This is a Final Asbestos Statement of Work/Specifications document for the California Department of Education (CDE) Diagnostic Center located at 4339 State University Drive in Los Angeles. The project involves a Ceiling Tile Replacement Project that requires the removal of asbestos-containing materials (ACM) from specific locations within the facility. An asbestos survey conducted by Panacea, Inc. in October 2023 identified various ACM materials, including plaster ceilings, plaster walls, joint compound, pipe insulation, and floor tiles/mastics. The contractor will be responsible for spot removal of ACM in selected locations across the first and second floors, with work to be performed by a State of California-licensed asbestos contractor.
The project will be completed in multiple phases, with specific requirements for removal, disposal, and handling of asbestos-containing materials. The contractor must obtain necessary permits, comply with federal, state, and local regulations, and follow strict safety protocols, including establishing regulated work areas, using appropriate personal protective equipment, and implementing proper decontamination procedures. The estimated quantities of ACM to be removed include approximately 350 square feet of plaster ceilings, 300 square feet of plaster walls, and various other materials in small quantities. The contractor will be responsible for air monitoring, waste disposal, and providing comprehensive documentation of the abatement process, with all work to be conducted under careful oversight and following specific clearance criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Package.pdf | ||
| Plans-.pdf | ||
| For_Reference_-_Universal_Waste_-SOW.pdf | ||
| Project_Manual.pdf | ||
| For_Reference_-_LBP-SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FINAL – ASBESTOS
STATEMENT OF WORK/SPECIFICATIONS
C23-978F - Asbestos SOW Page 1 of 10
1.0 DESCRIPTION OF WORK
The site/property is described and located as follows:
THE CALIFORNIA DEPARTMENT OF EDUCATION (CDE) DIAGNOSTIC CENTER
4339 STATE UNIVERSITY DRIVE
LOS ANGELES, CALIFORNIA 90032
An asbestos survey was conducted by Panacea, Inc. (Panacea) for the Ceiling Tile Replacement Project in October 2023. Panacea’s survey findings are summarized in Section
3.1 of this Statement of Work (SOW) for use by the Bidder/CONTRACTOR (hereafter referred to as “CONTRACTOR”). Panacea’s survey results (table and figures) are attached to this asbestos
SOW.
For the purposes of this SOW, asbestos-containing materials (ACM) refers to material found or assumed to contain greater than 1 percent asbestos (>1% asbestos).
This SOW requires the CONTRACTOR to remove ACM from locations where follow-on renovation activities are to occur as presented in this SOW. The CONTRACTOR shall obtain all necessary permits for asbestos removal once the contract is issued and before beginning any work. The CONTRACTOR shall arrange timely inspection of all items to be removed and site conditions to ensure proper removal and disposal of the ACM in the Diagnostic Center in compliance with all applicable laws and regulations, and this SOW.
The ACM shall be removed by a State of California-licensed asbestos contractor and disposed of properly in accordance with applicable federal, state, and local laws and guidelines.
2.0 OBJECTIVE
The objective is to conduct proper removal and disposal of ACM from the Diagnostic Center in selected locations where it may be disturbed during the follow-on renovation activities for the Ceiling Tile Replacement Project.
The contractor is expected to conduct spot removal in selected locations and not complete removal of all ACM in the renovation areas.
3.0 NOTIFICATION TO CONTRACTOR
It is the sole responsibility of the CONTRACTOR to verify the quantities and conditions of ACM provided herein, comply with all applicable laws and regulations, and protect its workers and the environment from potential exposure related to ACM.
The CONTRACTOR shall perform measurements, as necessary, to estimate the cost to remove and dispose of the ACM.
The CONTRACTOR should be aware that this is a multi-phased project, and that the ACM will be removed based on the phasing of the project and not all at one time. The phasing schedule is included in the attachments.
C23-978F - Asbestos SOW Page 2 of 10
3.1 PRESENCE, LOCATIONS, AND QUANTITIES OF ACM
The information contained in this SOW is intended to help the CONTRACTOR identify ACM in locations where follow-on renovation activities will occur for the Ceiling Tile Replacement Project.
Identified or assumed ACM shall be removed prior to the renovation activities. The locations of ACM are summarized in the table below. For details of the survey results, see the attached table and figures in attachments.
PRESENCE
LOCATIONS
(Homogeneous Area)
ESTIMATED
QUANTITY
CONDITION
ASSUMED ACM (Assumed >1% Asbestos)
Plaster ceilings, light gray Included ~2,500 SF of plaster ceilings in various rooms on 1st and 2nd floors. See Figures 1 to 3.
~350 SF
(actual number of spot removal)
Nonfriable and good.
Plaster walls, light gray Included ~7,300 SF of plaster walls in various rooms on 1st and 2nd floors. The plaster is exposed and behind ceramic wall tiles in these rooms. See Figures 1 to 3.
~300 SF
(actual number of spot removal)
Nonfriable and good.
Brown mastic associated with cove base, 3”, gray
Included brown cove base mastic in Room #241 on 2nd floor. See Figure 3. ~5 SF
Nonfriable and good.
ACM (>1% Asbestos)
Joint compound associated with unfinished wallboard (drywall), white
Included ~17,000 SF of ceilings and walls in the ceiling spaces of the main hallways on 1st and 2nd floors. See Figures 1 to 3.
Disturbance to ACM joint compound (on the seams of unfinished drywall only) is not anticipated.
Penetrations for new conduit lines and fire alarm equipment can be made in the non-asbestos-containing unfinished drywall. To avoid accidental disturbance to ACM joint compound, this work shall be performed by personnel with at least 16-hour asbestos operation and maintenance (O&M) training.
NO IMPACT
Nonfriable and good.
Pipe insulation, elbows, 3” OD, white
Included pipe elbows (~22 elbows total) in the ceiling spaces of Rooms #1, #21, #25, #50, #66, and #106 on 1st floor. See Figures 1 and 2.
No impact is anticipated to the ACM pipe elbows, they are included for informational purposes only.
NO IMPACT
Friable and good.
Black mastic associated with linoleum, light brown, white and brown specks
Included Rooms #33, #34, #37, #38, and #49 on 1st floor. See Figure 2. ~300 SF
Nonfriable and good.
Black mastic associated with floor tiles, 1’x1’, tan, light brown streaks
Included northeast portion of Room #66 on 1st floor.
See Figure 2. ~20 SF
Nonfriable and good.
Floor tile and black mastic, 9”x9”, light brown, brown streaks
Included Room #241 on 2nd floor. See Figure 3.
~20 SF
Nonfriable and good.
C23-978F - Asbestos SOW Page 3 of 10
Notes:
1. SF = square feet; > = greater than; < = less than, % = percent; ~ = approximately; OD = outside diameter
2. Refer to Figures 1 to 3 in the attachments for area/room designations and homogeneous areas covered.
4.0 GENERAL REQUIREMENTS
• The CONTRACTOR shall perform, as needed, all or partial demolition/removal of partition walls, carpet, debris, and other miscellaneous items to access the ACM.
• The work specified herein shall be the removal and disposal of ACM and all material that becomes contaminated with asbestos resulting from the abatement process.
• The work shall be conducted by competent people who are trained, knowledgeable about, and qualified in the techniques of abating, handling, and disposing of ACM and asbestos-contaminated material, as well as the subsequent cleaning of contaminated areas. These persons shall be capable of performing, and willing to perform, the work described in this SOW.
