FLHSMV-ITB-028-27 Addendum 3 .pdf

PDF 286 KB Posted

Attached to
Total Vehicle Upfitting Services
Solicitation number
ITB-17232
Issued by
Leon County, Florida

About this file

FLHSMV-ITB-028-27 Addendum 3 Summary

This addendum modifies the Invitation to Bid (ITB) FLHSMV-ITB-028-27 issued by the Florida Department of Highway Safety and Motor Vehicles, Division of Florida Highway Patrol, for total vehicle upfitting services across eleven FHP Troop regions in Florida. The Department anticipates approximately 300 vehicles annually requiring upfitting with services including portable radio chargers, two-way mobile radios, in-vehicle lighting, radar and laser equipment, mobile data equipment, weapon racks, prisoner partitions, antennas, utility boxes, decals, door armor, window guards, printers, push bumpers, and mobile video recording systems. Contractors must establish dedicated upfitting facilities located within specific Florida counties designated for each FHP Troop region and operate during regular business hours Monday through Friday, 8:00 a.m. to 5:00 p.m. Eastern Time. The original ITB bid submission deadline was November 16, 2026, at 2:00 p.m. Eastern Time, with bid opening by conference call at 2:30 p.m. The contract term is three years for the initial term with an option to renew for up to three additional years, contingent on satisfactory performance and legislative appropriation. Awards will be made to one responsible and responsive bidder per FHP Troop location based on the lowest Grand Total Price submitted on the revised Price Sheet.

Bidders must submit completed electronic Excel and signed PDF copies of the Price Sheet specifying their upfitting facility address, applicable FHP Troop region, facility location county(ies), per-vehicle pricing for initial and renewal terms, and hourly labor rates for all vehicle types. All prices must be firm and inclusive of labor, wiring, accessories, consumables, and materials. Contractors must secure Garage Liability and Garage-keepers Legal Liability insurance with limits sufficient to cover the actual cash value of vehicles, obtain Motor Vehicle Repair Shop Registration Certification from the Florida Department of Agriculture and Consumer Services, and employ at least one ASE-certified or Emergency Vehicle Technician-certified technician. Upfitting services must be completed within thirty days of the contractor's possession of the vehicle and all required equipment, with financial penalties of $50 per day per vehicle for delays beyond this period. The addendum clarifies that the Department intends to deliver all equipment to the contractor's facility prior to vehicle arrival, that inspections will occur within five business days of completion notification without counting against the thirty-day deadline or storage capacity requirements, and that contractors remain responsible for vehicles until final Department acceptance. Additional financial consequences include penalties for uncorrected work, warranty issues, and late invoice submissions, with a cap of $3,000 per month for general non-compliance incidents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLHSMV-ITB-028-27 Page 1 of 16

FLHSMV-ITB-028-27

Total Vehicle Upfitting Services

Addendum No. 3

November 17, 2026

FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION

120.57(3), FLORIDA STATUTES, OR FAILURE TO POST THE BOND OR OTHER

SECURITY REQUIRED BY LAW WITHIN THE TIME ALLOWED FOR FILING A BOND

SHALL CONSTITUTE A WAIVER OF PROCEEDINGS UNDER CHAPTER 120,

FLORIDA STATUTES.

Note: Additions to the ITB are shown in underlined text; deletions are shown in stricken text. All terms and conditions of the ITB, not modified by Addendum No. 3, shall remain in full force and effect.

Item No. 1

FLHSMV-ITB-028-27 Attachment E, PRICE SHEET is hereby replaced in its entirety with the revised version dated November 10, 2026.

Item No. 2

Section 3.1 of FLHSMV-ITB-028-27, is revised in its entirety to read as follows:

3.1 Price Sheet Instructions

The Bidder must submit a completed electronic copy (Excel) and a signed pdf copy

ATTACHMENT E, PRICE SHEET as provided by the Department, if both versions are not included the bid may be deemed non-responsive. Hardcopy/paper submissions will not be accepted, EMAIL ONLY.

