Airfield Damage Repair (ADR) Fiber Reinforced Polymer (FRP) Panel Kits
Solicitation number
FA805121R3008
Issued by

About this file

This solicitation is for fiber reinforced polymer (FRP) panel kits used for airfield damage repair. The Air Force Materiel Command seeks proposals by April 15, 2021 to establish a multiple award indefinite delivery/indefinite quantity contract with a five year ordering period. The estimated value of orders is between $500,000 to $600,000. Offerors must meet Buy American Act and Trade Agreement Act requirements, and the non-manufacturer rule applies. Proposals will be evaluated on a lowest price technically acceptable basis, considering technical approach, price, and past performance. Awards will be made to responsible offerors with acceptable proposals at fair and reasonable prices.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C - FRP ANCHOR KIT INDIVIDUAL ITEM SPECIFICATIONS

This specification is approved for use by all Departments and Agencies of the Department of Defense within the distribution limitations noted at the bottom of the page.

C1. BACKGROUND

C1.1. Scope. This technical characteristics describes the requirements for manufacturing and procuring the required anchor bushing, anchors, consumables, and the ISO container for the FRP anchor kit, needed to bolt together and install the bolt- together fiber-reinforced polymer (FRP) panel assembly. The FRP mats function as expedient foreign object debris (FOD) covers for crushed- stone or debris backfill crater repairs as part the airfield damage repair (ADR) program.

C2. FRP BUSHINNG COMPONENTS REQUIREMENTS

C2.1. Bushing Material.

C2.1.1. Anchor Bushing. Anchor bushings shall be made from 1045 Steel and plated per SAE-AMS-QQ-P-416 Rev F, TYP II, Class 2, Gold.

C2.1.2. Upper joining bushing. The upper joining bushing shall be made from 1045 Steel and plated per SAE-AMS- QQ-P-416 Rev F, TYP II, Class 2, Gold. The upper joining bushing bolt shall be SAE Grade 5, 5/8-11 Thread. The upper joining bushing bolt shall be plated per AMS QQ-P-416 Rev F, TYP II, Class 2, Gold Hydrogen Embrittlement release baked at 370 degrees F for 23 hours within 4 hours of plating before assembly. The upper joining bushing bolt shall be adhered to the upper joining bushing via a threadlocking material (C2.1.3.).

C2.1.3. Threadlocking Material. The threadlocking material shall be LOCTITE 263 Red Threadlocker or equivalent and shall be applied at the manufacturer recommended application rate to ensure adhesion of the upper joining bushing bolt to the upper joining bushing (C2.1.2.). If the threadlocking material is other than LOCTITE 263, the material shall be approved by the Government prior to use.

C3. FRP ANCHOR KIT COMPONENTS REQUIREMENTS

C3.1. Anchor Bushing. 500 anchor bushing are required in the FRP Anchor Kit. These anchor bushing used with either power bolt anchor or the tri-talon anchor to secure the FRP mat panel assembly. A detailed drawing of the anchor bushings is shown in Drawing 142011, on page C-8. The anchor bushing is designed to facilitate anchoring the system to a pavement surface through the holes on panel overlap edges and anchor panel edges.

C3.2. Upper Joining Bushing. 600 upper joining busing are required in the FRP Anchor Kit. These upper joining bushing are used to connect the various sized FRP mat panels, together during the installation of and/or during maintenance of the installed FRP mat panel assembly. A detailed drawing of the upper joining bushings is shown in Drawing 142010, on page C-9. The upper joining bushings will be connected to lower joining bushings to join panels together to form a cover. The head of the upper joining bushing bolt shall sit flush with the 2.40-in top shoulder of the upper joining bushing.

C3.3. Tri-Talon Anchor Assembly. 480 tri-talon anchor assemblies are required in the FRP Anchor Kit. These tri-talon anchor assemblies are installed/grouted into the base course materials under either asphalt or thin concrete airfield pavement to secure the FRP mat panel assembly. A detailed drawing of the tri-talon anchor assembly is shown in Drawing 142002, on page C-10. The tri-talon anchor assemblies connect to the FRP mat panels with the anchor bushing.

C3.4. Tri-Talon Set Tool. Ten (10) tri-talon set tools are required in the FRP Anchor Kit. These tri-talon set tools are uses to deploy the talons of the tri-talon anchor assemblies into the base course material under the airfield

C-1 pavements during the installation of and/or during the maintenance of the FRP mat panel assembly. A detailed drawing of the tri-talon anchor assembly is shown in Drawing 142001, on page C-11.

C3.5. Power-Bolt Plus, 3/4-in Dia. x 8-1/4-in Long. 480 power-bolt plus, 3/4-in dia. x 8-1/4-in long (NSN 5340-01- 603-0399), are required in the FRP Anchor Kit. These power-bolt plus, 3/4-in dia. x 8-1/4-in long, are required secure the FRP mat panel assembly to concrete airfield pavement during the installation of and/or during maintenance of the installed the FRP mat panel assembly. The power-bolt plus, 3/4-in dia. x 8-1/4-in long, shall be Fasteners/DeWalt part# 6957SD or equivalent (see C3.5.1.).

C3.5.1. Power-bolt plus, 3/4-in dia. x 8-1/4-in long property.

• Size: 3/4-in Dia x 8-1/4-in Long

• Material: Carbon Steel Hex Head Power Bolt

• Head Style: Hex Head

• Hex Head/Wrench Size: 15/16-in

C3.6. Bucket, Plastic, Utility, 5-Gal. Eight (8) buckets, plastic, utility, 5-gal (NSN 7240-01-411-0581), required in the FRP Anchor Kit. These buckets, plastic, utility, 5-gal are required support the mixing of the rapid set grout material and cleaning of the mix hand/power tools during installation of and/or during maintenance of installed FRP mat panel assembly. The bucket, plastic, utility, 5-gal, shall be US Plastics part# 3826 or equivalent (see C3.6.1.).

C.36.1. Bucket, Plastic, Utility, 5-Gal property.

• Material: High density polyethylene construction

• Stackable with lid

• Color: White or Green

C3.7. Bucket, Lid, Plastic, Utility, 5-Gal. Eight (8) bucket, lids, plastic, utility, 5-gal (NSN 7240-01-411-0581) are required in the FRP Anchor Kit. These bucket, lids, plastic, utility, 5-gal are required to support the installation of and/or during maintenance of installed FRP mat panel assembly. The bucket, lid, plastic, utility, 5-gal, shall be US Plastics part# 2287 or equivalent (see C3.7.1.).

C3.7.1. Bucket, Lid, Plastic, Utility, 5-Gal property.

• Material: High density polyethylene construction

• Stackable with lid

• Color: White or Green

C3.8. Ammo Can, Plastic. 44 ammo cans, plastic, are required in the FRP Anchor Kit. These ammo cans, plastic, are required to store 25 each of either the anchor bushing or upper joining bushing during shipment and long term storage of this kit. The ammo can, plastic, Plano part# 1712000 or equivalent (see C3.8.1.). See Figure C3.8.

C3.8.1. Ammo Can, Plastic property.

• Exterior Size: 13.75-in x 7-in x 8.75-in

• Interior Size: 11.25-in x 5.5-in x 7-in

C-2

Figure C3.8.

C3.9. HT Treated Wooden Crate (#A) w/Pallet. Five (5) HT treated wooden crates (#A) w/pallet, are required in the FRP Anchor Kit. These HT treated wooden crates (#A) w/pallet, are required store and secure the ammo cans with anchor bushing and upper joining bushing and the power-bolts during shipment and long term storage of the kit.

The HT treated wooden crate (#A) w/pallet, equivalent (see C3.9.1.). See Figure C3.9.

C3.9.1. HT treated wooden crate (#A) w/pallet.

• Size: 29-in L x 23-in W x 20-in H

• Lid Included: Yes

• Lid Secured with #2 Phillip Head Wood Screws

• Must have forklift pallet spacing (min 2.5-in opening)

• Material: HT Treated Wood

• Material Spec: ISPM 15

• Contractor shall stencil on the top of crate (lid) in 4-in black ink “RETAIN FOR FUTURE USE”.

• Contractor shall stencil on the front side of the crate in 1-in black ink “[RESPECTIVE QUANTITY AND

PART NUMBER]”.

• Contractor shall provide ISPM 15 Certification with each/all wood pallets

Figure C3.9.

C3.10. HT Treated Wooden Crate (#B) w/4-Way Entry Pallet. Two (2) HT treated wooden crates (#B) w/4-way entry pallet, are required in the FRP Anchor Kit. These HT treated wooden crates (#B) w/4-way entry pallet, are required to store and secure the tri-talon anchor assemblies during shipment and long term storage. The HT treated wooden crates (#B) w/4-way entry pallet, equivalent (see C3.10.1.). See Figure C3.10.

C3.10.1. HT treated wooden crate (#B) w/4-way entry pallet property.

• Size: 46-in L x 29-in W x 24-in H

• Lid Included: Yes

C-3

• Lid Secured with #2 Phillip Head Wooden Screws

• Must have forklift pallet spacing (min 2.5-in opening)

• Material: HT Treated Wood

• Material Spec: ISPM 15

• Contractor shall stencil on the top of crate (lid) in 4-in black ink “RETAIN FOR FUTURE USE”.

• Contractor shall stencil on the front side of the crate in 1-in black ink “[RESPECTIVE QUANTITY AND

PART NUMBER]”.

• Contractor shall provide ISPM 15 Certification with each/all wood pallets.

Figure C3.10

C3.11. HT Treated Wooden Crate (#C) w/4-Way Entry Pallet. One (1) HT treated wooden crate (#C) w/4-way entry pallet, is required in the FRP Anchor Kit. This HT treated wooden crate (#C) w/4-way entry pallet, is required to store and secure the tri-talon set tools during shipment and long term storage. The HT treated wooden crate (#C) w/4-way entry pallet, equivalent (see C3.11.1.). See Figure C3.11

C3.11.1. HT treated wooden crate (#C) w/4-way entry pallet property.

• Size: 49-in L x 12-in W x 6-in H

• Lid Included: Yes

• Lid Secured with #2 Phillip Head Wooden Screws

• Must have forklift pallet spacing (min 2.5-in opening)

• Material: HT Treated Wood

• Material Spec: ISPM 15

• Contractor shall stencil on the top of crate (lid) in 4-in black ink “RETAIN FOR FUTURE USE”.

• Contractor shall stencil on the front side of the crate in 1-in black ink “[RESPECTIVE QUANTITY AND

PART NUMBER]”.

• Contractor shall provide ISPM 15 Certification with each/all wood pallets.

Figure C3.11.

C-4

C4. FRP KIT ISO QUADRUPLE (QUADCON) REQUIREMENTS AND COMPENENTS

C4.1. Quadruple Container (QUADCON). One (1) QuadCon (NSN 8150-01-533-8677), is required for the FRP Anchor Kit. This QuadCon stores and secures all items within the FRP Anchor Kit for shipment, long term storage and for use during the installation of and/or maintenance of the installed FRP mat panel assembly. The QuadCon, NSN 8150-01-533-8677 or equivalent (see C4.1.1.).

C4.1.1. Quadruple container (QUADCON) property.

• QuadCon shall have corrugated steel sides, roof, and swing doors on both sides.

• QuadCon shall have a heavy-duty steel floor.

• QuadCon shall have four-way fork lift pockets.

• QuadCon shall be in good condition.

• QuadCon shall be the following dimensions:

o Exterior Length – 4-ft, 9 3/8-in o Exterior Width – 8-ft o Exterior Height – 8-ft o Interior Length – 4-ft, 6-in o Interior Width – 7-ft, 6-9/16-in o Interior Height – 7-ft, 5-in o Door Width – 4-ft, 5-1/2-in o Door Height – 7-ft, 1-1/8-in

• QuadCons shall have dual swing doors on two opposite sides. Doors shall incorporate gaskets for a weatherproof seal when closed.

• QuadCons shall be forest green, tan, or brown in color, in priority order.

• The contractor shall mark each QuadCon according to the uniform procedures detailed in Defense

Transportation Regulation (DTR) – Part VI, chapter 603 (paragraph 5).

• Serial numbers shall be displayed on all four sides and on top of the QuadCon.

• ISO containers shall be weatherproof.

• Maximum tare weight shall not exceed 2,120 lbs. and maximum payload capacity shall not exceed 9,040 lbs.

• QuadCon shall have vents, two (2) each in door panels.

• QuadCon shall have connecting couplers, three (3) per QuadCon.

