About this file

This is an Invitation for Bid (IFB) issued by the California Department of Corrections and Rehabilitation (CDCR) for Exterior Insulation Finish System (EIFS) materials and fabrication for two housing units at California State Prison, Lancaster (LAC). The solicitation number is FPCM-LAC-I-001138-M001-RS, with a bid due date of November 17, 2025, at 2:00 p.m. Bids are to be submitted to Procurement Support, Attn: Roberta Sanchez, at 9838 Old Placerville Road, Suite B, Sacramento, CA 95827, or electronically to roberta.sanchez@cdcr.ca.gov. A mandatory walk-thru is scheduled for November 6, 2025, at 9:00 a.m., and gate clearance information must be submitted by October 23, 2025. The project involves providing a complete EIFS system to cover approximately 12,878 square feet each on Building 348 HU D3 and Building 3410 HU D5, including custom pre-finished façade panels (approximately 4,000 square feet per building), sheet metal products, adhesives and sealants, warranties, and technical assistance. Bidders must provide a detailed materials list including quantities, unit pricing, and brand/model information. All deliveries are FOB Destination and must be coordinated with the Construction Supervisor; deliveries within the secure perimeter may require gate clearances. Materials must be delivered within three business days of request or within three business days of the first delivery with prior approval. The State reserves the right to increase the purchase order by 20 percent upon written approval prior to final delivery and may select two suppliers—a primary and an alternate—to ensure timely delivery.

Bids must remain valid until the purchase order is issued and must include a complete materials list for pre-award review. The State will not pay for deliveries that do not match the Construction Supervisor's written request, and vendors who fail to deliver as requested must remove materials from site within five business days at their own expense. All products must be newly manufactured and installed by the State. A ten-year, full-system manufacturer's warranty with no dollar limit and non-prorated labor/material coverage is required, with the warranty not payable until the EIFS system is installed and accepted by the manufacturer's representative. The contract includes 80 hours of technical assistance for on-site inspection, testing, training, and certification of CDCR staff by the EIFS manufacturer's representative. Bids will be evaluated on a lowest responsible bidder basis under an "All or None" award structure. Small business preference (5 percent), non-small business claiming 25 percent small business subcontractor participation, and Disabled Veteran Business Enterprise (DVBE) incentive provisions apply, with DVBE incentives ranging from 1 to 5 percent based on confirmed participation levels. Successful bidders must provide a Payee Data Record (STD 204), California seller's permit information, and comply with all applicable state and federal laws, including recycled content certification, non-discrimination requirements, and the Darfur Contracting Act. Payment will be made in accordance with the California Prompt Payment Act within 45 days of acceptance or invoice receipt, whichever is later.

View the file

Other files

File Type Posted
24-054_LAC_EIFS_Final_Specifications.pdf PDF
24-054_LAC_EIFS_Final_Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF CALIFORNIA

Department of Corrections and Rehabilitation

INVITATION FOR BID

Rev. 09/15/25

DUE DATE:

11/17/2025

Responses must be delivered to:

Procurement Support Attn: Roberta Sanchez 9838 Old Placerville Road, Suite B Sacramento, CA 95827 by no later than 2:00 pm on the due date.

DELIVERY TIME ARO:

(After Receipt of Order)

Supplier name and address:

Contact:

Phone: ( ) Fax: ( )

Email: ________________________________

Solicitation No. Rev. # Date

FPCM-LAC-I-001138-M001-RS ___ 10/09/2025

Ship to:

California State Prison LAC (LAC) Attn: George Cabrera, CS II 44750 60th St W Lancaster, CA 93536

ARE YOU CLAIMING PREFERENCE AS A

CALIFORNIA CERTIFIED SMALL BUSINESS?

Yes _________ No ________

ARE YOU A NON-SMALL BUSINESS

CLAIMING AT LEAST 25% SMALL BUSINESS

SUBCONTRACTOR PREFERENCE?

Yes _________ No ________

ARE YOU CLAIMING INCENTIVE AS A

DISABLED VETERAN BUSINESS ENTERPRISE

(DVBE) OR A NON-DVBE CLAIMING DVBE

SUBCONTRACTOR INCENTIVE?

Yes _________ No ________

Name (Print)

Title:

Signature:

________________________ Date: ________

Federal Employer Identification Number:

California Seller’s Permit Number:

Return bid to:

(Electronic Mail) Department of Corrections & Rehabilitation Procurement Support roberta.sanchez@cdcr.ca.gov

(Courier) Department of Corrections & Rehabilitation Procurement Support Attn: Roberta Sanchez 9838 Old Placerville Road, Suite B Sacramento, CA 95827

Section 14838 et seq. Of the California government code requires that a 5% preference be given to bidders who qualify as a small business as a non-small business claiming 25% California certified small business participation for requirements see title 2, California code of regulations section 1896 et seq. The requirements for nonprofit veteran service agencies qualifying as a small business are contained in section 999.50 et sec. Of the military and veterans code.

The purchasing authority for this acquisition is under the jurisdiction of California penal code 7000 (a)(b) and 7001 meeting the criteria as part of the master plan. conferred by statute upon the department of general services and the department – (refer to document 11 of the procurement file).

DELCARATIONS UNDER PENALTY OF PERJURY; By signing above, with inclusion of the date of signature, the above signed bidder DECLARES UNDER PENALTY OF PERJURY under the laws of the State of California as follows: (1) (STATEMENT OF COMPLIANCE). The above signed has complied with the non-discrimination program requirements of Government Code 12990 and Title 2, California Administrative Code Section 8103, and such declaration is true and correct. (2) The National Labor Relations Board declaration set forth in Paragraph 43 of the General Provisions is true and correct. (3) If a claim is made for the small business preference, the information set forth within is true and correct.

This is a product only purchase for delivery to CALIFORNIA STATE PRISON, LAC. Authority for this purchase is per Penal Code Sections 7000- 7001. Product(s) must be quoted as described on this Invitation for Bid (IFB). Bids must be in accordance with IFB FPCM-LAC-I-001138-M001-RS and Attachments I and II (plans and specifications). Bidders must meet the minimum requirements identified in the attached specification in order to be considered for award of the purchase order. A mandatory walk-thru for this IFB solicitation will be conducted on 11/06/2025 @ 9:00 AM.

ITEM

NO.

QTY UNIT DESCRIPTION UNIT PRICE EXTENSION

CALIFORNIA STATE PRISON, LAC

EIFS BLDG. 348 HU D3, BLDG. 3410 HU D5

FOB DESTINATION

NOTE: DELIVERIES MAY NEED TO BE MADE

WITHIN THE SECURE PERIMETER. GATE

CLEARANCES WILL BE REQUIRED.

IFB Page 1

INVITATION FOR

BID CONTINUATION

Supplier Name: Solicitation No.

FPCM-LAC-I-001138-M001-RS

Rev.

ITEM

LOT

EA

HR

EXTERIOR INSULATION FINISH SYSTEM

CSP LAC- BLDG. 348 HU D3, BLDG. 3410 HU D5

Housing Units 348/D3, 3410/D5

Bid per plans and specifications, to be installed over smooth painted concrete tilt-up wall substrate. A detailed materials list

FOR EACH EXTERIOR INSULATION FINISH SYSTEM

(EIFS), including quantities, unit pricing and brand/model information, must be provided with bid.

All Lot deliveries must be coordinated with project CSII's prior to delivery or will not be accepted.

LOTS FOR EACH EIFS SYSTEM TO INCLUDE, BUT ARE

NOT LIMITED TO THE FOLLOWING (AS APPLICABLE):

Ridged Insulation, Fasteners, Anchors, Drainage Track, Primer Sealer, Insulation Adhesive, Reinforcing Mesh, Trim, Joint Sealants, Backer Rod, Metal Lath, Base Coat Material, Finish Coat material, and Air/Water Resistive Barrier Coatings according to Plans and Specifications.

BUILDING 348 HU D3

EXTERIOR INSULATION FINISH SYSTEM (EIFS)

ASSEMBLY, COMPLETE EIFS SYSTEM, to cover approx..

12,878 square feet on BUILDING 348 HU D3. Bid must include all materials to be installed over a smooth painted concrete tilt-up wall substrate. Custom pre-finished façade panels as needed for face of building, approx. 4,000 square feet; Color, façade and texture to be selected by institution from the manufacturers standard range, to be determined on job walk.

SHEET METAL PRODUCTS: to include but not limited to:

Cladded sheet metal provided in 5' X l0' sheets, in quantities as required per plans and specifications. Provide premanufactured coping per detail. (Quantity, unit price and product information of sheet metal products must be included on materials list.)

ADHESIVES AND SEALANTS FOR WALLS: To be delivered upon request by CCM Construction Supervisor. (Quantity, unit price and product information of Adhesives and Sealants must be included on materials list.) For bidding purposes, prospective vendors are to utilize plans to determine coverage needed.

WARRANTY, Manufacturer's, Standard Ten (10), Full System, No Dollar Limit Warranty, (labor/material warranty), warranty shall be non-prorated.

NOTE: Warranty will not be paid until the EFIS system is installed and is accepted by the manufacturer’s representative.

TECHNICAL ASSISTANCE, on-site inspection, testing, training and certification of CCM staff by EFIS manufacturer’s representative.

IFB Page 2

Supplier Name: Solicitation No.

EA

HR

BUILDING 3410 HU D5

EXTERIOR INSULATION FINISH SYSTEM (EIFS)

ASSEMBLY, COMPLETE EIFS SYSTEM, to cover approx..

12,878 square feet on building 3410 HU D5. Bid must include all materials to be installed over a smooth painted concrete tilt-up wall substrate. Custom pre-finished façade panels as needed for face of building, approx. 4,000 square feet; Color, façade and texture to be selected by institution from the manufacturers standard range, to be determined on job walk

SHEET METAL PRODUCTS: to include but not limited to:

Cladded sheet metal provided in 5' X l0' sheets, in quantities as required per plans and specifications. Provide premanufactured coping per detail. (Quantity, unit price and product information of sheet metal products must be included on materials list.)

ADHESIVES AND SEALANTS FOR WALLS: To be delivered upon request by CCM Construction Supervisor. (Quantity, unit price and product information of Adhesives and Sealants must be included on materials list.) For bidding purposes, prospective vendors are to utilize plans to determine coverage needed.

WARRANTY, Manufacturer's, Standard Ten (10), Full System, No Dollar Limit Warranty, (labor/material warranty), warranty shall be non-prorated.

NOTE: Warranty will not be paid until the EFIS system is installed and is accepted by the manufacturer’s representative.

TECHNICAL ASSISTANCE, on-site inspection, testing, training and certification of CCM staff by EFIS manufacturer’s representative.

SUBMITTALS FOR ALL BUILDINGS, Product data sheets, shop drawings, manufacturer’s certification, manufacturer’s installation instructions, and warranty (sample) must be included in submittal package.

IFB Page 3

Supplier Name: Solicitation No.

THIS FOLLOWING WILL PERTAIN TO ALL LINE

ITEMS ON THE PURCHASE ORDER:

Materials to be delivered upon written request of Construction Supervisor. Requested materials may not be split into multiple deliveries. If shipped separately, deliveries may be rejected. Exceptions may be made by the Construction Supervisor. Written approval is required prior to delivery. All requested materials must be delivered within 3 business days or within 3 business days of the first delivery (if prior approval from Construction Supervisor has been obtained). Invoice for requested materials must match Construction Supervisor’s written request prior to acceptance and invoice submission. If vendor fails to deliver as requested, the delivery may be rejected and the vendor shall remove all materials from site within five (5) business days at vendor’s expense. Prospective vendors must initial below to indicate their understanding and compliance.