A. On ATTACHMENT E, PRICE SHEET, the Bidder shall:

• Specify the FHP Region Troop location (see Table 1 – FHP Regions Troop

Locations in Section 2.1 of ATTACHMENT B, SCOPE OF WORK), the address of the Bidder’s Upfitting Facility, and the county(ies) in which the Bidder’s

Upfitting Facility is located, in the yellow cells;

• Provide a Price(s) per vehicle for each Vehicle Type in each yellow cell for both the Initial Term and Renewal Term below the words “Price per Vehicle”; and

• Provide Hourly Labor Rates for each Vehicle Type in each yellow cell for both the Initial Term and the Renewal Term below the words “Hourly Labor Rate”.

FLHSMV-ITB-028-27 Page 2 of 16

Failure to specify an FHP Region Troop location, the address of the Bidder’s Upfitting

Facility, and the county(ies) in which the Bidder’s Upfitting Facility is located, in the yellow cells or to provide a Price per Vehicle or Hourly Labor Rates, in the yellow cells for such information for both the Initial Term and Renewal Term, of the Price Sheet may deem the

Price Sheet non-responsive.

B. If bidding on more than one FHP Region Troop location, the Bidder must provide a separate, completed price sheet for each FHP Region Troop location. The Bidder must have a separate Upfitting Facility in each FHP Troop and that facility must be located within one of the counties within that FHP Troop, as specified in Table 1 - FHP

Regions Troop locations in Section 2.1 of ATTACHMENT B-SCOPE OF WORK.

C. The Hourly Labor Rate must include all expenses the Bidder will incur in performing work. Hourly labor rates will only be applied if additional work is required as determined by the Department.

D. The prices submitted by the Bidder shall be firm and include all costs related to services as outlined in the ITB and ATTACHMENT B, SCOPE OF WORK.

E. The Bidder shall use legible handwriting, if applicable, when completing the price sheet(s).

F. All price sheet calculations will be verified for accuracy by the Department. If mathematical error(s) in a Bidder’s Price Sheet calculations are identified, Unit Prices submitted by the Bidder will be used to determine the “Initial Term Subtotal”, “Renewal

Term Subtotal”, and “Grand Total Price” for that Bidder, unless determined otherwise by the Department.

The “Initial Term Subtotal”, “Renewal Term Subtotal”, and “Grand Total Price” on the Price

Sheet will be final based on Department verification. Department-corrected price sheets will be made available upon written request to the Bidder as permitted by state law.

G. The Department will not agree to caveat language within ATTACHMENT E, PRICE

SHEET relating to pricing or the requirement that the Bidder’s Upfitting Facility for the specified FHP Region Troop must be located within one of the counties specified in

Table 1 - FHP Regions Troop locations in Section 2.1 of ATTACHMENT B, SCOPE

OF WORK. A bid submittal that includes such caveat language will be viewed as a conditional bid and the Department will reject the Bidder’s bid submittal. (See, also subsection 3.4, Non-Responsive Bids, Non-Responsible Bidders, below.)

H. ATTACHMENT E, PRICE SHEET shall be labeled and tabbed separately by Troop

Region location and should be included with the original copy of the submission.

Item No. 3

FLHSMV-ITB-028-27 Page 3 of 16

Section 5.1 of FLHSMV-ITB-028-27, is revised in its entirety to read as follows:

5.1 Basis of Award

The Department intends to award one contract in each of the eleven (11) FHP Regions

Troop Locations specified in Table 1 – FHP Regions Troop Locations in Section 2.1 of

ATTACHMENT B, SCOPE OF WORK. Each such contract will be awarded to the responsible and responsive Bidder that submits a responsive bid with the lowest “Grand

Total Price” shown on ATTACHMENT E, PRICE SHEET, for each respective FHP

Region Troop Location as specified in Table 1 – FHP Regions Troop Locations.