• QuadCons shall be CSC certified and cargo worthy, Reference: MIL-HDBK-138B, Guide to Container

Inspection for Commercial and Military Intermodal Containers, 01 Jan 2002

C4.2. D-Ring, Track Fitting. One (1) d-ring, track fitting (NSN 5120-01-336-5636), is required for the FRP Anchor Kit. This d-ring, track fitting, are used with Item C4.3. to secure crates and buckets within the FRP Anchor Kit for shipment and long term storage. The d-ring, track fitting, SeaBox part # SB SB3410 or equivalent (see C4.2.1.).

C4.2.1. D-Ring, track fitting property.

• Breaking Strength: 4500-lbs

• Working Load Limit: 1500-lbs

• Compatible with Item C4.1.

C4.3. Snap Hook Ratchet Strap, Heavy Duty, 2-in x 30-ft. Six (6) snap hook ratchet straps, heavy duty, 2-in x 30-ft, are required for the FRP Anchor Kit. These snap hook ratchet straps, heavy duty, 2-in x 30-ft, are used to secure crates and buckets within the FRP Anchor Kit for shipment and long term storage. The snap hook ratchet strap, heavy duty, 2-in x 30-ft, US Cargo part# US-2HDRFS-Y or equivalent (see C4.3.1.).

C4.3.1. Snap hook ratchet strap, heavy duty, 2-in x 30-ft property.

• Length: 30-ft

• Wide: 2-in

• Material: Polyamide nylon webbing and steel connector snap

• Special features: 30-ft long and web strength of 12,000-lbs

C-5

• Tightening device: Ratchet w/integral hooks and operating strength of 11,000-lbs for the ratchet and 10,000-lbs for the hooks.

C4.5. Lock, Combination, Government. Two (2) locks, combination, government (NSN 5340-00-292-0896), are required for the FRP Anchor Kit. These locks, combination, government, are used to secure both sets of doors on the QuadCon during shipment and long term storage. The lock, combination, government, (NSN 5340-00-292- 0896) or equivalent (see C4.5.1.).

C4.5.1. Lock, combination, government property.

• Size: 5/16-in diameter, 2-1/4-in high, 1-in wide shackle.

• 2-in wide laminated steel body padlock.

• Hardened steel shackle for extra cut resistance.

• Combination change instructions and change tool included.

• 4-digit dialing allows for thousands of possible combinations.

• Without chain.

• Spec Number (CID): ASTM F883 A-A-1928

C5. IDIQ RESUPPLY UNIT OF ISSUE

C5.1. IDIQ Unit of Issue per Item for FRP Anchor Kit. Table 1, shows what the unit of issue for each item in the FRP each kit listing, when NOT procured as a full kit.

TABLE 1. IDIQ Quantities per Item for FRP Anchor Kit Item Unit of Issue Anchor Bushing 1 ammo can with 25 each Upper Joining Bushing 1 ammo can with 25 each Tri-Talon Anchor Assembly 1 bundle of ten (10) each Tri-Talon Set Tool 1 each Power-Bolt Plus, 3/4-in Dia. x 8-1/4-in Long 1 box of ten (10) each Bucket, Plastic, Utility, 5-Gal 1 each Bucket, Lid, Plastic, Utility, 5-Gal 1 each Ammo Can, Plastic 1 each HT Treated Wooden Crate (#A) w/Pallet 1 each HT Treated Wooden Crate (#B) w/Pallet 1 each HT Treated Wooden Crate (#C) w/Pallet 1 each QuadCon 1 each D-Ring, Track Fitting 1 each Snap Hook Ratchet Strap, Heavy Duty, 2-in x 30-ft 1 set of six (6) Lock, Combination, Government 1 set of two (2)

C6. PACKAGING FRP ANCHOR KIT IN ISO QUADCON

C6.1. Packaging Ammo Can, Plastic. Package 20 ammo cans, plastic with 25 each of Item C3.1. Package 24 ammo cans, plastic with 25 each of Item C3.2. per drawings/inventory on page C-13.

C6.2. HT Treated Wooden Crate (#A) w/Pallet. Package two (2) crate ‘A’s with 10 each ammo cans of Item C3.1.

Package two (2) crate ‘A’s with 12 ammo cans of Item C3.2. Package one (1) crate ‘A’ with 48 bolts of Item C3.5.

per drawings/inventory on pages C-13 and C-15.

C6.3. HT Treated Wooden Crate (#B) w/Pallet. Package two (2) crate ‘B’s with 240 each of Item C3.3. per drawings/inventory on page C-14.

C6.3. HT Treated Wooden Crate (#C) w/Pallet. Package the one (1) crate ‘C’ with 10 each of Item C3.4. per drawings/inventory on page C-16.

C-6

C6.4. QuadCon. Package the one (1) QuadCon with the appropriate items per drawings/inventory on pages C-17 and C-18.

C6.4.1. ISPM 15 Certification. The ISPM 15 certifications will be secured in some kind of plastic document protector and placed inside the QuadCon or attached to the inside of one of the container doors.

C6.4.2. Container Inventory & Packaging Diagram. The vendor shall provide a full container inventory listing and packaging diagram. The container inventory listing and packaging diagram will be secured in some kind of plastic document protector and placed inside the QuadCon or attached to the inside of one of the container doors.

C6.5. Full FRP Drawing Package. The vendor shall furnish to the gov’t a full FRP anchor kit drawing package. This drawing package shall include a complete inventory listing with National Stock Numbers (NSNs)/manufacturer’s part numbers (if not a NSN has been created for item), packaging drawings with item details (as seen in drawings on pages C-12 thru C-18), be gov’t owned, and have the AFCEC logo on each page. If there are any approved (gov’t) changes to any item in this FRP mat panel assembly, the vendor shall provide updated revisions of the drawing package within 90 days of each approved change.

C7. FRP ANCHOR KIT COMPONENTS VERIFICATION

C7.1. Classification of Inspections of FRP anchor kit components. The inspection requirements specified herein are classified as follows:

• First article inspection.

• Conformance inspection.

C7.1.1. First Article Inspection. The purpose of this inspection shall be to determine FRP Anchor Kit’s conformity with the contract. Acceptance of the First Article inspection shall not constitute a waiver by the Government of its rights under the provisions contract document or relieve the manufacturer from any requirements defined in this specification. Failure to meet inspection criteria shall constitute cause for rejection.

C7.1.2. Conformance Inspection. The conformance inspection shall be conducted on all full FRP Anchor Kits prior to the vendor shipping the FRP Anchor Kits as stated in SOW paragraph 3.1.1.

C-7

C- 8

G3-1 Distribution limited to US Government agencies and their contractors; critical technology.

C-9

C - 1 0

C- 1 1

DESCRIPTION REV DATE APPROVED

INITIAL RELEASE -- 5/11/2018 JBB

UPDATED A 4/26/2019 JBB

PART NO ITEM NO QTY U/I DESCRIPTION MATERIAL MATERIAL SPEC NSN

UNIT

WEIGHT

(LBS)

TOTAL

WEIGHT (LBS) NOTES

FRP-AK-QC 0003 1 FIBER-REINFORCED POLYMER (FRP) ANCHOR KIT 7171

AMS NETWORK, LLC

CONSISTS OF ITEM 0003-01

THROUGH 0003-18

FRP-AJB 0003-02 500 EA ANCHOR BUSHING 1045 STEEL MIL-DTL-XXXX-142011 N/A 1.75 875.00 AMS NETWORK, LLC

1712000 0003-04 20 EA AMMO CAN PLASTIC N/A N/A 2.00 40.00 PLANO

CRATE A 0003-05 2 EA HT TREATED WOODEN CRATE W/ PALLET

29L X 23W X 20H-IN (ID) FILLED WEIGHT 521 LBS/CRATE

HT TREATED WOOD ISPM 15 MARKED FOR RE-USE N/A 60.00 120.00 SECURE IN MOTION

FRP-UJB 0003-03 600 EA UPPER CONNECTOR BUSHING 1046 STEEL MIL-DTL-XXXX-142010 N/A 0.80 480.00 AMS NETWORK, LLC

1712000 0003-04 24 EA AMMO CAN PLASTIC N/A N/A 2.00 48.00 PLANO

CRATE A 0003-05 2 EA HT TREATED WOODEN CRATE W/ PALLET

29L X 23W X 20H-IN (ID) FILLED WEIGHT 304 LBS/CRATE

HT TREATED WOOD ISPM 15 MARKED FOR RE-USE N/A 60.00 120.00 SECURE IN MOTION

FRP-TTAA 0003-06 480 EA TRI TALON ANCHOR ASSEMBLY ASTM A193 B7 ASSBLY DWG DTD 02/26/2014 5340-01-627-7924 4.80 2304.00 AMS NETWORK, LLC

