Steel Pole Structures Specification Summary

This document is a comprehensive technical specification prepared by a manufacturer located at 123 North White Street, Fort Mill, South Carolina 29715, for the design, fabrication, and delivery of steel pole structures for transmission lines. The specification establishes detailed requirements for tapered steel monopole structures, including anchor bolt cages for self-supporting poles and three-foot ground sleeves for direct embedded poles, with galvanizing, testing, and delivery as integral components. The specification references conceptual design drawings and includes requirements for structure design, materials, welding, bolts, protective coatings, fabrication, inspection, marking, shipping, and erection considerations. Bidders must submit proposals with an "Individual Pole Bid Summary" list, work schedules indicating engineering, shop drawing submittal, fabrication, and shipment timelines, and completed Manufacturer Data Sheets documenting any specification exceptions. Shop drawings must be submitted as PDF files and three sets of hard copy prints, with certified prints required in PE-sealed format where applicable. The specification requires full-scale acceptance testing at seventy-five percent, ninety percent, and one hundred percent of design loading conditions if Appendix A is attached to the purchase order, with the manufacturer bearing all associated costs. Structures must be designed in accordance with ASCE/SEI No. 48-05 and the National Electrical Safety Code (ANSI C2), with delivery schedules established by the owner on the purchase order and the manufacturer liable for additional charges resulting from failure to meet agreed delivery dates.

The specification establishes that galvanized steel structures must conform to ASTM A-123 with minimum three-point-five-mil coating thickness on both interior and exterior surfaces, with weathering steel structures fabricated from ASTM A-871 as an alternative when specified. Materials must be of domestic origin with full traceability maintained for major components, and welding must conform to AWS Structural Welding Code D1.1 with comprehensive quality control including ultrasonic and radiographic testing of circumferential and longitudinal welds. All costs for fabrication, testing, materials, and meeting delivery schedules are included in the bid price with no additional charges to the owner for overtime or schedule accommodation. The manufacturer assumes full responsibility for design, fabrication quality, field service if specification failures occur, and warranty coverage for one year following installation, with the owner retaining rights to reproduce all drawings and submit them to other vendors for future projects. Specification exceptions must be documented on the Manufacturer Data Sheet and require written approval from the owner prior to proposal submission, with any unapproved nonconformities subject to corrective action at the manufacturer's expense. Detailed quality assurance requirements include mill test reports, impact toughness testing on a plate lot basis, weld test reports available to the owner, and the owner's right to obtain sample coupons for independent laboratory testing, with the manufacturer bearing costs for rejected material lots.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7/18/2019 1

STEEL POLE STRUCTURES SPECIFICATION

For the Design, Fabrication, and Delivery of Steel Pole Structures

TRANSMISSION LINE

Prepared by

123 North White Street

Fort Mill, South Carolina 29715

Revision Date

07/18/2019

7/18/2019 2

SECTION Title Page

1. SCOPE 3

2. GENERAL INFORMATION 4

3. BACKCHARGES 4

4. SUBSTITUTIONS 5

5. FIELD SERVICE ENGINEER 5

6. GUARANTEES 5

7. STRUCTURE ACCEPTANCE 5

8. FULL SCALE ACCEPTANCE TESTS 5

9. DELIVERY SCHEDULE 5

10. SUBCONTRACTORS 6

11. WORK SCHEDULE 6

12. SHOP DRAWINGS 6

13. GENERAL STRUCTURE DESIGN REQUIREMENTS 7

14. ANCHOR BOLTS AND BASEPLATES 8

15. STRUCTURAL DEFLECTION AND CAMBERING 9

16. MATERIAL 9

17. WELDING 10

18. BOLTS, NUTS, AND LOCKING DEVICES 11

19. CLIMBING DEVICES 12

20. GROUNDING 12

21. JOINTS 12

22. PROTECTIVE COATINGS 13

23. FABRICATION 14

24. INSPECTION AND TESTS 15

25. MARKING AND IDENTIFICATION 15

26. SHIPPING AND DELIVERY 16

27. ERECTION CONSIDERATION 17

28. APPEARANCE 17

29. FABRICATION COMMENCEMENT 17

30. SPECIFICATION EXCEPTIONS 17

31. PROPOSALS 18

32. APPENDIX A – FULL SCALE ACCEPTANCE TEST 19

7/18/2019 3

1. SCOPE

1.1 The specifications cover the design, fabrication, galvanizing, testing, and delivery of tapered steel pole structures. An anchor bolt cage shall be furnished with self-supporting poles. Three

(3) foot ground sleeves shall be furnished on direct embedded poles. Conceptual design drawings will be provided and are to be considered part of this specification.

1.2 An “INDIVIDUAL POLE BID SUMMARY” list will be provided for uniformity of presentation.

1.3 All submissions and requests should be directed as per the pole RFQ to the CLIENT / OWNER

/ PURCHASER.

1.4 The desired pole quantity of steel pole structures will be specified on the drawings and RFQ documents.

1.5 Structures shall be designed and fabricated in accordance with this specification, design drawings, and all indicated design and reference documents.

7/18/2019 4

2. GENERAL INFORMATION

2.1 References to standard specifications herein shall be interpreted to mean the latest approved revision with the following abbreviations used:

ACI American Concrete Institute AISC American Institute of Steel Construction ANSI American National Standards Institute ASTM American Society of Testing Materials AWS American Welding Society NEMA National Electric Manufacturers' Association ASNT American Society of Nondestructive Testing ASCE American Society of Civil Engineers NESC National Electric Safety Code

2.2 Steel structures shall be built in accordance with the latest approved codes and standards.

The specifications shall take precedence in the event of conflicts with other documents.

2.3 Structures shall include all appurtenances.

2.6 Costs for full-scale testing, when required, shall be listed as a separate item.

2.7 Manufacturer specifications and conditions shall be supplementary to the OWNER’S final specifications and conditions. The OWNER’S specifications and conditions shall take precedence in the event of conflict between the two. Valid specification exceptions listed in the bid proposal will be considered. If the exceptions are acceptable, the final specifications and purchase order will be modified accordingly.

2.8 Addenda shall be acknowledged in proposals submitted and shall automatically become a part of these specifications.

2.9 Work Scope Changes - The OWNER may issue change orders during any part of the procurement process. Change orders may include, but are not limited to the following:

A. The addition of purchase order items.

B. The modification of purchase order items.

C. The deletion of purchase order items.

Change orders shall be made without invalidating the order.

2.10 Work Execution - Work shall be performed in a continuous manner and order of precedence established on the purchase order. If necessary, the manufacturer shall work overtime to meet required delivery dates. The OWNER shall incur no additional expense for the manufacturer to meet purchase order delivery dates.

2.11 Work Completion - Work shall be completed within the time frame established on the purchase order unless an extension is granted in writing by the OWNER.

2.12 Line hardware will be supplied by others. Unloading and erection work will be done by others.

3. BACKCHARGES

3.1 If corrective work is required at any time because of faulty workmanship or materials, the OWNER will notify the manufacturer and proceed as follows:

7/18/2019 5

A. If the OWNER’S time schedule permits, the manufacturer will be allowed to perform the corrective work; assuming all costs for such.

B. If the OWNER’S time schedule does not permit corrective action by the manufacturer or if the manufacturer neglects to take immediate action, the OWNER shall have the right to perform the corrective work. The OWNER shall exercise care to insure the lowest possible expense, with the manufacturer reimbursing the OWNER for costs incurred.

4. SUBSTITUTIONS

4.1 Substitutions will not be allowed for specified materials except upon written approval by the

OWNER.

4.2 The manufacturer shall submit substitution requests in writing to the OWNER.

4.3 Substitution justification and proof of technical equivalency shall be provided with each substitution request.

5. FIELD SERVICE ENGINEER

5.1 If the services of the manufacturer’s field service engineer are required due to the manufacturer’s failure to meet the specifications, such services shall be furnished promptly and without cost to the OWNER.

6. GUARANTEES

6.1 Material and Workmanship - The manufacturer shall guarantee replacement of items which fail to perform properly due to defects in materials, design, or workmanship without cost to the OWNER.

6.2 Incorrect Material - The manufacturer shall guarantee to repair, replace, or cover the cost of correcting flawed or substandard material. The guarantee shall cover defective material discovered following installation.

7. STRUCTURE ACCEPTANCE

7.1 Structures will be accepted once all work, as specified in the purchase order and accompanying attachments, is completed to the satisfaction of the OWNER and performance guarantees are met.

8. FULL SCALE ACCEPTANCE TESTS

8.1 Full scale acceptance tests, if required, shall be performed as described in Appendix A. Full scale acceptance tests are required only if Appendix A is attached.

9. DELIVERY SCHEDULE

9.1 The manufacturer shall meet the delivery schedule as stated on the purchase order. The delivery schedule is subject to modification by the OWNER.

9.2 The manufacturer shall be liable for any additional charges incurred by the OWNER due to the manufacturer’s failure to meet the agreed upon delivery schedule.

9.3 The steel pole structures described in this specification are scheduled for delivery on or before a date that will be provided by the OWNER with the request for quotation.

7/18/2019 6

10. SUBCONTRACTORS

10.1 The manufacturer shall furnish the names of proposed subcontractors (including material suppliers) and the type of work sublet. Subcontractors are subject to the OWNER’S approval.

10.2 The manufacturer shall be solely responsible for work performed by subcontractors.

11. WORK SCHEDULE

11.1 The manufacturer shall attach a work schedule to the bid proposal. The work schedule shall indicate the start date and completion date for major tasks including engineering, shop drawing submittal, fabrication, and shipment.

11.2 Should the material being supplied under this specification be of a nature that does not lend itself to the use of a Time Schedule and Progress Report, the manufacturer shall propose an alternate form or method of reporting progress for the OWNER’s approval.

12. SHOP DRAWINGS

12.1 Drawings for Review - The manufacturer shall email a PDF file containing legible prints of each structure detail drawing to the OWNER in addition to 3 sets of hard copy prints. The manufacturer shall, at the time of drawing submittal and in writing, call the OWNER’S attention to any deviations from the specification requirements, and the reasons therefor.

The OWNER’s comments/actions on the drawings shall not:

A. Imply a complete check of all details.

B. Imply approval of structure designs.

C. Constitute a waiver of any specification requirements.

D. Constitute a waiver of applicable codes, regulations, and standards governing the manufacture of the structures, except as specifically stated by the OWNER in writing.

12.2 Procedure – The OWNER will review the shop drawings and return one (1) print marked

"ACCEPTED - NO EXCEPTIONS", "ACCEPTED - MAKE CORRECTIONS NOTED",

"AMEND AND RESUBMIT", or "REJECTED - SEE REMARKS”.

12.3 Certified Prints - The manufacturer shall furnish the OWNER with 2 signed certified prints of each final drawing and 1 copy of all final drawings in electronic form compatible with AutoCAD, latest version. The certified prints must be PE Sealed in the designated jurisdiction of the project if a PE seal is specified as a requirement on the RFQ / PO.

12.4 Drawings submitted for review and certified prints, including reproducibles, shall be clear and legible to the satisfaction of the OWNER.

