Forms to return with quote_140P8320Q0091.docx

DOCX document 30 KB Posted

Attached to
RESTORE WATSON STORE WINDOWS AND DOORS Federal contract opportunity
Solicitation number
140P8320Q0091
Issued by
Department of the Interior National Park Service Pacific West Region

View the file

Other files for this federal contract opportunity

Other files attached to RESTORE WATSON STORE WINDOWS AND DOORS, newest first.
File Type Posted
Sol_140P8320Q0091.pdf PDF
ATTACHMENT 1_SOW-Restore Watson Store Windows and Doors.pdf PDF
ATTACHMENT 3-52.204-24 (AUG 2020) rep for telecomm prohibitions - fillable.pdf PDF
Attachment 2_Wage Determinationspdf.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION A: Standard Form 1442 (Pages 1-3)

SECTION B: Price Schedule

INSTRUCTIONS. On lump-sum-priced line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of errors in summations, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. Complete this page and return with other documents described in Section L.

All work shall be performed in accordance with the attached Statement of Work (SOW) and wage determinations. Refer to Definition of Line Items in SOW for details.

CONTRACT PRICE SCHEDULE – Restoring Windows and Doors Nez Perce NHP

Line item description
Price (lump sum)
Item 1: Preservation of Windows and Doors (Lump Sum)
$__________
TOTAL FOR BASE ITEM
$__________
Business name: ______________________Phone number: _____________
DUNS number: __________and CAGE code: ___________

Point of contact name: _____________ and e-mail:______________________

This business’ registration is active in SAM _yes __no (check one).

The representations and certifications in SAM apply to this quote (see FAR provision 52.204-8(b)(2)):

_yes __no

Experience and Past Performance Page 1 of 2 READ CAREFULLY: The purpose of this form is for the quoter to list construction projects performed during the past five (5) years that are similar to the work described in this solicitation. The number of projects listed shall not exceed three (3) and shall be numbered consecutively, beginning with the most recent project. Use this form to address your familiarity with the Scope of Work described in the plans and specifications and with the capability criteria described in the Request for Quote (RFQ). Include area codes with all telephone numbers. Fill in the information by typing or printing legibly.

It is especially important that the quoter disclose instances in which their past performance may be considered by others to be less than fully satisfactory. The quoter should tell their side of the story and describe remedial corrective action that has been taken or will be taken to correct the deficiency. Failure to do so may result in a determination that an quoter has been less than candid with the Government, which could result in an unfavorable assessment of the quoter’s past performance record.

Name of Contractor/quoter:

Project Name:

Project Location:

Name of Owner:

Address of Owner:

Telephone Number:

Project Value:

Dates of Construction:

Description of the Project and Scope of quoter’s Work

Performance Remarks

Description of the Project and Scope of quoter’s Work (continuation) Page 2 of 2

Performance Remarks (continuation)

List of proposed subcontractors

READ CAREFULLY: The purpose of this form is for the Quoter to list the proposed subcontractors who will perform on the contract.

Include a brief description of the work they will perform. Fill in the information by typing or printing legibly.

NAME OF CONTRACTOR/QUOTER:

SUBCONTRACTOR NAME:

DUNS:

HUBZone?
__yes; __no.

Address and website (if applicable):

DESCRIPTION OF PROPOSED SUBCONTRACT WORK:

SUBCONTRACTOR NAME:

DUNS:

HUBZone?
__yes; __no.

Address and website (if applicable):

DESCRIPTION OF PROPOSED SUBCONTRACT WORK:

SUBCONTRACTOR NAME:

DUNS:

HUBZone?
__yes; __no.

Address and website (if applicable):

DESCRIPTION OF PROPOSED SUBCONTRACT WORK:

SUBCONTRACTOR NAME:

DUNS:

HUBZone?
__yes; __no.

Address and website (if applicable):

DESCRIPTION OF PROPOSED SUBCONTRACT WORK:

Subcontractor Reference READ CAREFULLY: The purpose of this form is for the quoter to list certain subcontractors identified in the Instructions, Conditions, and Notices to Quoters (Section L) who are considered critical to the successful accomplishment of the project. Use as many sheets as necessary. These subcontractor references should include additional relevant projects similar to the work described in the plans and specifications. Include area codes with all telephone numbers. Fill in the information by typing or printing legibly.

SUBContractor (PROPOSED):

ADDRESS:

TELEPHONE NUMBER:
( )

Project Name:

Name of Owner:

Location:

Prime Contractor

Telephone Number:

Subcontract $ Value:

Dates of Construction:

Reference Name and Telephone Number:
( ) .

Dates of Construction:

Description & Scope of Work specific areas of experience (SEE INSTRUCTIONS FOR THE SUBMISSION OF quotes AND OTHER INFORMATION – capability CRITERIA):

Description & Scope of Work {continuation} specific areas of experience (SEE INSTRUCTIONS FOR THE SUBMISSION OF quotes AND OTHER INFORMATION – capability CRITERIA) {continuation}:

File details come from the government source that posted it. Updated .