PROSPECTIVE VENDOR INITIALS

Subtotal W/O Sales Tax $______________________

IFB Page 4

Supplier Name: Solicitation No.

Bid Requirements:

1. Important Note: Only bids quoted on the State’s own bid forms will be considered. Bids shall be submitted via US Postal Service in a sealed envelope/package with the solicitation number and the bid due date and time clearly marked on the outside of the envelope/package, or emailed to roberta.sanchez@cdcr.ca.gov before 2:00 p.m. on the bid due date.

2. Bid attachments: Bid responses that reference a supplier’s own terms and conditions or provisions will be considered non-responsive and will be rejected.

3. Bidder’s Instructions and General Provisions: The attached Bidder’s Instructions and General Provisions have recently been revised. Please read carefully.

4. Inquiries/questions: Written questions must be received by 5:00 PM, close of business on 11/10/2025.

5. Bid Award: For the purposes of this solicitation, contract award will be made on the basis of “All or None”.

6. Cash Discounts: Cash discounts will not be considered when evaluating bid responses for award purposes. However, cash discounts may be offered and taken by departments processing invoices within the time frame specified.

7. Shipment: For the purposes of this solicitation, only bid responses quoting F.O.B. Destination will be accepted.

8. Delivery: Final delivery, inspection and acceptance shall be at the location described herein: CALIFORNIA STATE PRISON, LAC - 44750 60TH

STREET W, LANCASTER, CALIFORNIA.

Responsible Bidder: The Department of Corrections and Rehabilitation may require bidder(s) to submit evidence of their qualifications at such times and under conditions, as it may deem necessary. The question of whether a particular bidder is a responsible bidder may involve an evaluation of the bidder’s experience, type of facility, expertise, or financial resources regarding the particular items requested by the pertinent solicitation. If a bidder has been determined to be non-responsible, the bid shall be rejected.

New Equipment: All equipment to be provided in response to a State of California solicitation shall be new and latest model in current production. USED, SHOPWORN, DEMONSTRATOR, PROTOTYPE OR DISCONTINUED MODELS ARE NOT ACCEPTABLE.

Electronic Mail (Email) Bids: Bids received via email will be considered only if they are sent to roberta.sanchez@cdcr.ca.gov. Bids sent to any other email will not be considered. To be considered, all pages of an emailed bid must be completely received prior to the bid due date and time specified in this solicitation.

Please be advised that there is a heavy demand placed on the email account receiving bids, and the State assumes no responsibility if a bidder cannot transmit their bid via email, or if the entire bid is not received prior to the specified bid due date and time.

Recycled Content Products: State agencies are required to report purchases in many product categories. In order to comply with those requirements, contractors are required to complete and return the attached Recycled Content Certification form with your bid response. Failure to complete and return the form may disqualify your bid from consideration.

Payee Data Record: The successful bidder will be required to submit a Payee Data Record, STD. Form 204, listing their Taxpayer Identification Number (see Exhibit 2). Return this form with your bid.

Seller’s Permit: If applicable, please note that award will be conditional on providing the following document prior to award:

You must provide your company’s California retailer’s seller’s permit or certification of registration and, if applicable, the permit or certification of all participating affiliates, issued by California’s State Board of Equalization (BOE), pursuant to all requirements as set forth in Sections 6487, 7101 and Sections 6452.1, 6487.3, 18510 of the Revenue and Taxation Code, and Section 10295.1 of the Public Contract Code. In order to expedite the process of verifying the validity of the permit, provide the BOE seller’s permit number (on page 1) or attach a copy of the permit with your quote.

Disabled Veteran Business Enterprise (DVBE) Program Requirements: The State has established goals for DVBE participation in State contracts. The intent of the DVBE participation requirement and incentive is to encourage DVBE certified suppliers to participate in bidding opportunities, and to encourage firms to seek and include DVBE’s as sub-contractors.

For the purposes of this solicitation the department elects to waive the DVBE Program Requirements, but opts to include the DVBE Incentive. This solicitation does not include a required minimum DVBE participation percentage.

DVBE Incentive: A DVBE incentive will be given to bidders who provide DVBE participation. For evaluation purposes only, the State shall apply a DVBE bid incentive to bids that propose a California certified DVBE participation as identified on the Bidder Declaration, GSPD-05-105, and confirmed by the State. The DVBE incentive amount for awards based on low price will vary in conjunction with the percentage of DVBE participation. The California DVBE Bid Incentive Instructions (09/03/09) includes information about the DVBE incentive and can be located at www.documents.dgs.ca.gov/pd/poliproc/MASTER-DVBEIncentivePkg.pdf. The following percentage will apply to this solicitation:

Confirmed DVBE Participation of: DVBE Incentive:

5% or over 5%

4% to 4.99% 4% 3% to 3.99% 3% 2% to 2.99% 2% 1% to 1.99% 1%

Darfur Contracting Form: Pursuant to Public Contract Code Section 10478, if a bidder or proposer currently or within the previous three years has had business activities or other operations outside of the United States, it must certify that it is not a “scrutinized” company as defined in Public Contract Code, Section 10476. See last page of this IFB for the Darfur Contracting form that must be returned with your bid.

Payment Discount: The supplier may offer a discount to the amount paid on invoices received and accepted by CDCR in order for the invoices to be paid within thirty (30) days from date CDCR receives the invoice. Discounts offered on invoices must be at least 1% of the invoice amount and a minimum of $50.00. If offering a discount, please provide the following:

________________________ is offering a discount of ______% on invoices paid within thirty (30) days*. *The percent of discount (Company Name) (highest discount prevails) may be used in the event of tie bids. Refer to Notice to Prospective Bidders, Bid Submission Requirements. Representative Initials: _________

IFB Page 5

Supplier Name: Solicitation No.