• The work shall comply with all applicable federal, state, and local laws, regulations, guidelines, and this SOW. Where conflict exists, the most stringent requirements shall apply.
• The contractor shall direct and perform all waste management activities in accordance with the Department of General Services (Client) policies and local, state, and federal regulations.
• The CONTRACTOR shall dispose of all friable (hazardous) and non-friable (non-hazardous) ACM at a state-approved landfill in strict accordance with all applicable federal, state, and local laws, regulations, and guidelines.
• The CONTRACTOR shall encapsulate any remaining surfaces from which ACM are removed.
• The CONTRACTOR shall have a competent person(s), as defined by the Code of Federal Regulations, Title 29, Section 1910.1101 (29 CFR 1910.1101), and certified supervisor(s) and qualified person(s), as defined by the California Code of Regulations, Title 8, Section 1529 (8 CCR 1529), onsite always when the abatement work is in progress.
• The CONTRACTOR shall supply all labor, materials, services, equipment, insurance, licenses, expertise, permits, and taxes necessary to conduct the work in accordance with this SOW and all applicable federal, state, and local laws, regulations, and guidelines including but not limited to the following:
- South Coast Air Quality Management District (SCAQMD) Rule 1403, including Procedure 5 requirements as needed.
- National Emission Standard for Hazardous Air Pollutants (NESHAP) Rule 40, CFR 61, Subpart M.
C23-978F - Asbestos SOW Page 4 of 10
- Federal Occupational Safety and Health Administration (Fed-OSHA) 29 CFR 1910.1101, and California Division of Occupational Safety and Health (DOSH) 8
CCR 1529.
- 8 CCR 5144: Respiratory Protective Equipment.
- 22 CCR Chapter 12, Articles 1 to 4: Standards Applicable to Generators of Hazardous Waste.
- 22 CCR Chapter 13, Articles 1 to 5: Standards Applicable to Transporter of Hazardous Waste.
- American Society for Testing and Materials (ASTM) E 1368 (current version): Visual Inspection of Asbestos Abatement Projects.
• The most recent editions of any relevant laws, regulations, guidelines, standards, documents, and codes shall be followed. Where conflict exists among the laws, regulations, standards, documents, codes, and this SOW, the most stringent shall apply.
• The CONTRACTOR shall be responsible for complying with changes in regulatory requirements and enforcement at no additional expense to the Client.
• The CONTRACTOR shall be responsible for abatement measures for each area where removal will be performed (e.g., security measures, storage areas for equipment, design and locations of disposal areas, and decontamination area).
• The CONTRACTOR shall coordinate all site activities with the Client and coordinate with other construction work performed as part of the project.
• The CONTRACTOR is responsible for its employees’ and its subcontractors’ safety at all times while on the Client’s premises.
• While the crew size is at the discretion of the contractor, time is of the essence and any measures to shorten the time frame should be identified.
• INSURANCE: Prior to commencement of asbestos-related construction work, the Contractor shall provide the Client with a certificate of insurance with the following provisions:
- Coverage Requirements. Contractor shall obtain, at its sole cost and expense, from a reputable insurance company, with a current A.M. Best’s rating of not less than “A-“ and a financial size of “VIII” as set forth in the most recent edition of Best’s Insurance Reports, and shall maintain throughout the term of this Agreement and for a period of not less than two years beyond termination of this Agreement the following insurance coverages in at least the following amounts:
Workers’ Compensation Insurance in an amount not less than that prescribed by law, together with Employer’s Liability Insurance in amounts of not less than $1,000,000 bodily injury each accident, $1,000,000 bodily injury by disease each employee, and $1,000,000 bodily injury by disease policy limit.
C23-978F - Asbestos SOW Page 5 of 10
Commercial General Liability Insurance on a broad-form, per project, occurrence basis (including XCU coverage) with limits of at least $1,000,000 per occurrence, $2,000,000 aggregate, $2,000,000 products and completed operations, and $1,000,000 personal and advertising injury.
Professional Errors and Omissions Insurance containing no exclusions or limitations applicable to the work or operations of the type being performed, with limits of at least $2,000,000 per claim and $2,000,000 annual aggregate on a claims made basis.
Commercial Automobile Liability Insurance (owned, non-owned and hired), including personal injury and property damage, with a combined single limit of at least $1,000,000.
Umbrella and/or Excess Liability Insurance on a follow form basis in excess of the primary Commercial General Liability, Commercial Automobile Liability and Employer’s Liability insurance required herein, with minimum limits of $5,000,000 each occurrence and $5,000,000 annual aggregate.
Contractor’s Pollution Liability Insurance on an occurrence form, with minimum amounts of $5,000,000 per occurrence and $5,000,000 in the aggregate, providing coverage for mold.
- Limit of liability shall be job specific with no "sunset clause." A "claims made" policy shall not be acceptable.
- Policy must specifically cover asbestos-related construction work.
5.0 JOB SUBMITTALS
5.1 PRE-JOB SUBMITTALS
No less than seven (7) calendar days prior to commencement of abatement work, the CONTRACTOR shall provide the Client and its designated consultant the following documentation:
• California Contractors State License Board license for asbestos removal.
• Certificate of insurance.
• DOSH registration.
• SCAQMD notification (if required).
• DOSH notification.
• Asbestos Workplan or standard operating procedures (SOP) with a work schedule (note:
the workplan shall include methods for waste containerization, labeling, storage, characterization, profiling, transport, and disposal/recycling).
• A diagram of containment and regulated locations, including decontamination units.
C23-978F - Asbestos SOW Page 6 of 10
• Site-Specific Health and Safety Plan – A site-specific health and safety plan will be submitted which will include special precautions taken by the CONTRACTOR in performing respective tasks, safety equipment to be worn by employees, frequency of safety meetings, and all other relevant functions to be performed by the CONTRACTOR, to ensure a safe workplace. The plan will include a contingency plan addressing emergency, equipment failures, and barrier failure. The plan will include telephone numbers of representatives of the CONTRACTOR to be contacted in emergencies.
• Site-Specific Respiratory Protection Plan - Proposed respiratory protection program for employees throughout all phases of the job including make, model, and National Institute for Occupational Safety and Health approval numbers of respirators to be used.
• Workers' medical release forms, training certificates, and respiratory fit-testing records.
• Transporter's name, Department of Toxic Substances Control (DTSC) registration, and Department of Motor Vehicle license.
• Landfill operator's name and permit.
• SCAQMD permits.
• Other relevant records.
5.2 POST-JOB SUBMITTALS
Upon completion of the abatement work, the CONTRACTOR shall provide the Client and its designated consultant the following documents within thirty (30) calendar days unless otherwise stipulated:
• A written statement of completion of work performed and certification that the abatement areas are free of ACM.
• All daily contractor supervisor daily logs.
• All entry/exit logs.
• All employee sign-in logs.
• All personal air-monitoring results performed by CONTRACTOR.
• All waste manifest records and weight tickets from the landfill.
• Other relevant records obtained during the abatement process.
6.0 WORK AREA PREPARATION
• The CONTRACTOR shall establish a regulated work area (RWA) for all ACM removal.
• The CONTRACTOR shall pre-clean the RWA prior to setting up the RWA(s).
C23-978F - Asbestos SOW Page 7 of 10
• For all indoor asbestos abatement work where a negative pressure containment(s) is installed, the CONTRACTOR shall perform the following:
- Install critical barriers in all regulated work areas where asbestos abatement work is to be performed.
- Install decontamination units adjacent to each regulated work area. All workers must enter and exit the RWA through the decontamination unit. Establish a three-stage decontamination unit with a shower for Class 1 asbestos work and a two-stage decontamination unit with a wash station for Class II asbestos work.
• Asbestos signs shall be posted on any entrance/exit to the RWAs.
7.0 REMOVAL OF ACM
The procedures described in this SOW shall always be used. If the specified procedures cannot be used or if alternative procedures are requested by the CONTRACTOR, then a written request must be made to, and written approval must be obtained from the Client.
7.1 REMOVAL OF ACM
• ACM shall be removed in accordance with the methods specified in 8 CCR 1529 and in conjunction with a negative pressure enclosure (NPE) as follows:
- For all Class I asbestos work, a NPE capable of providing at least one air-change every 15 minutes and maintaining -0.02 inches of water pressure is required until final clearance is achieved.
- For all Class II asbestos work, a NPE capable of providing at least one air-change every 30 minutes is required until final clearance is achieved.
• Friable ACM – Removal shall be conducted in strict accordance with Class I asbestos work requirements as set forth in DOSH regulations. At a minimum, a powered, air-purifying respirator (PAPR) equipped with HEPA filters shall be used unless a negative exposure assessment (NEA) of the work indicates that the exposure level will not exceed 1 fiber per cubic centimeter of air (f/cc) as an 8-hour time-weighted average (TWA). Full-body coveralls, safety glasses, and work gloves will also be worn.
• Non-friable ACM – Removal shall be conducted in strict accordance with Class II asbestos work requirements as set forth in DOSH regulations. If non-friable ACM is in a sufficiently intact or wet state, then at a minimum, half-face, negative-pressure, air-purifying respirators equipped with HEPA filters shall be used. Full-body coveralls, safety glasses, and work gloves will also be worn.
• The surfaces and immediate areas from which ACM are removed shall be cleaned using wet-wiping and HEPA-vacuuming methods and shall be encapsulated with an approved encapsulant.
• Any debris and loose material shall be HEPA-vacuumed and/or removed in a wet condition.
C23-978F - Asbestos SOW Page 8 of 10
• The procedures described in this SOW are to be always utilized. If the specified procedures cannot be utilized or if alternative procedures are requested by the CONTRACTOR, a written request must be made to, and written approval must be obtained from the Client.
8.0 CLEANING AND ENCAPSULATION
• After the removal is completed, all surfaces within the RWA(s) shall be cleaned.
• All tools and equipment utilized inside the RWA(s) shall be thoroughly cleaned by HEPA-vacuuming and/or wet-wiping.
• All tools and equipment shall be cleaned and removed from the RWA(s) except for tools that may be required for additional cleaning if final visual clearance fails.
• All workers must decontaminate themselves using vacuums equipped with high-efficiency particulate air filter(s) (HEPA vacuum) and/or wet-wiping methods.
• At the completion of the final cleanup and when the CONTRACTOR’s supervisor has declared the work area free of visible dust and debris, the Client (or its consultant) shall be notified to perform the final clearance visual observation. After receiving approval from the Client (or its consultant), the CONTRACTOR shall encapsulate the areas where removal occurred inside the RWA(s).
9.0 TRANSPORTATION AND DISPOSAL REQUIREMENTS
• Asbestos-containing waste material (ACWM) [i.e., used protective suits and poly sheeting] shall be collected and placed in transparent, leak-tight containers (i.e., double bagged) or wrapping with a thickness of 6-mil as required by SCAQMD and applicable DOSH and Department of Transportation (DOT) requirements. The bags or wrapping will be stored in a lockable waste container that is leak-tight and lined with two (2) layers of 6-mil poly sheeting. The waste container will have asbestos signage on the outside of container.
• Each asbestos bag or wrapping shall have a generator label applied to the outside of the bag as required by SCAQMD. Each generator label shall include at a minimum, the generator name, location, and site address where the asbestos was removed.
• The ACWM shall be transported by a licensed transporter and disposed of at an approved landfill.
10.0 REQUEST FOR SITE OBSERVATIONS
The CONTRACTOR shall notify the Client (or its consultant) at least 24 hours prior to any of the following:
• The actual removal of ACM but after the regulated area(s) has been established.
• The encapsulation of RWA(s).
• Final clearance visual observation and/or air monitoring.
C23-978F - Asbestos SOW Page 9 of 10
• The CONTRACTOR’s tearing down the containment(s).
11.0 AIR MONITORING AND RELEASE OF CONTRACTOR
For indoor asbestos abatement work where a NPE is established, the clearance criteria will be based on both visual observation and air monitoring.
The following shall apply:
• Personal air monitoring shall be performed by the CONTRACTOR in accordance with DOSH regulations and at no additional cost to the Client.
• The Client reserves the right to engage the services of an independent consultant to perform area air monitoring and final clearance air monitoring for the project.
• The Client (or its consultant) reserves the right to refuse to perform the final clearance visual observation and/or air monitoring and require the CONTRACTOR to reclean the work area if the RWA is judged to be visually unclean. The visual observation will be conducted in accordance with the current version of American Society for Testing and Materials (ASTM) Designation E1368.
• The final clearance air monitoring shall be conducted by the Client (or its consultant) using an aggressive sampling method and be performed prior to deregulating the work area(s) and at least 4 hours after the completion of encapsulation. The clearance criteria will be based on the results of phase contrast microscopy (PCM) laboratory analysis.
The CONTRACTOR shall include in its pricing any necessary down time for the clearance air monitoring and laboratory analysis.
• The clearance criteria shall be based on PCM analytical results. The clearance criterion for PCM samples shall be that all sample concentrations are less than or equal to 0.01 f/cc as determined using National Institute of Occupational Safety and Health (NIOSH) Method 7400, Count Rule A.
• If the CONTRACTOR fails to achieve the PCM clearance criterion, then the CONTRACTOR may request additional transmission electron microscopy (TEM) analysis at its sole cost/expense and delays. The Client shall reserve the right to approve or deny the TEM analysis request. The clearance criterion for TEM samples shall be that all sample concentrations are less than or equal to 0.01 structures per cubic centimeter (s/cc) of air as determined using the U.S. Environmental Protection Agency Yamate Level II analytical procedure. TEM results are considered to be more accurate than PCM results, and therefore TEM results shall supersede PCM results.
• The number of final clearance air samples collected shall be at the discretion of the Client and/or its consultant.
• If the clearance criterion has not been met, the CONTRACTOR shall be required to reclean all surfaces inside RWA using wet-cleaning methods and provide a negative air-filtration system during the recleaning process. This process of recleaning, allowing surfaces to dry, and retesting shall be repeated until compliance is achieved.
C23-978F - Asbestos SOW Page 10 of 10
• The Client shall bear the cost of the initial clearance air sample test for each RWA. If samples fail to pass the test as outlined above, the CONTRACTOR shall reclean the area and the area shall be subjected to repeated final visual observations and final clearance air sample tests, as necessary, until samples achieve the clearance criteria.
THE CONTRACTOR SHALL BEAR THE COST OF ALL SUBSEQUENT CLEANING,
ENCAPSULATION, SAMPLE COLLECTION, AND AIR SAMPLE ANALYSES (LABOR
AND MATERIAL) PERFORMED DUE TO FAILURE TO PASS THE INITIAL FINAL
CLEARANCE AIR SAMPLE TEST. All subsequent clearance air samples shall be collected using the same protocol listed above and shall be analyzed by the same laboratory used by the Client or its consultant. The Client or its consultant shall collect all subsequent air samples in the case of an initial failure. The CONTRACTOR shall be notified as soon as clearance air monitoring results are available.
12.0 ATTACHMENTS
Asbestos Survey Summary Table
Figures 1 to 3
Phasing Schedule
C23-978F - Asbestos SOW
ATTACHMENTS
Asbestos Survey Summary Table
Figures 1 to 3
ASBESTOS SURVEY SUMMARY TABLE
Sample No. Description of Material Sample Location Analytical
Results Homogeneous Area Additional Comments Est. Area Covered
4339 State University Drive, Los Angeles, California
4339-B-001 Ceiling tile and brown mastic, 1'x1', off-white, beige matrix, random pinholes
First floor, South Wing, Room #98
ND
Priority No.
4339-B-002 Ceiling tile and brown mastic, 1'x1', off-white, beige matrix, random pinholes
Second floor, Room #250
ND
Priority No.
4339-B-003 Ceiling tile and brown mastic, 1'x1', off-white, beige matrix, random pinholes
First floor, North Wing, Room #1
ND
Priority No.
4339-B-004 Plaster ceiling, beige First floor, South Wing, Room #98, above ceiling tile
ND
Priority No.
4339-B-005 Plaster ceiling, beige Second floor, Room #250, above ceiling tile
ND
Priority No.
4339-B-006 Plaster ceiling, beige Second floor, Room #230, above ceiling tile
ND
Priority No.
4339-B-007 Plaster ceiling, light gray Second floor, Room #224
ASSUMED ACM
~2,500 SF Included plaster ceilings in various rooms on 1st and 2nd floors. See Figures 1 to 3.
Nonfriable and in good condition. PLM result = <1% (trace) asbestos. Until additional PLM-point counting or TEM-quantitative analysis is performed, it is considered as ACM under EPA.
Priority No.
4339-B-008 Plaster ceiling, beige First floor, North Wing, Room #25, above ceiling tile
ND
Priority No.
4339-B-009 Plaster ceiling, beige First floor, Central Wing, Room #51, above ceiling tile
ND
Priority No.
4339-B-010 Plaster ceiling, beige First floor, North Wing, Room #6, above ceiling tile
ND
Priority No.
Tuesday, March 19, 2024Page 1 of 8Project No.: C23-978F
Analytical
Results Homogeneous Area Additional Comments Est. Area Covered
4339 State University Drive, Los Angeles, California
4339-B-011 Plaster wall with drywall backing, white and beige
Second floor, Room #238
ND
Priority No.
4339-B-012 Plaster wall with drywall backing, white and beige
Second floor, Room #232
ND
Priority No.
4339-B-013 Plaster wall with drywall backing, white and beige
Second floor, Room #207
ND
Priority No.
4339-B-014 Plaster wall with drywall backing, white and beige
First floor, North Wing, Room #25
ND
Priority No.
4339-B-015 Plaster wall with drywall backing, white and beige
First floor, North Wing, Room #20
ND
Priority No.
4339-B-016 Plaster wall with drywall backing, white and beige
First floor, Central Wing, Room #33
ND
Priority No.
4339-B-017 Plaster wall with drywall backing, white and beige
First floor, South Wing, Room #87
ND
Priority No.
4339-B-018 Plaster ceiling, white and beige
Second floor, Room #229
ND
Priority No.
4339-B-019 Plaster ceiling, white and beige
First floor, North Wing, Room #23
ND
Priority No.
4339-B-020 Plaster ceiling, white and beige
First floor, North Wing, Room #8
ND
Tuesday, March 19, 2024Page 2 of 8Project No.: C23-978F
Analytical
Results Homogeneous Area Additional Comments Est. Area Covered
4339 State University Drive, Los Angeles, California
4339-B-021 Ceramic wall tile with grout and mortar over plaster and black barrier paper, light yellow
Second floor, Room #220, on lower wall
ND Nonfriable and in good condition. This material was Assumed ACM by Steven Modtland (CAC).
Priority No.
4339-B-022 Ceramic wall tile with grout and mortar over plaster and black barrier paper, pink
First floor, Central Wing, Room #66, on lower
ND Nonfriable and in good condition. This material was Assumed ACM by Steven Modtland (CAC).
Priority No.
4339-B-023 Ceramic wall tile with grout and mortar over plaster and black barrier paperv, pink
First floor, South Wing, Room #96, on lower wall
PL=ASSUMED
ACM, ALL
OTHER
LAYERS=ND4
~7,300 SF Included plaster walls in various rooms on 1st and 2nd floors. The plaster is exposed and behind ceramic wall tiles in these rooms. See Figures 1 to 3.
Nonfriable and in good condition. PLM result for plaster layer = <1% (trace) asbestos. Until additional PLM-point counting or TEM-quantitative analysis is performed, it is considered as ACM under EPA.
Priority No.
4339-B-024 Barrier paper, black First floor, North Wing, Room #3, behind plaster wall
ND
Priority No.
4339-B-025 Barrier paper, black First floor, Central Wing, Room #53, behind plaster wall
ND
Priority No.
4339-B-026 Barrier paper, black Second floor, Room #240, behind plaster wall
ND
Priority No.
4339-B-027 Ceramic floor tile with grout and mortar, brown
Second floor, Room #220
ND
Priority No.
4339-B-028 Ceramic floor tile with grout and mortar, pink
First floor, South Wing, Room #105
ND
Priority No.
4339-B-029 Ceramic floor tile with grout and mortar, off-white
First floor, South Wing, Room #101
ND
Priority No.
4339-B-030 Wallboard (drywall) and joint compound, white
Second floor, Room #217
ND
Tuesday, March 19, 2024Page 3 of 8Project No.: C23-978F
Analytical
Results Homogeneous Area Additional Comments Est. Area Covered
4339 State University Drive, Los Angeles, California
4339-B-031 Wallboard (drywall) and joint compound, white
Second floor, Room #217B
ND
Priority No.
4339-B-032 Plaster ceiling, white and beige
Second floor, Room #214
ND
Priority No.
4339-B-033 Plaster ceiling, white and beige
First floor, Central Wing, Room #72
ND
Priority No.
4339-B-034 Plaster wall, light gray First floor, North Wing, Room #3
ASSUMED ACM
0 Included in 4339-B-023. Nonfriable and in good condition. PLM result = <1% (trace) asbestos. Until additional PLM-point counting or TEM-quantitative analysis is performed, it is considered as ACM under EPA.
Priority No.
4339-B-035 Plaster wall, light gray First floor, Central Wing, Room #36
ASSUMED ACM
0 Included in 4339-B-023. Nonfriable and in good condition. PLM result = <1% (trace) asbestos. Until additional PLM-point counting or TEM-quantitative analysis is performed, it is considered as ACM under EPA.
Priority No.
4339-B-036 Plaster wall, light gray First floor, South Wing, Room #104
ASSUMED ACM
0 Included in 4339-B-023. Nonfriable and in good condition. PLM result = <1% (trace) asbestos. Until additional PLM-point counting or TEM-quantitative analysis is performed, it is considered as ACM under EPA.
Priority No.
4339-B-037 Plaster wall, light gray Second floor, Room #224
ASSUMED ACM
0 Included in 4339-B-023. Nonfriable and in good condition. PLM result = <1% (trace) asbestos. Until additional PLM-point counting or TEM-quantitative analysis is performed, it is considered as ACM under EPA.
Priority No.
4339-B-038 Plaster wall, light gray Second floor, Room #240
ASSUMED ACM
0 Included in 4339-B-023. Nonfriable and in good condition. PLM result = <1% (trace) asbestos. Until additional PLM-point counting or TEM-quantitative analysis is performed, it is considered as ACM under EPA.
Priority No.
4339-B-039 Wallboard (drywall) and joint compound, white
First floor, Central Wing, Room #66
ND
Priority No.
4339-B-040 Ceiling tile, 2'x4', white, beige matrix, random crevices and holes
First floor, Central Wing, Room #46
ND
Tuesday, March 19, 2024Page 4 of 8Project No.: C23-978F
Analytical
Results Homogeneous Area Additional Comments Est. Area Covered
4339 State University Drive, Los Angeles, California
4339-B-041 Wallboard (drywall) and joint compound, white
First floor, South Wing, Room #90, on ceiling
ND
Priority No.
4339-B-042 Wallboard (drywall) and joint compound, white
First floor, Central Wing, Room #47, on ceiling
ND
Priority No.
4339-B-043 Wallboard (drywall) and joint compound, white, unfinished
First floor, South Wing, Room #98, in ceiling space
JC=2% CH,
DW=ND
~17,000
SF
Included ceilings and walls in the ceiling spaces of the main hallways on 1st and 2nd floors. See Figures 1 to 3.
Nonfriable and in good condition.
Priority No.
4339-B-044 Wallboard (drywall) and joint compound, white, unfinished
First floor, Central Wing, Room #50, in ceiling space
JC=2% CH,
DW=ND
0 Included in 4339-B-043. Nonfriable and in good condition.
Priority No.
4339-B-045 Wallboard (drywall) and joint compound, white, unfinished
Second floor, Room #218, in ceiling space
JC=2% CH,
DW=ND
0 Included in 4339-B-043. Nonfriable and in good condition.
Priority No.
4339-B-046 Wallboard (drywall) and joint compound, white, unfinished
First floor, South Wing, Room #98, on ceiling in ceiling space
JC=2% CH,
DW=ND
0 Included in 4339-B-043. Nonfriable and in good condition.
Priority No.
4339-B-047 Wallboard (drywall) and joint compound, white, unfinished
First floor, North Wing, Room #25, on ceiling in ceiling space
JC=2% CH,
DW=ND
0 Included in 4339-B-043. Nonfriable and in good condition.
Priority No.
4339-B-048 Wallboard (drywall) and joint compound, white, unfinished
Second floor, Room #252, on ceiling in ceiling space
JC=2% CH,
DW=ND
0 Included in 4339-B-043. Nonfriable and in good condition.
Priority No.
4339-B-049 Plaster overspray, beige First floor, Central Wing, Room #50, in ceiling space
ND
Priority No.
4339-B-050 Plaster overspray, beige First floor, North Wing, Room #25, in ceiling space
ND
Tuesday, March 19, 2024Page 5 of 8Project No.: C23-978F
Analytical
Results Homogeneous Area Additional Comments Est. Area Covered
4339 State University Drive, Los Angeles, California
4339-B-051 Plaster overspray, beige Second floor, Room #207, in ceiling space
ND
Priority No.
4339-B-052 Pipe insulation, elbow, 3" OD, white
First floor, Central Wing, Room #50, in ceiling space
2% CH
~11 SF
(~22 elbows)
Included pipe elbows in the ceiling spaces of Rooms #1, #21, #25, #50, #66, and #106 on 1st floor. See Figures 1 and 2.
Friable and in good condition. Additional pipe elbows may be hidden in inaccessible areas of the ceiling spaces inspected.
Priority No.
4339-B-053 Pipe insulation, elbow, 3" OD, white
First floor, North Wing, Room #1, in ceiling space
2% CH
0 Included in 4339-B-052. Friable and in good condition.
Priority No.
4339-B-054 Pipe insulation, elbow, 3" OD, white
First floor, South Wing, Room #106, in ceiling space
2% CH
0 Included in 4339-B-052. Friable and in good condition.
Priority No.
4339-B-055 Linoleum and black mastic, light brown, white and brown specks
First floor, Central Wing, Room #37
LN=ND,
MAS=2% CH
~300 SF Included Rooms #33, #34, #37, #38, and #49 on 1st floor. See Figure 2.
Nonfriable and in good condition.
Priority No.
4339-B-056 Linoleum and black mastic, light brown, white and brown specks
First floor, Central Wing, Room #49
LN=ND,
MAS=ASSUMED
ACM
0 Included in 4339-B-055. Nonfriable and in good condition. Black mastic was not observed in this sample according to the lab. The linoleum is homogeneous with sample 4339-B-055 which had black mastic >1% asbestos. Therefore, black mastic was assumed present.
Priority No.
4339-B-057 Linoleum and yellow mastic, light brown, white and brown specks
Second floor, Room #247
ND
Priority No.
4339-B-058 Floor tile and black mastic, 1'x1', tan, light brown streaks
First floor, Central Wing, Room #66
FT=ND,
MAS=2% CH
~20 SF Included northeast portion of Room #66 on 1st floor. See Figure 2.
Nonfriable and in good condition.
Priority No.
4339-B-059 Floor tile and black mastic, 9"x9", light brown, brown streaks
Second floor, Room #241
FT=2 % CH,
MAS=ASSUMED
ACM
~20 SF Included Room #241 on 2nd floor. See Figure 3.
Nonfriable and in good condition. The black mastic in this sample was judged to be homogeneous with samples 4339-B- 055 and 4339-B-058; therefore, it was Assumed ACM.Priority No.
4339-B-060 Cove base and brown mastic, 3", light brown
Second floor, Room #241
CB=ND,
MAS=ASSUMED
ACM
~5 SF Included brown cove base mastic in Room #241 on 2nd floor. See Figure 3.
Nonfriable and in good condition. PLM result = <1% (trace) asbestos. Until additional PLM-point counting or TEM-quantitative analysis is performed, it is considered as ACM under EPA.
Tuesday, March 19, 2024Page 6 of 8Project No.: C23-978F
Analytical
Results Homogeneous Area Additional Comments Est. Area Covered
4339 State University Drive, Los Angeles, California
4339-B-061 Cove base and white mastic, 3", gray
Second floor, Room #242
ND
Priority No.
4339-B-062 Cove base and white mastic, 3", tan
First floor, Central Wing, Room #33
ND
Priority No.
4339-B-063 Cove base and white mastic, 4", dark brown
Second floor, Room #245
ND
Priority No.
4339-B-064 Wallboard (drywall) debris, white
Second floor, Room #207, in ceiling space
ND
Priority No.
4339-B-065 Wallboard (drywall) debris, white
Second floor, Room #232, in ceiling space
ND
Priority No.
4339-B-066 Wallboard (drywall) debris, white
First floor, North Wing, Room #25, in ceiling space
ND
Tuesday, March 19, 2024Page 7 of 8Project No.: C23-978F
This summary table is intended to be used with the figure(s) prepared by Panacea, Inc. Please refer to the figure(s) for the room or area designations.
Estimated area covered is intended for discussion and management purposes only. Actual square footage may vary. Other asbestos-containing materials (ACMs) may be present in inaccessible areas.
AC = actinolite; AM = amosite; AN = anthophyllite; CH = chrysotile; CR = crocidolite; TR = tremolite.
<1% = trace amount of asbestos; "+" = positive; ND = none detected.
"~" = approximately; "<" = less than; ">" = greater than; LF = linear feet; OD = outside diameter; SF = square feet.
"x" = times; FP = floor plan; HVAC = heating, ventilation, and air conditioning unit; OH = overhang.
PLM = polarized light microscopy; TEM = transmission electron microscopy.
BLK = black; BN = brown; GY = gray; SI = silver, WH = white; YEL = yellow; OWH = off-white; BG = beige.
CB = cove base; CBM = cove base mastic; CT = ceiling tile; DI = duct insulation; DW = wallboard (drywall); ES = Exterior Stucco; FC = finish coat; FLC = floor leveling compound; FM = flooring material; FT = floor tile; HDT = HVAC duct tape material; HDS = HVAC duct sealant material; HDW = HVAC duct wrapping material; IS = Interior Stucco; LN = linoleum; MAS = mastic; PI = pipe insulation; PRC = plastic roof cement; RM = roofing material; SFP = silver foil paper; SP = silver paint sealant; SACTM = spray-applied ceiling texture material; LNY = linoleum and yellow mastic; FTY = floor tile and yellow mastic; PL = plaster.
JC = asbestos concentration for joint compound; COMP = assumed asbestos concentrations for a composite system (walls and/or ceiling) consisting of wallboard (drywall) and joint compound. Estimated area covered by joint compound and other wall material is based on the floor area. Actual square footage of the composite wall and/or ceiling system can vary from 2 to 5 times the floor area.
ACM = asbestos-containing material; ACCM = asbestos-containing construction material.
EPA = U.S. Environmental Protection Agency; Cal/OSHA or DOSH = California Division of Occupational Safety and Health.
1.
2.
3.
4.
5.
6.
7.
8.
9.
NOTES (Where Applicable):
10.
11.
12.
Tuesday, March 19, 2024Page 8 of 8Project No.: C23-978F
Bulk Sample Location (Negative or <0.1% Asbestos)
Bulk Sample Location (Positive, >1% Asbestos)
Bulk Sample Location (Positive, Assumed >1% Asbestos)
Pipe Elbow Location And Quantity (>1% Asbestos) in Ceiling Space
PROJECT NO. FIGURE
LEGEND
GENERAL NOTES
1. All locations are approximate. No scale or dimension is implied.
2. Base map obtained from the client.
3. Room numbers or area designations are arbitrarily assigned for discussion purposes only.
4. Sample numbers are shortened for graphic presentation purposes (e.g., sample number [BLDG NO.]-B-001 is shortened to B1).
5. Other asbestos-containing materials may be present in inaccessible areas of the building.
C23-978F 1
BULK SAMPLE LOCATIONS
FIRST FLOOR PLAN - NORTH WING
4339 STATE UNIVERSITY DRIVE
LOS ANGELES, CALIFORNIA
PORTION OF BUILDING INCLUDED
Joint Compound (>1% Asbestos) Associated with Unfinished Drywall Ceiling (Negative) in Ceiling Space
Not Included in Scope of Work
Joint Compound (>1% Asbestos) Associated with Unfinished Drywall Wall (Negative) in Ceiling Space
Plaster Ceiling (Assumed >1% Asbestos)
Plaster Wall (Assumed >1% Asbestos). The Plaster is Exposed and Behind Ceramic Wall Tiles.
273'
B3
B8
B10
B34
B14,B66
B20
B15
B19
B50
B53
B47
B24
#1
#2
#4
#5
#3
#6
#25#25#25
#7
#8
#9
#10
#11
#12
#13
#15#16
#18
#19
#20
#21
#24
#23
#22
#19A
Bulk Sample Location (Positive, >1% Asbestos)
Bulk Sample Location (Positive, Assumed >1% Asbestos)
Pipe Elbow Location And Quantity (>1% Asbestos) in Ceiling Space
PROJECT NO. FIGURE
LEGEND
GENERAL NOTES
1. All locations are approximate. No scale or dimension is implied.
2. Base map obtained from the client.
3. Room numbers or area designations are arbitrarily assigned for discussion purposes only.
4. Sample numbers are shortened for graphic presentation purposes (e.g., sample number [BLDG NO.]-B-001 is shortened to B1).
5. Other asbestos-containing materials may be present in inaccessible areas of the building.
C23-978F 2
BULK SAMPLE LOCATIONS
FIRST FLOOR PLAN - CENTRAL
AND SOUTH WINGS
4339 STATE UNIVERSITY DRIVE
LOS ANGELES, CALIFORNIA
PORTION OF BUILDING INCLUDED
Joint Compound (>1% Asbestos) Associated with Unfinished Drywall Ceiling (Negative) in Ceiling Space
Not Included in Scope of Work
Joint Compound (>1% Asbestos) Associated with Unfinished Drywall Walls (Negative) in Ceiling Space
Plaster Ceiling (Assumed >1% Asbestos)
Plaster Wall (Assumed >1% Asbestos). The Plaster is Exposed and Behind Ceramic Wall Tiles.
Black Mastic (>1% Asbestos) on Floor Tile or Linoleum (Negative)
See Enlarged View
183'
130'
B9
B40
B33
B25
B49
B52 B44
B56
B42
B1,B4
B23
B41
B17
B36
B28 B29
B43
B46
B54
B22
B39 B58
B35
B55
B16B62
#38
#37
#36 #35
#33 #34
#32
#44
#45
#46
#47 #48
#49
#50
#51
#65
#66
#68
#69
#70
#71 #72
#77 #76
#59 #55 #54
#56
#58
#53
#57#58#62
#64 #50
#50
Enlarged View
#49
South Wing
#98
#90
#91 #87
#85
#86
#93
#94
#95
#96
#99
#97
#100
#101
#102 #103
#104
#105
#106 #107
#108
#109
#110
#113
#114
#111 #112
Central Wing
Enlarged View
#48
#66
#33 #34
#35#36
#37
#38
Enlarged View
Bulk Sample Location (Positive, >1% Asbestos)
Bulk Sample Location (Positive, Assumed >1% Asbestos)
PROJECT NO. FIGURE
LEGEND
GENERAL NOTES
1. All locations are approximate. No scale or dimension is implied.
2. Base map obtained from the client.
3. Room numbers or area designations are arbitrarily assigned for discussion purposes only.
4. Sample numbers are shortened for graphic presentation purposes (e.g., sample number [BLDG NO.]-B-001 is shortened to B1).
5. Other asbestos-containing materials may be present in inaccessible areas of the building.
C23-978F 3
BULK SAMPLE LOCATIONS
SECOND FLOOR PLAN
4339 STATE UNIVERSITY DRIVE
LOS ANGELES, CALIFORNIA
Joint Compound (>1% Asbestos) Associated with Unfinished Drywall Ceiling (Negative) in Ceiling Space
Not Included in Scope of Work
Joint Compound (>1% Asbestos) Associated with Unfinished Drywall Walls (Negative) in Ceiling Space
Plaster Ceiling (Assumed >1% Asbestos)
Plaster Wall (Assumed >1% Asbestos). The Plaster is Exposed and Behind Ceramic Wall Tiles.
Floor Tile (>1% Asbestos) and Black Mastic (Assumed >1% Asbestos)
See Enlarged View
194'
B2,B5 B6
B7
B13
B32
B30
B31
B11
B21,B27 B37
B12 B18 B57 B61
B63
B48
B64 B51
B45
B65
B60
B59
B38
B26
#200 #201 #202 #203
#207
#208 #209 #210 #211
#214 #216
#217B
#217
#217A
#217C #218 #219
#221
#220
#222 #223
#225
#224
#226
#218
#252
#250 #249 #248 #245
#247 #246
#244
#243
#242 #241
#240A #240
#239
#238
#237 #236 #235
#234
#233 #231
#232
#230 #228
#229
#227
#252 #252 #252
Enlarged View
#217D
#245 #240
#240A
#243
#241
#234A
Special Note for Room #241 Brown cove base mastic in Room #241 is assumed to contain >1% asbestos.
STOR R-166
1/300
MAINTENANCE
SHOP R-37
1/300
M LKR
1/15
W LKR
1/15
OFFICE R-59
1/150
OFFICE R-58
1/150
OFFICE R-57
1/150
STOR
1/300
STOR R-182
1/300
OFFICE
R-186
1/150
OFFICE
R-176
1/150
STOR R-177
KITCH R-178
1/150
OFFICE R-56
1/150
OFFICE R-55
1/150
TRAINING
R-54
1/150
OFFICE
R-56A
19A
1/150
CONF R-173
1/15
STOR R-174
1/300
KITCH
1/150
CORR
JAN R-64
1/300
OFFICE R-63
1/150
ELECT R-65
1/300
BOILER R-66
1/300
MECHANICAL
R-51
1/300
MECHANICAL
R-52
31A
1/300
ELEV
TESTING
R-40
1/150
STOR
39A
1/300
OFFICE R-50
1/150
OFFICE R-42
1/150
CONF R-36
1/15
OFFICE R-35
1/150
CORR
OFFICE R-33
1/150
JAN
1/300
CORR
OFFICE R-30
1/150
OFFICE R-47
1/300
OFFICE R-49
1/150
TESTING
R-48
1/150
CORR
TESTING
R-46
1/150
OBSV R-45
1/150
TESTING
R-44
1/150
STOR R-27
1/300
OFFICE R-29
1/150
LIBRARY
R-26
1/45
EMPLOYEE
LUNCH
ROOM R-24
1/15
DINING
HALL R-23
1/15
STOR
1/300741
STORAGE
R-18
1/50
OFFICE R-20
1/150
STOR R-19
1/300
STORE R-21
1/300
JAN R-22
1/300
OFFICE
R-122
1/150
OFFICE
R-134
1/150
EXAM R-138
1/150 108
OFFICE R-9
1/150
ASSESSMENT
RM R-10
1/150
STOR
1/300
STOR
1/300
OFFICE R-11
1/150
MULTIPURPOSE
RM R-12
1/150
STOR
1/300
OFFICE R-13
1/150
OFFICE R-14
1/150
OFFICE R-15
1/150
CORR
OFFICE R-1
1/150
OFFICE R-2
1/150
OFFICE R-3
1/150
OFFICE R-4
1/150
OFFICE R-5
1/150
OFFICE R-6
1/150
OFFICE R-7
1/150
OFFICE R-8
1/150
ELECT
9 5
30 30
34/2=17
EXIT 4
OCC = 51
RW = 10.2"
AW = 72"
EXIT 5
OCC = 60
RW = 12"
AW = 72"
EXIT 6
OCC = 53
RW = 10.6"
AW = 72"
EXIT 1
OCC = 56
RW = 11.2"
AW = 72"
EXIT 3
OCC = 60
RW = 12"
AW = 72"
EXIT 10
OCC = 68
RW = 13.6"
AW = 42"
MATCH LINE
2/G022
STOR
1/300
STOR
1/300
STOR
1/300
STOR
1/300
STOR
1/300
STOR
1/300
STOR
1/300
STOR
1/300
PATIO
ASSESSMENT
R-62
1/150
OFFICE
R-103
1/150
STOR R-192
1/300
STOR R-191
1/300
OFFICE R-61
1/150
STAFF
OFFICE R-60
1/150
STOR R-190
1/300
OFFICE
R-188
1/150
OFFICE
R-187
1/150
OFFICE R-59
1/150
OFFICE R-58
1/150
OFFICE R-57
1/150
CORR
STOR R-194
2A
1/300
1836/2=18
EXIT 2
OCC =18
RW = 3.6"
AW = 72"
PATIO
NONSTRUCTURAL PROVISIONS
OCCUPANCY GROUPS AND VARIED USES:C (BASED ON 1961UBC (EXIST NON-CONFORMING)
BUILDING CONSTRUCTION TYPE:ORIGINAL CONSTRUCTION TYPE: V 1-HOUR
NUMBER OF STORIES:2
ACTUAL BUILDING HEIGHT:±26'-0" TOP OF ROOF DECK
BUILDING AREA IN SQUARE FEET:51,889 SF
AREA OF PROJECT IN SQUARE FEET:58,484 SF
SEPARATED, NON-SEPARATED, ACCESSORY USE:NON-SEPARATED
ALLOW ABLE AREA:NORTH W ING: 42,211 SF, SOUTH W ING: 15,729 SF (1961 UBC TABLE 5-C)
AREA INCREASE:NORTH W ING: 21,070 SF, SOUTH W ING: 3,929 SF (1961 UBC 505(a) & 506.3)
HEIGHT INCREASE: NA
FIRE SPRINKLERS (TYPE, FULL, PARTIAL):NONE.
FIRE ALARM (TYPE):AUTOMATIC.
OTHER FIRE PROTECTION SYSTEM (TYPE):NO
SMOKE CONTROL SYSTEM (Y/N):NO
OCCUPANT LOAD FOR ENTIRE BUILDING AND EACH FLOOR:519,
FIRST FLOOR: 315, SECOND FLOOR: 204
YEAR BUILDING W AS CONSTRUCTED:1962
HIGH FIRE HAZARD SEVERITY ZONE (Y/N):NO.
SEISMIC JOINTS AND LOCATIONS:NO
EMERGENCY RESPONDER RADIO COVERAGE (Y/N):NO
ROOM
NAME
ROOM NUMBER
ROOM AREA
OCCUPANT LOAD FACTOR
TOTAL OCCUPANTS
1/100
FUNCTION OF SPACEBUSINESS
OCC MAXIMUM EXITING OCCUPANTS
RW REQUIRED OPENING W IDTH
AW ACTUAL OPENING W IDTH
EXIT LOCATION AND NUMBER OF
OCCUPANTS USING EXIT
MAXIMUM PATH OF TRAVEL TO
EXIT W ITH DISTANCE INDICATED
FIRE EXTINGUISHER /
FIRE EXTINGUISHER CABINET *
EXISTING 1-HR RATED W ALL
EXISTING 2-HR RATED W ALL
FIRE LIFE SAFETY LEGEND
CENTER UNIT
SOUTH W ING
NORTH
W ING 1
NORTH
W ING2
KEY PLAN
G022
G022
Issue
Project
Supervisor Designed Drawn
DSA App No.
Sheet Title
Project Number
Sheet Scale
Sheet Number
A x
C o p y ri g h t
C a lif o rn ia D e p a rt m e n t o f
G e n e ra l S e rv ic e s
R e a l E s ta te S e rv ic e s D iv is io n
BCDEFGHIJKLMNO
ABCDEFGHIJKLMNO
SFM Permit No.
RELATIVE BORDER SCALE IN INCHES
0 1 2 3
/6
/2
:5
:1 P
M C
P ro je c ts
\0
A
R C
C
E N
T R
A L E le n a .K e lt g e n
.r vt
G022
MG IM EK
02-11####
FIRST FLOOR FIRE
LIFE SAFETY PLAN
00000000010532
AS SHOWN
CEILING REPLACEMENT
CDE DIAGNOSTIC CNR
4339 STATE UNIVERSITY DRIVE
LOS ANGELES, CA 90032
LOS ANGELES COUNTY
DEPARTMENT OF EDUCATION
00/00/00 25% WD PROGRESS
08/31/23 50% WD PROGRESS
10/12/23 95% WD PROGRESS
##-#-####-X
V1
1/16" = 1'-0"1 LEVEL 1 FLOOR PLAN FLS
1/16" = 1'-0"2 LEVEL 1 FLOOR PLAN FLS CONT.
No. Date Description
PHASE 9
PHASE 6
PHASE 6
PHASE 10
PHASE 6
PHASE 6
PHASE 8
PHASE 11
TO BE COMPLETED
JUNE 9 TO JULY
31ST. PHASE 2
PHASE 7
StevenModtland Typewriter
LOBBY R-69
1/14
RECEPT
R-72
1/150
OFFICE R-73
1/150
OFFICE R-74
1/150
CLOSET IT
R-75
1/300
STOR R-76
1/300
OFFICE R-77
1/150
OFFICE R-78
1/150
OFFICE R-79
1/150
CONF. R-80
1/15
MECHANICAL
R-81
1/300
STOR R-82
1/300
CONFERENCE
R-83
1/15
OFFICE R-84
217B
1/150
OFFICE R-86
217C
1/150
OFFICE R-85
217A
1/150
OFFICE
R-115
217E
1/150
TEST R-116
217D
1/150
CORR
OFFICE
R-114
1/150
OFFICE
R-111
1/150
OFFICE
R-110
1/150
OFFICE
R-107
1/150
OFFICE
R-106
1/150
CORR
OFFICE
R-105
1/150
OFFICE
R-104
1/150
OFFICE
R-103
1/150
OFFICE
R-102
1/150
STOR
1/300
OFFICE
R-101
1/150
OFFICE
R-101A
1/150
STOR
233A
1/300
OFFICE
R-100
1/150
OFFICE R-99
1/150
OFFICE R-98
1/150
DATA/COMM
R-97
1/300
STO
1/300
JAN R-92
1/300
COPPIER
R-93
1/150
OFFICE R-90
1/150
OFFICE R-89
1/150
OFFICE R-88
1/150
OFFICE R-87
1/150
ELEV
68 68
EXIT 7
OCC = 68
RW = 13.6"
AW = 42"
EXIT 8
OCC = 68
RW = 13.6"
AW = 42"
EXIT 9
OCC = 68
RW = 13.6"
AW = 42"
(E) ROOF (E) ROOF
ROOM
NAME
ROOM NUMBER
ROOM AREA
OCCUPANT LOAD FACTOR
TOTAL OCCUPANTS
1/100
FUNCTION OF SPACEBUSINESS
OCC MAXIMUM EXITING OCCUPANTS
RW REQUIRED OPENING W IDTH
AW ACTUAL OPENING W IDTH
EXIT LOCATION AND NUMBER OF
OCCUPANTS USING EXIT
MAXIMUM PATH OF TRAVEL TO
EXIT W ITH DISTANCE INDICATED
FIRE EXTINGUISHER /
FIRE EXTINGUISHER CABINET *
EXISTING 1-HR RATED W ALL
EXISTING 2-HR RATED W ALL
FIRE LIFE SAFETY LEGEND
CENTER UNIT
SOUTH W ING
NORTH W ING 1
NORTH W ING2
KEY PLAN
Issue
Project
Supervisor Designed Drawn
DSA App No.
Sheet Title
Project Number
Sheet Scale
Sheet Number
A x
C o p y ri g h t
C a lif o rn ia D e p a rt m e n t o f
G e n e ra l S e rv ic e s
R e a l E s ta te S e rv ic e s D iv is io n
BCDEFGHIJKLMNO
ABCDEFGHIJKLMNO
SFM Permit No.
RELATIVE BORDER SCALE IN INCHES
0 1 2 3
/6
/2
:5
:2 P
M C
P ro je c ts
\0
A
R C
C
E N
T R
A L E le n a .K e lt g e n
.r vt
G023
MG IM EK
02-11####
SECOND FLOOR FIRE
LIFE SAFETY PLAN
00000000010532
AS SHOWN
CEILING REPLACEMENT
CDE DIAGNOSTIC CNR
4339 STATE UNIVERSITY DRIVE
LOS ANGELES, CA 90032
LOS ANGELES COUNTY
DEPARTMENT OF EDUCATION
00/00/00 25% WD PROGRESS
08/31/23 50% WD PROGRESS
10/12/23 95% WD PROGRESS
##-#-####-X
V1
1/16" = 1'-0"1 LEVEL 2 FLOOR PLAN FLS
No. Date Description
PHASE 2
AREA TO BE
COMPLETED
DURING BREAK
12/13 - 01/
- CONTRACTOR TO BRING IN A CONTAINER.
- MOVING BOXES, LIBRARY CARTS, TAPE AND
LABELS TO BE SUPPLIED BY CONTRACTOR.
- CONTRACTOR TO MOVE LABELED BOXES OUT
AT THE START OF THE PHASE AND BACK INTO
THE ROOMS AT THE END OF THE PHASE.
- NEED TO LOCATE STAGING AREAS PER PHASE,
AREAS TO BE SUGGESTED BY CONTRACTOR
AND APPROVED BY DGS/CDE PRIOR TO START.
- NO MORE THAN 2 PHASES SHUT DOWN AT A
TIME. A ROLLING SCHEDULE TO BE PROVIDED
TO DGS/CDE FOR APPROVAL.
- PATH OF EGRESS TO BE APPRIVED BY
ARCHITECT FOR EACH PHASE.
- ANY UTILITY (POWER/WATER)
SHUTDOWNS/INTERUPTIONS TO BE COMPLETED
OF HOURS/WEEKENDS.
- CONTRACTOR TO COVER AND PROTECT MSF.
- FLOORING PROTECTION REQUIRED.
- HOURS OF WORK 6:00AM-3:30PM
PHASE 4
THIS PHASE CAN
NOT START UNTIL
PHASE 3 HAS BEEN
COMPLETED.
PHASE 5
PHASE 1
PHASE 2
STAIRS (1ST AND
2ND FLOOR) TO BE
COMPLETEDWITH
PHASE 2. MINIMAL
SHUT DOWN.
CONTRACTOR TO
PROVIDE ARTIST
FOR MURAL TOUCH
UP.
PHASE 3
StevenModtland Typewriter
File details come from the government source that posted it. Updated .