12.5 Each structure drawing shall include the following information: base design moment, shear and vertical loads; weight of each component and of the assembled structure; center of gravity and lifting instructions, anchor bolt arrangement and setting plan, cambering and raking data, ladder clip information, and structure bill of material. Bolt size, length, quantity, location, and torque requirement shall be provided on each structure drawing.

12.6 Drawings shall become the property of the OWNER who will have full rights to reproduce and submit them to other vendors for bids on future projects.

7/18/2019 7

12.7 Drawings shall not be shipped with structures. Drawings shall be encased and sealed in weather-tight containers and mailed to the OWNER within the time frame listed on the purchase order.

13. GENERAL STRUCTURE DESIGN REQUIREMENTS

13.1 Structures shall be designed in accordance with the latest revision of ASCE/SEI No. 48-05 “Design of Steel Transmission Pole Structures" in addition to this specification and the referenced design drawings.

13.2 Structures shall satisfy all loading conditions imposed by the attached load tree diagrams, or

PLS-Pole .lca files shown on the referenced drawings or included in the RFQ. Supplier shall include PLS-Pole .bak file as part of proposal and final design.

13.3 Double circuit single pole structures shall be designed to support both single and double circuit installations in a vertical configuration (one circuit on each side of the structure).

13.4 Additional stresses from vertical loads applied in the final deflected position (P-delta effects) must be analyzed and incorporated within designs.

13.5 Conditions, limitations and design data in addition to that shown on the load tree diagrams, shall be in accordance with the applicable sections of the National Electrical Safety Code (ANSI C2) and ASCE No. 48-05.

13.6 The general structure configuration, clearances, dimensional requirements of attachment plates, brackets, steps, miscellaneous holes, etc., shall be as shown on the referenced drawings.

13.7 Steel arms and their pole connections shall be capable of withstanding wind induced vibrations with structures completely or partially erected. Arms shall be considered without insulators, conductors, or shield wires installed (no load condition).

13.8 Steel arm connections to poles shall be bolted.

13.9 Steel arm design configuration shall be as shown and specified on the reference design

13.10 Steel arms shall be of minimum cross section and shall have a one (1) inch to twelve (12) inch rise to enhance the appearance of the complete structure.

13.11 The end fittings on steel arms shall be triangle or cloverleaf shaped with 3 holes each being 1

1/4” diameter with rounded edges as shown on the referenced drawings.

13.12 Pole joints shall be minimized as much as possible. When pole joint connections are required, the following types shall be used.

A. All guyed or non-guyed poles except switch structures (as specified on the purchase order) shall have either slip joint or bolted flange type joint connections.

B. Guyed or non-guyed switch structure poles shall have bolted flange type joint connections.

13.13 Structure pole shafts shall be of a poly-round tapered tubular bent plate design. The number of sides shall not be less than eight nor greater than sixteen.

7/18/2019 8

13.14 Structure shaft base diameters shall be minimized relative to overall pole design efficiency.

Any specific maximum pole and anchor bolt diameter limits will be called on the RFQ or pole

13.15 For direct embedded poles or vibratory caissons, the embedded section shall include a ground sleeve and protective coating as shown on the referenced design drawings

13.16 The bottom of direct embedded poles shall include an end bearing plate sufficient in size and strength to minimize the soil bearing pressure developed due to the cumulative axial loading at the pole base.

13.17 For vibratory caissons, the driving flanges shall be so dimensioned that the plate thickness is not less than one (1) inch. The flanges shall be attached to the caisson top plate by full penetration welding and shall be located such that there is no interference with the installation of the pole.

13.18 The bottom section of weathering steel structures shall be hermetically sealed to prevent the accumulation of moisture on interior walls. The middle section shall be sealed on the top only. The top section shall be sealed with a welded pole cap. The design and detail of weathering steel poles and components shall provide free drainage to prevent water from accumulating in pockets and to avoid ‘pack out‘ corrosion issues.

14. ANCHOR BOLTS AND BASEPLATES

14.1 Structures shall be attached to concrete foundations by steel double nutted anchor bolt baseplates welded to structure bottoms and attached to anchor bolts cast in the foundations or attached to vibratory caissons as specified. Heavy hex nuts shall be utilized.

14.2 Welding shall be restricted to the bottom twelve inches (3") of anchor bolts. Anchor bolts shall be of sufficient strength in bending to withstand all design loads when the base plate is a sufficient distance above the concrete to permit adjustment of leveling nuts and tightening of top nuts.

14.3 Anchor bolts, including cross bracing between anchor bolts, shall be furnished by the manufacturer. To facilitate foundation construction, anchor bolts shall be fabricated into a rigid pre-positioned cluster and shipped from the factory as a unit. The anchor bolt cluster shall be designed to sustain lifting and handling without deformation. Not to increase auger size, the bottom template shall be slotted and the anchor bolts secured. Bond stresses for anchor bolt design in concrete shall be in accordance with the latest revision of the American Concrete Institute Specification #318, using a twenty-eight (28) day compressive strength concrete of 3000 psi.

14.4 Anchor bolt nuts and the upper eighteen inches (36") of each bolt shall be galvanized in accordance with ASTM-A123.

14.5 The manufacturer shall specify the setting depth of the anchor bolt cage and any specific installation instructions.

14.6 Base plates shall be supplied factory welded level to bottom pole sections.

14.7 Base plate corners shall be clipped if square or rectangular.

14.8 A weld bead or notch shall be placed on baseplates and anchor bolt cages to indicate the transverse direction or axis (angle bisector). The transverse axis shall be as shown on the referenced drawings.

7/18/2019 9

15. STRUCTURAL DEFLECTION AND CAMBERING

15.1 Steel poles shall be precambered if normal load deflections exceed the values listed in the table below. Steel poles shall be raked if normal load deflections are less than the table values. Under all load cases the maximum deflection shall be limited to the percentage of total structure height indicated in the table. When poles are cambered, the deflection limit shall be increased by the amount of camber.

Unless otherwise shown on reference drawings, the following deflection limits shall be used.

Normal Load Maximum Load Pole Type Deflection Deflection Tangent 1% 10% Suspension Angle 1% 10% Deadend 1% 10% Deadend Angle 1% 10% Switch Support 1/2% 4%

Maximum deflection loads include overload factors. Normal load is defined as 60oF, no wind, no ice with overload factors of 1.0.

15.2 Unless indicated otherwise, for all non-tangent structures, the manufacturer shall provide either raking data or camber for the poles to ensure that poles remain plumb when pole top deflections exceed the normal load deflection limits of Section 15.1. Eccentric or unbalanced loads caused by pole deflections (P-delta effects) shall be considered in the design of structures.

15.3 The total structure height considered in deflection limit calculations and cambering shall be the total height of the structure from the base plate or groundline to the pole top.

15.4 Steel arms shall be cambered or raked at the pole connection point so that the end of the arm is at the specified height relative to the bottom of the arm under the deflection condition given in Section 15.1.

15.5 The manufacturer shall indicate any additional costs for precambering poles.

16. MATERIAL

16.1 Galvanized Steel

A. In addition to steels referenced in the AISC Manual of Steel Construction, the following materials may be used: ASTM A-633 Grade E and ASTM A-572, Grade 65.

B. When hot dipped galvanizing is specified, steel composition shall not exceed the following maximum percentages for the elements indicated:

Carbon 0.25% Phosphorus 0.05% Manganese 1.35% Silicon 0.05%

16.2 Weathering Steel - In addition to steels referenced in the AISC Manual of Steel Construction, the following materials may be used: ASTM A-871

7/18/2019 10

16.3 Structures fabricated with weathering steel shall have all parts made from weathering steel except anchor bolts, ground nuts or name plates or other items specified as stainless steel on the drawings.

16.4 Anchor bolt material shall comply with ASTM A-615, Grade 60 or 75.

16.5 Should the manufacturer desire to use steel other than that specified, written approval shall be obtained from the OWNER.

16.6 Materials shall be identified according to yield strength. Minimum steel thickness shall be

3/16”.

16.7 A 100% volumetric inspection of baseplates and flange plates shall be performed either side of the centerline of the subsequent shaft welding area using procedures specified by ASTM A-435.

16.8 Material shall have minimum longitudinal impact strength of 15 ft-lbs at -20oF, as determined by the Charpy Impact Test in accordance with ASTM A-673. Test frequency shall be made on a heat lot testing basis unless otherwise stated. The OWNER shall be furnished with a copy of all test data prior to structure shipment.

16.9 Material Traceability - The manufacturer shall provide, within his record keeping system, a method of maintaining base materials traceability for major components such as shafts, arms, base plates, flanges, arm bases, etc. Recording mill heat numbers on a traveler system is considered as meeting this requirement. Steel used in structure fabrication shall be of domestic origin.

17. WELDING

17.1 Welding shall conform to the recommended practice of the American Welding Society (AWS) Structural Welding Code D1.1, Sections 1 through 8. Machine welding shall be utilized wherever practical. Scale or torch-cut edges shall be removed by mechanical means.

17.2 Welding electrodes shall conform to AWS Specifications. Weld material shall be certified to meet the requirements of a Charpy impact value of 15 ft-lbs at -20oF and shall have strength properties equal to or greater than the steel being welded.

17.3 Welding may be performed by a manual shielded metal arc (SMAW), submerged arc (SAW), gas metal arc (GMAW), or flux cored arc (FCAW). Flux cored arc welding without the use of gas mixture shielding shall not be used without prior approval from the OWNER.

17.4 Preheating shall be in accordance with AWS D1.1, Section 4, Part I, Table 4.2.

17.5 Details of all welds including electrode type and welding procedure shall be submitted with the approval drawings.

17.6 Circumferential welds including baseplate welds and longitudinal welds within the area of the female portion of a slip joint shall be 100% penetration welds.

17.7 Welds for attaching plates, lugs, etc., to poles and arms shall be continuous fillet welds.

17.8 Longitudinal welds shall have a minimum penetration of 80%.

17.9 The following items outline a minimally acceptable quality control program. The manufacturer shall expand these items as required to assure a quality product.

7/18/2019 11

A. Primary inspection for conformance to the AWS Code shall be by close visual inspection.

B. Welds shall be inspected in accordance with the procedures of AWS D1.1, Section 6 and as specified below.

C. Circumferential welds shall be tested ultrasonically in accordance with Part Ill, Section 6, of AWS D1.1, using either 45o or 70o transducers.

D. Longitudinal welds shall have ultrasonic or radiographic tests performed on the entire length of each complete penetration, and on 10% of each partial penetration seam weld to ensure that no cracking or gross lack of penetration exits. These tests shall be performed as specified in AWS D1.1, Section 6, Parts B and C.

E. Circumferential welds between pole shafts and baseplates shall be tested in accordance with Section 18.9C. Additionally, these welds shall be tested in accordance with ASTM E114, Ultrasonic Testing by the Reflection Method Using Pulsed Longitudinal Waves Induced by Direct Contact. Tests shall be performed from the baseplate bottom into the weld.

F. Attachments to poles and arms shall be tested in accordance with ASTM E109, Dry

Power Magnetic Particle Inspection.

17.10 The cost of testing welds shall be incidental to the overall fabrication costs and shall be included in the bid price.

17.11 Test reports shall include all weld test results as well as the procedures followed in testing welds. The OWNER reserves the right to obtain a copy of all weld test reports prior to structure shipment.

17.12 Weathering Steel - Welding rods and procedures shall be compatible with weathering steel materials.

18. BOLTS, NUTS, AND LOCKING DEVICES

18.1 Galvanized Steel Structures - Field connections, where required, shall be bolted. Bolts and nuts shall, where practical strength requirements permit, conform to the latest specification for steel transmission tower bolts and nuts, ASTM A-394 or high strength bolts, ASTM A-325 Type 1. Bolts shall be galvanized in accordance with ASTM A-153.

18.2 Weathering Steel Structures - Field connections, where required, shall be bolted. Bolts and nuts shall, where practical strength requirements permit, conform to the latest specification for steel transmission tower bolts and nuts, ASTM A-394 or high strength bolts, ASTM A-325 Type 3.

18.3 Following galvanizing, bolts and nuts shall be assembled and shall have an interchangeable finger fit without shake. Wrench tightness or spinning fit shall be cause for rejection. Nuts must be tapped or rerun after galvanizing.

18.4 Should the manufacturer desire to utilize bolts not specified, written approval shall be obtained from the OWNER. For bolts other than A394 or A325, the manufacturer shall submit a protective coating recommendation to the OWNER for approval.

18.5 Bolts which have a common diameter must be of the same type and strength.

18.6 Each bolt shall be furnished with nut and MF type locknut.

7/18/2019 12

18.7 Five percent (5%) excess bolts, nuts, washers, and locknuts shall be supplied with each structure. Anchor bolts are exempt from this requirement.

18.8 Bolts shall have a minimum diameter of 5/8” unless otherwise specified.

19. CLIMBING DEVICES

19.1 Climbing details will be as specified on the drawings using one or combination of the options below:

A. Step bolt clips suitable for double nutted step bolt as shown on drawings. Galvanized step bolt quantity to be included with pole.

B. The manufacturer shall provide climbing step clips on poles in accordance with drawings and the following stipulations. Step clips shall be placed at intervals on a single pole face extending from 14’ above the baseplate to 2’-6” from the pole top. Working step clip sets shall also be placed approximately 5 ft below work locations on opposite faces of the pole. Pole price shall include step clips on the pole, but any climbing or working rungs are to be priced separately only if requested on the RFQ.

C. Ladder clips per McGregor standards. Pole price shall include ladder clips on the pole, but any climbing or working ladders are to be priced separately, only if requested on the

RFQ.

20. GROUNDING

20.1 Grounding details will be as specified on the drawings using one of the options below:

A. Untapped through holes shall be included in brackets and vangs, as shown on drawings, to serve as a location for ground lug attachment.

B. 1/2”-13 UNC heavy hex nut (galvanized for galvanized poles and stainless steel for weathering poles) shall be welded to:

A. Structures 2 feet above the baseplate (self supporting structures) B. Structures 2 feet above the ground line (direct embedded poles) C. Structures 2 feet below the pole top D. Structures near arm attachment locations E. Steel arms 1 foot from each end F. Structures 2 feet either side of flange joints G. Structures 1 foot from both the designated bottom and top of each slip joint H. A 5/8” through hole shall be located behind each welded nut for galvanized poles. On weathering steel poles, the through holes will be field drilled as needed to make sure all holes are sealed with a bolted fitting / ground lug.

20.2 Ground flange requirements shall be as shown on the reference design drawings.

21. JOINTS

21.1 The number of slip joints shall be minimized to reduce construction time and associated costs.

21.2 Bolt holes for through bolts shall not be located within the span of a slip joint.

21.3 Slip joints shall be designed for a snug fit with a minimum overlap length of 1.5 times the largest pole section diameter at the joint. Joints shall be designed to ensure that joints are as strong as the pole sections joined.

21.4 Bolted flange joints shall be designed to adequately carry the load between pole sections.

7/18/2019 13

21.5 Joints shall be prefitted and match marked to assure proper pole fit and arm alignment. Pole sections which are cambered shall be clearly marked with the camber direction on each section. Match marks shall be clearly visible and permanently inscribed.

21.6 Jacking lugs shall be provided on each pole section as required to facilitate field assembly.

Male sections shall be marked to indicate mating length. Lugs shall be designed so that connecting straps can be attached to hold pole sections together during erection.

21.7 The manufacturer shall provide detailed instructions for field joining and separating of pole sections.

22. PROTECTIVE COATINGS

22.1 Galvanized structures shall be galvanized on both inside and outside surfaces. A hot-dipped process shall be used in accordance with the latest revision of ASTM A-123 and NEMA Standards Publication #TT-1. Members that are machined, bent, or worked in any manner following galvanizing shall be regalvanized. Drain holes shall be provided as required.

22.2 Galvanizing shall be performed in a manner that produces neat and uniform surfaces.

"Double Dipping" or the procedure of dipping one end of the piece and then the other shall not be used.

22.3 Minimum galvanizing thickness shall be 3.5 mils in accordance with ASTM A-123 over the entire surface area.

22.4 Precautions shall be taken during the galvanizing process to avoid embrittlement, warpage, and distortion in accordance with ASTM A-143 and A-384.

22.5 The manufacturer shall be responsible for the repair of any deteriorated coating for a minimum of 1 year after delivery.