Prohibition on Tax Delinquents: Persons or companies identified as the largest tax delinquents by the Franchise Tax Board (FTB) or the Board of Equalization (BOE) under authority of Sections 7062 or 19195 of the Revenue and Taxation Code, shall be disqualified from the bidding process. PCC §10295.4. Contractors included on tax delinquency lists; contracts void and unenforceable; (a) Notwithstanding any other law, a state agency shall not enter into any contract for the acquisition of goods or services with a contractor whose name appears on either list of the 500 largest tax delinquencies pursuant to Section 7062 or 19195 of the Revenue and Taxation Code. Any contract entered into in violation of this subdivision is void and unenforceable. (b) This section shall apply to any contract executed on or after July 1, 2012.

Small Business Regulations: The Small Business regulations, located in the California Code of Regulations (Title 2, Division 2, Chapter 3, Subchapter 8, Section 1896 et. seq.), concerning the application and calculation of the small business preference, small business certification, responsibilities of small business, department certification, and appeals are revised, effective 09/09/04. The new regulations can be viewed at (www.pd.dgs.ca.gov/smbus). Access the regulations by clicking on “Small Business Regulations” in the right sidebar. For those without Internet access, a copy of the regulations can be obtained by calling the Office of Small Business and DVBE Services at (916) 375-4940.

Non-Small Business Subcontractor Preference: A 5% bid preference is now available to a non-small business claiming 25% California certified small business subcontractor participation. If applicable, claim the preference in the box on the right hand side of the first page of this solicitation.

Small Business Nonprofit Veteran Service Agencies (SB/NVSA): SB/NVSA prime bidders meeting requirements specified in the Military and Veterans Code Section 999.50 et seq. and obtaining a California certification as a small business are eligible for the 5% small business preference. If applicable, claim the preference in the box on the right hand side of the first page of this solicitation.

Attachment with bid required if claiming the Small Business Preference: All bidders must complete and include the Bidder Declaration form GSPD- 05-105. If claiming the non-small business subcontractor preference, the form must list all of the California certified small businesses with which you commit to subcontract in an amount of at least twenty-five percent (25%) of the net bid price. All certified small businesses must perform a “commercially useful function” in the performance of the contract, as defined in Government Code Section 14837(d)(4).

Small Business Certification: Bidders claiming the small business preference must be certified by California as a small business or must commit to subcontract at least 25% of the net bid price with one or more California certified small businesses. Completed certification applications and required support documents must be submitted to the Office of Small Business and DVBE Services (OSDS) no later than 5:00 p.m. on the bid due date, and the OSDS must be able to approve the application as submitted. Small business nonprofit veteran service agencies (SB/NVSA) claiming the small business preference must possess certification by California prior to the day and time bids are due. Questions regarding certification should be directed to OSDS at (916) 375-4940.

TARGET AREA CONTRACT PREFERNCE ACT (TACPA) PREFERENCE: Bidders desiring to apply for the TACPA, preference may download the appropriate form from the following web site: http:// www.documents.dgs.ca.gov/dgs/fmc/pdf/std830.pdf If your application for TACPA preference was granted for this contract, the requirement to provide the TACPA MONTHLY PERFORMANCE REPORT OF LABOR HOURS is a mandatory contract requirement that demonstrates your company is being a responsible supplier to the State of California. The required reports shall be submitted to the Department of General Services (DGS) – Dispute Resolution Unit (DRU) no later than the 15th day of each proceeding month, during the term of contract. If the State does not receive the required reports by the required due date, it may impact future contract awards to your company.

Declaration Forms: All bidders must complete the Bidder Declaration, Form GSPD-05-105, and include it with the bid response. When completing the declaration, bidders must identify all subcontractors proposed for participation in the contract. Bidders awarded a contract are contractually obligated to use the subcontractors for the corresponding work identified unless the State agrees to a substitution and it is incorporated by amendment to the contract. Bidders who have been certified by California as a DVBE (or who are bidding rental equipment and have obtained the participation of subcontractors certified by California as a DVBE) must also submit a completed form(s) STD. 843 (DVBE Declaration). All disabled veteran owners and disabled veteran managers of the DVBE(s) must sign the form(s). Should the form not be included with the solicitation, contact the State contracting official or obtain a copy online from the Department of General Services Procurement Division, Office of Small Business and DVBE Services (OSDS) website at www.pd.dgs.ca.gov/smbus. The completed form should be included with the bid response.

At the State’s option prior to award, bidders may be required to submit additional written clarifying information. Failure to submit the required written information as specified may be grounds for bid rejection.

Attachments: The following documents are considered part of this solicitation and those with an asterisk (*) must be returned with the bid response or the bid may be considered invalid and be rejected.

1. Scope of Work – Attachment I

2. Specification Sections – Attachment II

3. Bidder Declaration Form GSPD-05-105 – Attachment III*

4. Payee Data Record – Attachment IV*

5. Seller’s Permit (BOE) number or copy of Seller’s Permit*

6. Bidder Instructions (Form 451) – Attachment V

7. General Provisions (Form 401) – Attachment VI

8. Darfur Contracting Form – Attachment VII*

9. Post-Consumer Content Certification – Attachment VIII*

10. Commercially Useful Function Declaration – Attachment IX*

11. California Civil Rights Laws Certification – Attachment X*

12. STD 1000 GenAI Disclosure & Factsheet (04/24) – Attachment XI*

Loss Leader: It is unlawful for any person engaged in business within this state to sell or use any article or product as a “loss leader” as defined in Section § 17030 of the Business and Professions Code. A “loss leader” is any article or product sold at less than cost: (a) where the purpose is to induce, promote, or encourage the purchase of other merchandise; or (b) where the effect is a tendency or capacity to mislead or deceive purchasers or prospective purchasers; or

(c) where the effect is to divert trade from or otherwise injure competitors.

Commercially Useful Function: If you are claiming that your company is a certified Small Business, please complete and return the attached Commercially Useful Function Declaration form with your bid (Attachment IX).

