First_Tier.pdf

PDF 18 KB Posted

Attached to
Adams Annex Façade Repair
Solicitation number
2026.083-ITB
Issued by
Washington County, Oregon

About this file

This is a First-Tier Subcontractors Disclosure Form required by a state or local contracting agency for competitive bidding purposes. Prime contractors are required to identify all first-tier subcontractors that will furnish labor or labor and materials, including the subcontractor name, dollar value of the subcontract, and category of work to be performed. The disclosure form must be completed and submitted no later than two work hours after the bid closing time. Failure to submit the form by the disclosure deadline renders a bid non-responsive and ineligible for award consideration. Contractors may substitute first-tier subcontractors under the provisions of ORS 279C.585, and subcontractors may file complaints based on disclosure requirements under ORS 279C.590.

The contracting agency is required to accept subcontractor disclosures but is not obligated to verify the accuracy or completeness of the information provided. A bid submitted without the required subcontractor disclosure will be considered non-responsive and disqualified from award. The form requires the prime contractor to provide contact information, signature, phone number, and project identification details, with provisions for additional sheets if multiple subcontractors require disclosure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST-TIER SUBCONTRACTORS DISCLOSURE FORM

Project Name: Bid #

Bid Closing Date: Bid Closing Time:

Prime Contractor: Contact Name:

Signature: Phone Number:

List below the name of each subcontractor that will be furnishing labor or that will be furnishing labor and materials and that is required to be disclosed, the category of work that the subcontractor will be performing and the dollar value of the subcontract. Enter “NONE” if there are not subcontractors that need to be disclosed. (ATTACH ADDITIONAL SHEETS IF NEEDED)

SUBCONTRACTOR NAME DOLLAR VALUE CATEGORY OF WORK

Failure to submit this form by disclosure deadline will result in a non-responsive bid. A non-responsive bid will not be considered for award.

A contracting agency shall accept the subcontractor disclosure. The contracting agency shall consider the bid of any contractor that does not submit a subcontractor disclosure to the contracting agency to be a non-responsive bid may not award the contract to the contractor. A contracting agency is not required to determine the accuracy or the completeness of the subcontractor disclosure.

This list is to be completed and submitted no later than two (2) work hours after the time bids are due.

A contractor may substitute a first-tier subcontractor under the provisions of ORS 279C.585.

A subcontractor may file a complaint under ORS279C.590 based on the disclosure requirements of this subsection (1) of this section.

File details come from the government source that posted it. Updated .