FKEC_BID_26-07_EXHIBIT_F_ISSUED_FOR_CONSTRUCTION.pdf

PDF 6 MB Posted

Attached to
SPECIFICATIONS FOR SELF-SUPPORTING POLES UPGRADE, UTILITY PROTECTIVE MEASURES, PHASE 2 CONSTRUCTION
Solicitation number
FKEC BID #26-07
Issued by
Monroe County, Florida

About this file

This is a construction specification document issued by Florida Keys Electric Cooperative (FKEC) for hazard mitigation work involving the replacement of eleven guyed transmission structures with steel self-supported structures and concrete drilled pier foundations. The project spans from Key Largo (Card Sound) to Marathon, Florida, with four structures located on land and seven positioned in water. The specification document provides detailed technical requirements and standards for the construction work, including materials, installation procedures, testing protocols, and quality assurance measures that bidders must follow to meet FKEC's engineering and safety standards. The document establishes the technical baseline against which all bid proposals will be evaluated and represents the engineering requirements necessary for successful project completion.

The specifications document serves as the governing technical standard for all contractors submitting proposals for the self-supporting poles upgrade project. It establishes minimum performance requirements, material specifications, construction methodologies, and inspection criteria that all bidders must adhere to in their proposals and, if awarded, during project execution. The document ensures consistency across all potential bidders and provides clear expectations regarding structural integrity, installation quality, and compliance with applicable industry standards and regulations for transmission structure replacement in the unique environment of the Florida Keys, including considerations for water-based installations and coastal conditions.

View the file

Other files

File Type Posted
EXHIBIT_F_ISSUED_FOR_CONSTRUCTION.zip ZIP file
FKEC_BID_26-07_EXHIBIT_L_ACOE_NOAA_PROGRAMMATIC_BIOLOGICAL_OPINION.pdf PDF
FKEC_BID_26-07_EXHIBIT_L_ACOE_NOAA_PROGRAMMATIC_BIOLOGICAL_OPINION.pdf PDF
FKEC_BID_26-07_EXHIBIT_B_CUT_SHEETS.pdf PDF
FKEC_BID_26-07_EXHIBIT_H_DEP_POLE_EXEMPTIONS.pdf PDF
FKEC_BID_26-07_EXHIBIT_J_NOAA_FWCC_ENVIRONMENTAL_REQUIREMENT_GUIDES.pdf PDF
FKEC_BID_26-07_EXHIBIT_B_CUT_SHEETS.pdf PDF
FKEC_BID_26-07_EXHIBIT_E_KMZ_FILE.kmz KMZ file
FKEC_BID_26-07_EXHIBIT_F_ISSUED_FOR_CONSTRUCTION.pdf PDF
EXHIBIT_A_FKEC_Terms_&_Conditions_with_Subcontractor_Bonding.pdf PDF
FKEC_BID_26-07_EXHIBIT_D_POLE_FABRICATION_DRAWINGS.pdf PDF
FKEC_BID_26-07_EXHIBIT_I_STRUCTURE_5_ACOE_PERMIT.pdf PDF
SPECIFICATIONS_FOR_SELF-SUPPORTING_POLES_UPGRADE_UTILITY_PROTECTIVE_MEASURES_PHASE_2_CONSTRUCTION.pdf PDF
FKEC_BID_26-07_EXHIBIT_E_KMZ_FILE.kmz KMZ file
FKEC_BID_26-07_EXHIBIT_N_FDEM_PROJECT_4337-444-R_AGREEMENT.pdf PDF
EXHIBIT_A_FKEC_Terms_&_Conditions_with_Subcontractor_Bonding.pdf PDF
FKEC_BID_26-07_EXHIBIT_C_BILL_OF_MATERIAL.pdf PDF
FKEC_BID_26-07_EXHIBIT_D_POLE_FABRICATION_DRAWINGS.pdf PDF
FKEC_BID_26-07_EXHIBIT_H_DEP_POLE_EXEMPTIONS.pdf PDF
FKEC_BID_26-07_EXHIBIT_I_STRUCTURE_5_ACOE_PERMIT.pdf PDF
FKEC_BID_26-07_EXHIBIT_J_NOAA_FWCC_ENVIRONMENTAL_REQUIREMENT_GUIDES.pdf PDF
FKEC_BID_26-07_EXHIBIT_C_BILL_OF_MATERIAL.pdf PDF
FKEC_BID_26-07_EXHIBIT_G_FDEM_GRANT_APPROVAL.pdf PDF
FKEC_BID_26-07_EXHIBIT_K_ACOE_DELISTING_JOHNSON'S_SEAGRASS.pdf PDF
FKEC_BID_26-07_EXHIBIT_M_SWITCHING_BLACKOUT_DAYS_2026.pdf PDF
FKEC_BID_26-07_EXHIBIT_G_FDEM_GRANT_APPROVAL.pdf PDF
FKEC_BID_26-07_EXHIBIT_K_ACOE_DELISTING_JOHNSON'S_SEAGRASS.pdf PDF
FKEC_BID_26-07_EXHIBIT_M_SWITCHING_BLACKOUT_DAYS_2026.pdf PDF
FKEC_BID_26-07_EXHIBIT_N_FDEM_PROJECT_4337-444-R_AGREEMENT.pdf PDF
SPECIFICATIONS_FOR_SELF-SUPPORTING_POLES_UPGRADE_UTILITY_PROTECTIVE_MEASURES_PHASE_2_CONSTRUCTION.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .