The Fleet Remodel Scope is a detailed document outlining comprehensive renovation specifications for a fleet maintenance facility, likely located in the City of Kingman, Arizona. The scope of work includes multiple critical infrastructure and architectural modifications, such as demolishing and constructing block walls, installing a new back door with electronic access, creating a new stainless steel countertop, constructing a one-door office with specific door hardware, installing new panel LED lighting, adding data infrastructure, and implementing comprehensive HVAC upgrades. The project involves both downstairs and upstairs areas, with specific requirements for wall construction, electrical work, flooring treatment, and mechanical systems.
The project encompasses approximately 2,700 square feet of wall and ceiling painting, 1,000 square feet of floor acid washing and sealing, and installation of new ductwork and air conditioning systems. Specific technical details include an Amarr 4300 Series manual grille door, Schlage ND series lever set with Best IC core, Tarkett wall base molding, and a new 2½ ton Carrier/Bryant AC unit for downstairs. The existing 5-ton AC/heat system will be modified to supply upstairs, with new insulated ductwork replacing exterior wall ducts. The renovation requires coordination of work schedule, use of drywall for wall construction, and adherence to the City of Kingman's grand master key system for door hardware.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Public_Works_Fleet_Maintenance_Remodel.pdf | ||
| Additional_Bid_Information.pdf | ||
| Fleet_Remodel_Drawing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fleet Remodel Scope
1. Demolish block wall (D) measuring 5 'X 9' to make an opening for the back door (keep the existing door with a new surface closer LCN—4040XP Series surface mounted Door Closers in powder coated aluminum finish (689). Arm as required.). It is to be determined whether this wall is load-bearing. (D) Construct a new wall measuring 6'8" to enclose the new area.
2. Prewire for electronic door access (B) with a 15' run for the side door at the bottom of the stairs and (D) with a 30' run for the back door. The Server room is located upstairs at the top of the staircase.
3. (B) Amarr 4300 Series Manual (push/pull) operation, 42" high, 48" wide grille door. Drywall to go to the hard lid. Construct 2'11 frame walls on each side of the opening counter.
4. Construct a new stainless countertop (B), which is to be 9'10" wide, 3'3" deep, and 3'5" tall. Demolition of 88 SF of the old block countertop, with power on the north side of the counter to be removed, and new power and CAT6 to be run in the new wall to power the North and south of the countertop.
5. Construct a new wall 7'7" with a door on the south wall and a one-door office with an Amweld/steel craft steel door #3070 with a rectangular window and welded frame. The door hardware is a Schlage ND series lever set with the Best IC core. Best/Medeco SFIC will be keyed to the existing City of Kingman Grand Master key. Contact the City for the core brand per building. (B). The south wall is to be 10" lower than the ceiling for airflow. The ceiling is a hard lid.
6. Install all-new panel LED lighting in constructed areas per the floor plan. If the current lighting is where the constructed walls are, it must be removed. Light switches will be needed in designated zones in the new office and the store room.
7. Add a single-gang data box at each location shown on the plans. Two runs of Cat6 cable shall be pulled 20 feet from the data box to the server room upstairs, hard lid, and concrete upper floor.
8. Install wall base molding and door trim for newly constructed walls. 80 LF- Tarkett 440288081 Moon Rock 4.5 Inch Wall Base.
9. Paint all downstairs walls and ceilings, existing and new, approximately 2700 SF. Protect the floor from construction.
10. Acid wash the floor, complete with a flooring sealer. In all areas, this is approximately 1,000 SF of the floor.
11. Install new ductwork and return air for the new office and store room downstairs, which will be remodeled. Install new AC/heat and duct work for two offices upstairs, with no heating or cooling.
Install the duct and register to the east and west offices. Existing 5-ton AC/heat with new ducting to supply upstairs only and a new AC/heat to provide the downstairs remodel with a 2 ½ ton unit, Carrier/Bryant or equivalent. Condenser to be installed on roof and air handler placed in mezzanine with ductwork supply and return air for the downstairs office, store room, and parts room. Reuse the existing duct in the storage room. To accommodate 3 registers for remodeling. One register in A, one register in B, and one register in C with new ductwork. The duct on exterior walls from the upper level to the lower level will need to be demolished and replaced with new insulated ductwork.
Note:
All constructed walls are to be drywall with paint.
The ceiling is hard-lid, and the floors are concrete in the upper offices.
Work schedule to be coordinated.