About this file
This award posting document pertains to Florida Keys Electric Cooperative Association, Inc. (FKEC) and announces the award of a contract for replacement of insulators and reframing work on an 11-mile segment of 138 kV Transmission Line #5 spanning 179 poles from Tavernier Substation (Mile Marker 91.6) to Islamorada Substation (Mile Marker 80.5) in Florida. The project scope encompasses reframing 169 of 179 structures to adjust phase spacing, including 135 concrete poles requiring pole-mounted steel brackets and 34 steel poles requiring field drilling modifications, as well as removal and installation of 598 insulators across six categories and field drilling of 142 holes per specification. The original proposal submission deadline was October 26, 2026 at 2:00 p.m., with questions due by October 19, 2026 at 2:00 p.m. Site visits were permitted upon request via email to procurement@fkec.com. The intent to award was anticipated by November 5, 2026, with project completion anticipated by December 31, 2027. All work must be performed while the transmission line remains energized.
The contract was structured on a not-to-exceed cost basis with evaluation criteria weighted as follows: project cost (40%), proposed schedule (30%), work plan details including traffic control (20%), and past performance (10%). A bid bond equal to 5% of the not-to-exceed bid price was required. The contractor was responsible for supplying labor, tools, equipment, supervision, project management, traffic control coordination, and work plan development, while FKEC provided all materials listed in the bill of materials, temporary and permanent splice materials if needed, live-line training, and galvanized steel pole coating. The contractor was required to coordinate all permits for Maintenance of Traffic and Temporary Traffic Control, including pre-construction FDOT meetings, and adhere to FDOT requirements and FKEC work blackout dates. The selected contractor must execute a Firm Fixed Price agreement and comply with all applicable federal laws and FEMA requirements under 2 C.F.R. Part 200, including debarment certifications, lobbying certifications, drug-free workplace requirements, and public entity crime statements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLORIDA KEYS ELECTRIC COOPERATIVE
ASSOCIATION, INC. - FKEC
91630 Overseas Highway, P.O. Box 377, Tavernier, Florida 33070-0377 P (305) 852-2431 F (305) 852-4794
November 16, 2026
FKEC BID #26-19 SPECIFICATIONS FOR REFRAMING AND REPLACING INSULATORS, TAVERNIER TO
ISLAMORADA SECTION OF 138KV LINE #5
Has been awarded to:
DYNETEK SOLUTIONS, LLC
Since this was not a public bid opening, we cannot share the winning proposal information.
In accordance with Florida Statute: Title X, Chapter 119, 119.011 Definitions, paragraph (2) “Agency”, Florida Keys Electric Cooperative Association, Inc. does not meet the definition of “state and local government agency”, therefore, is not subject to enforcement of the statute.
FKEC reserves the right to protect our privacy and the privacy and business information of our bidders and vendors. The link below may be helpful in understanding the application of the “Sunshine Law”.
Thank You http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0100-
0199/0119/Sections/0119.011.html http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0100-0199/0119/Sections/0119.011.html http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0100-0199/0119/Sections/0119.011.html
File details come from the government source that posted it. Updated .