21 Series - Maintenance; or

(2) DCMA INST 8210-1D - Contractor’s Flight and Ground Operations

c. For Army customers

(1) AR 70-62 - Airworthiness Qualification of Aircraft Systems; or

(2) AR 95-1 - Flight Regulations; or

(3) DCMA INST 8210-1D; or

(4) AR 385-10 - The Army Safety Program; or

(5) AR 750-6 - Army Equipment Safety and Maintenance Notification System

d. For other US Government customers

(1) FAA 14 CFR Part 21 - Certification Procedures for Products and Articles; or

(2) FAA 14 CFR Part 43 - Maintenance, Preventive Maintenance, Rebuilding, and Alteration; or

(3) FAA 14 CFR Part 91 - General Operating and Flight; or

(4) FAA 14 CFR Part 145 - Repair Stations; or

(5) DCMA INST 8210-1D - Contractor’s Flight and Ground Operations

4.4.7 The Contractor shall provide facilities, up to a Secret level, to take custody of and perform platform modification and installation activities for a broad range of fixed and rotary wing platforms or ground systems. The Contractor modification and installation facilities shall be sufficient to support multiple concurrent large, fixed wing aircraft or rotary wing installation activities. Specific facility requirements will be defined at the DO/TO level.

4.4.8 The Contractor shall perform ground and flight based functional system testing and performance validation of experimentation, prototyping and production systems as defined at the DO/TO level.

4.4.9 Prior to the commencement of aircraft modification or installation activities, the Contractor shall develop, maintain, and train required personnel on Government approved Ground Operating Procedures (GOPs) to perform air vehicle modification and installations in accordance with DCMA INST 8210.1D. Additional tailoring may be required at the individual DO/TO level.

4.4.10 Prior to the commencement of aircraft flight activities, the Contractor shall develop, maintain, and train required personnel on Government approved Flight Operating Procedures (FOPs) to conduct aircraft systems operations and flights as required to meet the requirements of the individual DOs in accordance with DCMA INST 8210.1D. Additional tailoring may be required at the individual DO/TO level.

4.4.11 The Contractor shall provide inventory control, property management, storage, and distribution of materials, kits, and components in support of production and installation activities. Specific requirements shall be defined at the individual DO/TO level.

4.5 LOT III: SCOPE OF WORK (SMALL BUSINESS SET ASIDE)

4.5.1 The Contractor shall perform program management, program protection, aircraft modification / component electrical and mechanical production, and support services such as documentation, data configuration management, quality assurance, and procurement and/or material handling.

4.5.2 The Contractor shall perform non-recurring analysis, engineering, documentation, implementation, test, and qualification activity requirements as defined at the individual DO/TO level in support of:

· Item obsolescence and reverse engineering

· Diminishing manufacturing sources of supply

· Value-added engineering change proposals addressing manufacturability, supportability, maintainability and performance enhancements

· Aircraft structure improvements and upgrades

· Integration and advancement of aircraft materials, systems, technologies, and capabilities

· Experimentation and Proof of Concept

· Prototyping and Spiral Development

· Validation and Verification of developed systems

· Full Rate Production

4.5.3 The Contractor shall fabricate electrical and mechanical components, assemblies, systems, installation and modification kits at prototyping, limited production and full rate production levels in accordance with various Navy specifications and standards. Representative electrical manufacturing requirements include, but are not limited to, wireless components, multiple conductors, coaxial and fiber optic avionics wiring harnesses, signal and power distribution boxes, and control panels. Representative mechanical fabrication requirements include, but are not limited to, the manufacture of aircraft components from raw materials including composites, metal cutting, bending, and sheet metal fabrication and machining. Unless otherwise defined at the DO/TO level, the Contractor shall perform all electrical fabrication and installation activities in accordance with SAE AS50881 Wiring, Aerospace Vehicle and NAVAIR 01 1A 505 Installation Practices, Aircraft Electric and Electronic Wiring.

4.5.4 The Contractor shall perform system and platform modifications and installations at Government and/or Contractor facilities. Typical assets will be military fixed wing and rotary wing platforms but may include commercial derivative platforms and ground-based mission systems, laboratories, support equipment systems, and test equipment systems.

4.5.5 Individual DO/TO requirements may include scheduled or unscheduled modifications and alterations, including engineering change proposals (ECP), technical directives (TD), time compliance technical orders (TCTO), service bulletins (SB), airworthiness directives (AD), and configuration management.

4.5.6 Individual DO/TO requirements may include preventive, scheduled or unscheduled aircraft maintenance, including preventive maintenance inspections (PMI), aircraft condition inspections, organizational (O), intermediate (I), and depot (D) level maintenance in performance of aircraft installation and modification activities.

