The document is a Contractor Bid Form for the Fossil Creek and Stanton Creek Stream Rehabilitation Project, issued by the City of Fort Collins, Colorado. The project involves comprehensive stream rehabilitation and infrastructure improvements, including earthwork, channel realignment, pedestrian trail modifications, bridge removal and installation, and extensive environmental restoration across approximately 68,425 square feet of wetland and 821,591 square feet of upland areas. The bid form includes 73 line items covering mobilization, field office setup, surveying, utility coordination, erosion control, vegetation management, and specific construction activities along Fossil Creek from Trilby Road to the Union Pacific Railroad ROW and Stanton Creek from Carpenter Road to its confluence with Fossil Creek.
The bid form reveals a complex project with significant ecological and infrastructure components, featuring detailed pricing breakdowns for elements such as structural backfill, concrete work, helical piles, seeding, and vegetation installation. A notable line item is the $75,000 allocation for Minor Contract Revisions, suggesting flexibility for potential scope adjustments. The project involves extensive environmental restoration, including wetland and riparian seeding, installation of 15,100 wetland plugs, 4,897 willow stakes, and various native plant species. While the unit prices are currently listed as $0.00, the comprehensive nature of the bid form indicates a substantial infrastructure and ecological rehabilitation effort with multiple technical and environmental considerations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Tab
| Contractor's Bid Form | ||||||
| Fossil Creek and Stanton Creek Stream Rehabilitation | ||||||
| 6/23/25 | Checked and all good | |||||
| Contractor: | ||||||
| Needs to be checked | ||||||
| BID ITEM | DESCRIPTION | QUANTITY | PAY UNIT | UNIT PRICE | TOTAL COST OF BID ITEM | New item |
| 1 | Mobilization | 1 | LS | $0.00 | ||
| 2 | Field Office Trailer | 9 | Month | $0.00 | ||
| 3 | Potholing | 5 | EA | $0.00 | ||
| 4 | Clearing and Grubbing | 14.0 | AC | $0.00 | ||
| 5 | Surveying | 1 | LS | $0.00 | ||
| 6 | Water Control | 1 | LS | $0.00 | ||
| 7 | Erosion Control - Maintenance | 9 | Month | $0.00 | ||
| 8 | Traffic and Pedestrian Control | 1 | LS | $0.00 | ||
| 9 | Utility and Agency Coordination | 1 | LS | $0.00 | ||
| 10 | Fence, Tree Protection | 780 | LF | $0.00 | ||
| 11 | Fence, Limits of Construction | 15,489 | LF | $0.00 | ||
| 12 | Sediment Control Log | 7,160 | LF | $0.00 | ||
| 13 | Erosion Control Blanket | 19,993 | SY | $0.00 | ||
| 14 | Stabilized Staging Area | 6,820 | SY | $0.00 | ||
| 15 | Vehicle Tracking Control | 2 | EA | $0.00 | ||
| 16 | Temporary Stream Crossing | 8 | EA | $0.00 | ||
| 17 | Check Dam | 9 | EA | $0.00 | ||
| 18 | Tree Removal | 14 | EA | $0.00 | ||
| 19 | Miscellaneous Debris Removal | 4 | LOAD | $0.00 | ||
| 20 | Surface Roughening | 2.95 | AC | $0.00 | ||
| 21 | Concrete Trail Remove and Replace (Allowance) | 1,500 | SF | $0.00 | ||
| 22 | Remove Existing Trail | 6,175 | SF | $0.00 | ||
| 23 | Remove Existing 30' Span Pedestrian Bridge and Abutments | 1 | LS | $0.00 | ||
| 24 | Remove Existing 55' Span Pedestrian Bridge and Abutments | 1 | LS | $0.00 | ||
| 25 | Remove Abutments for Existing 60' Span Pedestrian Bridge | 1 | LS | $0.00 | ||
| 26 | Remove, Salvage, and Reset Existing 60' Span Pedestrian Bridge On-Site | 1 | LS | $0.00 | ||
| 27 | 72" Storm Manhole | 1 | EA | $0.00 | ||
| 28 | 42" Reinforced Concrete Pipe | 35 | LF | $0.00 | ||
| 29 | 42" Flared End Section | 1 | EA | $0.00 | ||
| 30 | Concrete Encasement - 30" Sanitary Sewer | 30 | LF | $0.00 | ||
| 31 | Boulder, 24" Diameter | 15 | EA | $0.00 | ||
| 32 | Earthwork, Excavation and Fill On Site | 6,463 | CY | $0.00 | ||
| 33 | Excess Earthwork, Excavation and Haul Off Site | 8,648 | CY | $0.00 | ||
| 34 | Topsoil, Excavate, Stockpile, and Replace | 8,107 | CY | $0.00 | ||
| 35 | Muck Excavation and Haul Off-Site (Trail) | 312 | CY | $0.00 | ||
| 36 | CDOT No. 57 Aggregate (Trail) | 312 | CY | $0.00 | ||
| 37 | Soil Riprap, Type M | 481 | CY | $0.00 | ||
| 38 | Fossil Creek Constructed Riffle Material | 66 | CY | $0.00 | ||
| 39 | Stanton Creek Channel Backfill Material | 420 | CY | $0.00 | ||
| 40 | Soil Lift, Wrapped | 5,118 | LF | $0.00 | ||
| 41 | Toe Wood | 187 | LF | $0.00 | ||
| 42 | Large Brush Piles - Floodplain Roughness Feature | 10 | EA | $0.00 | ||
| 43 | Engineered Debris Jam | 21 | EA | $0.00 | ||
| 44 | Log, Flow Deflector | 5 | EA | $0.00 | ||
| 45 | Log, Step-Pools | 33 | EA | $0.00 | ||
| 46 | Log, Step-Pools with Boulders | 7 | EA | $0.00 | ||
| 47 | Buried Flow Deflector Logs | 30 | EA | $0.00 | ||
| 48 | Beaver Dam Analog (BDA) | 35 | EA | $0.00 | ||
| 49 | Structural Backfill (Class 1) - CDOT Item No. 206-00100 (Pedestrian Bridge) | 10 | CY | $0.00 | ||
| 50 | Concrete Class D - CDOT Item No. 601-03000 (Pedestrian Bridge) | 6 | CY | $0.00 | ||
| 51 | Reinforcing Steel (Epoxy Coated) - CDOT Item No. 602-00020 (Pedestrian Bridge) | 649 | LB | $0.00 | ||
| 52 | Helical Piles (Pedestrian Bridge) | 6 | EA | $0.00 | ||
| 53 | Structure Excavation - CDOT Item No. 206-00000 (Concrete Retaining Wall) | 89 | CY | $0.00 | ||
| 54 | Structure Backfill (Class 1) - CDOT Item No. 206-00100 (Concrete Retaining Wall) | 68 | CY | $0.00 | ||
| 55 | Concrete Class D - CDOT Item No. 601-03000 (Concrete Retaining Wall) | 15 | CY | $0.00 | ||
| 56 | Structural Concrete Coating (Anti-Graffiti) | 244 | SF | $0.00 | ||
| 57 | Reinforcing Steel (Epoxy Coated) - CDOT Item No. 602-00020 (Concrete Retaining Wall) | 1,490 | LB | $0.00 | ||
| 58 | Concrete Trail (Integral Colored) | 5,893 | SF | $0.00 | ||
| 59 | Concrete Trail - Neighborhood Trail Connection | 804 | SF | $0.00 | ||
| 60 | Aggregate Base Course | 123 | CY | $0.00 | ||
| 61 | Wetland Seeding and Soil Preparation | 68,425 | SF | $0.00 | ||
| 62 | Riparian Seeding and Soil Preparation | 68,502 | SF | $0.00 | ||
| 63 | Upland Seeding and Soil Preparation | 821,591 | SF | $0.00 | ||
| 64 | Wetland Plugs | 15,100 | EA | $0.00 | ||
| 65 | Willow Stakes | 4,897 | EA | $0.00 | ||
| 66 | Riparian Shrubs | 920 | EA | $0.00 | ||
| 67 | Upland Shrubs | 2,063 | EA | $0.00 | ||
| 68 | Cottonwood Pole | 152 | EA | $0.00 | ||
| 69 | Cottonwood B&B, 2" Cal. | 61 | EA | $0.00 | ||
| 70 | Peachleaf Willow | 28 | EA | $0.00 | ||
| 71 | Mulch (Wood Straw) | 22.0 | AC | $0.00 | ||
| 72 | Noxious Weed Management | 1 | LS | $0.00 | ||
| 73 | Minor Contract Revisions | 1 | LS | $75,000.00 | ||
| TOTAL |