22.6 Groundline Coating – The embedded section of direct embedded poles and vibratory steel caissons shall be protected with a polyurethane coating, as shown on the referenced drawings. The outside surface of the embedded section shall be coated with a 16 mil thickness of “Corrocote II Classic” polyurethane coating as manufactured by Madison Chemical Industries, Inc., or approved equal. The corrocote coating shall extend as follows:

A. For poles 50ft or less – 2 ft above the groundline to 3 ft above the bearing plate or as shown on reference drawings

B. For poles, greater than 50 ft – 2 ft above the groundline to 5 ft above the bearing plate or as shown on drawings

22.7 Zinc Primer Combined with Paint – The primer and paint shall be applied in accordance with the SPCC “Surface preparation Specification”, SSPC-SP6, and the paint supplier’s recommendations.

A. At a minimum, preparation of the pole surface shall include shot or sandblasting prior to applying zinc primer and paint.

B. The paint supplier’s recommended coating thicknesses shall be followed, but the absolute minimum thickness of the zinc primer or paint shall be: (1) Zinc primer – 3 mils Dry Film Thickness (DFT) and (2) Paint – two coats of finish paint, each 3 mils DFT, for a total thickness of 6 mils.

C. For environmental protection, the paint system shall be within toxic acceptable levels with a high solids content and low Volatile Organic Compounds. Only the following materials will be acceptable in the formulation of the paint system: (1) Triglycidyl Isocyanurate (TGIC) or Urethane Polyester powder, (2) two-component Organic Zinc- Rich Urethane liquid, (3) Zinc Rich Epoxy powder, (4) two-component Polyamidoamine Epoxy liquid, (5) two-component Acrylic Aliphatic Poly-Urethane liquid, (6) two-

7/18/2019 14 component Tar-Extended Polyurethane Liquid with Pre-catalyzed one-component Polyurethane resin (touch up).

D. Before acceptance of the purchase order, the paint system formulation and color shall be agreed upon between the OWNER and the manufacturer and shall be clearly stated on the purchase order. The manufacturer shall provide to the OWNER samples obtained from the paint supplier.

E. The manufacturer shall send touch-up material with each structure, one gallon of primer and paint with each five (5) poles.

F. The manufacturer shall guarantee the pole against fading and flaking for a minimum of five (5) years.

22.8 If not so directed by the OWNER, the manufacturer may substitute hot dip galvanizing in accordance with ASTM A123 for the zinc primer with the OWNER’S approval.

23. FABRICATION

23.1 Workmanship and finish shall be of the highest available using current production practices for the manufacture and fabrication of tapered steel pole transmission structures, notwithstanding any omissions from the specifications or drawings.

23.2 All structure parts shall be neatly finished and free from kinks or twists. Holes, blocks, and clips shall be made with sharp tools and shall be clean-cut without torn or ragged edges.

23.3 Fabrication shall be performed in strict accordance with the shop drawings prepared by the manufacturer and approved by the OWNER.

23.4 Straightening Material - Structure material shall be straight and clean prior to being laid out or worked in any manner. If straightening is required, it shall be performed utilizing methods which will not injure the steel. Members which are bent, warped, or otherwise improperly fabricated will be rejected.

23.5 Shearing and Cutting - Shearing and cutting shall be done accurately with all pieces neatly finished. Copes and re-entrant cuts shall be filleted prior to cutting. Materials may be sheared of flame cut.

23.6 Bending - Forming or bending during fabrication shall be done by methods that will prevent embrittlement or loss of strength in the material being worked.

23.7 Holes shall be 1/8” larger than the nominal diameter of bolts. Baseplate anchor bolt holes shall be up to 3/16” larger than the nominal diameter of the anchor bolts. Connection and splice details shall be subject to the OWNER’S approval. Connections shall be detailed in a manner to avoid eccentricity as far as possible. All splices shall develop the stresses indicated for the members being spliced.

23.8 Holes in steel less than 13/16” thick may be punched to full size unless otherwise noted on the approved shop drawings. Holes in steel 13/16” thick or more shall be drilled or subpunched and reamed. Holes shall be clean cut without torn or ragged edges. Burrs resulting from reaming or drilling shall be removed with a tool which makes a 1/16” bevel.

Holes shall be cylindrical and perpendicular to members. Holes shall not be punched within 4” of a member bending point until after the member has been bent. A burning torch shall not be used for cutting holes.

23.9 Punching - For punching to full size, the punch diameter shall be 3/16” larger than the nominal bolt diameter and the die used shall not be more than 1/16” larger than the punch diameter. For subpunching, the punch diameter shall be 3/16” smaller than the nominal bolt diameter and the die used shall not be more than 3/32” larger than the punch diameter.

7/18/2019 15

Subpunching for reamed work shall be such that after reaming, no punched surface shall appear in the hole periphery.

23.10 Reaming and Drilling - Holes that are reamed or drilled shall have finished diameters that are no greater than the bolt nominal diameter plus 3/16” for connection bolts and 1/2” for anchor bolts.

23.11 Accuracy for Punching, Reaming, and Drilling - Holes shall be located accurately in accordance with the attached structure drawings. Hole locations shall not deviate more than 1/16” from the drawings.

24. INSPECTION AND TESTS

24.1 The manufacturer shall perform adequate tests and inspections to verify that materials are furnished in accordance with the specifications. Additionally, materials and workmanship shall, always, be open to inspection by the OWNER at the manufacturer's facility or at the delivery point. Any omission or failure on the part of the OWNER to discover and reject defective work or material shall not be construed as an acceptance of such. Any work or material rejected by the OWNER shall be remedied in a manner consistent with the specifications and purchase order. The manufacturer shall agree to promptly repair or replace defective material or work that develops within one (1) year following placement into service. Defective work or material shall be remedied without cost to the OWNER. This shall include reimbursement to the OWNER for any additional labor or transportation costs incurred in making corrections.

