Fossil Creek and Stanton Creek Combined Final Plan Set.pdf
PDF 241 MB Posted
- Solicitation number
- 10184
- Issued by
- Colorado
About this file
The document "Fossil Creek and Stanton Creek Combined Final Plan Set.pdf" appears to be a comprehensive engineering plan set developed for the City of Fort Collins, Colorado, for the Fossil Creek and Stanton Creek Stream Rehabilitation Project (Bid 10184). The project involves extensive stream rehabilitation and infrastructure improvements covering two creek systems: Fossil Creek from Trilby Road downstream to the Union Pacific Railroad Right-of-Way, and Stanton Creek from Carpenter Road downstream to its confluence with Fossil Creek. The scope of work includes multiple complex engineering and environmental restoration components such as earthwork, grading, dewatering, channel realignment and stabilization, instream rock and wood installation, topsoil management, revegetation, erosion control, pedestrian concrete trail realignment, and pedestrian bridge removal and installation.
While specific pricing details are not provided in the document, the project appears to be a significant municipal infrastructure and environmental rehabilitation initiative. The comprehensive nature of the work suggests substantial engineering complexity and potential environmental restoration objectives. The project likely involves multiple phases of construction and will require specialized contractors with expertise in stream rehabilitation, civil engineering, and ecological restoration techniques. The involvement of the City of Fort Collins indicates this is a publicly funded municipal infrastructure project, potentially supported by local, state, or federal environmental restoration grants or municipal infrastructure funds.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .