For construction package - Manchester Chiller 100_CD_R2 Drawings.pdf
PDF 18 MB Posted
- Attached to
- 4130--608-20-110 - Bldg. 1 Chiller Replacement Federal contract opportunity
- Solicitation number
- 36C24124B0019
About this file
This document provides details on a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. The solicitation number is 36C24124B0019 for the replacement of Building 1 Chiller at an unspecified location. The related file is construction drawings in PDF format totaling 18MB. The opportunity type is a solicitation for a chiller replacement project. No other details on products, services, pricing, responses dates or awards are provided in this document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 1409 Abstract.pdf | ||
| 36C24124B0019 0008.docx | DOCX document | |
| 36C24124B0019 0007.docx | DOCX document | |
| NEW RFI answers for CHILLERS REPLACEMENT_Alares responses.docx | DOCX document | |
| 36C24124B0019 0006.docx | DOCX document | |
| Limitations on Subcontracting.pdf | ||
| S02 PRE-AWARD CONTRACTOR EVALUATION FORM.pdf | ||
| 36C24124B0019 0005.docx | DOCX document | |
| RFI answers Chiller Replacement.docx | DOCX document | |
| 36C24124B0019 0004.docx | DOCX document | |
| sign in 608-20-110.pdf | ||
| 36C24124B0019 0003.docx | DOCX document | |
| 36C24124B0019 0002.docx | DOCX document | |
| 36C24124B0019 0001.docx | DOCX document | |
| WD NH 20230021 09-29-2023.pdf | ||
| Manchester Chiller 100_CD R1 Construction Specifications.pdf | ||
| Manchester Chiller 100_CD_R1 Narrative.pdf | ||
| 608-20-110 Building 1 Chiller Repacement SOW.docx | DOCX document | |
| 36C24124B0019_1.docx | DOCX document | |
| Manchester Chiller 100 CD R2 Electrical Drawings.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
N
EAST
ENTRANCE
WEST
ENTRANCE
SMYTH
ROAD
W2 W
W3
W
W5
N1
GOVERNMENT
VEHICLES
N3
N2
E2
E1
NO PARKING
CONSTRUCTION
SITE
EAGLE
ENTRANCE
SEACOAST
ENTRANCE
MOUNTAIN
ENTRANCE
BUILDING #4
B U
I L D
IN
G
BUILDING #6
BUILDING
#7
BUILDING
#18
BUILDING #5
SMYTH
TOWER
BU
IL
D
IN
G
URGENT
CARE
PRIMARY
CARE
BOILER PLANT
#20
BUILDING
#15
VETERANS
HEALTHCARE
ADDITION
BUILDING
#1
410 7
DRAWING INDEX
G-001 COVER PAGE
G-002 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
AE-101 ROOF PLAN
AE-501 ROOF DETAILS
AE-502 ROOF DETAILS
SD-001 CHILLER STRUCTURAL FRAME - DEMOLITION
SF-001 CHILLER STRUCTURAL FRAME - NEW WORK
MD-001 PENTHOUSE AND ROOF PLAN - DEMO PLAN
MH-001 GROUND LEVEL - TEMPORARY CHILLER
MH-002 PENTHOUSE AND ROOF PLAN - TEMPORARY CHILLER
MH-003 PENTHOUSE AND ROOF PLAN
MH-004 SECTIONS AND ISOMETRIC VIEWS
MI-101 PHASE 1 TEMPORARY PIPING DIAGRAM
MI-102 DEMO PIPING DIAGRAM
MI-103 NEW WORK PIPING DIAGRAM
MI-200 DETAILS
MI-300 EQUIPMENT SCHEDULES
MI-400 CONTROLS
E-000 ELECTRICAL LEGEND
E-001 ELECTRICAL GROUND PLAN - DEMOLITION
E-002 ELECTRICAL GROUND PLAN - NEW WORK
E-003 ELECTRICAL PENTHOUSE ROOF DEMOLITION
E-004 ELECTRICAL PENTHOUSE ROOF NEW WORK
E-005 ELECTRICAL LEVELS 1-6 CONDUIT ROUTING PLAN
E-006 ELECTRICAL ONE-LINE DIAGRAM - DEMOLITION
E-007 ELECTRICAL ONE-LINE DIAGRAM - NEW WORK
E-008 ELECTRICAL DETAILS + SCHEDULES
100% CONSTRUCTION DOCUMENTS
U.S. Department of Veterans Affairs
Manchester VAMC Chiller Replacement
718 Smyth Road, Manchester, NH 03104
Project Name:
Project Address:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:1
P M
COVER SHEET
DM HL
G-001
7/1/2021Revisions: Date:
SAD SOUND ATTENUATING DEVICE
SSD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SEN SENSIBLE HEAT
SI SQUARE INCHES
SP STATIC PRESSURE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SS STAINLESS STEEL
LC
M
DRAWING SYMBOLS
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION NUMBER
VENT LINE
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DRAIN LINE
MAKE-UP WATER
CONDENSER WATER RETURN (TO TOWER)
CHILLED GLYCOL-WATER RETURN
CHILLED GLYCOL-WATER SUPPLY
CONDENSER WATER SUPPLY (FROM TOWER)
V
CWR
CHR
GCR
CWS
CHS
GCS
MW
D
X EXISTING PIPE TO BE REMOVED
DIRECTION OF FLOW
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PRESSURE GAGE
THERMOMETER
VENTURI FLOW METER
PIPE UP
PIPE DOWN
TT TEMPERATURE TRANSMITTER
PT PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
FT FLOW TRANSMITTER
IT CURRENT TRANSMITTER
SPS STATIC PRESSURE SENSOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
ZC VALVE OR DAMPER POSITION CONTROLLER
PDS PRESSURE DIFFERENTIAL SWITCH
CONTROLS SYMBOLS
LTCP LOCAL TEMPERATURE CONTROL PANEL
HVAC HVAC CONTROL PANEL
ECC
INTEGRATE CONTROL POINT ON REMOTE GRAPHICS
WORKSTATION AT ENERGY CONTROL CENTER
VSMC VARIABLE SPEED MOTOR CONTROLLER
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
MODULATING (AUTOMATIC) CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLER
FLOW METER
1-CH-1
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
CHILLER NO. 1 IN BUILDING NO. 1
EQUIPMENT ABBREVIATION
FS FLOW SWITCH
MC MOTION CONTROLLER
VFD VARIABLE FREQUENCY DRIVE
FM FLOW METER
STS STATUS
S/S START/STOP
D/L DEMAND/LIMIT
FA FAULT ALARM
FLA LOAD STATUS / FULL LOAD AMPS
RS RUN STATUS
PIPING SYMBOLS
A/E ARCHITECT / ENGINEER
ACCH AIR COOLED CHILLER
AFF ABOVE FINISHED FLOOR
AMP AMPERE
AP ACCESS PANEL
AQST AQUASTAT
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
ASHRAE AMERICAN SOCIETY OF HEATING
REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD-1 CONSTRUCTION DOCUMENTS
(SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS
(SUBMISSION2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CS CONDENSATE STORAGE TANK
CV CONSTANT VOLUME
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
Db DRY-BULB TEMPERATURE
DB DECIBELS
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DP DEW POINT TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EGT ENTERING GLYCOL TEMPERATURE
EJ EXPANSION JOINT
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
FC FLEXIBLE CONNECTION
FD FLOOR DRAIN
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FV FACE VELOCITY
GAL GALLONS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
HOA HAND/OFF/AUTOMATIC
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HZ HERTZ
I/O INPUT/OUTPUT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND (OR METERS/SECOND)
MAX MAXIMUM
MBH 1,000 BTUH
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MTD MEAN TEMPERATURE DIFFERENCE
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
P PUMP
Pa PASCAL
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RPM REVOLUTIONS PER MINUTE
RV RELIEF VALVE
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
V VALVE
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VPS VARIABLE PRIMARY SYSTEM
VSD VARIABLE SPEED DRIVE
W WATTS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
VALVE SYMBOLS
ABBREVIATIONS
GENERAL NOTES
1. COORDINATE ALL SYSTEM SHUTDOWNS WITH VA COR AT LEAST ONE MONTH AHEAD OF TIME.
2. PHASING PLAN IS INCLUDED AS DESIGN INTENT. CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING DEDICATED PHASING PLAN. PLAN MUST BE APPROVED BY VA COR.
3. SEISMIC PROVISIONS REQUIRED - SEE SPECS
RECOMMENDED CONSTRUCTION PHASING PLAN
PHASE1: PROVIDE TEMPORARY CHILLERS AND PIPING
- PROVIDE 2x100 TON TEMPORARY CHILLERS AND PUMPS ON 40 FEET FLAT TRAILERS.
- PROVIDE TEMPORARY POWER FOR CHILLER TRAILERS. REFER TO ELECTRICAL DRAWINGS FOR MORE INFO
- PROVIDE TEMPORARY 4" CHWS/R FROM TEMPORARY CHILLERS TO THE ROOF AND REMOVE AT COMPLETION OF THE PROJECT.
- PROVIDE FLEXIBLE HOSES TO CONNECT TEMPORARY CHILLED WATER PIPING AND EXISTING CHILLED WATER SYSTEM IN
MECHANICAL ROOM. FLEXIBLE HOSES SHALL BE INCLUDED IN CHILLER RENTAL PACKAGE.
- PROVIDE 6" BUTTERFLY ISOLATION VALVE ON CHILLED WATER SUPPLY BEFORE HOOKING UP TEMPORARY CHILLER TO EXISTING
CHILLED WATER SYSTEM.
- THIS PHASE REQUIRES A SHUTDOWN. CONTRACTOR SHALL COORDINATE SHUTDOWN WITH THE VA COR.
PHASE 2: REPLACE CHILLERS AND PRIMARY LOOP PUMPS
- DEMOLISH CHILLERS CH-1 & CH-2 AND ACCESSORIES ENTIRELY.
- DEMOLISH CHILLER SUPPORTING STRUCTURE AND PATCH THE ROOF ACCORDING TO THE VA SPECIFICATIONS.
- DEMOLISH CHILLERS CHILLED WATER PIPING BACK TO MAINS.
- DEMOLISH PUMPS P-1 & P-2 AND ACCESSORIES ENTIRELY.
- PROVIDE NEW STRUCTURAL FRAME TO SUPPORT NEW CHILLERS.
- INSTALL NEW CHILLERS CH-1 & CH-2 AND ACCESSORIES. CHILLER MODEL IS YVAA0200 OR EQUAL AS BASIS OF DESIGN.
- INSTALL NEW PUMPS P-1 & P-2 AND ACCESSORIES.
- INSTALL NEW CHILLED WATER PIPING AS INDICATED ON DRAWINGS.
- INSTALL BUTTERFLY VALVES TO BYPASS BUFFER TANK
- RELOCATE THREE SPLIT SYSTEM CONDENSING UNITS. PROVIDE NEW ROOF CURB AT NEW LOCATIONS. REMOVE EXISTING
ROOF CURBS AND PATCH THE ROOF ACCORDING TO THE VA SPECIFICATIONS
PHASE 3 REPLACE SECONDARY LOOP PUMPS AND MODIFY SECONDARY LOOP PIPING
- AFTER NEW CHILLERS AND PRIMARY PUMPS ARE INSTALLED AND OPERATED.
- REMOVE ALL TEMPORARY CHILLERS, PIPING, HOSES. HOWEVER, THE TEMPORARY CHILLERS AND ACCESSORIES CAN BE KEPT
UNTIL THE PROJECT IS COMPLETE AS AN OPTION
- DEMOLISH PUMPS P-4, P-5, P-6 & P-7 AND ACCESSORIES ENTIRELY
- DEMOLISH 3", 4" AND 6" CHILLED WATER SUPPLY PIPE AS INDICATED ON DRAWINGS
- INSTALL NEW PUMPS P-4 & P-5 AND ACCESSORIES.
- CONNECT 3"Ø OPERATING ROOM RISER, 4"Ø RISER AND 6"Ø RISER TO CHILLED WATER SUPPLY MAIN HEADER AS SHOWN ON
DRAWING.
- PROVIDE SEISMIC BRACING FOR PIPING IN MECHANICAL ROOM
- THIS PHASE REQUIRES A SHUTDOWN. CONTRACTOR SHALL COORDINATE SHUTDOWN WITH THE VA COR.
MH-001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:1
P M
GENERAL NOTES ABBREVIATIONS AND
SYMBOLS
DM HL
G-002
� &'()*+,�-./0*'1.234256�-./0*'7'89256�-./0*'&'()*+,�:2,3*;(+8,2(5<==.*�78,* >?*+@*4 7'895
7'89256�:2,3*ABB'(C*4D
A E
FFGHI�JF�JKLMNOHMGJKPKQ� PHGRGMGIL�PKPSITIKMUVWV�XYZ[\]̂Y_]à�bY]Y\[_cdaa[e\c f g
A f g hi j k l m n o ip
&?8=*������������������� Ehi j k l m n o ipq*C2=2(5=D 78,*D hjn�>(B*3854�r,'**,s.25+tu�vA�philo&D�limwjniwlEopgD�limwlnmwkoop�����NGHxLMJKI��yOPNI�KQJzIN{�����
��|�}" ��}%�%��" |�}" ��"���"% �GN��JJRIQ��~GRRIN��I�RPHITIKM El>hjihp>ppjki��PKH~ILMIN�����IQGHPR��IKMIN"
��T�M~��JPQ{��PKH~ILMIN{�����!
�����JKLMNOHMGJK��JHOTIKML
��������������������������������������������������������������������������������������� �¡���������¢���£££�£¤¥¥¦§̈©ª«¬§®¤¬®¥�¬̄° ±������²��������³��� ��� &́ -µ&v
������������������¹����� �����������������������������$�
·�º�
�¹���������������������$
¼½¾¿À¾ÁÂ�Ã�ÄÅÅÆ�Ç¿ÈÁ
| ���� | ����������� | � | � |
| � | � |
| ���� | ����������� | � | � |
| � | � |
| ���� | ����� | ||
| ������� | �������� | ����"��� | �������� |
| �� | �� |
| ���� | �������� |
| ���� | ��� |
| ��� | ��������"��� |
| ��������� | � | � |
| � | � |
| !)�������� | ���� �� | ����������� | ��� |
| ��& ������# | �� | ||
| !�"� | ���� |
| ��� | ���*� |
| �� | ������� |
| ��# | �� |
| !�"� | ���� |
| � | � |
| �� | �� |
| ��������� | �� | |
| � | ����# | �� |
| ���� �"��� | |
| ������"������������ | ������������� |
0123456�789:41;8<=><?@�789:41A1BC<?@�789:410123456�D<6=4E25B6<2?FGG84�AB64 HI45J4> A1BC?
A1BC<?@�D<6=4KLL12M4>N
K O
�PPQRS�TP�TUVWXYRWQTUZU[��ZRQ\QWQSV�ZUZ]Ŝ SUW_̀à�bcdefghcigjk�lcgcfeimnkkeofm
H A p q
K H A p q rs t u v w x y sz
0IBG4
Ors t u v w x y sz{4M<G<2?GN AB64N rtx�H2L4=B?>�|61446}8<?5~���K�zrsvy0N�vsw�txs�vOyzqN�vsw�vxw�uyyz����"XQR�VWTUS���YZXS
U[T�SX)��
QX��TT\S[���Q\\SX��S�\ZRŜ SUW OvHrtsrzHzztus��ZUR�SVWSX��
��S[QRZ\��SUWSX��&��̂ �W���TZ[)��ZUR�SVWSX)�
������'������TUVWXYRWQTU��TRŶ SUWV
��������������������������������������������������������� ����¡��¢������£¤�����¥�£�¦§¦¦̈ §������©�ª�£�¦§¦¦̈ §«¤��¬¬¬¥¬®®̄°±²³́µ¶°·µ·®¥µ̧¹ º������»���§���§¼��� ��(��0½7¾0�
| ����������������� | ������������������������������� | � | ����������������������� | � | �� |
| ������������������� | � | ��� | � | ������ |
| �������� | |
| ���� | �� |
| (���� | ����������������� |
| ���� | ������ |
| ��� | �������� | |
| �������� | ���� | ������ |
| �������� | �� | ����� |
| ���� | �$������ |
| ����� | ��� | |
| �������� | � | ���� |
| � | ��� |
| �������� | ������ |
| ����� | ��� | |
| �������� | � | ���� |
| � | ��� |
| �������� | ������ |
0123456�789:41;8<=><?@�789:41A1BC<?@�789:410123456�D<6=4E25B6<2?FGG84�AB64 HI45J4> A1BC?
A1BC<?@�D<6=4KLL12M4>N
K O
�PPQRS�TP�TUVWXYRWQTUZU[��ZRQ\QWQSV�ZUZ]Ŝ SUW_̀à�bcdefghcigjk�lcgcfeimnkkeofm
H A p q
K H A p q rs t u v w x y sz
0IBG4����
Ors t u v w x y sz{4M<G<2?GN AB64N rtx�H2L4=B?>�|61446}8<?5~���K�zrsvy0N�vsw�txs�vOyzqN�vsw�vxw�uyyz%##��XQR�VWTUS� �YZXS�U[T�SX*����#���#�(��/��%�.�.%%/�(��/��$/&�&/.� �QX��TT\S[���Q\\SX��S�\ZRŜ SUW OvHrtsrzHzztus��ZUR�SVWSX�����S[QRZ\��SUWSX/���
̂ �W���TZ[*��ZUR�SVWSX*����# �#$�##���TUVWXYRWQTU� TRŶ SUWV
/+�+%#%������������������������������������������������������� ��¡������¢£�����¤�¢�¥¦¥¥§¦������̈�©�¢�¥¦¥¥§¦ª£��«««¤«¬®̄°±²³́µ̄¶¬́¶¤́·̧ ¹������º���¦���¦»��� ���&#%0¼7½0�
SF-001
SF-001
NOTES:
1. EXISTING BEAM W12X40 AND ROOF MEMBRANCE TO BE
REMOVED ENTRIRELY. PATCH THE ROOF ACCORDING TO THE
VA'S SPECIFICATIONS
2. EXISTING STRUCTURAL POST TO BE REMOVED
3. EXISTIING SUPPORT BEAM W10X33 TO BE REMOVED
3 3 3
2 2 2 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:3
P M
CHILLER STRUCTURAL FRAME - DEMOLITION
DM HL
SD-001
SF-001
17' - 4" 20' - 0" 20' - 6"
5' - 1" 16' - 2" 4' - 4"
SF-001
1-CH-2
1-CH-1
W X
W X
W X
W X
W10X33
W10X33
W10X33
W10X33
W X
W X
W X
LEVEL AND ANCHOR W12X40 TO CONCRETE WITH (2) 5/8"
HILTI KIWK BOLT TZ WITH WASHER. MAX SPACE 3'0",
COVER WITH ROOF MEMBRANE
Level 7 105' - 0"
High Roof 120' - 0"
Low Roof 107' - 0"
17' - 4" 20' - 0" 20' - 6"
SF-001
W12X40 W12X40 W12X40
W10X33 HSS 6X1/2
1-CH-2
BUFFER TANK
EXISTING FRAME
SUPPORT BUFFER
TANK
RELOCATED
CONDENSING UNIT
EXISTING
CONDENSING UNIT
EXISTING
CONDENSING UNIT
TOP OF STEEL
SF-001
Low Roof 107' - 0"
W10X33 W10X33 W10X33
W10X33
1-CH-1 1-CH-2
W8X10 W8X10
W12X40
HSS 6X1/2
HSS 6X1/2 HSS 6X1/2
HSS 6X1/2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:3
P M
CHILLER STRUCTURAL FRAME - NEW WORK
DM HL
SF-001
7/1/2021
1/4" = 1'-0"
Chiller Support Structure
1/4" = 1'-0"
Chiller Support Structure Section 1 1/4" = 1'-0"
Chiller Support Structure Section 2
CHILLERS STRUCTURE ISO VIEW
NOTES:
1.0 - STRUCTURAL STEEL
1. STRUCTURAL STEEL DESIGN, FABRICATION AND ERECTION SHALL CONFORM TO THE AISC "MANUAL OF STEEL CONSTRUCTION", "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS AND BRIDGES" (ANSI/AISC 360-10), AND "CODE OF STANDARD PRACTICE FOR
STEEL BUILDINGS AND BRIDGES" (ANSI/AISC 303-10).
2. STRUCTURAL STEEL SHALL BE NEW STEEL CONFORMING TO THE FOLLOWING:
(A) WIDE FLANGE SHAPES:_____ASTM A992
(B) OTHER STEEL SHAPES, PLATES AND BARS:_____ASTM A572 OR ASTM A36.
(C) STRUCTURAL TUBING:_____ASTM A500 GR B.
3. ALL WELDED CONNECTIONS SHALL BE MADE BY APPROVED CERTIFIED WELDERS AND SHALL CONFORM TO A.W.S. SPECIFICATIONS
AMENDED TO DATE. ELECTRODES SHALL BE E70XX.
4. BEAM TO BEAM CONNECTION SHALL BE BOLTED CONNECTION. BOLTS SHALL CONFORM TO ASTM A325 AND BE INSTALLED SNUG-TIGHT
UNLESS NOTED OTHERWISE
5. STRUCTURAL STEEL FRAMING SHALL BE WITHIN TOLERANCE BEFORE CONNECTIONS ARE FINALLY BOLTED OR WELDED.
6. FIELD CUTTING OF STRUCTURAL STEEL OR ANY FIELD MODIFICATIONS OF STRUCTURAL STEEL SHALL NOT BE MADE WITHOUT
PRIOR WRITTEN APPROVAL BY THE ENGINEER FOR EACH SPECIFIC USE.
7. STRUCTURAL STEEL SHAPES AND PLATES EXPOSED TO WEATHER AND AT ROOF SHALL BE HOT-DIPPED GALVANIZED PER ASTM A123 U.N.O. FASTENERS SHALL BE HOT-DIPPED GALVANIZED PER ASTM A153 U.N.O. HOT-DIPPED GALVANIZING SHALL ALSO CONFORM TO ASTM A385. THE GALVANIZER SHALL SUBMIT A CERTIFICATE OF CONFORMANCE FOR RECORD.
8. PROVIDE FIELD TOUCH-UP AND REPAIR OF GALVANIZING AS REQUIRED PER ASTM A780 USING AN INORGANIC ZINC-RICH PRIMER.
9. WHEN DISSIMILAR METALS ARE IN CONTACT (E.G. STAINLESS STEEL IN CONTACT WITH GALVANIZED STEEL), COAT SURFACE WITH
COAL TAR EPOXY OR PROVIDE OTHER APPROVED MEANS TO PROVIDE A BARRIER.
10. WELDS SHALL BE 1/4" FILLET WELDS MINIMUM UNLESS NOTED OTHERWISE ON THE DRAWINGS.
11. PROVIDE TEMPORARY ERECTION BRACING AND SUPPORTS TO HOLD STRUCTURAL STEEL FRAMING SECURELY IN POSITION. SUCH TEMPORARY BRACING AND SUPPORTS SHALL NOT BE REMOVED UNTIL PERMANENT BRACING HAS BEEN INSTALLED.
12. SUBMIT SHOP DRAWINGS AND PRODUCT DATA FOR APPROVAL PRIOR TO FABRICATION.
2.0 - POST INSTALLED CONCRETE ANCHORS
1. EXPANSION ANCHORS SHALL BE HILTI KWIK BOLT TZ EXPANSION ANCHORS.
2. INSTALL ANCHORS IN STRICT CONFORMANCE WITH THE MANUFACTURER'S REQUIREMENTS.
3. HOLES SHALL BE THOROUGHLY CLEANED AND DRY PRIOR TO INSTALLING ANCHORS.
4. DO NOT DAMAGE EXISTING REINFORCING. LOCATE REINFORCING WITH PROFOMETER OR OTHER MEANS PRIOR TO DRILLING
CONCRETE.
Revisions: Date:
ROOF
NO 3
NO 2
NO 1
N 702A
E 701
E 703
MECHANICAL
ELEVATOR
ELEVATOR
ELEVATOR
SERVICE
MECH.RM
ROOM
STAIR NO.2
"ø
"ø
"ø
"ø
3"ø
3"ø
6"ø
6"ø
6"ø
1-P-7
P
P
1-P-6
1-P-5
1-P-4
CH
CH
"ø
"ø 4 "ø
6"ø 6"ø
6"ø
AS
ET
4" CHWS/R
RISER
6" CHWS/R
RISER
3" CHWS/R
TO OR
GLYCOL
SUPPLY
BUFFER
TANK
"ø 6
"ø
4"ø
3"ø
4" CHWS/R FOR
FUTURE
CH-1 & CH-2 AND
ACCESSSORIES SHALL BE
DEMOLISHED ENTIRELY AS OF
PHASE 2
ELEVATED
PLATFORM
MH-004
MH-004
MH-004
DEMOLITION WORK KEY NOTES:
1. EIXSITNG CH-1 & CH-2 AND ACCESSSORIES SHALL BE DEMOLISHED AS PART OF PHASE 2
2. SPLIT SYSTEM CONDENSING UNITS TO BE RELOCATED (TYP. 3) AS PART OF PHASE 2
3. NEW P1 & P2 AND ACCESSSORIES SHALL BE DEMOLISHED AS PART OF PHASE 2
4. NEW 6" BUTTERFLY VALVE SHALL BE INSTALLED BEFORE HOOKING UP TEMPORARY
CHILLERS
5. NEW P4, P5, P6, P7 AND ACCESSSORIES SHALL BE DEMOLISHED AS PART OF PHASE 3
6. SECONDARY PIPING SHALL BE MODIFIED AS PART OF PHASE 3
7. EXISTING ELEVATED PLATFORM SHALL BE DEMOLISHED AS PART OF PAHSE 2.
8. TEMPORARY FLEXIBLE HOSES SHALL BE DEMOLISHED WHEN CHILLERS ARE INSTALLED
AND OPERATIONAL.
9. TEMPORARY CHILLED WATER PIPES SHALL BE DEMOLISHED WHEN CHILLERS ARE
INSTALLED AND OPERATIONAL.
10. EXISTING DUMBWAITER EQUIPMENT AND DOORS SHALL BE REMOVED FOR ALL FLOORS.
KEEP SHAFT CLEAR FOR NEW ELECTRICAL WORK. IMMEDIATELY PROVIDE NEW 2-HOUR
RATED ACCESS HATCHES FOR SAFETY. COORDINATE WITH VA COR TO ENSURE
DUMBWAITER SHAFT REMAINS ACCESSIBLE FOR OTHER ACTIVE PROJECTS.
PHOTO 1: PUMP P-1 & 2 TO BE
DEMOLISHED
PHOTO 2: PUMP P-4 & 5 TO BE
DEMOLISHED
PHOTO 3: PUMP P-6 & 7 TO BE
DEMOLISHED
PHOTO 5: CHILLERS TO BE
DEMOLISHED
PHOTO 4: EXISTING 6" AND 4"
RISER TO REMAIN
PHOTO 6: SPLIT SYSTEM
CONDENSING UNITS TO BE
RELOCATED
PHOTO 7: EXISTING BUFFER TANK
TO REMAIN
DUMBWAITER SHAFT
PHOTO KEYNOTE #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:2
P M
PENTHOUSE AND ROOF PLAN - DEMO PLAN
DM HL
MD-001
SCB-B
13,312 S.F.
TRAVEL DISTANCE TO
SMOKE BARRIER = 192'
M A
T C
H L
IN
E
A
M A
T C
H L
IN
E
B
BUILDING 15
EXISTING
ELECTRICAL
EQUIPMENT
TEMPORARY 100 TON CHILLER
AND PUMPS ON 40 FEET FLAT
TRAILER.
EXISTING FENCE SHALL BE
TEMPORARILY REMOVED
TEMPORARY FENCE
TEMPORARY 4" CHWS/R FROM TEMPORARY
CHILLERS TO THE ROOF SHALL BE INSTALLED BY
MECHANICAL CONTRACTOR AND REMOVED AT
COMPLETION OF THE PROJECT.
TEMPORARY PIPES SHALL BE
INSTALLED HIGH ENOUGH TO
MAINTAIN EXISTING EGRESS.
TEMPORARY 100 TON CHILLER
AND PUMPS ON 40 FEET FLAT
TRAILER.
TEMPORARY 4" CHWS/R FROM TEMPORARY
CHILLERS RISER TO THE ROOF SHALL BE
INSTALLED BY MECHANICAL CONTRACTOR AND
REMOVED AT COMPLETION OF THE PROJECT.
CONTRACTOR SHALL PROVIDE TEMPORARY
PIPING SUPPORT SUBMITAL TO THE VA AND A/E
TO REVIEW.
"ø
"ø
PROVIDE GATE WITH LOCK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:2
P M
GROUND LEVEL - TEMPORARY CHILLER
DM HL
MH-001
NO 2
NO 1
N 702A
E 701
E 703
MECHANICAL
ELEVATOR
ELEVATOR
ELEVATOR
SERVICE
MECH.RM
ROOM
STAIR NO.2
"ø
"ø
"ø
"ø
3"ø
3"ø
6"ø
6"ø
6"ø
P
P
P
P
P
P
CH
CH
"ø
"ø 4 "ø
6"ø 6"ø
6"ø
AS
ET
4" CHWS/R
RISER
6" CHWS/R
RISER
3" CHWS/R
TO OR
GLYCOL
SUPPLY
BUFFER
TANK
"ø 6
"ø
4"ø
3"ø
4" CHWS/R FOR
FUTURE
TEMPORARY CHILLED WATER
SUPPLY AND RETURN HOSES TO BE
PROVIDED BY CHILLER RENTAL
COMPANY. APPROXIMATE 150 FEET
HOSES ARE REQUIRED.
6" VALVE SHALL BE
INSTALLED BEFORE
HOOKING UP TEMPORARY
CHILLERS
P1 & P2 ISOLATION VALVES
SHALL BE CLOSED BEFORE
HOOKING UP TEMPORARY
CHILLERS.
ELEVATED
PLATFORM
TEMPORARY CHILLED WATER
SUPPLY AND RETURN RISER..
LOCATIONS FOR CONNECTION TO TEMPORARY CHILLER HOSES
PHOTO 1: CHWS CONNECTION
PHOTO KEYNOTE #
PHOTO 2: CHWR CONNECTION
CHWR CONNECTION
CHWS CONNECTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:2
P M
PENTHOUSE AND ROOF PLAN - TEMPORARY
CHILLER
DM HL
MH-002
NO 2
NO 1
N 702A
E 701
E 703
MECHANICAL
ELEVATOR
ELEVATOR
ELEVATOR
SERVICE
MECH.RM
ROOM
STAIR NO.2
UP
MH-004
"ø
"ø
"ø
3"ø
3"ø
6"ø
6"ø
6"ø6"ø 6"ø
6"ø
AS
ET
4" CHWS/R
RISER
6" CHWS/R
RISER
3" CHWS/R
TO OR
GLYCOL
SUPPLY
BUFFER
TANK
"ø 6
"ø
4"ø
4" CHWS/R FOR
FUTURE
"ø
"ø
1-P-1
1-P-2
3"ø
1-P-5
1-P-4
"ø
"ø
6"ø
6"ø
MH-004
MH-004
6"ø
6"ø
"ø6 "ø
"ø 6
"ø
1-CH-1
1-CH-2
ACV
ACV
3" CHWS/R
TO OR
BUFFER
TANK
SECONDARY PIPING
SHALL BE MODIFIED
AS PART OF PHASE 3
NEW WORK KEY NOTES:
1. NEW CH-1 & CH-2 AND ACCESSSORIES SHALL BE INSTALLED AS PART OF PHASE 2
2. SPLIT SYSTEM CONDENSING UNITS TO BE RELOCATED (TYP. 3) AS PART OF PHASE 2
3. NEW P1 & P2 AND ACCESSSORIES SHALL BE INSTALLED AS PART OF PHASE 2
4. NEW 6" BUTTERFLY VALVE SHALL BE INSTALLED BEFORE HOOKING UP TEMPORARY
CHILLERS
5. NEW P4, P5 AND ACCESSSORIES SHALL BE INSTALLED AS PART OF PHASE 3
6. SECONDARY PIPING SHALL BE MODIFIED AS PART OF PHASE 3
7. SEISMIC BRACING LOCATION. REFER TO DETAIL SHEET FOR MORE INFO
8. THREE (3) 6" BUTTERFLY VALVES SHALL BE INSTALLED ON CHILLED WATER RETURN LINES
AND BYPASS LINE TO BYPASS BUFFER TANK IF NEEDED AS PART OF PHASE 2
9. NEW ELEVATED PLATFORM AND STAIR SHALL BE INSTALLED AS PART OF PHASE 2
10. PROVIDE 2-HOUR RATED ACCESS HATCHES FOR DUMBWAITER SHAFT ON ALL FLOORS.
KEEP SHAFT CLEAR FOR NEW ELECTRICAL CONDUITS.
11. WALL PENETRATION SHALL BE PATCHED AFTER NEW CHILLERS ARE OPERATIONAL AND
TEMPORARY CHILLERS ARE REMOVED. SEE ARCHITECTURAL DRAWING FOR WALL
PATCHING DETAIL.
DUMBWAITER SHAFT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:3
P M
PENTHOUSE AND ROOF PLAN
DM HL
MH-003
Level 7 105' - 0"
High Roof 120' - 0"
MH-004
1-CH-2
BUFFER TANK
EXISTING
CONDENSING
UNIT
EXISTING
CONDENSING
UNIT
RELOCATED
CONDENSING
UNIT Low Roof 107' - 0"
Level 7 105' - 0"
High Roof 120' - 0"
MH-004
1-CH-1 1-CH-2
6"ø
6"ø
Low Roof 107' - 0"
Level 7 105' - 0"
High Roof 120' - 0"
1-P-4 1-P-5 1-P-1 1-P-2
"ø
"ø 6
"ø
4"ø
6"ø
6"ø
6"ø
6"ø
CHWS FROM
CHILLERS
CHWR TO
CHILLERS
6"ø
Low Roof 107' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:3
P M
SECTIONS AND ISOMETRIC VIEWS
DM HL
MH-004
7/1/2021
1/4" = 1'-0"
CHILLER SECTION 1
1/4" = 1'-0"
CHILLER SECTION 2
CHILLERS ISO VIEW
PUMP ROOM ISO VIEW
1/4" = 1'-0"
PUMP ROOM SECTION
Revisions: Date:
BUFFER
TANK
PENTHOUSE
6" CHWS
6" CHWR
6" CHWR
6" CHWS
6" CHWR
4" CHWR
6" CHWR
6" CHWS
4" CHWR
4" CHWS
ROOF
TEMPORARY CHILLED WATER
SUPPLY AND RETURN HOSES
TO BE PROVIDED BY CHILLER
RENTAL COMPANY.
APPROXIMATE 150 FEET
HOSES ARE REQUIRED.
6" VALVE SHALL BE
INSTALLED BEFORE
HOOKING UP TEMPORARY
CHILLERS
P1 & P2 ISOLATION VALVES
SHALL BE CLOSED BEFORE
HOOKING UP TEMPORARY
CHILLERS.
TEMPORARY 4" CHWS/R FROM
TEMPORARY CHILLERS TO THE ROOF
SHALL BE INSTALLED BY
MECHANICAL CONTRACTOR.
TEMPORARY 100 TON CHILLER AND
PUMP ON 40 FEET FLAT TRAILER.
PHASE 1 - TEMPORARY FLOW DIAGRAM - CHILLED WATER SYSTEM
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
PENTHOUSE/ROOF
LEVEL 0
4" CHWS/R
RISERS
6"
CHWS/R
RISERS
3"
CHWS/R
TO OR
AS
ET
GLYCOL
FEED
6"
CHWS/R
HEADER
4" CHWS/R
FOR FUTURE
4" CHWS/R
TO CHILLER
4" CHWS/R
TO CHILLER
1-P-4 1-P-5 1-P-6 1-P-7 1-P-1 1-P-2
1-CH-1 1-CH-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:3
P M
PHASE 1 TEMPORARY PIPING DIAGRAM
DM HL
MI-101
4" CHWS
TANK
PENTHOUSE
6" CHWS
6" CHWR
6" CHWR
6" CHWS
6" CHWR
4" CHWR
6" CHWR
6" CHWS
4" CHWR
4" CHWS
ROOF
TEMPORARY 4" CHWS/R FROM
TEMPORARY CHILLERS TO THE ROOF
SHALL BE INSTALLED BY
MECHANICAL CONTRACTOR.
TEMPORARY 100 TON CHILLER AND
PUMP ON 40 FEET FLAT TRAILER.
4" CHWS/R
TO CHILLER
4" CHWS/R
TO CHILLER
1-P-1 1-P-2
1-CH-1 1-CH-2
1-P-4 1-P-5 1-P-6 1-P-7
6" CHWS
DEMO FLOW DIAGRAM - CHILLED WATER SYSTEM
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
PENTHOUSE/ROOF
LEVEL 0
4" CHWS/R
RISERS
6"
CHWS/R
RISERS
3"
CHWS/R
TO OR
AS
ET
GLYCOL
FEED
6"
CHWS/R
HEADER
4" CHWS/R
FOR FUTURE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:3
P M
DEMO PIPING DIAGRAM
DM HL
MI-102
6" CHWS
6" CHWS
3" CHWS
BUFFER
TANK
PENTHOUSE
6" CHWS
6" CHWR
4" CHWR
6" CHWR
6" CHWS
4" CHWR
ROOF
6" CHWS/R
TO CHILLER
6" CHWS/R
TO CHILLER
4" CHWS BRANCHES
OFF FROM 6" CHWS
MAIN
1-P-4 1-P-5 1-P-1 1-P-2
1-CH-1 1-CH-2
CIRCUIT SETTER
CIRCUIT SETTER
NEW WORK FLOW DIAGRAM - CHILLED WATER SYSTEM
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
PENTHOUSE/ROOF
LEVEL 0
4" CHWS/R
RISERS
6"
CHWS/R
RISERS
3"
CHWS/R
TO OR
AS
ET
GLYCOL
FEED
6"
CHWS/R
HEADER
6" CHWS
6" CHWR
6" CHWR
4" CHWS/R
FOR FUTURE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:3
P M
NEW WORK PIPING DIAGRAM
DM HL
MI-103
m m
M
A X
CONFIGURATION WORKS
FOR EITHER SIDE
ANGLE
MIN: 30
MAX: 60
CONNECTION
TO STRUCTURE
1-5\8" X 1-5\8" X 12 GA
STRUT UNISTRUT P1000
SERIES OR SIMILAR
A 307 STEEL
BOLT
CONFIGURATION WORKS
FOR EITHER SIDE
ANGLE
MIN: 30
MAX: 60
CONNECTION
TO STRUCTURE
1-5\8" X 1-5\8" X 12 GA
STRUT UNISTRUT P1000
SERIES OR SIMILAR
A 307 STEEL
BOLT
TYPICAL CIRCUIT SETTER DETAIL
DETAIL FOR SUPPORTING PIPE ON ROOF
NTS
NTS
SIDE VIEW TRAPEZE HANGER FOR UP TO
453KG [1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS
PROVIDE INSULATION
SHIELD
& INSERT FOR ALL
PIPING
(200mm [8"] MIN.)
BAND
43mm [1-5/8"] 12 GAUGE CHANNEL OR 50x50x6.4mm
[2"X2"X1/4"] ANGLE
15mm [1/2"] DIA.
HANGER RODS WITH
900mm [36"] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9
PSF MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
PIPE HANGERS DETAIL
NOTE:
SEE SPECIFER FOR DETAILED HANGER REQUIREMENTS
mm
[IN]
mm
[FT]
mm
[FT]
THRU 20
[THRU 3/4]
[7]
[5]
[1]
[7]
[6]
[11/4]
[7]
[7]
[11/2]
[9]
[8]
[2]
[10]
[8]
[21/2]
[11]
[9]
[3]
[12]
[10]
[4]
[14]
[12]
[5]
[16]
[13]
[6]
[17]
[14]
[8]
[19]
[16]
[10]
[22]
[12]
[23]
[14]
[25]
[16]
[27]
[18]
[28]
[20]
[30]
[24]
[32]
RISERS
SUPPLY RETURN
NTS
NOTE:
1. BRANCH VALVE LOCATIONS INDICATED BY
GATE VALVE SYMBOL ON RISER
DIAGRAMS.
PROVIDE BUTTERFLY
VALVES, P/T PLUGS
AND CIRCUIT SETTER
FOR EACH RISER.
NTS
STEEL EXPANSION SHIELD FOR EXISTING
CONSTRUCTION AND INSERTS FOR NEW
CONSTRICTION THIS TYPE SHALL BE USED
ONLY IN SLABS OR BEAMS OF 4" [100mm]
MIN DEPTH
3/8" [10mm] MIN DIA EXPANSION BOLTS FOR
EXISTING CONSTRUCTION AND INSERTS
FOR NEW CONSTRUCTION
CONCRETE
FLOOR SLAB
CLIP
ANGLE
NUTS & WASHERS
3/8" [10mm] MIN DIA
HANGER RODS
FOR PIPES UNDER 2" [50mm] IN SIZE USE 1 1/2"x1 1/2"x1/4" [40x40x6.4mm] ANGLE. ALL PIPES 2" [50mm] & LARGER USE 3"x3"x1/4" [75x75x6.4mm]
ANGLE
TURNBUCKLE
3/8" [10mm] MIN DIA
HANGER RODS
3/8" [10mm] MIN DIA
INSERTS NEW
CONSTRUCTION ONLY.
SECURING HANGER RODS IN CONCRETE
NTS
GREATER THAN 50mm [2"] DIA.
PIPE
50mm [2"] DIA. & SMALLER
VERTICAL
GREATER THAN 50mm [2"] DIA.
PIPE
50mm [2"] DIA. & SMALLER
HORIZONTAL
65mm [2 1/2"] DIA.
INSTALLATION OF THERMOMETER WELLS
NOTE:
PROVIDE THE APPROPRIATE WELL DEPTH TO HAVE THE
NECESSARY INSULATION STAND-OFF DISTANCE.
65mm [2 1/2"] DIA.
PRESSURE TRANSMITTER INSTALLATION
NTS
NOTES:
1. INSTALLATION OF SENSORS AND TRANSMITTERS SHALL CONFORM TO
RECOMMENDATIONS OF MANUFACTURERS OF TRANSMITTERS.
1/2" [15mm] STEEL PIPE OR
STEEL TUBING TO SENSORS
DIFFERENTIAL PRESSURE
TRANSMITTER (FLOW, LEVEL)
BLOWDOWN
PT
ELEVATION
(WITH BTU METER)
NTS
WATER FLOW MEASURING STATION
TE
TEMPERATURE ELEMENT
INTERFACE WITH
METERING STATION
TEFE
SUPPLY
OUTLET
FLOW
ELEMENT
BACNET INTERFACE
NOTE:
MAINTAIN UPSTREAM AND DOWNSTREAM DISTANCES RECOMMENDED BY METER
MANUFACTURERS.
NTS
NOTES:
SEE SPECIFICATION SECTION "PUMPS" FOR Y STRAINER OPTION
FIRST 3 HANGERS FOR EACH PIPE AND
BRANCH SHALL BE SPRING & NEOPRENE
TYPE. TYPE "H" FOR 4" [100mm] DIA. PIPE & SMALLER. TYPE "H-P" FOR 5" [125mm] DIA.
PIPE & LARGER.
RIGID PIPE
HANGER
INSTALL HANGER AS CLOSE TO
PIPE ELBOW AS POSSIBLE
(TYPICAL)
1/2" [15mm]
FLEXIBLE CONNECTOR (TYPICAL)
PUMP
FLOOR
VIBRATION
ISOLATOR (TYPICAL)
1" [25mm] MIN.
DIA. PIPE STAND
CONCRETE INERTIA
BASE
DRAIN
SUCTION DIFFUSER
WITH BUILT IN STRAINER.
OPTIONAL: LONG RADIUS
ELBOW AND INLET
STRAINER WITH 3XDIAM
STRAIGHT INLET TO PUMP
1/2" [15mm]
PRESSURE GAUGE
RIGID PIPE
HANGER
SINGLE SUCTION FLOOR-MOUNTED PUMPS -
CONNECTIONS WITH FLEXIBLE CONNECTORS
OPTIONAL STRAINER
BUTTERFLY OR BALL
SHUT OFF VALVE, TYP.
CHECK VALVE
WATER TREATMENT - CLOSED SYSTEMS
NTS
NOTE:
TOP OF CHEMICAL POT FEEDER
TANK SHALL NOT BE MORE THAN
4'-0" [1200mm] ABOVE FINISHED
FLOOR.
1" [25mm]
CHEMICAL POT
FEEDER-
MINIMUM CAPACITY 5
GALLONS [19L]
1" [25mm]
FUNNEL
3/4" [20mm]
TO
DRAIN
FROM PUMP DISCHARGE TO PUMP SUCTION
AUTOMATIC FLOW
CONTROL AND
BALANCE DEVICE
AIR COOLED CHILLER - PIPING CONNECTIONS
NTS
THERMOMETER
FLOW SWITCH
FLEXIBLE
CONNECTORS
IF REQUIRED
TEST PLUGS
CHS
EVAPORATOR
CHR
DDC
TEMPERATURE
SENSOR TO ECC
PRESSURE
GAUGE
UNDER CANOPY
FS
TT TT
PROVIDE SEISMIC BRACING AT
THE LOCATION INDICATED ON
THE DRAWINGS
NTS
EXTERIOR SKIN
PREFAB. WALL PANEL
AS SPECIFIED
MASTIC
INTERIOR SKIN
GASKET
S.S. WALL PLATE
SECURED WITH S.S.
SCREWS
PIPE
INSULATION
AS SPECIFIED
SEAL
INSULATION
AGAINST SKIN OF
WALL PANEL
TUBING, PIPING
OR CONDUIT
S.S. WALL PLATE
SECURED WITH S.S.
SCREWS
FIELD APPLIED INSULATION
AFTER INSERTION OF
RESPECTIVE SERVICE FACILITY
THRU REFRIGERATOR OR
FREEZER WALL
TUBING, PIPING, AND CONDUITS PASSING
THROUGH PRE-FAB INSULATED WALL PANELS
GUY WIRES SHALL BE ANCHORED TO THE ROOF. CONTRACTOR SHALL ALSO
PROVIDE ISOLATION PADS.
INSERT LEGS OF PIPE SUPPORT INTO BASES, (ATTACH WITH 2-1/2” BOLT AND 1/2″
NUT).
SPACE OUT PIPE SUPPORTS ACCORDING TO SPECIFICATIONS. THIS SHOULD BE
DONE BEFORE ANY PIPE IS SUPPORTED. ATTACH HORIZONTAL BRACING TO LEGS
OF PIPE SUPPORTS, (APPROXIMATELY 3/4” OF THE WAY UP THE HEIGHT OF THE
SUPPORT), WITH 3” BOLTS AND 1/2″ NUT.
INSERT INSULATION PROTECTION SHIELD BETWEEN THE BOTTOM HALF OF THE
HANGER AND INSULATED PIPE.
ADJUST HEIGHT OF HANGER SO HANGER IS SUPPORTING PIPING. CHECK THAT
WEIGHT OF PIPE IS DISTRIBUTED EVENLY THROUGHOUT THE SYSTEM.
PROVIDE 4 GUY WIRES
TO PREVENT
MOVEMENT IN ANY
DIRECTION
USE ANCHOR BOLTS
TO SECURE GUY WIRES
TO THE ROOF
NOTE:
TENSION CABLE ONLY ENOUGH
TO REMOVE SAG.
HEAVY WIRE ROPE
THIMBLE
U-BOLT CLIP
7x19 GALVANIZED
AIRCRAFT CABLE
CHAIN
SHACKLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:3
P M
DETAILS
DM HL
MI-200
CHILLER SCHEDULE
TAG LOCATION AREA SERVED TYPE
COOLING
CAPACITY (TONS)
NPLV (KW/TON)
TOTAL
PRESSURE
DROP (FT W.C.)
ENERGY
EFFICIENCY
RATIO (BTU/W*H)
INTEGRATED
PART LOAD
VALUE (BTU/W*H)
EVAPORATOR ELECTRICAL
OPERATING
WEIGHT (LBS)
NOTES
FLOW (GPM)
EWT (°F) LWT (°F) WPD (FT WC) FOULING FACTOR MCA MOCP POWER (KW) VOLTAGE (V) PHASE FREQUENCY (HZ) SPEED CONTROL
DESIGN MIN
CH-1 ROOF BUILDING 1 AIR-COOLED 180 17 14.7 9.68 17.61 310 229.8 56 41 11.5 0.0001 374 400 228.6 460 3 60 6-STAGE 10,450 1
CH-2 ROOF BUILDING 1 AIR-COOLED 180 17 14.7 9.68 17.61 310 229.8 56 41 11.5 0.0001 374 400 228.6 460 3 60 6-STAGE 10,450 1
NOTES:
1. BASIS OF DESIGN IS YORK AIR-COOLED SCROLL-HERMETIC CHILLER MODEL YLAA0200HE46XFBBCTX, OR EQUAL.
PUMP SCHEDULE
TAG LOCATION SERVICE SUCTION SIZE
DISCHARGE
SIZE
FLUID
GPM NPSHR HEAD (FT)
SHUT-OFF
HEAD (FT)
IMPELLER
SIZE (IN)
PUMP RPM
MOTOR
MANUFACTURER AND MODEL NUMBER NOTES
TYPE TEMPERATURE BHP MOTOR HP VOLT PH Hz
1-P-1 & 2 MECH ROOM PRIMARY LOOP 4 3 GLYCOL 41 310 6 110 N/A 11 1760 11.71 20 208 3 6 TACO SFI3011D-1760-20 1, 2, 3, 4
1-P-4 & 5 MECH ROOM SECONDARY LOOP 4 3 GLYCOL 41 310 8 150 N/A 13 1760 17.47000 25 208 3 6 TACO SFI3013-1760-25 1, 2, 3, 4
NOTES:
1. PUMP BASIS OF DESIGN IS TACO, OR EQUAL
2. END SUCTION WITH DIFFUSOR
3. FURNISH AND INSTALL BY MECHANICAL CONTRACTOR
4. PROVIDE NEW VFDs TO WORK WITH NEW PUMPS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:3
P M
EQUIPMENT SCHEDULES
DM HL
MI-300
TANK
(175 TONS)
TT
FS
DPT
ZC
TT
FS
DPT
ZC
DPT DPT DPT
HSVFD
IT
STS
ECC
TYPICAL SECONDARY PUMP
HSMC
IT
STS
ECC
TYPICAL PRIMARY PUMP
COUPON RACK
FM
FM-1-XX
SIGNAL TO BAS
WALL MOUNTED
READ-OUT PANEL
FOR FM (TYP)
PRIME CHW FLOW
METER
FM
FM-2-XX
SIGNAL TO BAS
WALL MOUNTED
READ-OUT PANEL
FOR FM (TYP)
SECONDARY CHW
FLOW METER
6"Ø RISER4"Ø RISER
OPERATING ROOMS RISER
1-CH-I 1-CH-2
6" CHW
DECOUPLER
1-P-1
1-P-2
1-P-3
1-P-4
ACV-3
MINIMUM PUMP
FLOW BYPASS
DP SENSOR
LOCATED AT
RISER ON
LEVEL 3
DP SENSOR
LOCATED AT
RISER ON
LEVEL 2
DP SENSOR
LOCATED AT LEVEL
5 MECHANICAL
ROOM
TT
TT
AS-1
ET-1
(175 TONS)
(PRIMARY - LEAD)
(310 GPM)
(PRIMARY - LAG)
(310 GPM)
(SECONDARY - LAG)
(310 GPM)
(SECONDARY - LEAD)
(310 GPM)
S/S
CH-1
CHILLER CONTROL
PANEL
BACNET
INTERFACE
CONNECTION
TO BAS
START/STOP
CHWT D/L
CHW TEMP RESET
DEMAND LIMIT
FA FLA RS
FAULT ALARM
LOAD STATUS
RUN STATUS
S/S
CH-2
CHILLER CONTROL
PANEL
BACNET
INTERFACE
CONNECTION
TO BAS
START/STOP
CHWT D/L
CHW TEMP RESET
DEMAND LIMIT
FA FLA RS
FAULT ALARM
LOAD STATUS
RUN STATUS
NOTE:
CHILLER CONTROL POINTS INDICATED MAY BE PROVIDED THROUGH
SERIAL COMMUNICATION WITH PRIMARY DDC CONTROLLERS.
6"CHWR
6"CHWR
6"CHWS
6"CHWR
"C
H W
R
"C
H W
S
"C
H W
R
"C
H W
S
"C
H W
R
"C
H W
S
ACV-1
TT
TT
TT
ACV-2
TT
CIRCUIT SETTER CIRCUIT SETTER CIRCUIT SETTER
A. GENERAL
1. INITIAL CHILLER START SHALL BE A MANUAL START VIA INPUT FROM THE OPERATOR. AFTER INITIAL CHILLER IS ON-LINE, THE DDC SYSTEM
SHALL AUTOMATICALLY ENERGIZE OR DE-ENERGIZE CHILLERS.
2. CHILLED WATER TEMPERATURE SENSORS FOR EACH OF THE CHILLERS SHALL BE FURNISHED BY THE CHILLER MANUFACTURER AND WIRED TO
THE CHILLER CONTROL PANELS BY THE ATC CONTRACTOR.
3. THE CHILLER MANUFACTURER SHALL PROVIDE DIFFERENTIAL PRESSURE SENSORS (DP) FOR CHILLED WATER PUMPS. THE ATC CONTRACTOR SHALL WIRE (DP) SENSORS TO THE CHILLER CONTROL PANELS FOR REQUIRED FLOW CONFIRMATION.
4. PROVIDE COMMUNICATION WITH EACH PRIMARY PUMP MOTOR CONTROLLER TO INDICATE STATUS VIA CURRENT TRANSDUCERS. CONNECT TO
CHILLER CONTROL PANELS TO PROVIDE FAILURE ALARMS.
5. PROVIDE AUTOMATIC CONTROL VALVES TO ISOLATE EACH CHILLER AS SHOWN.
6. PROVIDE VENTURI TYPE WATER FLOW SENSOR/TRANSMITTERS FOR EACH CHILLER AND CONNECT TO CHILLER CONTROL PANELS TO PROVIDE
FAILURE ALARMS.
7. PROVIDE TEMPERATURE SENSORS FOR EACH CHILLER, FOR CHWS/CHWR ON PRIMARY LOOP, FOR CHWS/CHWR ON SECONDARY LOOP.
8. THE DDC SYSTEM SHALL BE TIED INTO EACH CHILLER AND PUMP FOR KW MONITORING AND RUN TIME MEASUREMENT.
9. THE CHILLED WATER SYSTEM IS DESIGNED TO OPERATE CONTINUOUSLY ALL YEAR ROUND.
10. CIRCUIT SETTERS SHALL BE SET TO MAXIMUM FLOW ALLOWED FOR EACH RISER BY TESTING AND BALANCING CONTRACTOR
B. CHILLER CONTROL
1. CHILLER OPERATION
1.1. CHILLERS SHALL BE AUTOMATICALLY STARTED AND STOPPED (SEQUENTIALLY) BY THE BAS. PRIMARY PUMPS ARE CAPABLE OF SERVING ANY CHILLER. CHILLER ISOLATION VALVES SHALL OPEN FULLY BEFORE PUMPS ARE STARTED. CONTROL OF INTERNAL CHILLER OPERATION SHALL BE THROUGH THE CONTROL PANEL PROVIDED BY THE CHILLER MANUFACTURER. AFTER STOPPING, A CHILLER SHALL NOT BE RESTARTED FOR 15 MINUTES(ADJ), AND, AFTER STARTING, SHALL RUN FOR AT LEAST 15 MINUTES(ADJ) BEFORE STOPPING. CHILLERS SHALL BE LIMITED TO TWO STARTS PER HOUR AND A MAXIMUM OF TEN STARTS IN ANY 24 HOUR PERIOD. SUPPLY WATER TEMPERATURE
FOR EACH CHILLER SHALL BE INITIALLY SET FOR 41°F.
1.2. UPON ACTIVATION OF THE LEAD CHILLER START SEQUENCE, THE DDC SYSTEM SHALL FIRST OPEN THE CHILLER WATER ISOLATION VALVES (ACV-1 OR ACV-2). ONCE THE VALVE POSITION IS VERIFIED BY ZC, THE LEAD PRIMARY LOOP PUMPS SHALL START. CHILLED WATER FLOW TO EACH OPERATING CHILLER SHALL BE MONITORED AND ALARMED VIA THE WATER FLOW TRANSMITTER. AFTER A 30 SECOND TIME DELAY (ADJUSTABLE FROM 0 TO 300 SECONDS TO PROVE FLOW), THE LEAD CHILLER SHALL BE ALLOWED TO START.
1.3. ONLY ONE PRIMARY PUMP AND ONE CHILLER SHALL OPERATE AT A TIME. IF EITHER CHILLER FAILS, IT SHALL BE LOCKED OUT. THE CHILLER'S ISOLATION VALVES SHALL CLOSE AND AN ALARM SHALL BE GENERATED. THE LAG CHILLER SHALL BE STARTED. THE BAS SHALL
NOT ATTEMPT TO START THE FAILED CHILLER UNTIL THE LOCKOUT IS MANUALLY RESET.
2. CHILLER LEAD/LAG CONFIGURATION
2.1. THE CHILLER SHALL OPERATE WITH 6 STAGES OF OPERATION ACCORDING TO CHILLER MANUFACTURER INTERNAL CONTROL.
2.2. THE DDC SHALL ROTATE THE LEAD/LAG CHILLER SELECTION ON EACH RESTART TO EQUALIZE RUN TIME.
2.3. COORDINATE PART LOAD AMPS CORRESPONDING WITH CHILLER PART LOAD % OF FULL LOAD TONS WITH CHILLER MFGR'S DATA.
3. CHILLER ACTIVATION / DEACTIVATION SEQUENCES:
3.1. ACTIVATE THE CHILLER.
3.2. SLOWLY OPEN THE LEAD CHILLER ISOLATION VALVE BEFORE STARTING THE LEAD PRIMARY PUMP.
3.3. AFTER CHILLED WATER FLOW TO THE LEAD CHILLER IS VERIFIED VIA THE DP SENSORS, THE LEAD CHILLER SHALL BE ACTIVATED.
3.4. DEACTIVATE THE CHILLER.
3.5. AFTER A 3 MINUTE DELAY. THE PRIMARY PUMP SHALL BE STOPPED. AFTER THE PUMP STOPS, SLOWLY CLOSE THE CHILLER ISOLATION
VALVE
C. PRIMARY AND SECONDARY PUMP CONTROL
1. SAFETIES AND ALARMS
1.1. IF PUMP FAILS TO OPERATE AFTER BEING COMMANDED ON, AN ALARM SHALL BE INDICATED AT THE BAS, THE LEAD PUMP SHALL SHUT
DOWN, AND THE LAG PUMP SHALL BE STARTED.
1.2. THE BAS SHALL MONITOR THE POSITIONS OF THE HOA AND NORMAL-TEST-BYPASS SWITCHES ON THE VFD.
1.3. THE BAS SHALL MONITOR THROUGH BACNET INTERFACE THE OPERATION OF THE CHILLERS.
1.4. THE BAS SHALL DISPLAY ALL CHILLER ALARM PANEL ALARMS AND OPERATING PARAMETERS THROUGH THE DDC SYSTEM TO THE BAS
FRONT END.
1.5. THE BAS SHALL ROTATE THE LEAD/LAG PUMP TO EQUALIZE RUN TIME.
2. OPERATION
2.1. PRIMARY PUMP SHALL RUN ANYTIME THE CHILLER IS COMMANDED TO RUN AND RUN AT CONSTANT VOLUME TO MEET THE DP SENSOR SETPOINT OF THE CHILLER. SETPOINT SHALL BE SET DURING TESTING, ADJUSTING AND BALANCING. THE VFD SHALL BE USED FOR TAB
ONLY, AND SHALL BE LOCKED WHEN TAB IS COMPLETED.
2.2. SECONDARY PUMP SHALL RUN UPON COOLING COMMAND FROM ANY EQUIPMENT AND RUN AT VARIABLE SPEED TO MEET THE DP SENSOR SETPOINT AT THE CHILLED WATER RISER. SETPOINT SHALL BE SET AND VERIFIED DURING TESTING, ADJUSTING AND BALANCING.
2.3. WHEN CHILLER SYSTEM IS FIRST STARTED, SECONDARY PUMP SHALL BE STARTED AT LOW SPEED AND SHALL OPERATE BY ITSELF FOR 0.5 HOUR (ADJ). THE PRESSURE DIFFERENTIAL (DP'S) SENSORS PROVIDED ON EACH RISER SHALL BE POLLED. THE DP WITH THE LOWEST READING AS CONFIRMED BY THE TAB CONTRACTOR SHALL BE USED TO CONTROL THE PUMP(S). DP SENSORS ARE USED TO CONTROL THE PUMP VARIABLE FREQUENCY DRIVE (VFD'S) AND INCREASE PUMP SPEED AS REQUIRED TO MAINTAIN DP SENSORS SETPOINT.
2.4. DESIGN DP SETPOINTS ARE SPECIFIED BELOW: (TO BE VERIFIED DURING TESTING, ADJUSTING, AND BALANCING)
OPERATING ROOM: 12.0 PSI
4"Ø RISER: 18.0 PSI
6"Ø RISER : 8.5 PSI
2.5. IF DIFFERENTIAL PRESSURE AT ANY SENSOR IS ZERO FOR 30 MINUTES (ADJ) OR HAS BEEN DETERMINED TO BE UNRELIABLE BY THE EMCS, IT SHALL BE REMOVED FROM THE MONITORING SEQUENCE AND AN ALARM SHALL BE ISSUED AT THE BAS. THIS ALARM SHALL BE RESET
AUTOMATICALLY WHEN THE SENSOR RETURNS TO AN OPERABLE STATE.
2.6. SHOULD THE MINIMUM FLOW ALLOWED FOR THE PUMP BE REACHED, ACV-3 SHALL OPEN UP TO MAINTAIN MINIMUM REQUIRED FLOW FOR THE PUMP.THE MINIMUM SPEED OF THE PUMPS SHALL BE SET BY THE MINIMUM PUMP FLOW AS REQUIRED BY THE PUMP MANUFACTURER (+ 10% SAFETY), OR THE MINIMUM VFD SPEED AS RECOMMENDED BY THE VFD MANUFACTURER, WHICHEVER IS GREATER.
2.7. THE CHILLER SHALL OPERATE WITH 6 STAGES OF OPERATION ACCORDING TO CHILLER MANUFACTURER INTERNAL CONTROL.
2.8. CHILLED WATER SUPPLY TEMPERATURE SETPOINT RESET
THE CHW SUPPLY TEMPERATURE SET POINT FOR THE OPERATING CHILLERS SHALL BE RESET AS FOLLOWS:
OA DRY BULB CHW TEMPERATURE SETPONT
55°F (ADJ) 42°F (ADJ)
65°F (ADJ) 41°F (ADJ)
90°F (ADJ) 40°F (ADJ)
SET POINT SHALL BE LIMITED TO 1°F (ADJ) PER HOUR.
2.9. CHILLED WATER DIFFERENTIAL PRESSURE SETPOINT RESET
THE CHW DIFFERENTIAL PRESSURE SET POINT SHALL BE RESET BASED ON AIR HANDLING UNIT (AHU) CHW CONTROL VALVE POSITIONS TO MINIMIZE PUMP ENERGY AND TO ENSURE THE WARMEST POSSIBLE RETURN WATER. BAS SHALL RESET THE CHW DIFFERENTIAL PRESSURE
SET POINT AS FOLLOWS:
NUMBER OF CHW VALVES 100% OPEN 1 OR LESS (ADJ) 6 OR MORE (ADJ)
CHW DP SET POINT REDUCE 5 PSI (ADJ) 2 PSI (ADJ)
2.10. CHILLER TONNAGE CALCULATION THE INDIVIDUAL CHILLED OPERATING OUTPUT (CHILLER TONS) SHALL BE CALCULATED AND INDICATED AT
THE BAS USING CHILLED WATER FLOW RATE AND TEMPERATURES AS FOLLOWS:
CHILLER TONS = ((CHWR - CHWS)) X FLOW RATE (GPM)) / 12
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction Documents
C U se rs
\P e te r\
D o cu m e n ts \C h ill e rR e p la ce m e n t_
R jw e e k s L E
Y
R .r v t
/5
/2
:4
:3
P M
CONTROLS
DM HL
MI-400
SWITCH LEGEND
S a
ABBREVIATIONS
RMS
TSP
KW
WIRING DEVICE LEGEND
GFI
J
PB
MOTOR & CONTROLS LEGEND
HT
SM
60AS
50AF
C
CP
VFD
ATS
G
30AS
60AF
60AS
CB
100AF
90AT
POWER DISTRIBUTION
G
T
LIGHTING FIXTURE LEGEND
LIGHTNING PROTECTION LEGEND
BOLTED BONDING CONNECTION
AT
G
ONE LINE SYMBOLS LEGEND
XXAS
XXAF
XXAF
XXAT
K
HOA
N E L
R21A
EXISTING EQUIPMENT LEGEND
BRANCH CIRCUIT & FEEDER LEGEND
FEEDER HOMERUN. REFER TO LEGEND OF FEEDER SIZES FOR CONDUCTOR
AND RACEWAY REQUIREMENTS DESIGNATED INSIDE TAG. H42B-1
INDICATES PANEL AND CIRCUIT NUMBER DESIGNATION FROM WHICH
HOME RUN SHALL ORIGINATE, 100A-3P INDICATES 100 AMPERE, 3 POLE
CIRCUIT BREAKER.
R22A-1,3,5
100A-3P H42B-1
E
AIR TERMINAL-FLAT ROOF MOUNT DETAIL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
7/01/2021Revisions: Date:
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990
200 Brickstone Square Andover, MA 01810 P: 978-296-6227 F: 978-475-5768
Air-Cooled Chiller Replacement 36C24120C0045
Manchester VA Medical Center 718 Smyth Road, Manchester, NH 03104
100% Construction
Documents
TRAILER.
AND PUMPS ON 40 FEET FLAT
TEMPORARY 100 TON CHILLER
TEM
TEMPORARILY REMOVED
EXISTING FENCE SHALL BE
TRAILER.
AND PUMPS ON 40 FEET FLAT
TEMPORARY 100 TON CHILLER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
7/01/2021Revisions: Date:
248 Copeland Street Quincy, MA 02169 P: 617-481-6390 F: 617-687-5990