ATTACHMENT 2- Technical Requirements v.2.pdf

PDF 610 KB Posted

Attached to
Sources Sought- Dental Washer Disinfector
Solicitation number
FM230032701269
Issued by

About this file

The document is a Statement of Work (SOW) for an AMSCO 5052 Dental Washer Disinfector, dated 17 April 2025, for the Wright Patterson Medical Center Dental Services Clinic. The SOW details technical specifications for a washer disinfector capable of sanitizing 190 instrument trays daily, with critical requirements including a cabinet-style design with vertical sliding doors, steam operation, 200-208V power, and the ability to process 18 trays across three levels. The equipment must meet OSHA, The Joint Commission, and AAMI standards, with specific performance requirements such as maintaining temperatures between 82-90°C, operating a minimum of 19 cycles per day, and featuring a control system with adjustable screen and locked program parameters.

The procurement includes comprehensive installation services, with the contractor responsible for removing existing equipment, relocating water and air lines, cutting wall openings, installing electrical connections, and performing startup testing. The washer must come with accessories including a 3-level manifold rack, protocol printer, and two auto-docking transfer carts. Delivery is specified as 120 days from ARO, with a minimum one-year original equipment manufacturer warranty. The technical requirements are part of a sources sought synopsis for potential vendors, targeting small businesses, 8(a) participants, HUBZone businesses, women-owned small businesses, and service-disabled veteran-owned small businesses, with a NAICS code of 339113 and a small business size standard of 800 employees.

View the file

Other files

File Type Posted
ATTACHMENT 1 - Instructions.pdf PDF
ATTACHMENT 2- Technical Requirements.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMSCO 5052 Dental Washer Disinfector 17 April 2025

1. Introduction: The Wright Patterson Medical Center Dental Services Clinic is in need of a washer disinfector for the sanitization of 190 trays of instruments on a daily basis.

Without this capability they are unable to disinfect their instruments leading to the potential cancellation of Active duty and beneficiary appointments.

2. Background: The Dental washer prevents the spread of infection and cross contamination for our patients and staff. Our current washer is within its 3-year life expectancy and has undergone several unexpected repairs causing interoperability.

Without the washer we are forced to use a back-up process which is inefficient and cannot keep up with the demands of a large dental clinic. Having a properly functioning washer will provide an efficient and proper decontamination of all dental instruments and keep us in compliance with The Joint Commission (TJC).

3. Delivery Date: 120 Days from ARO.

o Requested delivery dates 120 Days from ARO o Base Access Point of Contact

SSgt Vivian Thompson, Vivian.e.thompson5.mil@health.mil, 937-522-

SrA Jeffrey Allen, Jeffrey.w.allen58.mil@health.mil, 937-257-2352 TSgt Nana Ofosu-Yeboah, nana.y.ofosuyeboah.mil@health.mil, (937)

257-5956

4. Building address: 4881 Sugar Maple Drive, BLDG 830 Wright Patterson Air Force Base, OH 45433

5. Minimum Requirements:

o Size Requirements:

• Shall fit in the current space available 44 x 74 x 37''.

• Exterior Dimensions: Maximum 1067 x 2032 x 787 mm (42 x 80 x 31").

• Interior Chamber Dimensions: Maximum 673 x 667 x 660 mm (26-1/2 x 26-1/4 x 26").

• Loading Height: 787 mm (31") above finished floor.

o Design Requirements:

Washer shall be cabinet style with vertical sliding doors. The doors shall have an option to open manually in the event of a power failure and double pane tempered

STATEMENT OF WORK

glass to allow operator view into the chamber during operation and to protect operator from potential harm with cool to touch glass on the exterior. Washer shall be pneumatically activated and be equipped with a built-in safety system that has an emergency stop button, a door safety switch, pressure reliefs and an alarm system. Product shall be mounted on a compressed seal to reduce heat loss and increase heating capability. An interlock feature shall be provided to prevent cross contamination. Chamber shall have horizontal fixed surfaces that are sloped with overlapping metal sheets for complete sanitary drain and to reduce the number of hard-to-clean locations within the chamber.

WASHER DISENFECTOR additional specifications:

Shall operate on Steam.

200-208V, 60Hz

TRAY DIMENSIONS:

25 1/2'' X 25 1/2'' X 22 1/4'', current instrument trays can be used with the new manifold rack.

Weight: 31 lbs.

Shall have a three level multi-functional rack that holds a maximum of six trays on each level (18 trays total).

Shall hold both general and special purpose racks to process large and small items.

Durable and highly versatile racks to accommodate processing needs.

o Performance Requirements Washer shall be able to complete reverse osmosis to meet all

Occupational Safety and Health Administration (OSHA), TJC and infection preventions, and be able to operate a minimum of 19 cycles/day, delivering full coverage cleaning to all instruments with properly dosed disinfecting solutions. Product shall have a rack capacity of at minimum 10 trays, and factory-loaded with 7 wash cycles and a decontamination cycle to ensure effective washing and disinfection.

Washing cycles include Instruments, Utensils, Plastic goods, Anesthesia products, Gentle and RIGID MIS cycles. System shall include an audible warning system that alerts users of any abnormal conditions and have a screen to display and set settings.

o Wash Chamber Requirements:

Washer shall be constructed of 16-gauge stainless steel, argon-welded and have a polished finish. Washer shall be single-walled and have an insulated exterior to reduce heat loss and noise level within the clinic.

Products shall include two rotary spray assemblies; one located at the top of the chamber the other at the bottom and be positioned in a way to reach all load surfaces (620 mm [24 3/8”’] long based on requested maximum chamber dimensions).

o Temperature Requirements:

Raise/Maintain 82 °C (180 °F) during the Wash phase.

Raise/Maintain up to 90 °C (194 °F) during the Thermal Rinse phase.

o Control System Requirements:

Screen shall be mounted on unit and be adjustable at eye level for optimal visibility while monitoring all wash cycles. System shall have locking program cycle parameters with access code, and service mode for preventive maintenance testing and troubleshooting. Washer shall have a security lock-out feature that enables programs and temperatures to be locked and unchangeable without the proper access code.

o Accessories – The equipment shall come with the following accessories 3 Level Manifold rack – Qty 1 Protocol Printer - Qty 1 Auto Docking Transfer Cart Adapter for 5052 Washers-Qty 2 Auto Docking Transfer Cart for Standard Chamber Washers-Qty 2 o Configuration – Configuration may be required.

o Deinstallation, Installation & Testing – The contractor that is awarded the contract shall complete the following services to ensure functionality prior to the job being considered completed.

Install IRCA barriers Remove door frame for equipment removal Remove the existing equipment that is being replaced from room BR17 within the WPMC Dental Clinic, transport to dock and request pick-up.

Shall relocate existing water lines for new equipment. 2-lines to be 1/2 ‘ with threaded shut-off valves Shall insulate new piping.

Tie into air system in the hallway and run new ½’ compressed air line to new equipment with threaded shut-off valve and regulator Shall provide and install wiring and conduit to the nearest electrical room for successful operation.

Provide and install 1-40amp breakers to existing panels and install EQ whip to new equipment Cut the wall opening larger to accept new equipment.

Shall seal concrete floor under equipment and new equipment in place.

Shall accept delivery of new equipment Shall install the new equipment and make final utility connections Shall install any accessories included., including soap pumps, racks, chemical lines, and provide Panduit for run Shall startup equipment to ensure successful cycle prior to job completion.

Shall tear down contain barriers o Warranty – A minimum of a year original equipment manufacturer warranty shall be included with this equipment.

o Standards, guidelines or approvals – Shall meet AAMI ST-79, comprehensive guide to steam sterilization and sterility assurance in health care facilities.

According to AAMI ST-79, a steam penetration test shall be carried out at the beginning of each day the sterilizer is to be used. Any test package shall be constructed in accordance with instructions given in the AAMI ST-79 standard.

ANSI/AAMI ST-79 requires an air removal (Bowie-Dick) test cycle be run as the first cycle each day the sterilizer is in use. The chamber shall be at operating temperature when the test cycle is performed. According to AAMI standards, a measured leak rate greater than 1mm Hg/minute (1.3 mbar/mil) indicated a problem with the sterilizer. Shall follow ANSI/AAMI/ISO 18472 2022 and ANSI/AAMI ST79/2017 & 2020 Amendments.