FLS Review Summary.docx

DOCX document 15 KB Posted

Attached to
3rd Party Fire Protection and Life Safety Reviews
Solicitation number
36C24726Q0443
Issued by

About this file

This is a Fire Protection and Life Safety Review (FPLSR) Status Summary documenting the progress and completion status of eight facility improvement projects across multiple buildings within the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7. The document provides design completion percentages and current review status for each project, with all items currently in "Pending" status.

The projects include: replacement of flooring and wall repairs in Building 1 (100% design complete); replacement of mechanical and air handling equipment in Building 1 (95% design complete); repair/replacement of mechanical HVAC and AHU deficiencies in Buildings 120 and 129 (75% design complete); replacement of the boiler plant in Building 12 (90% design complete); renovation of Building 10 (100% design complete); correction of mechanical fixtures and piping for Buildings 2, 4, and 4A (100% design complete); replacement of roofs in Buildings 19, 20, 50, 51, and 62 (100% design complete); and renovation of the Dothan Clinic (65% design complete). The solicitation (36C24726Q0443) seeks an independent third-party contractor to provide all labor, materials, equipment, and supervision necessary to conduct these eight Fire Protection and Life Safety Reviews across the specified facilities.

View the file

Other files

File Type Posted
S02-36C24726Q0443 - Questions and Responses-2.docx DOCX document
36C24726Q0443 - Questions and Responses.docx DOCX document
36C24726Q0443.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Description+B1:D24

Design % Complete
FPLSR Status (Fire Protection & Life Safety Review)
Replace flooring and repair walls in Building 1
100%
Pending
Replace Mechanical and Air Handling Equipment - Building 1
95%
Pending
Repair/Replace Mechanical HVAC and AHU Deficiencies in Buildings 120 and 129
75%
Pending
Replace Boiler Plant in Building 12
90%
Pending
Renovate Building 10
100%
Pending
Correct the Mechanical / Fixtures and Piping for Buildings 2,4, 4A
100%
Pending
Replace Roofs in Bldgs. 19, 20, 50, 51 and 62
100%
Pending
Dothan Clinic
65%
Pending