This is a freezer specifications addendum document for Sacramento County Sheriff's Property Warehouse RFB 2026-RFB-0061 procuring a prefabricated, knock-down style walk-in frost-free freezer kit for evidence storage. The freezer must be new and unused with an exterior footprint of approximately 24 feet wide by 18 feet deep by 8 feet 6 inches high, capable of maintaining -10 degrees centigrade with no more than three-degree fluctuation and minimal humidity. The unit must be compatible with and expand the existing Dalton walk-in freezer system, include four walls, ceiling, and non-skid aisled flooring coordinated with existing shelving. A 36-inch-wide by 6-foot-8-inch-high outward-opening door with plastic insulation strips and panic bar opener is required on the 24-foot wall, with appropriate doorway ramping. The freezer shall include approximately eighteen LED lights meeting current safety standards and positioned no more than 16 inches from the ceiling. Installation must occur during normal business hours (8:00 a.m. to 5:00 p.m. Monday through Friday) and be completed within a single work week. The mandatory pre-bid meeting is scheduled for June 29, 2026 at 12:00 p.m. at 3750 Bradview Drive, Sacramento, with bids due July 7, 2026 at 3:00 p.m. Award is anticipated July 10, 2026, with delivery, assembly, and invoicing required by August 30, 2026.

Pricing must be submitted F.O.B. destination with freight prepaid and inside delivery included, with separate line items for disassembly, materials, assembly and labor, and taxes. The vendor shall warrant the system against defects in materials and workmanship for one year from installation completion and must affix a warranty label showing warranty period dates and dealer contact information. Complete equipment specifications and material data sheets must accompany bid proposals. All hazardous materials must be identified and accompanied by Material Safety Data Sheets per California Code of Regulations Title 8 Article 110 Section 5194. The procurement is funded by federal and state grant funds subject to 2 CFR Part 200 requirements and conducted using full and open competition without race or gender-based preferences. Bidders must comply with debarment and suspension certifications, submit a Disabled Veteran Business Enterprise Compliance Statement, and maintain general liability coverage of $2 million per occurrence and workers' compensation coverage. All services and merchandise must comply with California State Division of Industrial Safety Orders and OSHA requirements. Payment terms are NET 30, and bid responses remain valid for 90 days from closing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2026-RFB-0061 Attachment A Addendum 1

Freezer Specifications:

Freezer: Walk-in, referred to as a knock-down style, frost free Freezer with the following specifications.

Size: Freezer “kit” exterior footprint should be approximately 24' 23’ (feet) wide, 18' 39 1/2’ (feet)-deep and 8' (feet) 6" (inches) high, outside dimensions. Vendor to verify all measurements at pre-bid site viewing.

• The freezer must maintain a temperature of -10 degrees centigrade with no more than a three-degree fluctuation. The humidity must be as low as possible.

• The freezer must be compatible with and expand the Dalton Walk-In freezer unit that is currently in place. The Dalton brand is not specified, however the brand utilized must meet or exceed specifications for those of Dalton.

• The new freezer unit will require all four walls, unless the bid equivalent is one big kit verses two kits.

• The new freezer unit requires a ceiling and a floor. The floor is to have non-skid aisles appropriately placed. Aisles must be coordinated to accommodate the existing shelving system. See Attachment D Verify with current system at Pre-Bid site viewing for shelving specifications.

• A door will be required for the new unit. The door must be located on the 24' wall. The door must be 36" wide and 6' 8" high (standard). The door must open outward. The door must have plastic strips across the interior for insulation. The door must have a panic bar type opener on the interior. There must be no locks on the door. Door must be consistent with the current Dalton freezer door and latch system.

• The floor will require appropriate ramping at the doorway. The existing door on the unit already installed is to remain intact. The floor on the new unit must adjust for this or the ramping on the existing unit must be modified. THIS WOULD NOT BE NEEDED IF THE BID EQUIVALENT IS ONE BIG KIT VERSUS 2 KITS

LIGHTING:

• Freezer kit(s) unit should have approximately eighteen (18) lights LED lighting to light the space equivalent to most current standards.

• Lights must not extend more than 16" down from the ceiling.

• Light placement to be coordinated -with existing shelving units.

• Lights must meet safety requirements for a freezer environment.

ASSEMBLY (kit(s)place panels):

• The installation must occur during normal business hours of 8:00 a.m. and 5:00 p.m. Monday through Friday.

• The installation shall commence and be completed within the same Monday through Friday work week.

• All parts are to be inspected for shortages or freight damage prior to delivery to the job site in order to expedite the installation process.

WARRANTY:

• The vendor will ·warrant the system against defects in materials and workmanship for a period of one (1) year from the date that installation was completed.

· WARRANTY LABEL: Vendor will be required to affix a label or decal to this equipment at the time of installation, showing warranty period by dates, and the name, address and phone number of the dealer responsible for the service of the equipment (during the warranty period only).

LITERATURE (Material Data Sheets):

· Complete descriptive literature showing specifications of equipment offered must accompany your bid proposal.

Delivery: Prices must be F.O.B. destination to include freight and inside delivery. Awarded Vendor must be able to provide the Freezer and complete assembly by August 30, 2026.

HAZARDOUS MATERIALS: All materials subject to the requirements of the California Code of Regulations, Title 8, Article 110, Section 5194 must be identified.

It is required by law that all hazardous materials be accompanied with a 'Material Safety Data Sheet' (MSDS) at the time of delivery.

SAFETY REQUIREMENTS: All services and merchandise must comply with current California State Division Of Industrial Safety Orders and O.S.H.A.

AWARD: Deleted.

File details come from the government source that posted it. Updated .