CRATE B 0003-08 2 EA HT TREATED WOODEN CRATE W/4 WAY ENTRY PALLET

46L X 29W X 24H-IN (ID) FILLED WEIGHT 1280 LBS/CRATE

HT TREATED WOOD ISPM 15 MARKED FOR RE-USE N/A 130.00 260.00 SECURE IN MOTION

FRP-TTST 0003-07 10 EA TRI TALON SET TOOL 1025/4340A TOOL DWG DTD 02/26/2014 5340-01-627-8246 12.00 120.00 AMS NETWORK, LLC

CRATE C 0003-15 1 EA HT TREATED WOODEN CRATE W/4 WAY ENTRY PALLET

49L X 12W X 6H-IN (ID) FILLED WEIGHT 180 LBS/CRATE

HT TREATED WOOD ISPM 15 MARKED FOR RE-USE N/A 60.00 60.00 SECURE IN MOTION

6957 0003-12 480 EA POWER-BOLT PLUS, 3/4 DIA X 8-1/4-IN LG CARBON STEEL N/A 5340-01-603-0399 1.05 504.00 POWERS FASTENERS

CRATE A 0003-05 1 EA HT TREATED WOODEN CRATE W/PALLET

29L X 23W X 20H-IN (ID) FILLED WEIGHT 564 LBS/CRATE

HT TREATED WOOD ISPM 15 MARKED FOR RE-USE N/A 60.00 60.00 SECURE IN MOTION

T9A237797WH 0003-16 8 EA 5 GAL PLASTIC BUCKET PN: 3826 PLASTIC COMML N/A 2.10 16.80 US PLASTICS T91237798WH 0003-17 8 EA 5 GAL PLASTIC BUCKET LID PN: 2287 PLASTIC COMML N/A 1.00 8.00 US PLASTICS SB812.0 0003-01 1 EA QUADCON TY II W/3 EACH CONTAINER CONNECTORS STEEL N/A 8150-01-533-8677 2120.00 2120.00 SEA BOX SB3410 0003-10 1 EA TRACK FITTING D-RING STEEL N/A 5340-01-592-9659 0.30 0.30 SEA BOX US-2HDRFS-Y 0003-19 6 EA 2-IN SNAP HOOK RACHET STRAPS H.D. 30 FT. YELLOW POLYESTER COMML N/A 5.00 30.00 RATCHET STRAPS USA 179LH 0003-18 2 EA GOVERNEMENT NSN COMIBINATION PADLOCK METAL COMML 5340-00-292-0896 1.50 3.00 MASTER N/A 0003-14 1 EA ISPM 15 CERTIFICATIONS FOR CRATES/PALLETS PAPER N/A N/A 1.00 1.00 SECURE IN MOTION

N/A 0003-15 1 EA INVENTORY LIST PAPER N/A N/A 1.00 1.00 AMS NETWORK, LLC

PREPARED: J.B.B DATE: 4/26/2019

CHECKED: N/A DATE: 4/26/2019

ENGINEER: J.B.B. DATE: 4/26/2019

APPROVED: J.B.B. DATE: 4/26/2019

SCALE: NONE

FIBER-REINFORCED POLYMER (FRP) ANCHOR KIT

REV:

A

SHEET

C

A

DRAWING NO:

6833284-03

4 3 2 1

4 3 2 1

C

A

TITLE:

FIBER-REINFORCED POLYMER

(FRP) KIT ANCHOR

KIT

THIRD ANGLE PROJECTION

CAGE CODE:

65S22

C-12

INITIAL RELEASE -- 5/11/2018 JBB

UPDATED A 4/26/2019 JBB

PREPARED: J.B.B DATE: 4/26/2019

CHECKED: N/A DATE: 4/26/2019

ENGINEER: J.B.B. DATE: 4/26/2019

APPROVED: J.B.B. DATE: 4/26/2019

SCALE: NONE

5 4 3 2 1

A A

TITLE:

FIBER-REINFORCED POLYMER

(FRP) KIT ANCHOR

KIT

THIRD ANGLE PROJECTION

CAGE CODE:

