This Invitation to Bid (ITB No. 2026.083-ITB) is issued by Washington County, Oregon's Facilities Department for facade repair work at the Adams Annex Building located at 235 W Main Street, Hillsboro, Oregon. The project scope includes repairs to a concrete masonry unit (CMU) exterior wall damaged by a vehicle collision, requiring installation of new insulated metal doors with access control, CMU wall reconstruction with decorative blocks matching existing facade, interior and exterior repairs including painting, electrical work, and new flooring installation in select impact areas. The pre-bid conference is scheduled for September 8, 2026 at 8:30 a.m. at the project site, and the bid deadline is September 23, 2026 at 2:00 p.m., with questions due by September 17, 2026. All bids must be submitted electronically through the County's Procurement Portal. The contract term is one year initially with renewal options up to a maximum of five years total. The estimated project value is approximately $100,000.

Bidders must be licensed with the Oregon Construction Contractors Board and demonstrate three consecutive years of experience constructing exterior load-bearing CMU walls. All work is subject to prevailing wage requirements under ORS 279C.800 through 279C.870 or the Davis-Bacon Act, with hourly rates provided for reference in change order calculations only. Bid and performance bonds have been waived for this project. Contractors must establish not-to-exceed labor rates for subcontractors, with a maximum 15 percent markup allowable on materials and equipment rental. First-tier subcontractor disclosure is required within two hours of the bid deadline for subcontracts valued at five percent of the total bid or minimum $15,000. Successful bidders must comply with drug and alcohol testing programs, submit to the B2G Now subcontractor utilization reporting system, utilize Procore for project information management at no additional cost, and execute a contract within fifteen business days of award notification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB

ADAMS ANNEX FAÇADE REPAIR

(NO. 2026.083-ITB)

FOR

Washington County, Oregon

RELEASE DATE: August 28, 2026 DEADLINE FOR QUESTIONS: September 17, 2026

RESPONSE DEADLINE: September 23, 2026, 2:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://procurement.opengov.com/portal/washington-county-or

Adams Annex Façade Repair

1. Introduction

2. Legal Advertisement

3. Pre-Bid Conference - Non-Mandatory

4. Scope of Work

5. Pricing Proposal

6. Instructions to Bidders for ITB

7. Special Instructions

8. Program Compliance Requirements

9. Project Information Management

10. Vendor Questionnaire

Attachments:

A - Construction Contract Sample B - Washington County Public Improvement Projects Standard General Conditions C - Insurance Requirements D - Adams Annex CMU repair set E - Owner Project Requirements F - First Tier Subcontractor Disclosure G - Standard_Terms_and_Conditions H - A101 - Lighting Notes - TEO 09.17.26 I - ADAX Facade Repair - Door Hardware Group 01 - TEO Notes

Adams Annex Façade Repair

1. 1. Introduction

1. 1.1. Summary

Washington County Facilities Department is seeking bids from qualified contractors for repairs to the Adams Annex Building due to a car crash which damaged a portion of the building facade.

Repairs are needed in order to provide weather protection and access to space within the building.

2. 1.2. Background

Building is an existing one story CMU building with wood roof structure, composite roof and crawlspace. A car crashed into the southernmost tenant space, creating a large hole in the front facade that now needs repair.

3. 1.3. Contact Information

Danielle Howard Procurement Analyst II 155 North First Ave

MS-28

Hillsboro, OR 97124 Email: danielle_howard@washingtoncountyor.gov Phone: (503) 846-8757 Department:

Facilities

4. 1.4. Timeline

The County reserves the right to modify this schedule at the County’s discretion. Proper notification of changes in the bid closing date will be made to all bidders who have received bid documents.

Bid Advertised and Released August 28, 2026

Informational Pre-Bid Conference (Non- Mandatory)

September 8, 2026, 8:30am Adams Annex Building located at 235 W Main St, Hillsboro OR 97124 Contractors will meet in the parking lot to sign in starting any time after 8:15am. Meeting will start promptly at 8:30am mailto:danielle_howard@washingtoncountyor.gov tel:(503)846-8757

Adams Annex Façade Repair

Last Date to Submit Questions September 17, 2026, 5:00pm

Bid Closing Date and Time September 23, 2026, 2:00pm

Adams Annex Façade Repair

2. 2. Legal Advertisement

1. 2.1. Legal Advertisement

WASHINGTON COUNTY, OREGON INVITATION TO BID

No. 2026.083-ITB Adams Annex Façade Repair

The Invitation to Bid (“ITB”) documents will be available at www.WashCoPurch.com/biz

A Pre-Bid Conference with project walk through will be held at 8:30 am, Tuesday, September 8, 2026 at Adams Annex Building located at 235 W Main St, Hillsboro OR 97124 Contractors will meet in the parking lot to sign in starting any time after 8:15am. Meeting will start promptly at 8:30am.

Bidders are responsible for checking the site for any addenda to the ITB documents before submitting their bids to the site.

Bids are due no later than 2:00 pm on Wednesday, September 23, 2026 late bids are unable to be entered.

The estimated expense for this contract will be $100,000.

Bids must contain:

• A statement as to whether the bidder is a resident bidder, as defined in ORS 279A.120(1)(b).

• Confirmation that bidder will comply with the statement in the bid document regarding compliance with the provisions of ORS 279C.800 to 279C.870 or 40 U.S.C. 3141 et seq.

“Workers on Public Works to be Paid Not Less Than Prevailing Rate of Wage".

The County may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the County it is in the public interest to do so.

Washington County reserves the right to reject any and all bids and to waive any and all informalities in the best interest of the County.

Bidders are solely responsible for ensuring receipt of their bid by the Procurement Division.

All bidders must be registered with the Oregon Construction Contractors Board prior to submitting bids. Failure to be registered will be sufficient cause to reject a bid as "non-responsive.”

Licensing per ORS 468A.720 (working with asbestos) is not required for this project.

Bidders must conform to the requirements of these bid documents and all related, applicable laws.

http://www.washcopurch.com/biz

Adams Annex Façade Repair

Contractor will demonstrate that an employee drug and alcohol testing program is in place and that employees who are engaged in the construction, reconstruction or maintenance of a project (all public works projects) have tested negative for drugs and alcohol or have entered a rehabilitation program.

The County does not intend to pre-qualify any bidders for this project. All bids submitted for this project will be considered provided that they meet the criteria set forth in the bid documents with respect to submission in a timely manner, bonding, and all other applicable requirements.

However, all bidders will be checked against the Bureau of Labor and Industries and the Construction Contractor’s Board list of contractors ineligible to receive public works contracts.

Dated this 28 day of August, 2026

Danielle Howard

Procurement Analyst II

(503) 846-8757

Posted to: Friday, August 28, 2026 Oregon Buys

Adams Annex Façade Repair

3. 3. Pre-Bid Conference - Non-Mandatory

1. 3.1. Pre-Bid Conference

An informational Pre-Bid Conference with project walk through will be held at 8:30 am, Tuesday, September 8, 2026 at Adams Annex Building located at 235 W Main St, Hillsboro OR 97124 Contractors will meet in the parking lot to sign in starting any time after 8:15am. Meeting will start promptly at 8:30am.

Attendance is not required in order to submit a bid packet.

Adams Annex Façade Repair

4. 4. Scope of Work

1. 4.1. Overview and Purpose

A car crash damaged a portion of the building facade of the Adams Annex Building located at 235 W Main St, Hillsboro OR 97124. Repairs are needed in order to provide weather protection and access to space within the building.

A. Contractor will provide and install a new pair of insulated metal doors and HM frame. The door will require access control (key card) per County standards.

B. Remainder of wall to be filled in with CMU to match existing building facade.

C. Contractor will repair existing CMU bond beam, repair existing electrical damage, replace light switch as well as prep/prime/paint the ceiling, interior walls, and portion of exterior wall.

D. Exterior wall color must match existing. Interior wall and ceiling color to be per County standards.

E. Contractor will prep floor as needed and install new flooring in select areas impacted by accident - flooring to be provided by the County.

F. Contractor shall make every reasonable effort to ensure that all repairs blend seamlessly with the existing construction. The County will inspect and approve the completed work before it is considered final and eligible for payment. If any adjustments or modifications are required to meet County standards, the County will notify the Contractor accordingly.

1. This includes the few decorative accent blocks on existing CMU that will need to be matched in order to provide building continuity.

G. Contractor must have experience constructing exterior load bearing walls using Concrete

Masonry Units (CMU) H. Work to commence immediately upon contract approval.

2. 4.2. Scope of work and Specifications

Refer to Attachment D: "Adams Annex CMU Repair Set" which contain the drawings and specifications. The bid set is dated 04/15/2026 and includes the following sheets:

G001 Cover Sheet + Code Compliance

A101 Plans, Elevations, & Details

S-001 General Structural Notes and Special Inspections

S-002 Elevations and Details

See addendum #3 for added scope of work to electrical requirements

Adams Annex Façade Repair

3. 4.3. Hourly Rates - Informational Only

Hourly rates in the pricing table will be used for reference when reviewing and processing change orders only. Rates will not have any bearing on bid decision.

A. Any changes to the scope or additional requests to the project outside the scope will be done on a time and materials basis using bid rates for labor per hour.

1. Cost-plus, Guaranteed Maximum Price, Lump Sum, or Unit Pricing basis using bid rates for labor per hour may be used if determined appropriate and agreed upon by both Contractor and Contract Administrator. Contractor must provide additional information explaining how cost was determined.

B. The amount of the charges under Change Orders is limited to the charges allowed under Section IV of the Washington County Public Improvement Project Standard General Conditions.

C. Mark-up not to exceed 15% on additional materials and/or equipment rental and must be approved by Contract Administrator.

D. Contractor and subcontractors not eligible for mark-up on labor rates.

1. The Contractor shall establish a not-to-exceed (maximum) labor rate for subcontractors and for any work performed with its own forces when executing Change Orders (Bid - Hourly Rates).

2. Subcontractors shall be paid based on their submitted labor rates; however, these rates may not exceed the established maximum.

3. If the Contractor’s usual subcontractors have rates above this limit, the Contractor shall utilize qualified subcontractors whose rates comply with the maximum.

Adams Annex Façade Repair

5. 5. Pricing Proposal

All items must have a price or percentage in order to be seen as responsive. The County considers a line marked as $0 to be the price bid for that line item.

BASE SCOPE

Line Item Description Quantity Unit of Measure

Unit Cost Total

1 General Requirements. Refer to Attachment B "Washington County Public Improvement Projects Standard General Conditions", including closeout.

1 lump sum

2 Selective Demolition 1 lump sum

3 Exterior Construction. Includes new exterior CMU wall and all components necessary for complete, weathertight installation; decorative CMU blocks to match existing; new pair of doors, hardware and frame;

repairs/replacement of exterior soffit as needed to complete wall installation.

1 lump sum

4 Exterior Finishes. Includes clean transitions between existing and new portions of existing wall; exterior paint to match existing.

1 lump sum

5 Interior Construction/Finishes.

Includes patching, repair of ceiling;

prep of ceiling and wall surfaces for paint; interior paint.

1 lump sum

6 Electrical/Communications. 1 lump sum

7 Electronic Safety and Security. See Div.

28 of Owner Project Requirements for Access Control standards.

1 lump sum

TOTAL

HOURLY RATES - INFORMATIONAL ONLY

Adams Annex Façade Repair

For information only. Not to be used in bid decision. Reference section 4.3 in the Scope of Work for specifications.

Line Item Description Quantity Unit of Measure

Unit Cost Total

1 Regular Rates - Project Manager 1 hourly rate

2 Regular Rates - Superintendent 1 hourly rate

3 Regular Rates - General Labor (self-performed)

1 hourly rate

4 Overtime Rates - Project Manager 1 hourly rate

5 Overtime Rates - Superintendent 1 hourly rate

6 Overtime Rates - General Labor (self-performed)

1 hourly rate

TOTAL

Adams Annex Façade Repair

6. 6. Instructions to Bidders for ITB

1. 6.1. Deadline Disclaimer

A. It is the responsibility of the responder to upload and submit their electronic response before the deadline date and time approaches as posted on the County's Procurement Portal. Allow for a sufficient amount of time for the bid entry/document upload process in order to ensure timely submission.

B. Make sure that all documents are uploaded as soon as possible well in advance of the deadline. The County's Procurement Portal will close promptly at the deadline date and time. All responses must be submitted, not in process, by that time…no exceptions are allowed.

C. Please note the system will accept Google Docs or Google Pages, but they are not readable by the County. DO NOT upload your response using a Google product.

2. 6.2. Overview

The following instructions, terms and conditions apply to all bids or other such offers to provide construction services, services, or goods to Washington County.

3. 6.3. Precedence of Documents

The order of precedence of documents is as follows:

A. Instructions to Bidders B. Specifications/Scope of Work C. Pricing Proposal D. Special Instructions

4. 6.4. Copies of Bid Documents

Documents obtained from sources (such as directly from other bidders) other than www.WashCoPurch.com/biz are not valid solicitation documents. It is the bidder’s responsibility to insure they are listed as an interested party on the County's Procurement Portal website for a particular project in order to receive notification of all addenda as well as additional relevant information.

5. 6.5. Bidder's Requirements

If this solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should indicate “No Bid” in the column provided for any item on which no price is submitted.

The bidder further agrees to the following:

Adams Annex Façade Repair

A. To examine all specifications, instructions, terms and conditions thoroughly.

B. To provide for appropriate insurance, bid guaranties, and performance bonds as required.

C. To comply fully with specifications as attached for the agreed bid and/or contract, especially where materials and work are involved.

D. To clean up all debris and remove debris from the site as specified.

E. All equipment replaced or removed by the bidder shall remain the property of the

County unless otherwise noted in the specifications or special instructions.

F. Upon completion of the contract and/or delivery and installation, to pass a good, free and clear title for goods and services rendered to the County. Such goods and services shall be free of all claims, mechanic’s liens, subcontractor judgments and other encumbrances which might cloud the County’s title to said goods and services.

G. That they have met any and all registration requirements where required for contractors as set forth in the Oregon Revised Statutes. As required, bidders shall furnish a valid contractor's license number at the time of bid opening.

H. To accept any claims, liens and demands to indemnify the County and hold harmless the County and preserve the property the entire time of equipment installation and/or contract duration.

6. 6.6. Specification Protest or Suggested Change Process

Delivery: Any protest of the specifications must be delivered to the County in writing no later than seven (7) calendar days prior to the bid closing date, a postmark is not sufficient, as follows:

Specification Protest Bid #:2026.083-ITB Washington County Procurement Division ATTN: Procurement Manager 155 North First Avenue, Suite 270 MS 28 Hillsboro, Oregon 97124-3072

A. Content: A written protest must include:

1. Sufficient information to identify the solicitation that is the subject of the protest;

2. The grounds that demonstrate how the procurement process is contrary to law or how the solicitation document is unnecessarily restrictive, is legally flawed or improperly specifies a brand name;

3. Evidence or supporting documentation that supports the grounds on which the protest is based; and

4. The relief sought; and

5. A statement of the desired changes to solicitation document that the prospective bidder believes will remedy the conditions upon which the prospective bidder based its protest.

B. County Response: The County may reject without consideration a bidder’s protest after the deadline established for submitting protest. The County shall provide notice to the applicable protestor if it entirely rejects a protest. If the County agrees with the protest, in whole or in part, the County shall either issue an addendum reflecting its determination or cancel the solicitation.

Adams Annex Façade Repair

C. Extension of Closing: If the County receives a written protest in accordance with this Section the County may extend closing if the County determines an extension is necessary to consider the protest and to issue addenda, if any, to the solicitation document.

D. Judicial review of the County’s decision relating to a specification protest shall be in accordance with ORS 279B.405.

7. 6.7. Licenses/Permits

A. ORS 701.026 and ORS 671.530 require that bidders be licensed with the Oregon Construction Contractors Board or licensed by the State Landscape Contractors Board prior to the submission of a bid.

1. A contractor licensed under ORS Chapter 701 may bid on a landscaping job or perform a construction project that includes landscape contracting as a portion of the project if the landscape contracting portion is subcontracted to a licensed landscaping business as defined in ORS 671.520.

2. A landscaping business may bid on a job or perform a contract that includes the phase of landscape contracting for which it is not licensed if it employs a licensed landscape contractor, or subcontracts with another landscaping business, licensed for that phase.

3. Failure to be licensed will be sufficient cause to reject bids as “non-responsive.”

B. The contractor shall maintain in effect all licenses, permits and certifications required for the performance of the work. The contractor shall notify the County immediately if any license, permit or certification required for the performance of this contract ceases to be effective for any reason.

8. 6.8. Bid Submission

A. All bids must be submitted through our electronic Procurement Portal.

B. Email, phone, fax and paper bids will not be accepted.

C. It is the responsibility of the bidder to submit electronic bids before the deadline date and time approaches as posted on the County's Procurement Portal.

D. It is the sole responsibility of the bidder to ensure receipt of bids and success of uploaded documents or bid modifications by the County by the specified time.

E. Bidders are required to use the bid forms or tables posted on www.WashCoPurch.com/biz.

F. Please note the system will accept Google Docs or Google Pages, but they are not readable by the County. DO NOT upload your response using a Google product.

9. 6.9. Bid Guaranty Form and Bid Bond

The County has decided that the requirement of Bid Guaranty Form and Bid Bond will be waived for this project.

https://www.washcopurch.com/biz

Adams Annex Façade Repair

10. 6.10. Unit Prices

If the bid document includes a schedule of unit prices for labor and materials or other items to establish a cost basis for unforeseen contract changes, Washington County reserves the right to reject, without impairing the balance of the bid, any or all such predetermined unit prices, and negotiate such unit prices during the term of the award.

11. 6.11. Bid Opening

A. All bids received will be publicly opened immediately after the bid closing date and time.

All bidders and other persons who may be interested in this matter are invited to attend online through Microsoft Teams.

B. Bids shall contain all required documents and descriptive literature. The Vendor Questionnaire must be complete in order to submit your response. Any statement accompanying and tending to qualify a bid may cause rejection unless the statement is required or permitted.

C. Microsoft Teams Bid Opening Link Join Microsoft Teams Meeting

+1 971-337-3439 United States, Portland (Toll)

Conference ID: 522 346 32#

12. 6.12. Performance Bond

The County has decided that the requirement of a Performance Bond will be waived for this project.

13. 6.13. Payment Bond

The County has decided that the requirement of a Payment Bond will be waived for this project.

14. 6.14. Oregon Corporate Activity Tax (“CAT”)

A. In 2019 Oregon adopted a Corporate Activity Tax (“CAT”) applicable to all types of business entities. The legislation accomplishes the following:

1. Establishes a "Fund for Student Success" that is separate and distinct from the state's general fund

2. Adopts a new Corporate Activity Tax (CAT) imposed on all types of business entities

B. The CAT is in addition to the state's current corporate income tax. The CAT is imposed on businesses for the privilege of doing business in this state. It is measured on a business's commercial activity, which is the total amount a business realizes from transactions and activity in Oregon. The CAT is applied to taxable Oregon commercial activity in excess of $1 million. Any costs relating to Oregon’s Corporate Activity Tax will not be reimbursable under Cost of the Work.

https://teams.microsoft.com/l/meetup-join/19%3ameeting_NWJmZjlmNzUtZGQ5NC00MjY1LTk4YzgtZGYzYjJkYzY4NGE0%40thread.v2/0?context=%7b%22Tid%22%3a%2240d27439-4752-4445-a1f9-bb649e5f3042%22%2c%22Oid%22%3a%22e52c78da-3539-4e4f-a9e3-a4a48dcdfd9a%22%7d

Adams Annex Façade Repair

15. 6.15. Questions, Interpretations, and Addenda for Facilities

Enter all questions regarding the meaning or intent of the solicitation into the questions area of the solicitation in www.WashCoPurch.com/biz.

A. Interpretations or clarifications considered necessary in response to such questions will be posted as addenda or in Questions and Answers in the County's Procurement Portal .

Bidders will be solely responsible to check for all addenda or questions and answers, if any, from the Procurement Portal prior to submitting their bid.

B. Questions received afterThursday, September 17, 2026 will not be answered.

C. Formal addenda and answers to questions posted in the Question and Answer section are made part of this solicitation and will be binding. Oral and other interpretations or clarifications will be without legal effect.

D. Written addenda may also be issued to modify the bid documents at the discretion of the County.

E. Receipt of addenda must be acknowledged on the County's Procurement Portal.

F. All questions pertaining to this bid shall be addressed only through the County's

Procurement Portal. Do not contact any other Washington County staff, employee or official regarding this bid. Communication between bidder and any County staff is prohibited from the time the bid is advertised until the award of a contract to the bidder selected by The County.

16. 6.16. Contract Award

The County reserves the right to award this bid based on the following:

Lowest responsive responsible bidder

17. 6.17. Execution of Contract

A. The successful bidder(s) shall within fifteen (15) business days from the date of receiving from the County the contract prepared and ready for execution, furnish the County the corporate performance and payment surety bonds specified herein if required and enter into a contract with the County.

B. If the successful bidder fails to comply with any of the requirements herein, the County may, at its option, determine that the bidder has abandoned the contract and the security accompanying this bid shall be forfeited and the same shall become the property of the County.

C. Successful bidder(s) will be held to all County policies and procedures.

18. 6.18. Pre-Construction Meeting

A. Before the contractor begins work, a pre-construction meeting will be held to establish a working understanding among the parties to the Project. Procedures will be established for operations coordination and administrative communications for matters such as submittals, clarifications and interpretations, and change orders, and for processing applications for payment. At this meeting, the contractor shall submit to the County a

Adams Annex Façade Repair preliminary work progress schedule, a preliminary submittal schedule and the Contractor Safety Information Form (See Attachment H) for review by the County.

B. The contractor shall submit the Contractor Safety Information Form for safety planning purposes. The County expects that the contractor will abide by all Oregon OSHA requirements and the Contract Documents to provide for the safety of its employees, agents, County employees and the general public. Work performed by subcontractors must be included on the submitted Contractor Safety Information Form. The contractor shall also include applicable company policies, procedures, or plans. Material safety data sheets (MSDS) for chemical products introduced to Washington County shall not be submitted with this information, butinformation but shall accompany the contractor on site and be available to the County upon request.

C. The following information must be submitted at the Pre-Construction Meeting:

1. Detailed schedule, and

2. Contractor Safety Information Form.

19. 6.19. Form of Contract

A. A copy of the County's contract that the County expects the successful firm or individual to execute is attached. The contract will incorporate the terms and conditions from this RFP document, attachments provided, and the successful proposer's response documents.

B. Firms taking exception to any of the contract terms should indicate the same by uploading in the Vendor Submission or their exceptions will be deemed waived.

Adams Annex Façade Repair

7. 7. Special Instructions

1. 7.1. Laws and Regulations

A. The bidder shall be familiar with all Federal, State, County and /or City laws and regulations, which in any manner affect those engaged or employed in the work or the materials or equipment used or which in any way affect the conduct of the work, and no pleas of misunderstanding will be considered on account of ignorance thereof. If the bidder discovers any provision in the specifications or project information, plans or contract documents that is contrary to or inconsistent with any law or regulations, they shall report it to Washington County in writing via the County’s e-Procurement portal .

B. All work performed by the contractor shall be in compliance with all Federal, State, County and local laws, regulations and ordinances. Unless otherwise specified, the contractor shall be responsible for applying for applicable permits and licenses.

2. 7.2. Recycled Materials and Sustainable Products and Processes

A. To the extent practicable and economically feasible, suppliers shall provide a competitive preference for products and services that conserve natural resources and protect the environment and are energy efficient.

B. Examples of such products may include, but are not limited to, products described in U.S.

Environmental Protection Agency (U.S. EPA) guidelines at 40 C.F.R. Parts 247-253, implementing section 6002 of the Resource Conservation and Recovery Act, as amended, 42 U.S.C. § 6962. Suppliers shall include this provision in all its subcontracts, with the requirement that it shall flow down to all subcontracts regardless of tier.

C. These efforts must be consistent with maintaining a satisfactory level of competition unless the supplier determines that such items: (1) are not reasonably available in a reasonable period of time; (2) fail to meet reasonable performance standards, which shall be determined on the basis of the guidelines of the National Institute of Standards and Technology, if applicable to the item; or (3) are only available at an unreasonable price.

3. 7.3. State Provisions for Prevailing Wages (this applies to all public works over $50,000)

A. In compliance with ORS 279C.800 through 279C.870 or the Davis-Bacon Act (40U.S.C.

3141 et seq.) and as part of this bid, the bidder herein agrees and it shall be a condition of their bond that in performing this contract they shall pay and cause to be paid not less than the prevailing rate of wages as of the date of their bid for and to each and every worker who may be employed in and about the performance of this contract. If the public officers who make the contract determine at any time that the prevailing rate of wages has not been or is not being paid as required by the contract, they may retain from

Adams Annex Façade Repair the monies due to the contractor an amount sufficient to make up the difference between the wages actually paid and prevailing rate of wages, and they may also cancel the contract.

B. The Contractor shall promptly, as due, make payment to any person, co-partnership, association or corporation, furnishing medical, surgical and hospital care or other needed care and attention, incident to sickness or injury, to employees of each contractor, of all sums which the contractor agrees to pay for such services and all moneys and sums which the contractor collected or deducted from the wages of the contractor's employees pursuant to any law, contract or agreement for the purpose of providing or paying for such services. (Reference: ORS 279C.530)

C. When a public works project is subject to ORS 279C.800 to279C.870 and the Davis-Bacon Act (40 U.S.C. 3141 et seq.):

1. Every contractor or subcontractor employing workers on a public works project must pay to such workers no less than the applicable prevailing rate of wage for each trade or occupation, as determined by the Commissioner.

2. If the state prevailing rate of wage is higher than the federal rate of wage, the contractor and every subcontractor shall pay no less than the state prevailing wage rate; and

3. If the federal prevailing rate of wage is higher than the state prevailing rate of wage, the contractor and every subcontractor on the project shall pay no less than the federal prevailing rate of wage as required by the Davis-Bacon Act.

D. If the Contractor fails, neglects, or refuses to make prompt payment of any claim for labor or services furnished to the Contractor or a subcontractor by any person, or the assignee of the person, in connection with the public works contract as such claim becomes due, the proper officer or officers of the public contracting agency may pay such claim and charge the amount of the payment against funds due or to become due the Contractor by reason of the contract (Reference: ORS 279C.570).

E. A person may not be required or permitted to labor more than 10 hours in any one day, or 40 hours in any one week, except in cases of necessity or emergency or when the public policy absolutely requires it, in which event, the person so employed for excessive hours shall receive at least time and a half pay:

1. For all overtime in excess of eight hours in any one day or 40 hours in any one week when the work week is five consecutive days, Monday through Friday; or

2. For all overtime in excess of 10 hours in any one day or 40 hours in any one week when the work week is four consecutive days, Monday through Friday; and time worked on Saturday and on any legal holiday specified in ORS 279C.540.

F. As per rule OAR 839-025-0020 (4) the County incorporates the most current prevailing wage rate publication entitled: Prevailing Wage Rates for Public Works Contracts in Oregon and include any amendments.

These rates can be viewed at the following web site:

https://www.oregon.gov/boli/employers/pages/prevailing-wage.aspx

As of July 1, 2026 the following has been added to prevailing wage law:

https://www.oregon.gov/boli/employers/pages/prevailing-wage.aspx

Adams Annex Façade Repair

A. Satellite & Off-Site Work: Prevailing wage laws now extend to off-site fabrication and satellite locations. Contract specifications must include a list of potential off-site work, and we must require contractors to provide notice when utilizing these sites.

B. Wage Posting: All applicable wage rate determinations must be posted at both primary and satellite locations.

C. Fee Structure: While the PWR fee remains at 0.1%, public agencies now have the option to pass this fee to third parties or funding awardees in specific scenarios. Please note that the agency retains legal liability for payment. Additionally, the Public Works Fee (PWR) cap rose from $7,500 to $12,500 effective June 5, 2026 (HB 4027 (2026)).

D. Mandatory Contract Clauses: Agencies are required to integrate updated clauses regarding labor protections, overtime thresholds, mandatory written notice to workers, and medical/benefit payment enforcement.

E. Public Works Bond Requirements (OAR 839-025-0015):

F. Core Requirement: Contractors and subcontractors must file a $30,000 public works bond with the Oregon Construction Contractors Board (CCB) for any contract or subcontract worth $100,000 or more.

G. Entity Registration: The name on the bond must exactly match the name registered with the Oregon Corporation Division.

H. Business Changes: Name changes must be reported to the CCB within 30 days. If a business changes its entity type (e.g., from a sole proprietorship to an LLC), a new bond must be purchased; insurance "riders" are not accepted.

I. Compliance for Certified Businesses: If a certified minority, woman, veteran-owned, or emerging small business violates prevailing wage laws, any bond exemptions are revoked, and they must file the standard $30,000 bond.

4. 7.4. Discrimination in Subcontracting

A. A contractor who contracts with a public contracting agency shall not discriminate against minority, women or emerging small business enterprises in the awarding of subcontracts. The contractor shall certify by signing the Certification and Contract Offer that the contractor has not discriminated against minority, women or emerging small business enterprises in obtaining any required subcontracts. ORS 279A.110

B. The public contracting agency may disqualify any person as a bidder on a public contract if the agency finds that the person has violated this section in a contract between the person and the agency.

C. If the person wishes to appeal the disqualification, the appeal procedure shall be pursuant to ORS 279C.450.

5. 7.5. The Rights of the County

The County expressly reserves the following rights:

A. To waive any irregularities in the bids submitted.

B. To base awards with due regard to price, delivery, compliance with specifications, and other such factors as may be necessary and in the public interest in the circumstances.

Adams Annex Façade Repair

C. To make awards to any bidder whose bid, in the opinion of management and the Board, is the lowest responsible bid.

D. To cancel the procurement or reject any or all bids, or selected portions thereof, in accordance with ORS 279B.100. Under no circumstances shall the County be responsible for, nor shall it reimburse, any costs associated providing a bid for this solicitation.

E. To negotiate final contract terms and conditions to the fullest extent allowed by the law and as in the best interests of the County.

Acceptance of an offer is subject to budget approval and budgetary constraints as determined by the County.

6. 7.6. Qualifications of Bidders

Qualifications of bidders may be evaluated when determining the award. Bidders may be required to produce acceptable personal, business, and credit references and completed examples of previous work of a similar nature.

The County reserves the right to investigate references and to consider the past performance of any bidder with respect to its successful performance of similar projects, compliance with specifications and contractual obligations, its completion or delivery of services on schedule, and its lawful payment of employees and workers whether or not specifically listed by the bidder.

7. 7.7. Low Tie Bids

A. Low tie bids are subject to the Oregon preference as provided by ORS279A.120: “For purposes of awarding a public contract, a contracting agency shall give preference to goods or services that have been manufactured or produced in this state if price, fitness, availability and quality are otherwise equal.”

B. Low tie bids that remain after application of the statutory Oregon preference shall be awarded according to the following sequence:

1. Award shall be made by drawing lots among any tied Oregon bidders. Such bidders shall be given notice and an opportunity to be present when lots are drawn.

2. If none of the tied bidders is located in Oregon, award of the contract shall be made by drawing lots among all tied bidders. Such bidders shall be given notice and an opportunity to be present when lots are drawn.

8. 7.8. Award Recommendation / Intent to Award

A Notice of Intent to Award will be posted on the www.WashCoPurch.com/biz web site at least seven (7) days before the award of the contract.

9. 7.9. Contract Term

A. The term of the contract will be Initial contract term will be one year, with the option to renew for up to a total of five years.. Changes in the term of the contract are allowed if agreed upon by both parties and not to exceed 5 years.

B. The maximum term of the contract will be five years.

Adams Annex Façade Repair

C. The estimated expenditure for the contract is approximately 100,000. Actual expenditures may be more or less depending on actual requirements.

10. 7.10. Form of Contract

A. A copy of the County's contract that the County expects the successful firm or individual to execute is attached. The contract will incorporate the terms and conditions from this RFP document, attachments provided, and the successful proposer's response documents.

B. Firms taking exception to any of the contract terms should indicate the same by uploading in the Vendor Submission or their exceptions will be deemed waived.

11. 7.11. Bid Files

A completed bid file for each project will be available, by appointment only, for public inspection at the Washington County Procurement Division Office.

12. 7.12. Protest and Judicial Review of Award

A. Purpose. The award by the Washington County Board of Commissioners of the contract shall constitute a final decision of the County to award the contract if no written protest of the award is filed. A bidder may protest the award of a contract, or the intent to award of a contract, whichever occurs first, if the conditions set forth in ORS 279B.410(1) are satisfied. A bidder must file a written protest with the County and exhaust all administrative remedies before seeking judicial review of the County's contract award decision.

B. Delivery. A bidder must deliver a written protest to the Washington County Procurement Manager within seven (7) days after issuance of the notice of intent to award the contract. Protests must be physically received by 5:00 PM on the 7th day. A postmark is not sufficient.

C. Content of Protest. A bidder’s written protest shall specify the grounds for the protest to be considered pursuant to ORS 279B.410(2). Bidder may not protest the content of Specifications, nor shall the County consider any such grounds, in an award protest.

Bidders may protest only deviation for laws, rules, regulation or procedures, including procedures set out in the ITB. Protests must specify the grounds for protest including the specific citation or law, rule, regulation, or procedure upon which the protest is based.

D. County Response. The Board or its designee shall not consider a bidder’s contract award protest submitted after the timeline established for submitting such protest has expired per B above. The County shall issue a written disposition of the protest in a timely manner as set forth in ORS 279B.410(4). If the protest is upheld, in whole or in part, the Board or its designee may in its sole discretion either award the contract to the successful protestor or cancel the procurement or solicitation.

E. Judicial Review. Judicial review of the Board’s or its designee’s decision relating to a contract award protest shall be in accordance with ORS 279B.415.

Adams Annex Façade Repair

13. 7.13. Contractor's Responsibility

It is understood that the specifications and other contract documents do not purport to control the method of performing the work, but only the requirements as to the nature of the completed work. The contractor assumes the entire responsibility for the method of performing the work. Suggestions as to the method included in the contract documents shall be deemed advisory only and the feasibility of such methods, or the lack thereof, shall not affect the contractor's liability, or status as an independent contractor under this contract.

14. 7.14. Performance

Contractor shall perform all services required by this contract within the time specified.

Contractor shall provide all services in accordance with the highest industry standard prevalent in the industry or business most closely related to the construction industry. Unless the means or methods of performing a task are specified elsewhere in the contract, contractor shall employ methods that are generally accepted and used by the industry. Any performance that is found unacceptable will be documented and the contractor will be given written notice to correct the problem within a specified period. If the problem continues beyond the specified period the contractor may be found in breach of this contract, and the contract may be terminated.

15. 7.15. Non-Performance

In the event of nonperformance under the resulting contract the County will have the right to obtain from other sources such equipment, supplies, and/or services as may be required to fulfill the contract. It is agreed that the difference in cost, if any, for said equipment, supplies and/or services shall be borne by the contractor awarded this contract.

16. 7.16. Drug and Alcohol Testing for Public Works Contracts

Contractor shall demonstrate that an employee drug and alcohol testing program is in place and that the employees who are engaged in the construction, reconstruction or maintenance of a project (all public works projects) that have tested negative for drugs and alcohol or have entered a rehabilitation program. By signing the certification and contract offer the contractor is certifying that they have a program in place. ORS 279C.505(2)

17. 7.17. Guarantee

Contractor agrees to repair any failures due to inferior workmanship and/or materials without additional expense to the County.

18. 7.18. Damage Clause

A. Contractor shall be responsible for renovating, restoring, or otherwise repairing any portion of the County's premises, facilities, or any County owned properties or right-of-

Adams Annex Façade Repair ways which are damaged by the contractor and its agents in the case of any work related to its obligation under this contract.

B. Contractor agrees to repair any avoidable damage to existing materials, surfaces and equipment caused during the execution of the work, without additional expense to the County.

19. 7.19. Product Safety

A. In accordance with all applicable laws and generally accepted practices, the contractor will be solely and completely responsible for conditions of the job site, including the safety of all persons and property during the performance of the work. This requirement will apply continuously and not be limited to normal working hours.

B. Performance, or other, reviews conducted by the County’s representative are not intended to include review of the adequacy of the contractor’s safety measures in, on, or near the project.

20. 7.20. OSHA

During the performance of this contract, the Contractor is required to comply with the conditions of the Federal Occupational Safety and Health Act of 1972 (OSHA) and the standards and regulations issued there under. The bidder shall further agree to hold the County, its employees, agents, commissioners, and assigns harmless and free from liability for failure to comply with said standards and regulations by the bidder. It shall be the sole responsibility of the bidder to remain familiar with said standards and regulations and maintain their enforcement.

21. 7.21. Hazardous Materials

A. All materials that include solvents, paints, cleaning agents, chemicals, reagents or other hazardous materials shall be labeled in accordance with Oregon law with the name(s) of the hazardous ingredient(s), the hazard(s) of the material(s) and the appropriate precautions. Materials for which toxicological or hazard data are unavailable shall carry a label stating: “Toxicological and other hazards unknown. Handle as extremely hazardous.”

B. Environmentally Preferred Products/Material Safety Data Sheets. Whenever possible, the Contractor should use environmentally preferable products which present a lesser impact to the public health and the environment than competing products. Contractor agrees, upon execution of this contract, to submit a copy of the relevant material safety data sheet(s) for any chemical substance the Contractor will bring on to the County’s premises and use as part of the work described in this contract.

22. 7.22. Patent or Franchise Infringement

The Contractor agrees to protect the County against all claims for patent or franchise infringement arising from the purchase, installation, or use of the material(s) or service(s) ordered from this solicitation, and to assume all expense and damage arising from such claims.

Adams Annex Façade Repair

23. 7.23. Assignment to the County

A. By entering into a contract under this solicitation, the contractor irrevocably assigns to Washington County any claim or cause of action which the contractor now has or which may accrue in the future, including, at the option of Washington County, the right to control any such litigation, by reason of any violation of 15 USC 15 §1-15 or ORS 646.725 or ORS 646.730, in connection with any goods or services provided to the contractor by any person which are used, in whole or in part, for the purpose of carrying out the contractor's obligations under such contract.

B. Contractor shall require any subcontractor to irrevocably assign to Washington County, as a third party beneficiary, any right, title or interest that has accrued or may accrue to the subcontractor by reason of any violation of 15 USC 15 §1-15, ORS 646.725 or ORS 646.730, including, at the option of Washington County, the right to control any litigation arising there under, in connection with any goods or services provided to the subcontractor by any person, in whole or in part, for the purpose of carrying out the subcontractor's obligations as agreed to by the contractor in pursuance of the completion of this contract.

C. In connection with this assignment, it is an express obligation of the contractor that it will take no action that any way diminishes the value of the rights conveyed or assigned hereunder to the County. It is an express obligation of the contractor to advise the Office of County Counsel for Washington County:

1. In advance of its intention to commence any action on its own behalf regarding such claims or causes of action;

2. Immediately, upon becoming aware of the fact that an action has been commenced on its own behalf by some other person or persons, of the dependency of such action; and

3. The date on which it notified the obligor(s) of any such claims for relief or causes of action of the fact of its assignment to the County.

24. 7.24. Price Adjustment

A. Revised Published Price Lists will be used as a means of price increases. However, all bids are to be firm for a period of 180 calendar days after the bid closing date and Revised Price Lists will not be accepted by the County until after that date. Revised Published Price Lists will be accepted only in the event of an industry-wide price change, as evidenced by the issuance of revised price lists by the manufacturer. Price adjustments will not be made for changes in freight.

B. Price increases will not become effective until revised list(s) are submitted to the County Contract Administrator under Contractor’s cover letter identifying the applicable requirements contract number. Contractor cover letter and pricing list(s) must be dated, signed and submitted at least thirty (30) days prior to the date the increase becomes effective. The County reserves the right to accept or reject any proposed changes in prices or discounts. If the price changes are accepted, they shall become effective upon completion of the contract amendment process.

Adams Annex Façade Repair

C. If price increases are necessary, the County must receive the same or better percentage discount from list as was reflected in the original bid prices.

D. All price decreases and store specials shall be passed through in total to the County on the effective date of the price decrease.

E. The County reserves the right to determine the acceptability of price verification documentation. Increases shall apply to orders issued on or after the effective date of the increase request once approved by the County. In the event of price increases(s), the County reserves the right to audit Contractor’s books and records relating to cost or pricing data.

25. 7.25. Purchasing by Contractor

Contractor shall make all purchases in its own name and not in any way attempt to bind the County in Contractor’s contractual agreements. Delivery of goods to County facilities will be at contractor’s own risk and expense.

26. 7.26. Contact Persons

The contractor shall designate one or more person(s) as the contact person for this contract. The contractor should provide to the County the names, addresses and telephone numbers of such person(s) and shall keep this information current at all times.

27. 7.27. Payment

A. Payment shall be made upon submission of invoice and any required supporting documentation after final acceptance of each phase and/or monthly progress payments.

B. Contractor shall invoice the County no later than thirty (30) days following completion of work.

C. The County will pay the invoice within 30 days after approval of the invoice by the contract administrator.

28. 7.28. Public Contracting Statutes

The provisions of Oregon Revised Statutes 279C.500 through 279C.870, Public Contracts, as applicable are incorporated herein by reference. Any bidder accepting a purchase order from the County and/or executing a contract with the County for the delivery of materials and/or services agrees to comply with said provisions.

29. 7.29. First-Tier Subcontractors Disclosure

A. Pursuant to ORS 279C.370, within two (2) working hours after the date and time of the deadline when bids are due to a contracting agency for a public improvement, a bidder shall submit to the contracting agency a disclosure of the first-tier subcontracts that:

1. Will be furnishing labor or will be furnishing labor and materials in connection with the public improvement…

This is the start of the file's text. The full file is on GovTribe.