Item No. 4

Section 2.0 of FLHSMV-ITB-028-27, ATTACHMENT B-SCOPE OF WORK, is revised in its entirety to read as follows:

2.0 SERVICES TO BE PROVIDED BY CONTRACTOR

The Contractor shall provide all required labor necessary for the total upfitting for FHP vehicles. The cost shall include all labor, tools, wiring including connectors and other accessories, any and all consumables for cleaning, preparation, and installation of equipment in accordance with the terms and conditions of this ITB.

Based on the past volume of vehicles purchased by the Department on an annual basis, the Department anticipates approximately three hundred (300) vehicles for vehicle upfitting each year. Quantities are estimated for informational purposes only and should not be construed as representing actual, guaranteed, or minimum purchases to be made by the Department.

The Department will coordinate the delivery of FHP vehicles from the dealership where they are purchased by the FHP to the Contractor’s Upfitting Facility for the respective

FHP Regions Troop specified in Table 1 of Section 2.1 to which each vehicle will be assigned. It is the intent of The Department intends to deliver or have delivered all equipment required for upfitting such vehicles to the Contractor’s facility prior to the vehicle’s arrival. The Contractor will be responsible for this equipment and will be responsible for repairing or replacing lost or damaged equipment once the equipment is in the Contractor’s possession.

The Contractor shall begin upfitting services for such vehicle(s) within ten (10) business days of being notified by the Department representative or Central Installation Facility

(CIF) authorized representative of the availability of new FHP vehicle(s) for upfitting and confirmation that the Contractor received all equipment required for upfitting such

FLHSMV-ITB-028-27 Page 4 of 16 vehicles. Unless otherwise agreed to in writing by the Department, the upfitting services for all such vehicles shall be completed within thirty (30) days of Department notification pertaining to such vehicle(s) of the Contractor being notified of the availability of new

FHP vehicles and the Department confirming the Contractor received all equipment required for upfitting such vehicles.

Contact Information for the Central Installation Facility:

Florida Highway Patrol

Central Installation Facility

3646 County Road 220, Middleburg, Florida 32068-3831

2.1. At a minimum, the selected Contractor’s Upfitting Facility for each FHP Troop

Region must be located within the state of Florida and in one of the counties specified for the respective FHP Region Troop or below in Table 1 –FHP

Regions Troop Locations.

Table 1 – FHP Regions Troop Locations

FHP

Region Troop

FHP Troop or Region Location Counties in which the Contractor’s Upfitting Facility

Must Be Located

A West 150 W. Stumpfield Rd., Pensacola, FL 32503

Escambia, Santa Rosa, Okaloosa, and Walton.

A East 6030 County Road 2321 Panama City, FL 32404

Holmes, Jackson, Washington, Bay, Calhoun, and Gulf.

H 2100 Mahan Dr., Tallahassee, FL

32308 Leon, Jefferson, Gadsden, and

Wakulla.

B South 6300 NW 13th St., Gainesville, FL

32653 Alachua and Marion.

B North 1350 W. US Highway 90

Suite 201, Lake City, FL 32055 Columbia, Suwannee, and Hamilton.

G 7322 Normandy Blvd., Jacksonville, FL 32205

Clay, Duval, Nassau, and St.

Johns.

C 11305 N. McKinley Dr., Tampa, FL

33612 Hillsborough, Sumter, Hernando, Pasco, Pinellas, and Polk.

D 11059 International Drive, Orlando, FL 32821

Lake, Orange, Osceola, Seminole, Volusia, and Brevard.

F 5023 53rd Ave E, Bradenton, FL

34203 Manatee, Sarasota, Charlotte, Collier, and Lee.

L 14190 State Road 84, Davie, FL

33325 Indian River, St. Lucie, Martin, Palm Beach and Broward.

FLHSMV-ITB-028-27 Page 5 of 16

2.2 Upfitting Facility; Location in FHP Region(s) Troop

A Bidder shall provide the address of and a map showing, the location of the

Contractor’s Upfitting Facility for and within each respective FHP Regions

Troop (specified above in Table 1 – FHP Regions Troop) for which the Bidder seeks to receive a contract.

The Contractor’s Upfitting Facility must be located within one of the counties for each respective FHP Region Troop for which the Bidder seeks to receive the contract for that FHP Region Troop, as specified above in Table 1- FHP

Troops and FHP Troop Regions.

A Bidder seeking a contract in more than one FHP Region Troop must have a separate Upfitting Facility for each such FHP Region Troop that is within one of the counties specified for each such FHP Region Troop, as indicated above in Table 1 – FHP Regions Troop Locations.

For FHP Troops I, J, K and L, which cover toll facilities and commercial vehicle enforcement, the Department plans, at its sole discretion, to allocate work to the nearest Upfitting Facility with capacity.

The Department reserves the right to allocate vehicles to any awarded

Contractor within an adjacent Region Troop area if operational needs require

it. By doing so, it would ensure continuity of service and prevent delays when a facility within a Region Troop experiences capacity, staffing, or scheduling constraints. The Department will determine the most appropriate facility if the need arises in order to maintain efficient and timely upfitting services.

Contractors with multiple facility locations within an FHP Region may provide services from any eligible location under a single bid submission for that FHP

Region and are not required to submit separate Price Sheets for each location.

Item No.5

Section 4.0 of FLHSMV-ITB-028-27, ATTACHMENT B – SCOPE OF WORK, is revised

E 1011 NW 111th Ave, Miami, FL

33172 Miami-Dade.

FLHSMV-ITB-028-27 Page 6 of 16

4.0 GENERAL FACILITY REQUIREMENTS

A. The Contractor’s facility must be open during regular business hours, at a minimum Monday through Friday from 8:00 AM to 5:00 PM, EST.

B. The Contractor shall maintain a secure storage area for all FHP owned vehicles in their possession. The Contractor must be able to securely store up to ten

(10) FHP vehicles at one time at their facility while processing. The Contractor’s secure storage must include, but is not limited to, the following:

• Controlled access ensuring vehicles cannot be accessed by unauthorized persons;

• Sufficient physical security measures to protect vehicles and their contents while in the Contractor’s custody; and

• Conditions and measures which allow the Contractor to assume full responsibility for FHP vehicles while stored at the Contractor’s facility.

C. The Contractor must perform all services at the location of the facility indicated in the Contractor’s bid submission unless approved and agreed upon by the

Department in advance.

D. The Contractor shall request approval, in writing, from the Department’s

Contract Manager prior to any change in the location of the approved service facility.

E. The Contractor shall possess all license(s) and certification(s) required to complete the services under this Contract.

F. The Contractor shall provide all labor, wiring, accessories, consumables, and materials necessary to perform the services required under this Contract.

NOTE: Noncompliance with this Section 4.0, General Staffing

Requirements, subsections A. – F., may result in the bid being deemed non-responsive or no contract being executed or purchase order issued.

G. Prior to Contract execution and upon Department request, the Contractor shall provide a copy of its Motor Vehicle Repair Shop Registration Certification.

Please refer to the following link for more information:

Motor Vehicle Repair / Consumer Rights and Responsibilities / Consumer

Resources / Home - Florida Department of Agriculture & Consumer Services

(fdacs.gov) https://www.fdacs.gov/Consumer-Resources/Consumer-Rights-and-Responsibilities/Motor-Vehicle-Repair https://www.fdacs.gov/Consumer-Resources/Consumer-Rights-and-Responsibilities/Motor-Vehicle-Repair https://www.fdacs.gov/Consumer-Resources/Consumer-Rights-and-Responsibilities/Motor-Vehicle-Repair

FLHSMV-ITB-028-27 Page 7 of 16

H. The Contractor will assume full liability and responsibility for all vehicles, and their contents, placed in its custody by FHP under this contract.

I. Additional Insurance Requirements: In addition to the insurance requirements outlined in Attachment C, Additional Terms and Conditions, the

Contractor shall obtain and provide proof of Garage Liability Insurance and

Garage-keepers Legal Liability Insurance, with minimum limits of liability in an amount sufficient to cover the actual cash value of the subject property, prior to Contract execution or issuance of a purchase order.

Item No. 6

Section 8.0 of FLHSMV-ITB-028-27, ATTACHMENT B-SCOPE OF WORK, is revised in its entirety to read as follows:

8.0 COMPLETION TIME

A. The Contractor shall prioritize FHP vehicles due to time sensitivity.

B. Unless otherwise agreed upon in writing by the Department, the Contractor must complete each vehicle within thirty (30) days of accepting possession of the vehicle and all applicable parts after notification from the Department.

Unless otherwise agreed upon in writing by the Department, the Contractor must complete upfitting services for each FHP vehicle within thirty (30) days of the Contractor being notified of the availability of new FHP vehicles and the

Department confirming the Contractor has received all equipment required for upfitting such vehicles.

C. The thirty (30) day return requirement begins when the vehicles are accepted by the Contractor.

D. In the event the thirty (30) day return requirement may not be met, the

Contractor is responsible for notifying the Department representative in writing immediately (no later than same day) to request approval for additional time from the Department.

E. The Contractor shall provide detailed justification in the time extension request.

If the request if approved, the Contractor shall provide the Department representative with any necessary updates, including the estimated time of completion.

FLHSMV-ITB-028-27 Page 8 of 16

F. Quantities may vary throughout the Contract. Large quantities may be requested at times based on inventory and recent purchases by FHP.

G. If the Department determines that the workload of the Contractor is such that timeliness is not possible in a given situation, the Department reserves the right to reassign the work to an alternate Vendor for completion.

Item No.7

Section 10.0 of FLHSMV-ITB-028-27, ATTACHMENT B-SCOPE OF WORK, is revised

10.0 INSPECTION AND ACCEPTANCE

A. For all services provided under the resultant contract, the Contractor shall be responsible for testing and inspecting all equipment prior to installation to determine its working status. Based on its findings, the Contractor shall contact the Central Install Facility (CIF) to verify if any equipment and/or parts are currently under warranty and/or to verify if any equipment and/or parts are available at the CIF.

B. The Contractor shall also be responsible for testing and inspecting all equipment following installation to ensure its working status and for notifying the Department representative of any issues, as indicated above.

C. Completion of the vehicle(s) does not constitute acceptance for the purposes of payment. Final acceptance and authorization of payment shall be given by the Department only after a thorough inspection indicates that the vehicle(s) are undamaged, meet the requirements, specifications, terms, and conditions, as described herein.

D. The Department intends to inspect completed vehicles within five (5) business days after the Contractor has notified the Department that the Contractor has completed all upfitting services and the vehicles are ready for inspection.

Item No.8

Section 21.0 of FLHSMV-ITB-028-27, ATTACHMENT B-SCOPE OF WORK, is revised

FLHSMV-ITB-028-27 Page 9 of 16

21.0 DELIVERABLES AND FINANCIAL CONSEQUENCES

The Contractor shall submit all deliverables in accordance with the Deliverable Schedule below. Deliverables must be approved by the Department’s Contract Manager prior to payment. Deliverable due dates may be extended upon prior written approval of the

Department. The Department reserves the right to impose financial consequences upon the Contractor for failure to comply with the performance standard requirements set forth in the table below.

Table 21

Deliverable and Financial Consequences

Deliverable Due Date Financial

Consequences

1. The Contractor shall schedule and complete vehicle upfitting in accordance with Section 8.0

(Completion Time) above once vehicle, parts, and a request from designated

Department personnel are received.

Within thirty (30) days of accepting possession of the vehicle.

Fifty dollars ($10050), per day, per vehicle for each day following the thirty (30) day period after accepting possession of the vehicle.

2. The Contractor shall correct or repair deficiencies in preparation to pass

Department inspection before acceptance.

Within the timeframe determined by the

Department.

Twenty dollars ($20) per hour (on-site correction), or seventy-five dollars ($75), per day, per vehicle (off-site correction), for repairs not completed within the timeframe determined by the

Department.

3. The Contractor shall submit a properly completed invoice to the Department’s Contract

Manager by the fifteenth

(15th) of the month following the month to which invoice pertains, prior to 5:00 PM

By the fifteenth (15th) of each month.

Ten percent (10%) of the invoice amount will be deducted from the corresponding invoice.

FLHSMV-ITB-028-27 Page 10 of 16

General Financial Consequences

Except as otherwise stated, the Department may impose up to $100 per day for each incident in which the Contractor has failed to perform as specified in this scope document and the Contract, not to exceed $3,000 per month.

Item No.9

ATTACHMENT B – EXHIBIT 1 – VEHICLE LOG is replaced in its entirety with the attached replacement EXHIBIT 1 – VEHICLE LOG.

Item No. 10

Questions and Answers

Note: All written questions are reproduced in the same format as submitted by the Vendor.

Question(s) received on 10/14/2026 from LEHR.

1.

Question:

1. Affiliated Legal Entities and Facilities

LEHR Upfitters Southeast, LLC intends to respond and can obtain the required manufacturer authorization letters.

May LEHR Upfitters Southeast, LLC submit pricing for multiple FHP troop locations using qualifying facilities operated by affiliated LEHR companies under separate EINs, provided each facility meets the solicitation requirements?

If not, may each affiliated LEHR entity submit independently for its qualifying troop locations, and must manufacturer authorization letters be issued in each bidding entity's legal name?

Answer: LEHR Upfitters Southeast, LLC may obtain the required manufacturer authorization letters on behalf of its affiliated entities, however, letters

(EST), in accordance with

Section 22.c below.

4. The Contractor shall address component failures or installation issues under warranty, providing corrective action and component replacements as necessary.

Within three (3) business days of notification by the

Department of component failures or installation issues which are under warranty.

Thirty dollars ($30) per day.

FLHSMV-ITB-028-27 Page 11 of 16 must clearly state the specific participating facilities which are authorized to perform the required work. Acceptance of any proposed facilities is at the Department’s sole discretion.

Also, please see Item No. 3 and 6 above.

2.

Question:

2. Vehicle Log Exhibit

Attachment B, Sections 15.0 and 22.0, reference the Vehicle Log as Exhibit

1. However, the Vehicle Log included in the solicitation is labeled Attachment B – Exhibit 2.

Please confirm which exhibit is required for invoicing and whether a corrected exhibit will be issued.

Answer:

The vehicle log is EXHIBIT 1 – VEHICLE LOG and is the supporting documentation for invoicing. Please see Item No. 9 above.

3.

Question:

3. Vehicle Decommissioning and Additional Labor Attachment B, Section 3.0(B), requires costs associated with transferring existing equipment to be included in the installation price.

Beyond removing equipment from outgoing FHP vehicles for reinstallation in new vehicles, is the contractor responsible for complete decommissioning of the outgoing vehicles, including removal of remaining wiring, lighting, mounting hardware, and other equipment not being transferred?

If so, should this additional labor be included in the fixed installation price or separately authorized and billed at the contracted hourly labor rate?

Response:

The complete decommissioning of FHP vehicles is not included with the scope of this ITB or any contract resulting from this ITB.

4. Question: 4. Thirty-Day Completion Requirement

Attachment B contains differing language regarding when the 30-day completion period begins. The introductory scope language references Department notification, while Section 8.0 references acceptance of the vehicle and applicable parts.

Please confirm the exact event that starts the 30-day completion period and whether all required equipment must be available before that period begins.

Answer: Please see Item No. 4 and Item No. 6 above.

The requirement for completion of all upfitting services for each FHP vehicle within thirty (30) days begins when the Contractor is in possession of all necessary equipment and the vehicle(s) onto which such equipment is to be installed.

5. Question: 5. Equipment Availability and Delays

FLHSMV-ITB-028-27 Page 12 of 16

If required equipment is backordered, defective, unavailable, or delayed after the contractor takes possession of a vehicle, will the completion deadline be extended without financial consequences for delays outside the contractor's control?

Is written notification documenting the delay sufficient, or must an extension be approved in writing before the original deadline?

Answer: The Department intends to deliver or have delivered all equipment required for upfitting services to the Contractor’s facility prior to the FHP vehicle(s) arriving at the Contractor’s facility. The requirement for completion of all upfitting services for each vehicle within thirty (30) days begins when the Contractor is in possession of all necessary equipment and the vehicle(s) onto which such equipment is to be installed.

Please see Item No. 6 above. As revised, Section 8.0, Completion Time, C.

and D., of ATTACHMENT B – SCOPE OF WORK, require that if the thirty

(30) day completion time for upfitting services cannot be met, the Contractor is responsible for notifying the Department’s representative and providing a detailed justification.

6. Question: 6. Completed Vehicle Pickup and Storage

Once a vehicle is completed and FHP is notified that it is ready for inspection and pickup, what is the required timeframe for FHP to inspect, accept, and retrieve the vehicle?

If pickup is delayed, does the completed vehicle continue to count toward the contractor's required secured storage capacity of ten vehicles?

Answer: The Department intends to inspect vehicles within five (5) business days of Contractor notification; however, the five (5) business days will not count against the thirty (30) day deadline for completing upfitting services nor the ten (10) vehicle storage capacity requirement.

7. Question:

7. Responsibility for Completed Vehicles Awaiting Pickup

Attachment B, Section 7.0(E), places responsibility for vehicle loss or damage on the contractor until Department acceptance.

If a vehicle is completed and ready for pickup but FHP delays inspection or acceptance, does the contractor remain responsible for the vehicle throughout that period?

Answer: Yes, the Contractor remains responsible until Department acceptance of each vehicle.

FLHSMV-ITB-028-27 Page 13 of 16

8. Question: 8. Acceptance and Invoicing

Attachment B, Sections 10.0 and 22.0, address Department acceptance and invoicing.

May the contractor invoice once a vehicle has received written acceptance, even if FHP has not physically picked it up?

If inspection or acceptance is delayed, what process should the contractor follow to avoid unnecessary payment delays?

Answer:

A Contractor may invoice the Department only after all upfitting services for a vehicle have been completed and the vehicle has passed Department inspection.

9. Question: 9. Vehicle Delivery Scheduling and Shop Capacity

Will FHP coordinate vehicle deliveries with the contractor based on available production capacity, or may multiple vehicles be delivered without an agreed production schedule?

Can the contractor establish a mutually agreed intake schedule to manage shop capacity without starting the 30-day completion period before vehicles are accepted?

Answer: The Department may deliver up to ten (10) vehicles at one time in coordination with the Contractor to ensure compliance can be met within the applicable timeframes. The 30-day completion period is intended to begin after the Department notifies the Contractor that the vehicles are ready for upfitting (i.e., vehicles and equipment are in possession of the Contractor).

10. Question: 10. Financial Consequences for Late Completion

The financial consequences table references “Fifty dollars ($100)” for late completion.

Please confirm whether the intended daily financial consequence is $50 or $100 per vehicle and whether it applies to delays outside the contractor's control.

We appreciate your assistance and want to ensure our response accurately reflects the Department's requirements.

Answer: Please see Item No. 8 above, the Department revised the language. The financial consequence is $50.

Question(s) received on 10/19/2026 from Night Ride Thermal.

11. Question: Can you add Vehicle Thermal to the list of approved manufacturers for this and future bids?

FLHSMV-ITB-028-27 Page 14 of 16

Answer: No. The only approved equipment manufacturers are those listed in the table included in Section 2.3, Vehicle Types and Equipment, of

ATTACHMENT B – SCOPE OF WORK.

Question(s) received on 10/20/2026 from Dana Safety Supply

12. Question: 1. Can we get an itemized list showing the equipment for the Slick Top vehicles and Lightbar Lighting packages for the marked and unmarked vehicles.

Answer: As outlined in ATTACHMENT B, Scope of Work, section 3.0 specific instructions and schematics will be provided by the Department to the awarded vendor. These materials will include detailed, itemized information for each vehicle type and installation package.

The Department provides the following examples of the equipment and configurations used for Slick Top vehicles and Lightbar Lighting packages:

Slick Top:

• Front ILS

• B-Pillar Lights

• Rear ILS

• Six MicroPulse Lights (Push/PIT Bumper)

• Four flush-mount circular perimeter lights

• Two MicroPulse Lights (Tag Mount)

• Four Flush-Mount Circular Perimeter (SUVs Only on Rear + Hatch)

• DynaFlare

• Siren

• FS PF400

• FS Join Sync Module

• 100 Amp Circuit Breakers

Light Bar:

• XStream Lights

• Light Bar

• Rear ILS

• Six MicroPulse Lights (Push/PIT Bumper)

• Four flush-mount circular perimeter lights

FLHSMV-ITB-028-27 Page 15 of 16

• Two MicroPulse Lights (Tag Mount)

• Four Flush-Mount Circular Perimeter (SUVs Only on Rear + Hatch)

• DynaFlare

• Siren

• FS PF400

• FS Join Sync Module

• 100 Amp Circuit Breakers

The above list is specific to lighting configurations for Slick Top and Lightbar vehicles. There are additional components included in each build that are optional for members, such as prisoner partitions (full or single cell) and weapon racks. Other components are included in the majority of builds, such as rear utility boxes, metal consoles, computer stands/docks, push/PIT bumpers, rear cargo/prisoner barriers, decals, tonneau covers (trucks), and radio infrastructure and components. Vehicles are configured to meet specific operational requirements and may include varying combinations of the equipment listed above.

13. Question: 2. Please provide information related to the importance of ASE certification rather than

Emergency Vehicle Technician certification (EVT) for the purpose of this contract.

Answer: The Department will accept either ASE or EVT certification, provided that the technician’s qualifications demonstrate the necessary knowledge, skills, and competencies to perform the required vehicle upfitting services safely and effectively.

14. Question: 3. Please clarify what constitutes a "secure storage facility". (Section 4.0.B)

Answer: Please see Item No. 5 which revises ATTACHMENT B – SCOPE OF WORK, Section 4.0, General Facility Requirements.

15. Question: 4. In section 21 clarify what the fee is for late delivery $50.00 per day or $100 per day.

Answer: Please see the answer to question No. 10 above.

16. Question: 5. Section 1.2(H) Please clarify whether an awarded vendor will execute a separate three year master services agreement establishing the contract term, pricing and obligations with individual purchase orders issued for specific vehicle installations, or whether individual purchase orders will serve as the contractual instruments.

FLHSMV-ITB-028-27 Page 16 of 16

Answer: Section 1.2. H. of the ITB defines the term “”Purchase Order” to mean:

“The purchasing document memorializing and/or incorporating the terms and conditions of the purchase issued by the Department via Florida’s eProcurement system. See PUR form 1000, paragraph 2, referenced in ATTACHMENT C, ADDITIONAL TERMS AND CONDITIONS. If there is not a separate signed written agreement, the Purchase Order constitutes the contract between the Vendor and the Department. (Note: The terms “Purchase Order” and “Contract” are intended to be utilized interchangeably herein, although a purchase order is not “executed” by the parties.)”

Accordingly, a separate written contract resulting from the ITB may or may not exist and, if no separate written contract does exist, a Purchase Order issued by the Department will constitute the contract between the Contractor and the Department and will include the terms and conditions of the purchase in accordance with PUR form 1000, paragraph 2 referenced in ATTACHMENT C, ADDITIONAL TERMS AND CONDITIONS.

File details come from the government source that posted it. Updated .