65S22

DRAWING

NO:

6833284-03

REV:

A

SHEET

BB

C C

4 3 2 1

C-13

INITIAL RELEASE -- 5/11/2018 JBB

UPDATED A 4/26/2019 JBB

PREPARED: J.B.B DATE: 4/26/2019

CHECKED: N/A DATE: 4/26/2019

ENGINEER: J.B.B. DATE: 4/26/2019

APPROVED: J.B.B. DATE: 4/26/2019

SCALE: NONE

5 4 3 2 1

A A

TITLE:

FIBER-REINFORCED POLYMER

(FRP) KIT ANCHOR

KIT

THIRD ANGLE PROJECTION

CAGE CODE:

65S22

DRAWING

NO:

6833284-03

REV:

A

SHEET

BB

C C

4 3 2 1

08 HT TREATED WOODEN CRATE X 2 EA

C-14

INITIAL RELEASE -- 5/11/2018 JBB

UPDATED A 4/26/2019 JBB

PREPARED: J.B.B DATE: 4/26/2019

CHECKED: N/A DATE: 4/26/2019

ENGINEER: J.B.B. DATE: 4/26/2019

APPROVED: J.B.B. DATE: 4/26/2019

SCALE: NONE

5 4 3 2 1

A A

TITLE:

FIBER-REINFORCED POLYMER

(FRP) KIT ANCHOR

KIT

THIRD ANGLE PROJECTION

CAGE CODE:

65S22

DRAWING

NO:

6833284-03

REV:

A

SHEET

BB

C C

4 3 2 1

05 HT TREATED WOODEN CRATE X 1 EA

C-15

INITIAL RELEASE -- 5/11/2018 JBB

UPDATED A 4/26/2019 JBB

PREPARED: J.B.B DATE: 4/26/2019

CHECKED: N/A DATE: 4/26/2019

ENGINEER: J.B.B. DATE: 4/26/2019

APPROVED: J.B.B. DATE: 4/26/2019

SCALE: NONE

5 4 3 2 1

A A

TITLE:

FIBER-REINFORCED POLYMER

(FRP) KIT ANCHOR

KIT

THIRD ANGLE PROJECTION

CAGE CODE:

65S22

DRAWING

NO:

6833284-03

REV:

A

SHEET

BB

C C

4 3 2 1

15 HT TREATED WOODEN CRATE X 1 EA

C-16

INITIAL RELEASE -- 5/11/2018 JBB

UPDATED A 4/26/2019 JBB

PREPARED: J.B.B DATE: 4/26/2019

CHECKED: N/A DATE: 4/26/2019

ENGINEER: J.B.B. DATE: 4/26/2019

APPROVED: J.B.B. DATE: 4/26/2019

SCALE: NONE

5 4 3 2 1

A A

TITLE:

FIBER-REINFORCED POLYMER

(FRP) KIT ANCHOR KIT

THIRD ANGLE PROJECTION

CAGE CODE:

65S22

DRAWING NO:

6833284-03

REV:

A

SHEET

BB

C C

4 3 2 1

O F

C-17

INITIAL RELEASE -- 5/11/2018 JBB

UPDATED A 4/26/2019 JBB

PREPARED: J.B.B DATE: 4/26/2019

CHECKED: N/A DATE: 4/26/2019

ENGINEER: J.B.B. DATE: 4/26/2019

APPROVED: J.B.B. DATE: 4/26/2019

SCALE: NONE

4 3 2 1

REV:

A

SHEET

4 3 2 1

C C

B B

A A

TITLE:

FIBER-REINFORCED POLYMER

(FRP) KIT ANCHOR KIT

THIRD ANGLE PROJECTION

CAGE CODE:

65S22

DRAWING NO:

6833284-03

O F

C-18

FRP - ATTACHMENT C - FRP ANCHOR KIT SPECS 29 JAN 21
Attachment C - Anchor Bushing Drawings
Attachment C - Lower and Upper Bushing Drawings
Attachment C - TRI-TALON ANCHOR DRAWING July 2017
Attachment C - TRI-TALON SET TOOL DRAWINGS July 2017
FRP UTC - Anchor Kit Dwg 6833284-01-04 Rev E

File details come from the government source that posted it. Updated .