4.5.7 The Contractor may be required to use one or a combination of the aerospace, aviation maintenance, or industry standards or maintenance programs listed below in the performance of individual DO/TOs:

a. For Navy and Marine Corps customers

(1) COMNAVAIRFORINST 4790.2 series - Naval Aviation Maintenance Program (NAMP); or

(2) DCMA INST 8210-1D - Contractor’s Flight and Ground Operations

b. For Air Force customers

(1) AFI 21 Series - Maintenance; or

(2) DCMA INST 8210-1D - Contractor’s Flight and Ground Operations

c. For Army customers

(1) AR 70-62 - Airworthiness Qualification of Aircraft Systems; or

(2) AR 95-1 - Flight Regulations; or

(3) DCMA INST 8210-1D - Contractor’s Flight and Ground Operations; or

(4) AR 385-10 - The Army Safety Program; or

(5) AR 750-6 - Army Equipment Safety and Maintenance Notification System

d. For other US Government customers

(1) FAA 14 CFR Part 21 - Certification Procedures for Products and Articles; or

(2) FAA 14 CFR Part 43 - Maintenance, Preventive Maintenance, Rebuilding, and Alteration; or

(3) FAA 14 CFR Part 91 - General Operating and Flight; or

(4) FAA 14 CFR Part 145 - Repair Stations; or

(5) DCMA INST 8210-1D - Contractor’s Flight and Ground Operations

4.5.8 The Contractor shall provide facilities, at up to a Secret level, to take custody of and perform platform modification and installation activities for a broad range of fixed and rotary-wing platforms or ground systems. The Contractor modification and installation facilities shall be sufficient to support a single large fixed-wing aircraft installation activity, multiple concurrent tactical fixed-wing, or rotary-wing aircraft installation activities. Specific facility requirements will be defined at the DO/TO level.

4.5.9 The Contractor shall perform ground and flight based functional system testing and performance validation of prototyping and production systems as defined at the DO/TO level.

4.5.10 Prior to the commencement of aircraft modification or installation activities, the Contractor shall develop, maintain, and train required personnel on Government approved GOPs to perform air vehicle modification and installations in accordance with DCMA INST 8210.1D Additional tailoring may be required at the individual DO/TO level.

4.5.11 Prior to the commencement of aircraft flight activities, the Contractor shall develop, maintain, and train required personnel on Government approved FOPs to conduct aircraft systems operations and flights as required to meet the requirements of the individual DOs in accordance with DCMA INST 8210.1D. Additional tailoring may be required at the individual DO/TO level.

4.5.12 The Contractor shall provide inventory control, property management, storage, and distribution of materials, kits, and components in support of production and installation activities. Specific requirements shall be defined at the individual DO/TO level.

4.6 TRAVEL

4.6.1 The Contractor may be required to travel in support of all PWS requirements.

4.6.2 The Contractor may be required to travel in performance of a given DO/TO. Costs associated with travel and lodging shall be reimbursed in accordance with the Federal Acquisition Regulation 31.2. When Contractor employees are on temporary duty (TDY) status, the DO/TO may authorize Government provided transportation within the limits specified in the Joint Travel Regulations (JTR).Use of Government transportation by contractor personnel will be restricted to the conduct of official business and transportation of team personnel to/from worksite and quarters.

4.6.3 The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the Government Project Manager and the COR/TPOC for each individual DO/TO.

4.6.4 Travel may include, but is not limited to, various Contractor facilities, Navy facilities and/or vessels, DoD facilities/installations, other Government agency facilities and offices (e.g. Federal Aviation Administration, United States Coast Guard, test ranges, operational activities, project / program offices, and intelligence & support activities), conferences, and seminars.

4.6.5 To support required tasking as identified in CLINs 0X01 and 0X02 the Contractor may be required to travel outside of the contiguous United States (OCONUS). The Contractor shall perform OCONUS travel, inclusive of overseas locations, as required by the Government and as specified by individual DO/TOs. For OCONUS activities, the Contractor shall coordinate with the Government to ensure all documentation, approvals, access and other requirements authorizing personnel to enter the OCONUS operating location are met, including required personnel trainings, briefs, theater and country clearances, IAW Foreign Clearance Guide, Travel Orders, SPOT/Letter of Authorization, CAC, Contractor Verification System approval, etc.

4.6.6 Work Statement Limits. In accordance with DODI 3020.41, Contractor Personnel Authorized to Accompany the U.S. Armed Forces, and in order to preserve the status of Contractor personnel as “civilians accompanying the U.S. Armed Forces”, the Contractor personnel shall not be required to:

a. Operate weapons in combat, or
b. Perform services aboard aircraft while engaged in operational combatmissions.

4.7 CONTRACT DATA REQUIREMENTS LIST (CDRLs)

4.7.1 CDRL Deliverable requirements will be determined at the DO/TO level.

5. GOVERNMENT FURNISHED PROPERTY AND SPACES

5.1 Control of Government Furnished Property (GFP): Government property management shall be conducted in accordance with FAR 52.245-1.

5.2 For developmental, prototyping, and installation and modification requirements, access to Government installation and associated facilities will be available to the Contractor when provided for in the individual DO/TOs, in support of the DO/TO PWS requirements. However, the Contractor shall provide basic hand tools and personal protective equipment (PPE). Required basic hand tools are based on current industry standards for engineering, aircraft mechanical and electrical fabrication, and installation/modification activities, and shall be marked and controlled in accordance with the Contractor’s FOD and Tool Control GOP.

5.3 When required, the Government will provide limited on-site office space as specified in the individual DO/TO. If Contractor access to NMCI or any other Government owned IT system or network is deemed necessary by the Government to provide technical support for any task under this procurement, the Government will provide it.

6. SECURITY

6.1 The highest level of security required for performance of tasks in paragraph 4.0 is TOP SECRET and shall be defined at the DO/TO level. The highest level of safeguarding required to be performed at the Contractor site will be SECRET. DD254s will be issued at the DO/TO level.

6.2 The contractor shall comply with all applicable physical and cyber security requirements, abide by direction given by military police or other security personnel, and adhere to installation traffic laws, and other governing policies, as specified in individual DO/TOs. Contract security shall be IAW DOD 5000.02, DOD 5220.22-M, and DOD 5220.22-R, or latest guidance.

6.3 The Department of the Navy (DON) Automated Data Processing (ADP) Security Program outlined in OPNAVINST 5239.1C, or the most current version of this instruction, applies to all efforts under this contract.

6.4 For DO/TOs that require an operational security (OPSEC) program, the Contractor shall comply with specific command approved OPSEC awareness training, OPSEC program participation IAW Department of Defense Manual (DODM) 5205.02M, and requirements as defined in the individual DO/TO.

6.5 The following requirements apply to activities performed at Government facilities or installations:

6.5.1 All Contractor employees, to include subcontractor employees, requiring access to Government installations, facilities, and controlled access areas shall complete AT Level I Awareness training per the individual DO/TO. AT Level I awareness training is available at website http://jko.jten.mil.

6.5.2 Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation IAW SECNAVINST 5510.30B, and Department of Defense Instruction (DODI) 5200.46.The contractor employee will be issued a CAC only if duties involve one of the following:

· Physical access to a DoD facility and logon access to DoD networks (on-site or remotely)

· Remote logon access to a DoD network using approved remote access procedures; or Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the Federal Bureau of Investigation (FBI) fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

6.5.3 The Contractor and all associated subcontractor employees that require access to DoD facilities or installations that do not require the issuance of a CAC shall comply with adjudication standards and procedures using the National Crime Information Center (NCIC), DODI 5525.19, DODI 5200.46, and applicable installation or facility access policies and procedures provided by the Government as specified in the individual DO/TOs. Contractor and all associated subcontractor(s) employee(s) shall comply with adjudication standards and procedures as previously mentioned in conjunction with Status of Forces Agreement (SOFA) and other theater regulations at OCONUS locations.

7. NON-DISCLOSURE AGREEMENTS

7.1 In the performance of the contract, the Contractor may have access to non-public proprietary information. The Contractor may require that any employee performing under the contract execute a NDA satisfactory to the Contractor and the owner of the non-public proprietary information and the Contracting Officer or their designated representative. The NDA shall acknowledge the Contractor and employees’ duties with respect to non-public information and promise to comply with those obligations. As required, a copy of the executed non-disclosure agreements shall be provided to the Contracting Officer at the DO/TO level.

7.2 In the event that the Contractor knows of or identifies that it has a commercial interest in the subject matter of any proposed or on-going agreement with respect to which contract services are to be performed, the Contractor shall consider such interest a potential conflict of interest in accordance with NAVAIR 5252.209-9510(g) and promptly disclose it to the Contracting Officer.

8. PLACE OF PERFORMANCE

8.1 Primary place of performance for LOT I MSA is the Contractor facilities. Additional special requirements for place of performance will be defined at the DO/TO level.

8.2 Primary place of performance for LOT II is the Contractor facilities. Additional special requirements for place of performance will be defined at the DO/TO level.

8.3 Primary place of performance for production requirements under LOT III is the Contractor facilities. Primary place of performance of modification and installation requirements under LOT III are the Government facilities. Additional special requirements for place of performance will be defined at the DO/TO level.