Form 260 - FA.pdf

PDF 113 KB Posted

Attached to
F-16 Electrical Limiter
Solicitation number
FA821225R0005
Issued by

About this file

This document is a First Article Requirements form (AFMC IMT 260) for an F-16 Electrical Limiter contract dated 15 January 2025. The first article quantity is 1 unit, which will be part of the production quantity and subject to government testing. The testing requirements include conformance with all related drawings, specifications, and next higher assemblies, with the detailed technical requirements contained in reference VDX1859.

Key logistics details include a 120-calendar day delivery timeline from the contract date, with notification required 30 days prior to shipment. The first article will be delivered to 809 MXSS/MXDEB at Hill AFB, Utah. The government will have 60 days to approve or disapprove the article, with an estimated testing and inspection cost of $5,000. Approved first articles will be forwarded to USAF Supply, while disapproved articles will be returned to the contractor or retained by MXDEB pending further instructions. The document also outlines conditions for potential waiver of first article approval, including previous satisfactory performance of similar articles for the Air Force.

View the file

Other files

File Type Posted
FA821225R0005.pdf PDF
Engnieering Data List.pdf PDF
CDRL A001 - CPP.pdf PDF
Transportation Data.pdf PDF
Engineering Data Requirements.docx DOCX document
IUID.pdf PDF
Form 807.pdf PDF
Manufacturing Qualification Requirements-Section C.pdf PDF
CDRL B001 - FA Test Report.pdf PDF
Item Description.pdf PDF
Packaging Requirements.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

15 JAN 2025(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

88236 / VDX1859

4. NSN

5895015158924WF

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM 1

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

REQUIRED X NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A.

X

CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

Conformance with all related drawings, spec, and next higher assemblies.

B. The detailed technical requirements for First Article approval tests are contained in

VDX1859.

(Cite Spec and Para number)

C. TEST PLAN REQUIRED

(3) Number of days for government approval / disapproval days.

(1) DD Form 1423 ELIN

(2) Delivery due calendar days from date of contract.

D. Contractor's notification to ACO and

(Requesting Activity) of test time and location due days prior to start of testing.

E. X TEST REPORT REQUIRED

(3) Forwarded to

809 MXSS/MXDEB

concurrent with First Article Asset

Hill AFB, Utah 84056

(4) Government written notice of approval / disapproval due

(2) Due

(1) DD Form 1423 ELIN days after receipt of contractor's report.

calendar days from date contract.

AFMC IMT 260, 20230316, V-5,

Version 5Generated by PRPS using Jasper Reports on 06 Mar 2025

PREVIOUS EDITION IS OBSOLETE

Prescribed by: AFMCI23-110

F. FIRST ARTICLE DELIVERY

(1) Due within 120 calendar days from date contract.

(2) Notify 30 calendar days prior to shipment.

(3) Delivered to government at

809 MXSS/MXDEB

ATTN: NON-ACCOUNTABldg 849

Hill AFB, Utah 84056

MARK FOR: F/A I & TEST DO NOT POST

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 60 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$5,000.0000

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to

USAF Supply

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles will be returned to the contractor

X will be retained by MXDEB pending disposition instructions from the contractor.

X On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, X Air Force.

b. X Offerors currently in production of the same or similar article for a Government, DoD, X Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, X Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 36 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

AFMC IMT 260, 20230316, V-5,

Version 5Generated by PRPS using Jasper Reports on 06 Mar 2025

12. REMARKS

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING

(Name, Organization, Phone)

Joe Refahiyat

416 SCMS

801-775-4602

775-4602

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

First Article Lab

809 MXSS/MXDEB

801-775-4602

775-4602

AFMC IMT 260, 20230316, V-5,

Version 5Generated by PRPS using Jasper Reports on 06 Mar 2025

File details come from the government source that posted it. Updated .