Form_2_Bid_Form.pdf

PDF 596 KB Posted

Attached to
Landscaping Services at Page Field
Solicitation number
26-0080LB
Issued by
Lee County, Fort Lauderdale City, Florida

About this file

This is an Official Bid Form for RFB 26-0080LB, a landscaping services contract for Page Field Airport in Florida. The solicitation seeks a qualified bidder to provide comprehensive landscaping maintenance and enhancement services across six designated areas within the airport premises, including Page Field North and Fuel Farm, East Perimeter Road, Danley Drive, South Road, Perimeter Fence, and Base Operations Terminal Area. The scope of work encompasses routine maintenance of green spaces and plant life, annual mulch purchase and application, and annual tree trimming services. The bid form requires contractors to submit fixed annual rates for each area as a base bid, with a grand total price for all services.

The bid form includes provisions for alternate pricing items to accommodate additional services beyond the base contract, including maintenance area additions priced per square foot, irrigation repairs with hourly labor rates and material markup percentages, soil amendments and new plantings with labor and material costs, and emergency services with daily rates for supervisor and laborer teams, equipment rental markups, debris removal pricing per cubic yard, and additional hourly labor rates for emergency supervisors and laborers. Bidders are instructed to enter all official bid pricing in OpenGov, with pricing structure designed to allow the Authority flexibility in selecting base services and optional add-on services based on operational needs and budget availability. The contract structure emphasizes unit pricing transparency and detailed cost breakdowns for labor, materials, and equipment across multiple service categories.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFB 26-0080LB: LANDSCAPING SERVICES AT PAGE FIELD

FORM 2: OFFICIAL BID FORM (2-page form)

BIDDER'S NAME: ____________________________

The undersigned, as "Bidder," having examined the bid solicitation documents carefully and being familiar with conditions affecting the goods to be offered and/or the services to be provided, agrees to furnish all labor, materials, equipment, and other incidental items, and services necessary in full accordance with the RFB and contract documents for:

LANDSCAPING SERVICES AT PAGE FIELD

And, if awarded, Bidder agrees to provide the items for the unit pricing indicated below and as applicable, will complete all requirements within the time limits specified for the pricing awarded and provide all required warranties and guarantees:

BASE BID - FIXED ANNUAL RATE PER AREA

Annual Price Description Bid Item#

Area 1 - Page Field North and Fuel Farm 1

Area 2 - East Perimeter Road 2

Area 3 - Danley Drive 3

Area 4 - South Road 4

Area 5 - Perimeter Fence 5

Area 6 - Base Operations Terminal Area 6

Annual Mulch Purchase and Application 7

Annual Tree Trimming 8

Grand Total

GRAND TOTAL:

(Written)

Rev: 3.24.2026 Page 48 of 61

BID

DERS M

UST ENTER O

FFIC

IAL B

ID

PRIC

IN

G IN

OPENGOV

RFB 26-0080LB: LANDSCAPING SERVICES AT PAGE FIELD

ALTERNATE ITEMS

Bid Item# Description Unit of Measure Unit Price/Markup

1 Addition of Maintenance Areas Square Foot

2A Irrigation Repairs Hourly Labor Rate

2B Irrigation Repairs Material Markup Percentage over cost

3A Soil Amendments/New Plantings Hourly Labor Rate

3B Soil Amendments/New Plantings Material Markup Percentage over cost

4A

Emergency Services Daily Rate (7:00 a.m. to 4:00 p.m.): (1)

Supervisor and (3) Laborers with necessary tools and equipment

Daily Rate

4B Emergency Service Equipment Rental

Material Markup Percentage over cost

4C Emergency Services Debris Removal/Disposal Per Cubic Yard

4D Emergency Work Labor Hours for Additional Supervisor Hourly Labor Rate

4E Emergency Work Labor Hours for Additional Laborer Hourly Labor Rate

Rev: 3.24.2026 Page 49 of 61

BID

DERS M

UST ENTER O

FFIC

IAL B

ID

PRIC

IN

G IN

OPENGOV

Annual PriceArea 1 Page Field North and Fuel Farm:
Annual PriceArea 2 East Perimeter Road:
Annual PriceArea 3 Danley Drive:
Annual PriceArea 4 South Road:
Annual PriceArea 5 Perimeter Fence:
Annual PriceArea 6 Base Operations Terminal Area:
Annual PriceAnnual Mulch Purchase and Application:
Annual PriceAnnual Tree Trimming:
Annual PriceGrand Total:
Written:
Unit PriceMarkupSquare Foot:
Unit PriceMarkupHourly Labor Rate:
Unit PriceMarkupMaterial Markup Percentage over cost:
Unit PriceMarkupHourly Labor Rate_2:
Unit PriceMarkupMaterial Markup Percentage over cost_2:
Unit PriceMarkupDaily Rate:
Unit PriceMarkupMaterial Markup Percentage over cost_3:
Unit PriceMarkupPer Cubic Yard:
Unit PriceMarkupHourly Labor Rate_3:
Unit PriceMarkupHourly Labor Rate_4:
Text4:

File details come from the government source that posted it. Updated .