24.2 The OWNER’S representative shall have free entry to all parts of manufacturing facilities

(including subcontractor facilities) throughout the fabrication process. The manufacturer shall afford representatives reasonable facilities, without charge, for the inspection of materials and work processes.

24.3 If requested, the manufacturer shall make certified copies of mill test reports available to the

OWNER. Mill test reports shall document the chemical and physical properties of materials furnished under the specifications. Impact toughness tests shall be performed on a plate lot basis. Chemical tests may be performed on a heat lot basis.

24.4 If requested, the manufacturer shall make the following test reports available to the OWNER:

weld tests, bolt strength tests, impact property tests, and protective coating tests.

24.5 The OWNER reserves the right to obtain sample coupons, from any material lot being fabricated, for independent testing. Independent testing shall be performed by an ASTM approved laboratory. The OWNER reserves the right to reject any material lot which fails to meet test specification requirements.

25. MARKING AND IDENTIFICATION

25.1 Each separate structure part shall be distinctly marked with letters and numbers to identify the structure type and the location of the part in the structure. The ends of each pole section shall be marked. Component markings shall be as shown on the erection drawings.

25.2 A nameplate shall be provided on the pole face 4’ above the ground line, or as shown on the design drawing, and shall contain the following information:

a. Owner’s name

b. Structure number

c. Structure type

d. Pole length

7/18/2019 16

e. Pole weight

f. Pole taper

g. Manufacturer’s name

h. Manufacturer drawing number

i. Date of manufacture.

25.2 All parts shall be pre-fitted and match-marked in the shop to assure proper fit in the field and to aid field assembly.

25.3 All marks shall be made prior to galvanizing and shall be plainly visible.

25.4 Camber direction shall be clearly marked on pole tops as well as on each pole section.

26. SHIPPING AND DELIVERY

26.1 Materials delivered to the job site or other specified destination shall be plainly marked and identified in the shipping documents with the OWNER’S purchase order number and any additional markings specified in the shipping instructions. No markings shall be made on structures that will be exposed following erection.

26.2 The OWNER will specify the exact location where materials are to be delivered a minimum of

1 week prior to shipment. Delivery shall not be made without such notification.

26.3 Bolts, nuts, washers, and other small pieces of the same Iength, type, and size shall be packaged separately in sturdy containers. Containers shall be capable of withstanding the effects of weather and rough handling for several months. Bolts which are mixed in bulk containers will not be accepted.

26.4 All containers and bundles shall be clearly marked with permanent markings as to quantity, weight, and content.

26.5 Rustproof banding material shall be used on galvanized steel bundles to prevent staining.

26.6 All parts associated with a single structure, except anchor bolts, shall be shipped together.

Each member shall be clearly marked with the structure type, number, and location in the structure. Attachment plates and boxes shall be clearly marked with the structure type and number. Anchor bolts shall be shipped prior to structures.

26.7 The manufacturer shall exercise every precaution to protect shipments against damage while in transit. The manufacturer shall be liable for damage or loss while materials are in transit.

The manufacturer shall be responsible for filing and prosecuting claims against carriers. The manufacturer shall promptly replace or repair damaged or lost materials without awaiting the finalization of claims.

26.8 Expenses incurred by the OWNER due to careless bundling or shipment shall be considered as legitimate backcharges against the manufacturer.

26.9 The manufacturer shall provide instructions for unloading, handling, and storing of materials.

26.10 The manufacturer shall provide a packing list of all parts, container contents, and other materials sent within a shipment. One (1) copy of the packing list shall accompany each shipment and shall be plainly marked "Packing List".

26.11 Materials shall be shipped by truck.

7/18/2019 17

26.12 The OWNER will inspect materials upon arrival for transit damage or shortages and advise the manufacturer accordingly.

26.13 The manufacturer shall provide the person listed on the purchase order with the following information a minimum of one week prior to shipment:

A. The OWNER’S purchase order number B. Quantity of pieces being shipped C. Weight of heaviest piece D. Name of common carrier used E. BilI of lading number F. Expected time of arrival

26.14 The manufacturer shall specify the shipping contact person and telephone number on all shipping papers and bills of lading.

27. ERECTION CONSIDERATION

27.1 The manufacturer shall pay attention to design details in order to facilitate field erection wherever possible.

27.2 Structures shall be designed for field assembly.

27.3 Structure designs shall not require field welding.

27.4 Shop detail and erection drawings shall indicate the actual calculated scale weights of all members. Furthermore, drawings shall show the weight of each pole section and arm.

27.5 Sub-assemblies shall be shipped complete as a unit to minimize field assembly work.

27.6 The manufacturer shall supply a slip joint safety bar or other means of positive joint control for use during field erection.

27.7 The manufacturer shall specify all bolt torque values on erection drawings.

28. APPEARANCE

28.1 Steel poles shall present the most pleasing appearance possible consistent with the specification strength requirements. In general, a tapered pole of minimum cross section is desired.

29. FABRICATION COMMENCEMENT

29.1 The manufacturer shall give the OWNER advance notice of when structure fabrication will commence to allow for the arrangement of plant visits. Plant visits may include, but are not limited to, the inspection of facilities, materials, and fabrication methods by the OWNER or authorized representatives.

30. SPECIFICATION EXCEPTIONS

30.1 The specifications and drawings state the required capacity, material service requirements, and design elements of structures which, in the opinion of the OWNER, will best insure satisfactory performance. They are not intended to specify designs which depart from the manufacturer's standards, provided the manufacturer’s standards are equivalent to the specific provisions contained herein.