Prison Rape Elimination Act Policy: CDCR is committed to providing a safe, humane, and secure environment free from sexual misconduct. This will be accomplished by maintaining a program to ensure the education, prevention, detection, response, investigation, and tracking of sexual misconduct and to address the successful community re-entry of the victim. CDCR shall maintain a zero tolerance for sexual misconduct in its institutions, community correctional facilities, conservation camps, and for all offenders under its jurisdiction. All sexual misconduct is strictly prohibited. As a contractor with CDCR, you and your staff are expected to ensure compliance with this policy as described in Department Operations Manual, Chapter 5, Article 44.

IFB Page 6

California Department of Corrections and Rehabilitation IFB FPCM-LAC-I-001138-M001-RS

LIST OF ATTACHMENTS

DEPARTMENT OF CORRECTIONS & REHABILITATION

Facility Planning, Construction & Management

ATTACHMENT I SCOPE OF WORK

ATTACHMENT II PLANS AND SPECIFICATION SECTIONS

ATTACHMENT III BIDDER DECLARATION, FORM GSPD-05-105

ATTACHMENT IV PAYEE DATA RECORD, STD. 204

ATTACHMENT V BIDDER INSTRUCTIONS, FORM 451

ATTACHMENT VI GENERAL PROVISIONS, FORM 401 NON-IT GOODS

ATTACHMENT VII DARFUR CONTRACTING FORM

ATTACHMENT VIII POST-CONSUMER CONTENT CERTIFICATION

ATTACHMENT IX COMMERCIALLY USEFUL FUNCTION DECLARATION

ATTACHMENT X CALIFORNIA CIVIL RIGHTS LAWS CERTIFICATION

ATTACHMENT XI STD 1000 GenAI DISCLOSURE & FACTSHEET (New 04/24)

IFB Page 7

California Department of Corrections and Rehabilitation IFB FPCM-LAC-I-001138-M001-RS

ATTACHMENT I

SCOPE OF WORK

The project(s) described in this solicitation are critical to Facility Planning Construction and Management (FPCM) and must be completed on-time.

This description establishes the minimum requirements for a complete EFIS system to be delivered to

CALIFORNIA STATE PRISON, LAC, 44750 60TH ST W, LANCASTER, CALIFORNIA. THIS IS A

MATERIAL AND FABRICATION PURCHASE ONLY; THE STATE WILL INSTALL.

BID REQUIREMENTS:

1. Bidders must include a complete list of materials including quantity, description, cost, brand and model for pre-award review by CDCR. Bidders who do not provide this information may be disqualified from the bidding process.

2. Any reference herein to brands and products are for information only; CDCR will accept an approved equal.

3. Bids must remain valid until the purchase order has been issued.

4. Bidders must show an estimated square footage of EFIS materials.

5. Bidders must attend the mandatory walk-thru being held on 11/06/2025 at 9:00 AM. Bids will not be accepted by vendors who have not attended this walk-thru.

6. Bidders must return all required documents identified in this IFB with their bid. Bidders who do not provide all required documents may be disqualified from the bidding process.

THE SUPPLIER MUST:

1. The Supplier is to provide all material and fabrication (if applicable) as shown on the plans and specifications (attached) for a complete EFIS system.

2. The Supplier must ensure that the EFIS materials meets all design criteria and safety standards. All material must be approved by CDCR and must be in compliance with all applicable codes and laws given the installation location.

3. The Supplier must provide a written manufacturer’s warranty per the Invitation for Bid, upon installation by the STATE of the completed EFIS system.

4. The Supplier must coordinate the delivery of all material with CDCR. It is the responsibility of the supplier to deliver and off load the material, as directed by CDCR. Due to circumstances beyond CDCR’s control (i.e. weather, institution lockdown, etc.), delays may occur. Advance delivery scheduling is critical and required during all phases of the project.

5. The Supplier must ensure proper security clearances are submitted to CDCR, as institution security issues may exist. Any cost associated with delays caused by improper security clearances shall be borne by the Supplier. Inability to obtain security clearances shall be cause to cancel the purchase order.

SOW page 1

California Department of Corrections and Rehabilitation IFB FPCM-LAC-I-001138-M001-RS

ATTACHMENT I

SCOPE OF WORK, cont.

6. To ensure timely delivery of the materials specified in this solicitation, two Suppliers may be selected, a primary and an alternate.

The primary Supplier is responsible for delivering the required materials no later than the date specified by the Construction Supervisor which will normally be within 90 days after the purchase order and Notice to Proceed have been issued and after submittals have been approved.

The alternate Supplier shall be selected, if the primary Supplier fails to deliver the materials as specified by the Construction Supervisor. Failure by the primary contractor is defined as:

Failure to deliver all of the required materials specified by the Construction Supervisor, or Failure to deliver the materials by the date specified by the Construction Supervisor.

In the event of a failure by the primary Supplier, the alternate Supplier shall assume the role of the primary.

Note: The STATE reserves the right to increase the purchase order by 20%, upon written approval, and only prior to final delivery.

SOW page 2

California Department of Corrections and Rehabilitation IFB FPCM-LAC-I-001138-M001-RS

PLANS AND SPECIFICATIONS

To order copies of plans and or specifications please contact:

California Department of Corrections and Rehabilitation Facility Planning, Construction and Management Division Procurement Support Attn: Roberta Sanchez Phone: (279) 223-2802 E-Mail: roberta.sanchez@cdcr.ca.gov

Requests for plans must be received by 5:00 PM, close of business on 10/23/2025, to allow ample time to prepare bids by the bid due date of 11/17/2025 at 2:00 PM.

