This is an Air Force Material Command First Article Requirements form (AFMC IMT 260) dated September 4, 2025, for a critical turbine engine part used in F100 series engines. The procurement requires submission of three first article units: two that will be part of the production quantity and one in addition to the production quantity. The part is identified by NSN 2840014491573NZ under PR/MIPR number 77445/4084071-01.
The contractor is required to perform first article testing in accordance with drawing 4084071 and specification LPF-QAR-003. All three articles must be inspected per paragraphs 3.1 through 3.5 of LPF-QAR-003, with one article subject to destructive testing per paragraph 3.6. The test plan must be submitted within 30 calendar days of contract date, with government approval/disapproval required within 45 days of receipt. The test report is due within 120 calendar days of contract date, with government written notice of approval/disapproval due within 60 days thereafter. The estimated cost of government testing and inspection is $2,500. First article testing may be waived if the offeror is Pratt & Whitney (the prime contractor) or meets specified conditions regarding prior production history and satisfactory in-service performance within the past 36 months. The destructively tested first article will be condemned and disposed of at the vendor's facility. Carson M. Hazel of AFLCMC/LPSBE (405-582-1907) is identified as both the cognizant engineering organization responsible for approval and for conducting the test.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MQR.pdf | ||
| 807.pdf | ||
| IUID.pdf | ||
| 813.pdf | ||
| EDL.pdf | ||
| First Article DID.pdf | ||
| First Article Test Plan.pdf | ||
| Item Description.pdf | ||
| CDRL1_REPORT.pdf | ||
| FA812126R0016_Solicitation.pdf | ||
| 4248680_EI.docx | DOCX document | |
| DID.pdf | ||
| Packaging.pdf | ||
| Transportation.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
04 SEP 2025(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
77445 / 4084071-01
4. NSN
2840014491573NZ
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 3 UNIT(S) OF LOT / ITEM Item
AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
X REQUIRED NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A. X CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are identified in drawing 4084071, sub-tier drawings (if an assembly), and specifications identified therein.
B. The detailed technical requirements for First Article approval tests are contained in
BLOCK 12 OF THIS FORM AND LPF-QAR-003
(Cite Spec and Para number)
C. X TEST PLAN REQUIRED
(3) Number of days for government approval / disapproval days.
(1) DD Form 1423 ELIN
(2) Delivery due calendar days from date of contract.
D. Contractor's notification to ACO and
PCO
(Requesting Activity) of test time and location due 30 days prior to start of testing.
E. X TEST REPORT REQUIRED
(3) Forwarded to
AFLCMC/LZPED (within 120 days)
3001 Staff Dr, STE 1AB85A
Tinker, AFB OK 73145-3041
Attn: FA Monitor DODAAC:FA8111
(4) Government written notice of approval / disapproval due
(2) Due
(1) DD Form 1423 ELIN days after receipt of contractor's report.
N/A
N/A calendar days from date contract.
AFMC IMT 260, 20230316, V-5,
Version 8Generated by PRPS using Jasper Reports on 23 Apr 2026
PREVIOUS EDITION IS OBSOLETE
Prescribed by: AFMCI23-110
F. FIRST ARTICLE DELIVERY
(1) Due within 0 calendar days from date contract.
(2) Notify 0 calendar days prior to shipment.
(3) Delivered to government at
N/A
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 0 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$2,500.0000
10. DISPOSITION OF FIRST ARTICLES
Approved First Articles will be forwarded to
(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
Disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
X Other Disposition:
See block 12 of this form
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, X DoD, Air Force.
b. X Offerors currently in production of the same or similar article for a Government, X DoD, Air Force contract and who have received First Article approval under the existing contract.
c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, X DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 36 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
AFMC IMT 260, 20230316, V-5,
Version 8Generated by PRPS using Jasper Reports on 23 Apr 2026
12. REMARKS
Hazel, Carson MNAME: 04 SEP 2025DATE:
Block 3: Part Number:
Block 9: additional information for part C&E:
C. 1) DD Form 1423 ELIN:
2) Deliver due _____ calendar days from date of contract E. 1) DD Form 1423 ELIN:
2) Due ______ calendar days from date of contract
Block 5. First Article Quantity is 3 parts:
-2 parts will be part of production quantity -1 part will be in addition to production quantity
Block 9.B First article test requirements shall be per LPF-QAR-003 and the following:
-a. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003.
-b. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003 prior to assembly.
-c. After completion of inspections per 9.B.a above, one article shall be destructively tested/evaluated in accordance with the requirements of paragraph 3.6 of LPF-QAR-003.
-NOTE: Deliveries (FAT test plan and Reports) are preferably submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.
Block 10. Disposition of First Articles:
-1 First Article part will be destructively tested. This item will be condemned and disposed of at vendor's facility.
Block 11. The cognizant Government engineering authority shall be the final authority for determining if a contractor meets the conditions of waiver identified in 11.a and/or 11.c.
First article testing is waived if the offeror is the prime contractor, Pratt & Whitney.
This is a critical part used in the F100 series turbine engine. Poor quality parts will have an adverse effect on mission capability and system safety. For this reason, First Article Testing is required to insure first time manufacturers or manufacturers that have not produced the item within three years manufacture parts in accordance with the drawing and specification requirements.
Shelley, Eric CNAME: 16 NOV 2015DATE:
5. First Article Quantity is 3 parts:
2 parts will be part of production quantity 1 part will be in addition to production quantity 9.B. First article test requirements shall be per LPF-QAR-003 and the following:
" a. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003."
" b. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR -003 prior to assembly."
c. After completion of inspections per 9.B.a above, one article shall be destructively tested/ evaluated in accordance with the requirements of paragraph 3.6 of LPF-QAR- 003.
10. Disposition of first Articles:
Destructively tested first article assets will be condemned and disposed of at vendor's facility.
For FMS contracts, forward approved First Articles to contractor for shipment with production quantities.
11. The cognizant Government engineering authority shall be the final authority for determining if a contractor meets the conditions of waiver identified in 11.a or 11.c.
First article testing is waived if the offeror is the prime contractor, Pratt & Whitney.
This a critical part used in the F100 series turbine engine. Poor quality parts will have an adverse effect on mission capability and system safety. For this reason, First Article Testing is required to insure first time manufacturers or manufacturers that have not produced the item within three years manufacture parts in accordance with the drawing and specification requirements.
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING
(Name, Organization, Phone)
Hazel, Carson M
AFLCMC/LPSBE
405-582-1907
582-1907
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Hazel, Carson M
AFLCMC/LPSBE
405-582-1907
582-1907
AFMC IMT 260, 20230316, V-5,
Version 8Generated by PRPS using Jasper Reports on 23 Apr 2026
File details come from the government source that posted it. Updated .