7/18/2019 18

30.2 Manufacturers shall list specification exceptions on the Manufacturer Data Sheet. If no exceptions are taken, it shall be clearly indicated on the Manufacturer Data Sheet. No exceptions will be permitted without written approval from the OWNER prior to proposal submission. Any unapproved non-conformity with the specifications must be changed to complete conformity at the manufacturer's expense. Expenses shall include labor and material costs incurred by the OWNER.

30.3 If the manufacturer desires to furnish designs that vary from the specifications, a separate proposal shall be submitted. In such a case, one proposal shall be submitted for the structures specified and one proposal for alternate designs.

31. PROPOSALS

31.1 Proposals shall be submitted to the OWNER in accordance with the attached Request for Quote. Manufacturers shall submit a completed Manufacturer Data Sheet with each proposal.

31.2 Bid design calculations are required with submittal. Failure to submit shall be deemed as not meeting the technical requirements of the specification and the reference design drawings.

31.3 Specification Compliance - Specification exceptions shall be listed on each proposal submitted. If no exceptions are taken, then it shall be understood that the proposal is submitted in accordance with the specifications. Failure to comply with this requirement may be cause for elimination of the proposal from consideration.

If the manufacturer has reservations as to the performance of specified structures or parts, an alternate proposal shall be submitted with the requested bid. The alternate proposal shall clearly identify proposed changes and why the changes will result in successful structure performance. General structure arrangement shall be maintained as shown on the drawings and covered by the specifications. In the absence of an alternate bid qualifying the manufacturer's acceptance of the drawings and specifications; it shall be assumed, by submission of a bid, that the manufacturer accepts all specification conditions and responsibility for the successful performance of structures and associated parts.

7/18/2019 19

APPENDIX A

FULL SCALE ACCEPTANCE TESTS

(1) At the option of OWNER, full scale acceptance tests may be required.

(2) Tests shall be conducted with the structure erected in a vertical position. If the manufacturer is not equipped to perform vertical tests, horizontal testing may be considered. The manufacturer shall specify in the proposal whether the price is based on vertical or horizontal testing.

(3) Test structures shall be subjected to seventy-five percent (75%), ninety percent (90%), and one hundred percent (100%) of the design loading conditions including overload factors. The test sequence shall be approved by OWNER.

(4) Loads shall be applied at the actual point where conductors or shield wires attach to insulator or arm assemblies. Conductor I-string assemblies shall be made up of articulated bars to simulate the flexibility of actual conductor I-string assemblies. Shield wire attachments shall be single linkages simulating the actual shield wire assemblies. Structure wind loading shall be applied at a minimum of three (3) representative points approved by OWNER.

(5) Loads shall be applied in a manner to avoid structure impact. Loads shall be held at each increment for a period of not less than five (5) minutes.

(6) Loads shall be measured through a suitable system of strain devices or through the direct application of weights. All test systems shall be designed to minimize pulley friction.

(7) Strain devices shall be used in accordance with the manufacturer's recommendations. Certified calibration test reports of all load measuring devices shall be provided by the manufacturer prior to and following tests.

(8) Structure deflections shall be measured by a procedure approved by OWNER. Deflection readings at points specified by OWNER shall be recorded prior to each load increment, during the period the load increment is active, and after the release of each load increment.

(9) The structure shall be considered acceptable for the load increment if none of the members or bolts show evidence of permanent deformation. If any member or bolt shows evidence of permanent deformation, the member or connection shall be redesigned and replaced at the manufacturer's expense. The load increment shall be repeated until the structure is capable of withstanding the load increment without permanent deformation. Structure redesign, material replacement, and testing repetition due to premature deformation shall be performed at the manufacturer's expense.

(10) Coupons shall be cut from members which fail at less than 100% of design loads with overload factors included. These coupons shall be tested at a commercial laboratory at the manufacturer's expense.

(11) After successful completion of the acceptance tests, structures shall be disassembled and all welds shall be tested in accordance with the specifications. Test structures may be disassembled and shipped to OWNER for use as permanent line structures provided all welds appear satisfactory and written approval is obtained from OWNER.

(12) Prior to testing, the manufacturer shall furnish test arrangement drawings and load tabulations.

Drawings and load tabulations shall be subject to approval by OWNER.

(13) The manufacturer shall furnish 5 copies of complete certified test reports to OWNER. These reports shall include the following:

7/18/2019 20

A. General test arrangements

B. Loads applied to test structures

C. Structure deflection readings at each load increment

D. Photographs of test structures under the final load increment for each design load

E. Photographs of members and connections which fail

F. Certified mill test reports for each member used in test structures

G. Certified laboratory test reports of coupon samples tested

H. Certified calibration reports of load measuring devices

I. Certified weld test reports

(14) OWNER shall be notified, in writing, a minimum of 14 days prior to the commencement of acceptance testing. The written notice shall specify the test date and location.

(15) Unless specifically waived in writing by OWNER, acceptance tests shall be invalid unless witnessed by OWNER or authorized representative.

(16) If structures fail to perform as designed, the manufacturer shall make design changes as required to prove structure design performance through further testing. Required changes and further testing shall be performed at no additional cost to OWNER.

(17) Upon satisfactory completion of performance tests, production run fabrication of structures may commence upon authorization by OWNER.

(18) The manufacturer shall select production run pieces and assemble them in subsections or complete assemblies to verify fabrication fit and to assure ease of assembly. A sufficient number of bolts shall be used to insure proper member alignment. If structures are assembled in subsections, fit at the subsection interface shall be proved.