MANDATORY WALK-THRU

A mandatory bidder’s walk-thru will be held on 11/06/2025 at 9:00 AM at the CALIFORNIA STATE PRISON, LAC located at 44750 60TH ST W, LANCASTER, CALIFORNIA. Bidders must submit gate clearance information by 10/23/2025 to allow ample time for institutional staff to complete the gate clearance process. Gate Clearance information may be submitted to:

California Department of Corrections and Rehabilitation

CALIFORNIA STATE PRISON, LAC

Attn: George Cabrera, CS II Phone: (661) 902-8677 E-mail: George.Cabrera@cdcr.ca.gov

Please submit the following information for the person(s) entering institution grounds:

1. Full name as shown on the driver’s license

2. Driver’s license number

3. Social security number

4. Date of birth

SOW Page 3

California Department of Corrections and Rehabilitation IFB FPCM-LAC-I-001138-M001-RS

SUBMITTAL REQUIREMENTS

This section shall take precedence, if there is any inconsistency between submittal instructions as stated in specifications, drawings, or any other provisions of this purchase. The State reserves the right to cancel the award of the resulting purchase order, if the supplier's failure to provide submittals within the time frames specified results in a delay to the State. The awarded supplier will receive a Notice to Proceed (NTP) and a purchase order, which initiates the start of the submittal process. Production and shipment of materials can only begin after the awarded supplier receives written approval from the procurement officer identified in the NTP and purchase order. Shipment of materials prior to receiving an approved submittal letter will result in your invoice not being paid. Failure to adhere to this could result in your company being deemed non-responsive and the purchase order being canceled.

Within ten (10) working days after receipt of the NTP, the supplier shall submit: (Procurement Officer to indicate if submittals are to be hard copy or electronic).

The Supplier shall submit one (1) electronic copy of the submittals in accordance with the specifications for approval.

The Supplier must include the solicitation number on the submittal package.

One (1) electronic copy will be returned marked approved, approved with notation, or rejected (which requires resubmission). When resubmission is necessary, the supplier shall resubmit one (1) electronic corrected copy within five (5) working days of receipt of CDCR’s Submittal Rejection Letter. If approved, you will be notified via an approval letter issued by the procurement officer, which allows you to proceed with fabrication and shipment of the order. If applicable, supplier must provide LEED documentation, as required in the specifications with their submittals. Please note that LEED may not be a part of each CDCR project; however, if the project you are bidding on is a LEED project, specifications and submittal requirements will be provided to you at the time of bidding.

Shop drawings shall be created by the vendor who shall not reproduce the design documents provided by CDCR as a basis for the vendor’s shop drawings. The vendor may request electronic backgrounds from CDCR to assist in preparing their shop drawings; however, accepting these electronic backgrounds is solely for the vendors convenience and does not preclude the vendor from verifying all field and existing conditions, or verifying products and services comply with the design drawings and specifications, or other responsibilities to the subcontractor, contractor, or contractor performing the work.

NOTE: FABRICATION AND DELIVERY SHALL PROCEED ONLY AFTER THE VENDOR

RECEIVES APPROVED SUBMITTALS.

Submittals must be:

Submitted via email to: roberta.sanchez@cdcr.ca.gov

SOW Page 4

California Department of Corrections and Rehabilitation IFB FPCM-LAC-I-001138-M001-RS

INFORMATION REQUIREMENTS:

The following information is to be submitted to the Construction Supervisor within ten (10) days of approved submittals to avoid cancelation of the purchase order:

1. Assembly and/or installation details (1 electronic copy via email or 3 copies via U.S Postal Service and/or Courier Service) with exploded views (if available)

2. List of any special tools required for operation and/or repair

3. Product specifications, cut sheets, rough-in dimensions (3 copies)

4. Certification and testing requirements (3 copies)

GATE CLEARANCE INFORMATION:

The Supplier must submit the following gate clearance information for delivery, field service, site inspection, or entrance into the institution. The Supplier must allow two (2) weeks for processing and approval of gate clearances.

email information to: George Cabrera, CS II E-mail: George.Cabrera@cdcr.ca.gov

SECURITY INFORMATION:

Blue chambray shirts and blue jeans shall not be worn. Electronic devices (cellphones, blackberries, etc.) are not permitted on institution grounds. All materials, supplies, and persons shall be subject to inspection at all gates by institutional custody staff before entering or leaving institutional grounds. No firearms, narcotics, drugs, tobacco, or other restricted materials shall be allowed on the premises. Loss of time in checking in and out of the institution shall be borne by the Supplier.

Pursuant to Penal Code Section 5030.1, the use of tobacco products by any person on the grounds of any institution or facility under the jurisdiction of the Department of Corrections and Rehabilitation is prohibited.

DELIVERY INFORMATION:

Receiving hours are 8:00 a.m. to 2:00 p.m., Monday through Friday, excluding STATE holidays. Proper identification will be required for entrance into the institution. Contact the construction supervisor 48 hours prior to delivery to coordinate the delivery.

Pursuant to Labor Code, Section 6390, the Supplier agrees to provide a Material Safety Data Sheet, when applicable, at the time of delivery.

SOW Page 5

California Department of Corrections and Rehabilitation IFB FPCM-LAC-I-001138-M001-RS

DISPUTE INFORMATION

This section supersedes the General Provisions (attached), Section 38, a and c, to state:

a. The parties shall deal in good faith and attempt to resolve potential disputes informally. If the dispute persists, contractor shall submit to the Protest Coordinator a written demand for a final decision regarding the disposition of any dispute between the parties arising under, related to or involving this contract, unless the State, on its own initiative, has already rendered such a final decision.

Contractor’s written demand shall be fully supported by factual information, and if such demand involves a cost adjustment to the contract, contractor shall include with the demand a written statement signed by an authorized person indicating that the demand is made in good faith, that the supporting data are accurate and complete and that the amount requested accurately reflects the contract adjustment for which contractor believes the State is liable. If the contractor is not satisfied with the decision of the Protest Coordinator, the contractor may appeal the decision to the California Department of Corrections and Rehabilitations (CDCR), Contracts and Procurement Section.

c. Any final decision of the State shall be expressly identified as such, shall be in writing, and shall be signed by the CDCR Assistant Director, Facility Planning, Construction and Management if an appeal was made. If the State fails to render a final decision within 90 days after receipt of contractor’s demand, it shall be deemed a final decision adverse to contractor’s contentions. The State’s final decision shall be conclusive and binding regarding the dispute unless contractor commences an action in a court of competent jurisdiction to contest such decision within ninety (90) days following the date of the final decision or one (1) year following the accrual of the cause of action, whichever is later.

