FNWZ 17-0021A - Attachment E - Pricing Worksheet - Contractor.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Demo B6142
- Solicitation number
- FA46612526Q0006
About this file
This file is a Pricing Worksheet for a demolition project at Dyess Air Force Base, Texas. The document details a comprehensive demolition of Building 6142, which has approximately 15,275 square feet, requiring complete removal including concrete slabs, foundations, sidewalks, drives, utilities, and all associated building components such as structural elements, mechanical systems, electrical infrastructure, and interior finishes. The pricing breakdown is organized by construction divisions, with minimal pricing entries (only Division 1 and Division 3 showing $1.00 each), suggesting this may be a preliminary or template pricing document. The project is solicited under Solicitation Number FA46612526Q0006 by the Department of the Air Force Global Strike Command, with the contractor expected to provide all labor, equipment, supervision, and incidentals necessary to complete the full demolition in accordance with project specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B6142_RFQ_COMBO_V4.pdf | ||
| FNWZ 17-0021A B6142 RFIs - Final (12-10-2025)V2.xlsx | XLSX spreadsheet | |
| B6142_RFQ_COMBO_V3.pdf | ||
| 55-0597 - Original Construction.zip | ZIP file | |
| FNWZ 17-0021A Demo BLDG 6142 SoW (11-6-2025) 2.pdf | ||
| B6142_RFQ_COMBO.pdf | ||
| FNWZ 17-0021A Demo BLDG 6142 DWGs.pdf | ||
| FNWZ 17-0021A Demolish BLDG 6142 LibraryEduc Ctr Bid Schedule (11-6-2025).pdf | ||
| FNWZ 17-0021A - Att E - AF Form 3064.xlsx | XLSX spreadsheet | |
| Wage Determinations_2025.pdf | ||
| FNWZ 17-0021A - Att E - AF Form 3065.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT E | ||||||||
| PRICE BREAKDOWN BY DIVISION | Contractor: | |||||||
| Date: | ||||||||
| Dyess AFB, TX | Note: Due no later than 2 hours after official bid time. | |||||||
| FNWZ 21-0071 | Color Legend: | Pricing Areas | Formula Areas | |||||
| Division Line Items Include the Items Below: | ||||||||
| 0001-Base Pricing, Item 1 – FNWZ 17-0021A – Demo Building 6142 | ||||||||
| CONTRACTOR PRICE | Division 1: typically bonds, general liability, builders risk, O&P | |||||||
| (529 Funds) | LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | % of Est | Notes: If DB, typically includes design fees, geotechnical, CAD as-builts, materials testing, etc. | |
| Division 1 - General Conditions | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 50.00% | Notes: If Bid-Build, typically includes CAD as-builts, materials testing, superintendent, storage containers, vehicles, small tools, trash dumpsters, portable toilets, project signage, |
bulletin board, plan sets, temporary fencing, cleanup, etc.
| Division 2 - Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 2: earthwork, asbestos abatement, selective building demolition, site grading, tree trimming & removal, termite treatment, seeding, etc. |
| Division 3 - Concrete | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 50.00% | Division 3: basic concrete materials & methods, forms, accesssories, reinforcement, concrete placement & labor |
| Division 4 - Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 4: masonry, grout, labor |
| Division 5 - Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 5: structural framing, metal deck & joists, cold-formed metal framing, ornamental metal, expansion control |
| Division 6 - Woods & Plastic | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 6: rough & finish carpentry, casework |
| Division 7 - Thermal/Moisture | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 7: dampproofing, waterproofing, thermal protection, roofing, flashing, roof specialties, fire & smoke protection, joint sealers |
| Division 8 - Doors & Windows | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 8: doors, frames, windows, entrances & storefronts, skylights, hardware, glazing |
| Division 9 - Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 9: metal support facilities, gypsum board, tile, ceilings, flooring, wall finishes, acoustical treatment, paints & coatings |
| Division 10 - Miscellaneous Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 10: visual display boards, grilles & screens, architectural louvers & vents, corner guards, access flooring, flagpoles, identification devices/signage |
| Division 12 - Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 11: loading dock equipment, residential equipment |
| Division 15 - Plumbing & HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 12: manufactured casework |
| Division 16 - Electrical, Communication, & Fire Alarm | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | Division 13: sound, vibration & seismic control, lightning protection, pre-engineered structures, swimming pools, hazardous material remediation, building automation & control, |
| 100.00% | Division 14: elevator and associated equipment | ||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | Division 15: building services piping, fire protection piping, plumbing fixtures & equipment, HVAC equipment, air distribution, HVAC instrumentation & controls, HVAC testing & balancing | ||
| 0001-Base Pricing, Item 1 – FNWZ 17-0021A – Demo Building 6142 Totals: | 2.00 | 0.00 | 0.00 | 0.00 | $ 2.00 | Division 16: fire detection & alarms, wiring methods, electrical power, transmission & distribution, lighting, communications |
Total Construction Cost: $ 2.00