SPECIFICATION CONCERNS

This section supersedes the Bidders Instructions (attached), Section 12, to state:

12. SPECIFICATION CONCERNS:

a) In the event a supplier believes that the State’s solicitation is unfairly restrictive, ambiguous, contains conflicting provisions or mistakes or in the supplier’s experience any resulting contract will be commercially impracticable to perform, the matter or concerns should promptly be brought to the attention of the buyer identified in this solicitation in writing in order that the matter or concerns may be considered and appropriate actions, if deemed necessary in the sole determination of the State, may be taken prior to the closing time set to receive bids.

SOW page 6

California Department of Corrections and Rehabilitation IFB FPCM-LAC-I-001138-M001-RS

PROTEST INFORMATION

This section supersedes the Bidders Instructions (attached), Section 21, to state:

21. PROTESTS: Public Contract Code Section 10306: Whenever a contract or purchase order under this article is not to be awarded to the lowest bidder, the bidder shall be notified 24 hours prior to awarding the contract or purchase order to another bidder via electronic mail. Bidders who have submitted a bid may file a protest with DGS-Dispute and Resolution Unit (PDProtest@dgs.ca.gov) and notify CDCR’s Buyer/Protest Coordinator against the awarding of the contract or purchase order on the grounds that he/she is the lowest responsible bidder meeting specifications within 24 hours of the notification. Within 10 days after filing a protest, the protesting bidder shall file with the DGS-Office of Legal Services, a full and complete written statement specifying in detail the grounds of the protest and the facts in support thereof.

Bidders shall contact DGS directly for protest filing and/or information:

Department of General Services Procurement Division Dispute Resolution Unit 707 Third Street, 2nd Floor West Sacramento, CA 95814 Business Hours: 8:00am – 5:00pm Phone: 916-375-4587 Fax: 916-375-4611 PDProtest@dgs.ca.gov

CDCR’s Protest Coordinator Peter Tran, Manager Procurement Support

(279) 223-2799 peter.tran@cdcr.ca.gov

SOW page 7

California Department of Corrections and Rehabilitation IFB FPCM-LAC-I-001138-M001-RS

ATTACHMENT II

FACILITY PLANNING, CONSTRUCTION AND MANAGEMENT

CALIFORNIA STATE PRISON, LAC

EIFS BLDG. 348 HU D3, BLDG. 3410 HU D5

PLANS AND SPECIFICATION SECTIONS:

Complete Plans and Specification are posted on CaleProcure.

The specifications and plan sheets are attached as separate documentation. Specifications and plan sheets are to be used as reference only. Please disregard any verbiage pertaining to installation, as the State is responsible for the installation of all materials. Any reference to specific brand/models by name is for reference only; the State will accept a CDCR approved equal.

Roberta Sanchez

(279) 223-2802 roberta.sanchez@cdcr.ca.gov

ATTACHMENT III

BIDDER DECLARATION, FORM GSPD-05-105

All bidders must complete the Bidder Declaration, Form GSPD-05-105, and include it with the bid response. To obtain a copy, please visit:

https://www.documents.dgs.ca.gov/dgs/fmc/GS/PD/GSPD05-105.pdf

ATTACHMENT IV

PAYEE DATA RECORD, STD. 204

The successful bidder, as a result of this IFB, will be required to sign the Payee Data Record, STD. 204 prior to contract award. To obtain a copy, please visit:

https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf

GSPD-451 (REVISED AND EFFECTIVE 11/09/2011)

ATTACHMENT V

BIDDER INSTRUCTIONS

1. DEFINITIONS:

a) “Bid” means an offer, made in response to a solicitation to perform a contract for work and labor or to supply goods at a specified price, whether or not it is considered a “sealed bid” or results in award of a contract to a single or non-competitively bid contract.

b) “Bidder” means a supplier who submits a bid to the State in response to a solicitation.

c) “Solicitation” means the process, by whatever name known or in whatever format used, of notifying prospective bidders that the State wishes to receive bids for furnishing goods or services.

d) “Supplier” means a business entity, bidder, offeror, vendor or contractor.

2. SUBMISSION OF BIDS:

a) Bids must be hand delivered or sent via U.S. Mail or common carrier unless another method (e.g., facsimile) is specifically authorized in the solicitation.

b) Where a “sealed” bid is required, each bid shall be separately sealed inside an envelope and must be signed and received by the closing time and date specified, and on the forms furnished by the State to be considered for award.

The State reserves the right to consider authorized facsimile bids as properly “sealed” if received prior to the closing time specified, provided that a signature is shown on the facsimile.

c) The bidder is solely responsible for ensuring that the full bid is received by the State in accordance with the solicitation requirements, prior to the date and time specified in the solicitation, and at the place specified. The State shall not be responsible for any delays in mail or by common carriers or by transmission errors or delays or misdelivery.

d) Bids received after the time stated will be considered non-responsive.

e) If facsimile transmission of the bid is acceptable, and the bidder chooses to transmit their bid via facsimile, the bidder understands and agrees that the State will consider only those portions of the bid received prior to the closing time specified; any pages received after that time will not be considered.

f) If no time for receipt of bids is specified in the solicitation, the bid shall be due by the close of the business day on the date indicated. Close of the business day shall be 5:00 p.m. All times are Pacific Standard Time (PST)/Pacific Daylight Time

(PDT).

g) Generally, sealed bids will be opened and read on the due date unless another date and time is specified in the solicitation or any addendum thereto or the reverse auction terms and conditions are included in the solicitation.

When the Department of General Services, Procurement Division, facilitates a reverse auction all bids remain confidential before and during the auction.

Information is not public, including the number and names of the responders, until the Notice of Intent to Award or contract award is published, whichever occurs first.

3. SOLICITATION ADDENDUM (ADDENDA):

a) If a supplier received this solicitation through some means other than being a prequalified supplier on the State’s bidders list, it is the responsibility of the supplier to advise the buyer of its intention to provide a bid so that addenda or other correspondence related to the solicitation will be sent to the supplier.

b) In the event that the solicitation is revised by an addendum, supplier shall submit the original solicitation and any addenda that the buyer requires be submitted.

c) Price(s) offered shall reflect all addenda issued by the State.

Failure to do so will permit the State to interpret the bid to include all addenda issued in any resulting contract.

4. PRICES:

a) All prices and notations must be printed in ink or typewritten.

b) All prices must be bid in U.S. currency.

c) Unit prices may not be more than four (4) places to the right of the decimal point. For example, a unit price of $.56726 each, would exceed this limitation. Unit prices which exceed this limitation will automatically be truncated to the fourth decimal place for both evaluation and award purposes.

Using the example just cited, the "6" at the end of the unit price would be truncated (i.e., dropped off) leaving a unit price of $.5672 each.

d) An error in the bid may cause the rejection of that bid;

however, the State may at its sole option retain the bid and make certain arithmetic corrections. In determining if a correction will be made, the State will consider the conformance of the bid to the format and content required by the solicitation, and any unusual complexity of the format and content required by the solicitation.

i) If the bidder’s intent is clearly established based on review of the complete bid submittal, the State may at its sole option correct an error based on that established intent.

ii) The State may at its sole option correct obvious clerical errors.

iii) The total price of unit-price items will be the product of the unit price and the quantity of the item. If the unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, it shall be the amount obtained by dividing the “Extension” price by the quantity of the item.

5. CASH DISCOUNTS: The State encourages bidders to offer cash discounts for prompt payment, however, unless provided elsewhere in the solicitation, cash discounts offered by bidders for the prompt payment of invoices will not be considered in evaluating offers to determine the successful bidder for award of any resulting contract.

6. INSPECTION OF SOLICITATION DOCUMENTS: Supplier shall carefully review all documents referenced and made a part of this solicitation to ensure that all information required to properly respond to the solicitation has been received or made available and all requirements are priced in the bid. Failure to examine any document, drawing, specification, or instruction will be at the supplier’s sole risk.

7. BRAND NAMES: Any reference to brand names and model numbers in the solicitation is intended to be descriptive, but not restrictive, unless otherwise specified. Bids offering equivalent items meeting the standards of quality specified may be considered, unless otherwise specified, providing the bid clearly describes the article offered and how it differs from the referenced brand. Unless bidder specifies otherwise, it is understood that the bidder is offering a referenced brand item as specified in the solicitation. The State reserves the right to determine whether a substitute offer is equivalent to and meets the standards of quality indicated by the brand name references, and the State may require the supply of additional descriptive material and a sample.

8. EVALUATION OF BIDS:

a) Where more than one line item is specified in the solicitation, the State reserves the right to determine the lowest responsible bidder, either on the basis of individual items, combination of items as specified in the solicitation, or on the basis of all items included in the solicitation, unless otherwise expressly provided.

b) Unless otherwise specified in the solicitation, the State may accept any item or combination of items as specified in the solicitation, of any bid unless the bidder expressly objects and conditions its response on receiving all items for which it provided a bid. In the event that the bidder so objects, the State may consider the bidder’s objection and evaluate whether the award on such basis will result in the lowest

BIDDER INSTRUCTIONS

price to the State or may determine in its sole discretion that such an objection is non-responsive and renders the bidder ineligible for award.

c) This solicitation is subject to all requirements set forth in the Electronic Waste Recycling Act of 2003 (Chapter 8.5, Part 3 of Division 30, commencing with Section 42460 of the Public Resources Code, relating to hazardous and solid waste, hereafter called the “Act”). If the products and/or services being acquired pursuant to this solicitation are not subject to the Act, then bidder must demonstrate that the Act is inapplicable to all lines of business engaged by the supplier (or related agents, subsidiaries, partners, joint ventures, and sub-contractors). Contracts awarded, wherein a violation of the Act is found, are subject to sanctions defined in Public Resources Code, Chapter 8.5, Article 7.

d) This solicitation is subject to all requirements set forth in Sections 6452, 6487, 7101 and 18510 of the Revenue and Taxation Code, and Section 10295.1 of the Public Contract Code, requiring suppliers to provide a copy of their retailer’s seller’s permit or certification of registration, and, if applicable, the permit or certification of all participating affiliates issued by the State of California’s Board of Equalization. Unless otherwise specified in this solicitation, a copy of the retailer’s seller’s permit or certification of registration, and, if applicable, the permit or certification of all participating affiliates, must be submitted within five (5) State business days of the State’s request. Failure of the supplier to comply by supplying the required documentation will cause the supplier’s bid to be considered non-responsive and the bid rejected.

e) Public Resources Code Section 42290 et seq. prohibits the State from contracting with any supplier, manufacturer, or wholesaler, and any of its divisions, subsidiaries, or successors that have been determined to be noncompliant to the recycled content plastic trash bag certification requirements. This includes award of a State contract or subcontract or renewal, extension, or modification of an existing contract or subcontract.

Prior to award the State shall ascertain if the intended awardee or proposed subcontractor is a business identified on the current California Integrated Waste Management Board noncompliant list(s). In the event of any doubt of the status or identity of the business in violation, the State will notify the Board of the proposed award and afford the Board the opportunity to advise the State. No award will be made when either the bidder or a subcontractor has been identified either by published list or by advice from the Board, to be in violation of certification requirements.

f) All other criteria to be used in evaluating bids will be identified elsewhere in the solicitation.

9. CONFLICT OF INTEREST:

a) Current State Employees (PCC Section 10410):

i) No officer or employee shall engage in any employment, activity or enterprise from which the officer or employee receives compensation or has a financial interest and which is sponsored or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .