About this file

This Request for Proposals (RFP) is issued by Greenville County on behalf of the Tigerville Fire Department in South Carolina for the design, permitting, installation, testing, and acceptance of a new automatic fire sprinkler system and a new complete fire alarm system in an existing two-story fire station constructed around 1990. The selected contractor shall serve as the single point of responsibility for both systems and may utilize properly licensed and qualified subcontractors. The scope includes field verification of existing building conditions, design of NFPA 13-compliant sprinkler systems with hydraulic calculations, design of NFPA 72-compliant fire alarm systems, installation of all components, removal or approved abandonment of the existing 20-year-old fire alarm system, testing, inspection, final acceptance, closeout documentation, and training for Tigerville Fire Department personnel. The RFP was released on August 14, 2026, with a mandatory pre-proposal meeting and site visit scheduled for August 27, 2026, at 10:30 a.m. at the Tigerville Fire Department location. The deadline for submitting inquiries is August 28, 2026, at 3:00 p.m., and proposals must be submitted electronically by September 4, 2026, at 3:00 p.m. The tentative award date is September 18, 2026, with contract negotiations occurring September 18-25, 2026, and a Notice to Proceed issued September 25, 2026. The project completion deadline is July 1, 2027.

Pricing shall be submitted as clearly separated, all-inclusive costs for the complete automatic fire sprinkler system, the complete fire alarm system, and the combined total project price, with any alternates and unit prices listed separately. Proposals must include pricing based on payment terms of thirty days. The evaluation will be conducted across six equally weighted criteria (each worth 5 points for a total of 30 points): responsiveness to the RFP, cost, references, experience with similar projects, proposed approach and scope of work, and schedule. A bid bond of 5% of the bid price is required, along with performance and payment bonds equal to the total bid price. The contractor must maintain comprehensive general liability insurance of $1,000,000 per occurrence with $2,000,000 general aggregate, automobile liability insurance of $1,000,000 per occurrence, and statutory workers' compensation coverage with employer's liability of $1,000,000 per occurrence. The Tigerville Fire Department shall be named as an additional insured on all policies except workers' compensation, automobile liability, and professional errors and omissions. A minimum one-year warranty on materials and workmanship from the date of final acceptance is required, and the contractor must provide complete closeout documentation in both paper and electronic formats including approved shop drawings, as-built drawings, hydraulic calculations, product data, operation and maintenance manuals, and all access codes and programming files necessary for the Fire Department to operate and maintain the systems.

View the file

Other files

File Type Posted
TFD_FSSSS_4-29-26.pdf PDF
2025-08_Tigerville_FD_3-17-2026.pdf PDF
COG_Sub_W9_.pdf PDF
Sample_Services_Agreement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP #27012

Greenville County Issue Date: August 14, 2026

Procurement Services Division Opening Date: September 4, 2026

FIRE ALARM AND FIRE SPRINKLER

SYSTEMS

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https:// procurement.opengov.com/portal/greenvillecounty/greenvillecounty

Robert Brewer, NIGP-CPP, CPPO, CPPB

Procurement Services Division Director https://secure.procurenow.com/portal/%7bproject.government.code%7d

Greenville County

Fire Alarm and Fire Sprinkler Systems

I. Public Notice II. Introduction

III. Scope of Work IV. Instructions to Offerors V. General Information

VI. Insurance VII. Evaluation Phases

VIII. Bonds IX. Terms and Conditions X. Sample Contract

XI. Vendor Questionnaire

Attachments:

A - COG Sub W9

B - Sample Services Agreement

C - 2025-08 Tigerville FD 3-17-2026

D - TFD FSSSS 4-29-26

Title: Fire Alarm and Fire Sprinkler Systems

1. Public Notice

Greenville County is soliciting sealed proposals in response to Fire Alarm and Fire Sprinkler Systems, subject to the conditions and all provisions set forth herein and attached. Sealed proposals will be received through the County’s online procurement portal located at https://procurement.opengov.com/portal/greenvillecounty until Friday, September 4, 2026, 3:00 pm, then publicly opened. The goods and/or services must be furnished as described and specified herein and submitted to Greenville County.

All inquiries regarding this proposal shall be submitted no later than Friday, August 28, 2026, 3:00 pm via the County’s online procurement Portal, located at https://procurement.opengov.com/portal/greenvillecounty. Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the County’s online procurement Portal. Offerors may also click “Follow” on this proposal to receive an email notification when answers are posted. It is the responsibility of the Offeror to check the website for answers to inquiries.

https://secure.procurenow.com/portal/greenvillecounty

2. Introduction

2.1. Summary

The County of Greenville is seeking sealed proposals on behalf of the Tigerville Fire Department from qualified contractors for the design, permitting, installation, testing, and acceptance of a new automatic fire sprinkler system and a new complete fire alarm system in an existing two-story fire station. The selected contractor shall serve as the single point of responsibility for both systems and may use properly licensed and qualified subcontractors as identified in the proposal.

2.2. Background

The building was constructed around 1990 and does not currently have any type of fire sprinkler system.

An approximately 20-year-old fire alarm system presently serves portions of the living quarters and office areas but does not provide complete coverage of the entire station. The existing fire alarm system, including the control equipment and existing initiating and notification appliances, shall be removed or properly abandoned and replaced with a new system as part of this project.

The project shall result in complete, coordinated, code-compliant, tested, and accepted fire sprinkler and fire alarm systems serving the entire station. Both systems shall be installed under the same contract and completed on the same project schedule.

2.3. Contact Information

Bob Brewer

Procurement Director

301 University Ridge

Suite N-2400

Greenville, SC 29601

Email: rbrewer@greenvillecounty.org

Phone: (864) 467-7200

Department:

Procurement Services Division

2.4. Timeline

Release Project Date August 14, 2026

Pre-Proposal Meeting (Mandatory) August 27, 2026, 10:30am

Tigerville Fire Department

2605 Highway 414

Travelers Rest, SC 29690 mailto:rbrewer@greenvillecounty.org tel:(864)467-7200

Question Submission Deadline August 28, 2026, 3:00pm

Proposal Submission Deadline September 4, 2026, 3:00pm

Review of Proposals September 4 - 18, 2026

Tentative Date of Award September 18, 2026

Contract Negotiations September 18 - 25, 2026

Issue Notice to Proceed September 25, 2026

3. Scope of Work

3.1. Scope of Work

The selected contractor shall provide all labor, materials, equipment, supervision, design, engineering, permitting, testing, and documentation necessary to install complete automatic fire sprinkler and fire alarm systems The contractor shall coordinate all work between the sprinkler and fire alarm installation and remain responsible for the successful operation of both systems.

The scope shall include, but is not limited to:

• Field verification of existing building conditions.

• Design of a complete NFPA 13-compliant automatic fire sprinkler system.

• Hydraulic calculations.

• Stamped shop drawings and design documents as required.

• Permit submittals and AHJ coordination.

• Installation of all sprinkler piping, fittings, valves, hangers, supports, sprinkler heads, drains, test connections, and related components.

• Sprinkler protection for the first floor.

• Sprinkler protection for the second floor.

• Sprinkler protection for the apparatus bay.

• Sprinkler protection for apparatus bay closets, storage rooms, and accessory spaces.

• Testing, flushing, inspection, and final acceptance.

• Design of a complete NFPA 72-compliant fire alarm monitoring and alerting system.

• Removal or approved abandonment of the existing alarm system.

• Installation of the new fire alarm control unit, power supplies, initiating devices, notification appliances, modules, wiring, raceways, supports, labels, and related components.

• Supervision of the new sprinkler system.

• Closeout documents and Tigerville Fire Department training.

Any proposed omission of sprinkler or alarm coverage shall be clearly identified in the proposal and shall be subject to approval by the Tigerville Fire Department and the Authority Having Jurisdiction.

Applicable Codes and Standards

The sprinkler system shall comply with all applicable federal, state, and local laws, codes, ordinances, and standards.

At a minimum, the project shall comply with:

o NFPA 13, Standard for the Installation of Sprinkler Systems.

o NFPA 72, National Fire Alarm and Signaling Code.

o Applicable building code adopted by Greenville County.

o Applicable fire code adopted by Greenville County.

o Applicable plumbing and mechanical codes.

o Applicable electrical and fire alarm requirements.

o Requirements of the local water purveyor.

The contractor shall confirm the specific code editions currently adopted by the local jurisdiction and shall design the system accordingly.

Existing Building Conditions

The building is an existing operational fire station. The contractor shall be responsible for inspecting the building and verifying all existing conditions before submitting a proposal. The contractor shall account for existing conditions.

Any drawings or information provided by the Tigerville Fire Department as part of this RFP shall be considered for reference only. The contractor shall be responsible for field verification and shall not rely solely on Tigerville Fire Department-provided drawings.

Operational Fire Station Requirements

The fire station is an active emergency services facility and is expected to remain operational during construction. The Department will work with the selected company to minimize station disruptions while also providing the necessary access for system installation.

The contractor shall not block apparatus, driveways, bay doors, exits, or emergency response pathways without prior approval from the Tigerville Fire Department.

Any planned interruption to utilities, fire alarm systems, alerting systems, occupied areas, access, or emergency response operations shall be coordinated and approved in advance by the Tigerville

Fire Department.

The contractor shall maintain a clean and safe work area and shall secure tools, materials, lifts, ladders, and equipment at the end of each workday.

Water Supply and Underground Fire Service

The contractor shall verify the available water supply and determine whether the existing water service is adequate for the proposed sprinkler system.

The proposal shall clearly identify whether the following items are included, excluded, or proposed as alternates:

o Water flow test o New fire service tap o New underground fire line o Backflow prevention assembly o Fire department connection o Exterior control valves o Trenching o Asphalt, concrete, sidewalk, curb, or pavement cutting and repair o Landscaping repair and site restoration o Coordination with water purveyor o Coordination with local utility providers

If the contractor determines that the existing water supply is inadequate, the contractor shall identify the deficiency and provide recommended corrective options.

Hazard Classifications and Design Criteria

The contractor shall identify the proposed hazard classification and design criteria for each area of the building.

Areas to be evaluated shall include, but are not limited to:

o Apparatus bay o Mechanical rooms o Electrical rooms o Bunkrooms o Kitchen o Attics and concealed spaces

The contractor shall not assume that the entire facility is light hazard. The contractor shall evaluate each area based on its actual use, contents, storage, occupancy, and applicable code requirements.

Fire Alarm Requirements

Provide a new, complete fire alarm system for the entire building. The new system shall replace the existing fire alarm system in its entirety unless a specific existing component is inspected, listed for use with the new system, and approved in writing by both the Tigerville Fire Department and the Authority Having Jurisdiction (AHJ). The proposal shall not assume reuse of the existing approximately 20-year-old panel, initiating devices, notification appliances, wiring, or related equipment.

Provide a new listed addressable fire alarm system with a fire alarm control unit sized for the complete project and with reasonable spare capacity for future expansion. The proposal shall identify the proposed manufacturer, control-unit model, system type, available spare capacity, and all proprietary service or programming restrictions.

Building-wide coverage

Provide fire alarm coverage throughout the entire station, including both floors, apparatus bays, offices, corridors, stairs, kitchen and living areas, bunkrooms and sleeping areas, mechanical and electrical rooms, closets, storage rooms, restrooms, attic or concealed spaces where required, and all other occupiable or service spaces. Audible and visible notification shall be provided throughout the building as required by code.

Provide smoke detection, heat detection, carbon-monoxide detection, duct detection, and other initiating devices only where required by the applicable codes, with the exception of the manual fire alarm pull stations specifically requested in the next paragraph. Device selection and placement shall be designed to minimize nuisance alarms while maintaining required protection.

Provide manual fire alarm pull stations at all exits or within the required travel distance of exit doorways. Also provide additional manual fire alarm boxes at Owner-approved locations within or immediately accessible from the living and sleeping portions of the station. Final locations shall be shown on the shop drawings and approved by the Tigerville Fire Department and the AHJ before installation.

Provide audible and visible alarm notification throughout the building. The designer shall evaluate and provide all notification required for sleeping occupants, including low-frequency audible appliances, sound-pressure levels, visible notification, or other features required by the applicable codes. Notification in the apparatus bays shall be designed for the expected ambient noise level and operating conditions.

The new fire alarm system shall monitor and distinctly identify all required fire sprinkler waterflow, control-valve tamper, pressure, pump, tank, supervisory, and trouble signals applicable to the installed sprinkler system. The sprinkler and fire alarm contractors shall coordinate device quantities, locations, wiring, programming, labeling, and acceptance testing. No sprinkler monitoring point required for the completed sprinkler installation shall be omitted from the fire alarm scope.

The Tigerville Fire Department will retain its existing outside monitoring provider. The contractor shall provide all communicator equipment, modules, programming, wiring, coordination, testing, and other work necessary to transmit alarm, supervisory, and trouble signals from the new system to that provider. Recurring monitoring fees are not part of this bid. The contractor shall coordinate the cutover and final signal verification

The existing fire alarm and monitoring functions shall remain operational to the greatest extent practical until the new system is ready for coordinated cutover. Planned impairments shall be approved in advance by the Tigerville Fire Department. The contractor shall provide required impairment notifications and temporary precautions and shall not leave the occupied station without required protection except during an approved and controlled cutover period.

Provide all electrical work, raceway, conductors, supports, penetrations, firestopping, patching, labeling, and finish restoration required for a complete installation. Exposed device and raceway locations in finished, public, sleeping, living, or office areas shall be reviewed with the Tigerville Fire

Department before installation.

Cutting, Patching, Firestopping, and Restoration

Penetrations through fire-resistance-rated assemblies shall be firestopped using approved materials and methods to maintain the required fire-resistance rating of the assembly.

The contractor shall include restoration of disturbed areas, including:

o Ceiling tiles o Drywall o Plaster o Wall surfaces o Floor surfaces o Fire-rated assemblies o Utility penetrations o Apparatus bay walls or ceilings o Other disturbed finishes

Damaged ceiling tiles shall be replaced with matching or Tigerville Fire Department-approved tiles.

Any exposed piping routes or cable/raceway locations in finished, public, sleeping, living, or office areas shall be reviewed with and approved by the Tigerville Fire Department before actual installation.

Apparatus Bay

The contractor shall evaluate the apparatus bay based on actual use, ceiling height, storage, vehicles, tools, equipment, hose, turnout gear, flammable or combustible materials, and other relevant conditions.

Sprinkler heads, piping, and related components in the apparatus bay shall be located and protected to reduce the likelihood of damage from apparatus movement, equipment movement, ladders, hose, storage, or station operations.

Head guards shall be provided where required or where reasonably necessary due to potential mechanical damage.

Workmanship and Materials

All materials shall be new and listed or approved for fire sprinkler/alarm use.

The contractor shall coordinate pipe and wiring routing to minimize conflicts with building operations, apparatus movement, existing utilities, lighting, HVAC, ceilings, doors, and other building systems.

The contractor shall not install piping, valves, drains, or sprinkler heads in locations that interfere with apparatus operations, door travel, storage access, or normal building use without prior approval from the Tigerville Fire Department.

Permits and Approvals

The contractor shall be responsible for obtaining all required permits and approvals unless otherwise stated in the proposal.

The contractor shall coordinate with:

o South Carolina State Fire Marshal o Greenville County Code Enforcement o Tigerville Fire Chief

The contractor shall not begin installation until required permits and approvals have been obtained.

Testing and Acceptance

The contractor shall complete all required testing in accordance with NFPA 13, NFPA 72, applicable codes, and AHJ requirements.

Testing and acceptance shall include training personnel of the Tigerville Fire Department in required annual testing.

The system shall not be considered complete until final approval is received from Greenville County and all required closeout documents are delivered to the Tigerville Fire Department.

Closeout Documents

The contractor shall provide a complete closeout package at the conclusion of the project.

The sprinkler closeout package shall include, at minimum:

o Approved shop drawings o Hydraulic calculations o Product data sheets o Material certifications o As-built drawings o Aboveground test certificates o Underground test certificates, if applicable o Flushing documentation o Fire alarm interface test documentation o Backflow test documentation, if applicable o Final AHJ approval documentation o Operation and maintenance manuals o Valve chart o Spare sprinkler heads o Sprinkler head wrench cabinet o Warranty documents o Tigerville Fire Department training documentation.

The fire alarm closeout package shall include at minimum;

o Approved shop drawings o As-built drawings o Product data o Sequence of operations o Device-address and point lists o Record of completion o Operating and maintenance manuals o Warranty documents o All owner-level passwords, access codes, programming files, and other information necessary for the Tigerville Fire Department or its authorized service provider to operate, test, maintain, and service the system

Closeout documents shall be provided in both paper and electronic format unless otherwise approved by the Tigerville Fire Department.

Warranty

The contractor shall provide a minimum one-year warranty on materials and workmanship from the date of final acceptance by the Tigerville Fire Department and AHJ.

The contractor shall correct defects, leaks, installation deficiencies, or failures resulting from defective materials or workmanship during the warranty period at no additional cost to the

Tigerville Fire Department.

Manufacturer warranties shall be transferred to the Tigerville Fire Department as part of the closeout package.

Change Orders

No change order work shall proceed without written approval from the Tigerville Fire Department.

The contractor shall notify the Tigerville Fire Department promptly of any condition that may require a change in scope, price, or schedule.

Change-order requests shall include:

o Description of the changed condition o Reason for the change o Labor cost o Material cost o Equipment cost o Subcontractor cost o Overhead and profit o Schedule impact o Supporting documentation

3.2. Proposed Schedule

Proposals shall include a proposed schedule showing anticipated timeframes for:

• Design.

• Permit preparation.

• Permit review.

• Material procurement.

• Mobilization.

• Installation.

• Testing.

• AHJ inspection.

• Final completion.

• Closeout documentation.

The Tigerville Fire Department’s required project completion date is: July 1st, 2027.

The contractor must identify any anticipated long-lead materials or schedule concerns.

3.3. Tigerville Fire Department's Rights

The Tigerville Fire Department reserves the right to:

• Accept or reject any or all proposals

• Waive informalities or irregularities

• Request clarification from bidders

• Negotiate with one or more bidders

• Modify the project scope before award

• Cancel the RFP

• Award the project in the best interest of the Tigerville Fire Department

3.4. Evaluation and Award

The Tigerville Fire Department reserves the right to select the proposal that is most advantageous to the

Tigerville Fire Department. The Tigerville Fire Department is not required to select the lowest-priced proposal.

4. Instructions to Offerors

4.1. Pre-Proposal Meeting

A Mandatory Pre-Proposal meeting will be held at the date and time specified in the Timeline. A mandatory site visit will follow. Vendors are encouraged to RSVP for the meeting through the OpenGov portal. The RSVP link is in the header of the solicitation.

4.2. Pricing

Each proposal shall provide clearly separated, all-inclusive pricing for:

• The complete automatic fire sprinkler system

• The complete fire alarm system

• The combined total project price.

The two system prices shall include all labor, materials, design, permits, equipment, coordination, testing, restoration, training, and closeout work attributable to that system. Any alternates shall be listed and priced separately.

Suggested Alternates and Unit Prices

The Tigerville Fire Department may request pricing for alternates or unit prices to assist with change-order control.

Bidders should provide pricing for the following if applicable:

• Additional sprinkler head

• Additional concealed sprinkler head

• Additional upright or pendent sprinkler head

• Additional head guard

• Additional linear foot of sprinkler pipe by size

• Additional alarm audible notifier

• Additional alarm visual notifier

• Additional manual pull station

Pricing must be based upon payment in thirty (30) days. Discounts for payment in less than thirty (30) days will not be considered in making award.

Discounts shall be stated in proposals as a percentage. Time in connection with discount offered will be computed from date of delivery of commodities to carrier, when inspecting and acceptance is at point of origin; or date of delivery at destination; or if laboratory inspection is made part of bid, from date of laboratory report.

Unit pricing will govern over extended pricing, unless stated otherwise. Pricing shall include packing.

Unless indicated by County, pricing must be firm.

Payment

Payment shall be made according to the final contract terms. Progress payments may be considered based on percentage of completion if agreed upon in the contract.

The Tigerville Fire Department may withhold final payment until:

• Work is complete

• Greenville County approval is received

• Deficiencies are corrected

• Closeout documents are delivered

• Warranty documents are delivered

• Required lien waivers or affidavits are provided, if applicable

4.3. Bonding

Bonding will be required for this project. See Bonds section for the requirements.

4.4. Statement of Qualifications

Vendor shall include the following with their response:

A. Contractor name, address, phone number, and email

B. Primary contact person

C. Company qualifications

D. Proof of applicable fire sprinkler contractor licensing

E. Proof of insurance

F. Project approach

G. Proposed scope of work

H. Identification of included and excluded work

I. Proposed hazard classifications and design criteria

J. Proposed water supply approach

K. Identification of any required underground work

L. Identification of any required fire alarm work

M. Proposed project schedule https://procurement.opengov.com/portal/greenvillecounty/projects/292256/document?section=2813850

N. Number of calendar days required for completion

O. Proposed price

1. Alternates, if any

2. Unit prices, if any

P. Proposed subcontractors.

Q. Qualifications of project supervisor

R. At least three references for similar projects

S. List of similar fire station, public building, or retrofit sprinkler projects completed within the last five years

T. Any recommended changes, concerns, or value-engineering suggestions

4.5. Submission Procedures and Requirements

A. All submissions must be received by Friday, September 4, 2026 at 3:00 pm. Submissions will not be accepted after the deadline. There will be no exceptions. Responders submitting proposals shall be responsible for all cost of preparing such proposals. Information requested and not received at the time of submission may disqualify the submitted proposal.

B. Responders to this solicitation shall closely examine the specific requirements noted herein and the attached Terms and Conditions. Facsimile transmittals, hard copies, emails or offers communicated by telephone will not be accepted or considered.

C. Proposals shall be organized in the following manner with the subject headings and sequence indicated.

1. Introduction

2. Experience and past performance - to include list of similar fire stations, public buildings, or retrofit sprinkler projects completed within the last five years

3. Organization and Personnel - to include:

a. Contractor name, address, phone number, and email

b. Primary contact person

c. Company qualifications

d. Qualifications of project supervisor

e. Project approach

f. Proposed Scope of Work

g. Identification of included and excluded work

h. Proposed hazard classifications and design criteria

i. Proposed water supply approach

j. Identification of any required underground work

k. Identification of any fire alarm work

l. Proposed project schedule

m. Proposed sub-contractors

n. Number of calendar days required for completion

4. References

5. Pricing, Hourly Rates, and Other Fees - to include proposed pricing, alternates, and unit pricing

6. Proof of applicable fire sprinkler contractor licensing

7. Proof of insurance

8. Proposed subcontractors

9. Any recommended changes, concerns, or value-engineering suggestions

D. License and Permits – The Contractor shall obtain all applicable licenses and permits, and promptly pay all taxes required by the State of South Carolina, and/or Greenville County.

4.6. Inquiries and Addenda

Offerors shall submit all inquiries regarding this RFP via the County’s online procurement Portal, located at https://procurement.opengov.com/portal/greenvillecounty. Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the County’s online procurement Portal. Offerors may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. The County will not be responsible for or bound by any oral instructions made by any employee(s) of the County in regard to this RFP.

Addenda Notification: This RFP represents the most definite statement Greenville County will make concerning information upon which proposals are to be based. Offerors are required to register for an account via the County’s online procurement Portal hosted by OpenGov. Once you have completed the registration, you will receive addenda notifications to your email by clicking “Follow” on this project.

Ultimately, it is sole responsibility of each proposer to periodically check the site for any addenda at https://procurement.opengov.com/portal/greenvillecounty. No addenda will be issued later than five

(5) working days prior to the date for receipt for proposals except an addendum which, if necessary, postpones the date for receipt of proposals or cancels this RFP. Vendors shall acknowledge receipt of all addenda.

5. General Information

A. Proprietary Information – The County of Greenville is a public body and governed by the South

Carolina Freedom of Information Act. Documents submitted to the County relating to this

Solicitation are subject to requirements of the Freedom of Information Act and may be deemed public records.

B. Errors and Omissions – The Responder will not be allowed to take advantage of any errors or omissions in the Request for Proposals. Where errors or omissions appear in the RFP, the

Responder shall promptly notify the County of Greenville in writing of such error or omission it discovers. Any significant error, omission and/or inconsistency in the specifications are to be reported as soon as possible but no later than five (5) days before such time the response is to be submitted.

C. Withdrawal of Proposal – An official representative of a Responder may withdraw a

Responder’s response at any time prior to the proposal submission deadline. Acceptable proof establishing that he/she is the representative of the Responder must be provided.

D. Non-Endorsement – If the County awards a contract, the successful Responder shall not issue any news release or other statement relating to the award or servicing of the agreement which state or imply the County of Greenville’s endorsement of the successful Responder’s services.

6. Insurance

6.1. Insurance Requirements

The contractor is responsible for and must have all required insurance listed below and shall not commence work under the associated contract until it has obtained all insurance required, and the

County has approved such insurance in writing, nor shall the Contractor allow any subcontractor to commence work on its subcontract until all similar insurance required of the subcontractor has been obtained. All insurance policies shall be maintained for the life of the contract.

A. THE TIGERVILLE FIRE DEPARTMENT SHALL BE NAMED AS “ADDITIONAL INSURED” FOR ITS

INTEREST on all policies of insurance except Worker’s Compensation, Automobile Liability, and

Professional Errors and Omissions, as regards ongoing operations, products and completed operations, and this shall be noted on the face of the Certificate of Insurance. As a part of the certificate of insurance requirement the contractor shall also include acknowledgement and acceptance of the wavier of subrogation provision granted to Tigerville Fire Department. This acknowledgement and acceptance should be included in the same section of the Certificate of

Insurance that evidences the “Additional Insured” provision.

B. Certificates for all such policies of insurance shall be provided by the Contractor's insurance agent or broker to the Tigerville Fire Department within 10 working days from the date of

Notice of Award.

C. All Certificates of Insurance submitted shall provide on the face of the certificate reference to

County's RFP #RFP #27012.

D. Contractor will provide Tigerville Fire Department a minimum of 30 days advance notice in the event the insurance policies (or an insurance policy) are canceled. Subcontractors approved to perform work on this project are subject to all of the requirements in this Section.

E. Contractor agrees to maintain and keep in force during the life of this Agreement, with a company or companies authorized to do business in South Carolina, the following insurance policies:

1. Comprehensive General Liability:

a. $1,000,000 per occurrence - combined single limit /

b. $2,000,000 general aggregate, to include products and completed operations.

2. Automobile Liability:

a. $1,000,000 per occurrence - combined single limit (Coverage shall include bodily injury and property damage and cover all vehicles including owned, non-owned and hired)

3. Statutory Worker's Compensation:

a. Coverage A - State of SC

b. Coverage B - Employers liability

i. $1,000,000 Each Accident

ii. $1,000,000 Disease, Per Employee

iii. $1,000,000 Disease, Policy Limit

c. Policies shall contain a waiver of subrogation in favor of and/or that applies to

Tigerville Fire Department, its departments, agencies, boards, employees, and commissions for losses from work performed by or on behalf of the contractor.

No deviation from this coverage’s will be accepted unless, in the Tigerville Fire Department's sole discretion, it is more advantageous to the Tigerville Fire Department, i.e., $1,000,000 - a $2,000,000 or

$5,000,000 limit would be acceptable.

7. Evaluation Phases

The proposals will be evaluated on the following criteria. Greenville County reserves the right to interview responders or have demonstrations to this RFP at its discretion. Greenville County will not be responsible for any costs associated with interviews of responders or demonstrations. If interviews or demonstrations are needed, a second phase of the evaluation process may be implemented at the

County's discretion. Point values are described below.

5 = High

4 = Medium High

3 = Average

2 = Medium Low

1 = Low

0 = Non-Responsive

No. Evaluation Criteria Scoring Method Weight (Points)

1. Responsiveness to this RFP 0-5 Points 5 (16.7% of Total)

2. Cost 0-5 Points 5 (16.7% of Total)

3. References 0-5 Points 5 (16.7% of Total)

4. Experience of same or similar projects 0-5 Points 5 (16.7% of Total)

5. Proposed Approach and Scope of Work 0-5 Points 5 (16.7% of Total)

6. Schedule 0-5 Points 5 (16.7% of Total)

8. Bonds

8.1. Bid Bond:

This project requires a Bid Bond and a Performance/Payment Bond. Proposers shall submit with their proposal, a Bid Bond in the amount of 5% of the bid price. This bond may be in the form of Bid Bond from the American Institute of Architects (AIA), electronically through Surety 2000, Certified Check, Cashier’s or Bank Money Order of any national or state bank and shall be made payable to Greenville

County. Proposals submitted without being accompanied by any of the foregoing as required, may be considered informal and may be rejected. Any proposal accompanied by a bid bond not properly executed in the opinion of the County Attorney, may be rejected. The bond will be forfeited to the

County by the successful bidder as liquidated damages in case a proposal award is made to that bidder and the contract and bond are not promptly and properly executed.

1. Instructions for Bond through AIA or similar bond document: The Original (hard- copy) Signed-Bid

Bond must be delivered to the Procurement Services Office by the Bid Due Date/Time specified. The

Bid Bond must be submitted in a sealed-envelope to: Greenville County Procurement Services Division;

301 University Ridge, Suite N-2400; Greenville, SC, 29601. The following information must be included, on the outside of the envelope:

A. “Bid Bond” (labeled)

B. Bid Number

C. Company Name

2. Instructions for Surety2000:

The County has an account with an online Bid Security program called Surety2000. This is a fee-based program that bidders can use to obtain an electronically issued, verified and legal bid bond which can be used for bidding purposes. No bid bond can be created by the bonding agent on the site without the

Surety being fully aware of that bond. Only agents appointed directly by the Surety can issue bid bonds on the site.

If your company chooses to use Surety2000 to obtain the bid bond, please access Surety2000 at www.surety2000.com. Complete the necessary steps to log in to the site and obtain the bid bond.

Bond Identifier: RFP #27012

USE THIS CODE WHEN ACCESSING SURETY2000

Once an official bid bond is issued, use the space below to input your company's E-Bond Serial Number.

The number will look something like this: SNJ5185268

This number will then be used at the bid opening to verify your company's bid bond.

If you are not using this method for Bid Security submission please write "N/A" in the field provided.

Please note that the County is not responsible for late submissions and no consideration will be made for bid security received after the date and time stipulated in the Notice to Bidders even if you have electronically submitted your bid on time.

If the original bid security is not able to be verified by the date and time stipulated in the Notice to

Bidders, your submission will be rejected.

If required per solicitation and after proposals are awarded, the Procurement Services Division will return immediately all checks, except that of the successful bidder. The check of the successful bidder will be returned upon compliance with the performance and payment bond requirements.

If required per solicitation, the successful bidder, within fifteen (15) working days after acceptance of the bidder’s offer by the County, shall furnish a satisfactory performance and payment bonds in the amount of the total bid price. The performance and payment bonds must be received by the county prior to issuance of an executed contract and Notice to Proceed. The fifteen (15) working days may be extended upon written approval by the Procurement Director. A copy of the written approval shall be transmitted to the successful bidder stating the terms of any extension. In the event that the bidder fails to deliver to the County Procurement Services Division the performance and payment bonds in said period of fifteen (15) working days after acceptance of the bidder’s offer by the County, then the bid bond of the bidder shall be retained by the County in its entirety and the award will be withdrawn from the bidder. The successful bidder shall have as surety a corporate surety authorized to act as surety in

South Carolina. The Performance and Payment Bonds will insure that the successful bidder will promptly make payments to all persons supplying labor or materials to the bidder; and shall guarantee to indemnify and save the County, its officers, divisions, and employees harmless from all costs, damages, and expenses growing out of or by reason of the successful bidder’s failure to comply and perform the work and complete the contract in accordance with the specifications in the matter of making, furnishing and/or delivering said work or supplies. The Performance and Payment Bonds will be in effect for one year after completion of the contract.

If bonding is required per the solicitation, the bonding company must have an agent available to meet with County officials to clarify and explain the County’s responsibility in maintaining the integrity of the bond.

8.2. Return of Bid Bond:

After a contract is awarded, the Procurement Services Division will return immediately all checks, except that of the successful bidder. The check of the successful bidder will be returned upon compliance with the performance and payment bond requirements.

8.3. Performance and Payment Bond:

The successful bidder, within fifteen (15) working days after acceptance of the bidder’s offer by the

County, shall furnish a satisfactory performance and payment bonds in the amount of the total bid price.

The performance and payment bonds must be received by the county prior to issuance of an executed contract and Notice to Proceed. The fifteen (15) working days may be extended upon written approval by the Procurement Director. A copy of the written approval shall be transmitted to the successful bidder stating the terms of any extension. In the event that the bidder fails to deliver to the County

Procurement Services Division the performance and payment bonds in said period of fifteen (15) working days after acceptance of the bidder’s offer by the County, then the bid bond of the bidder shall be retained by the County in its entirety and the award will be withdrawn from the bidder. The successful bidder shall have as surety a corporate surety authorized to act as surety in South Carolina.

The Performance and Payment Bonds will insure that the successful bidder will promptly make payments to all persons supplying labor or materials to the bidder; and shall guarantee to indemnify and save the County, its officers, divisions, and employees harmless from all costs, damages, and expenses growing out of or by reason of the successful bidder’s failure to comply and perform the work and complete the contract in accordance with the specifications in the matter of making, furnishing and/or delivering said work or supplies. The Performance and Payment Bonds will be in effect for one year after completion of the contract.

8.4. Availability of Bonding Agency:

The bonding company must have an agent available to meet with County officials to clarify and explain the County’s responsibility in maintaining the integrity of the bond.

9. Terms and Conditions

9.1. Safety, Health, and Security

Contractor shall be solely responsible for its activities, that of its employees on the site and activities of its consultants, contractors and/or subcontractors for maintaining a safe job site. Contractor’s activities and activities of its consultants, contractors and/or subcontractors shall comply with all local, state, and federal safety regulations and their enforcement agencies. Contractor shall at all times conduct its operations under this Contract in a manner to avoid risk of endangerment to the health and safety of persons and property. The Contractor shall have sole responsibility for implementing its safety and health programs, taking all safety and health precautions necessary and continuously inspecting all equipment, materials and work to prevent, discover, determine and correct any conditions which might result in personal injury, equipment damage or damage to property or the public. Contractor’s safety, health and security programs shall be in compliance with all regulatory requirements and shall furnish accident, incident, injury, and other records and reports required by the Occupational Safety and Health

Administration, State and Local laws, or by the County.

9.2. Response Opening and Award:

Responses shall be publicly opened and only the names of the offerors disclosed at the opening. For

IFBs, the name of the responder as well as the price will be disclosed. However, no decision will be made until Procurement Services and the user Division have had ample time to review each response. Award will be made at the earliest possible date. The County reserves the right to award in whole or in part, by item, group of items, geographic area or by section where such action serves the County’s best interest.

The contract will be awarded to the response that meets the requirements and criteria set forth in the

Solicitation. No response may be withdrawn for a period of sixty (60) days after the opening date.

Submissions will not be accepted after the deadline. There will be no exceptions. By submission of a response, you are guaranteeing that all goods and services meet the requirement of the solicitation during the contract period.

9.3. Rights Reserved by Greenville County:

Greenville County reserves the right to reject any and all responses, any portion thereof, and waive any technicalities. Accordingly, the right is reserved to make awards in the best interest of the County.

Integrity, reputation, experience and past performance will be heavily weighed in response evaluation.

This solicitation does not commit the County of Greenville to award a contract, to pay any costs incurred in the preparation of the response, or to procure or contract for goods or services listed herein.

9.4. Responders Qualification:

Responders must, upon request of the County, furnish satisfactory evidence of their ability to furnish products or services in accordance with the terms and conditions of these specifications. The County reserves the right to make the final determination as to the responder’s ability to provide the products or services requested herein.

9.5. Responders Responsibility:

Each responder shall be fully acquainted with the conditions relating to the scope and restrictions attending the execution of the work under the conditions of this response. It is expected that this will sometimes require on-site observation. The failure or omission of a responder to be acquainted with existing conditions shall in no way relieve the responder of any obligations with respect to this response or to any contract as a result of this response.

9.6. References:

The County requires responders to list at least three (3) references including their company name, name of contact, address, telephone number, and email address of contact person with whom the responder has performed or provided similar work, service or product. The reference may be contacted to fill out a short questionnaire on the work with that company. If the reference does not complete the questionnaire by the time requested, the County may ask the responder to give an alternate reference.

The County asks that responders do not list County representatives or departments as a reference.

9.7. Waiver:

The County reserves the right to waive any Instructions to Responders, General or Special Terms and

Conditions, specifications, or technicalities when it is deemed to be in the best interest of the County to do so.

9.8. Rejection:

Greenville County reserves the right to reject any response that contains prices for individual items or services that are inconsistent or unrealistic when compared to pricing of like responses; or ambiguous responses which are uncertain as to terms, delivery, quantity, or compliance with specifications may be rejected or otherwise disregarded if such action is in the best interest of the County.

9.9. Response Signature and Solicitation Alterations:

The responder shall sign the response correctly or the response may be rejected. If the response shows any omissions, alteration of form, unauthorized additions, a conditional response or any irregularities of any kind, the response may be rejected.

9.10. Specification Changes, Additions and Deletions:

Responders are required to register for an account via the County’s online procurement Portal hosted by OpenGov. Once responder has completed registration, you will receive addenda notifications to your email by clicking “Follow” on this project. Ultimately, it is sole responsibility of each responder to periodically check the site for any addenda at https://procurement.opengov.com/portal/greenvillecounty.

The County of Greenville shall not be responsible for any verbal information given by any employees of the County of Greenville in regard to this proposal.

9.11. Response Changes:

Responses, amendments thereto or withdrawal requests received after the advertised time for response opening, shall be void regardless of when they were submitted.

9.12. Response Price:

The price presented as a result of these specifications shall be for the contract period. The response shall be acceptable for sixty (60) days from the date of opening. All prices and notations shall be printed in ink or typewritten. Errors should be crossed out, corrections entered and initialed by the person signing the response. Erasures or use of typewriter correction fluids may be cause for rejection. No response shall be altered or amended after specified time for opening.

9.13. Federal, State and Local Laws:

The contractor assumes full responsibility and liability for compliance with any and all local, state and federal laws and regulations applicable to the contractor and its employees including, but not limited to, compliance with the EEO guidelines, the Occupational Safety and Health Act of 1970, and minimum wage guidelines.

9.14. Tie Bids:

In the case of tie bids, the County reserves the right to make the award based on the factors outlined in

Section 7-305(9) of the Greenville County Code of Ordinance (Chapter 7, Article VIII), or in what it considers to be in the best interest of the County.

9.15. Deduction and Holdbacks:

In addition to the County’s right of termination, the County shall be entitled to full reimbursement for any costs incurred by the County by reason of the contractor’s failure to perform or to satisfactorily perform its responsibilities and duties. Such costs may include, but are not limited to, the cost of using the County’s employees or employees of any other entity to perform the obligations of the contract. The

County may obtain any such reimbursement by deduction from payments otherwise due to the contractor or by any other proper and lawful means. All deductions from any money due the contractor are to be as liquidated damages and not as a penalty. It is the County’s intent to give the contractor a reasonable opportunity whenever practicable, to correct any such failure to perform or satisfactorily perform its responsibilities and duties. In no circumstances shall any uncorrected situation extend for more than five days. The County will make the following deductions from the contract sum in the event that the contractor fails to perform any of the required work within the required time limits in the event the County carries out the work using its forces or another contractor.

A. For use of County’s forces – actual cost involved.

B. For use of another contractor – the amount charged by said contractor.

The County reserves the right to hold back and/or withhold part of complete payments for unsatisfactory work, deficiencies, etc. until said defects are satisfactorily corrected or cleared.

9.16. Evaluation Criteria:

The proposals will be evaluated using the criteria listed in the Evaluation Phases included in this RFP.

Greenville County reserves the right to interview responders or ask for demonstrations to this RFP at its discretion. Greenville County will not be responsible for any costs associated with interviews of responders or demonstrations.

9.17. Quality:

Unless otherwise indicated in this solicitation it is understood and agreed that any items offered or shipped on this solicitation shall be new and in first class condition unless otherwise indicated herein.

9.18. Affirmative Action - Small, Disadvantaged and Minority Businesses (SDMB):

A. Vendors submitting responses are encouraged to solicit small, disadvantaged and minority businesses participation in fulfilling their contract. Indicate in your response any SDMB areas of involvement for monitoring purposes.

B. The successful vendor will take affirmative action in complying with all Federal and State requirements concerning fair employment and treatment of all employees, without regard or discrimination by reason of race, color, religion, age, sex, national origin or physical handicap.

9.19. Default:

In case of default by vendor the County may procure the item or services from other sources and may recover the loss occasioned thereby from any unpaid balance due the vendor or by proceeding against the vendor’s performance bond, if any, and/or by suit against vendor.

9.20. Termination for Cause:

Any awarded contract is subject to termination for failure to comply with the specifications, terms and conditions by the County or the contractor upon written notice by registered mail. Such termination will be effective not less than ten (10) days nor more than sixty (60) days after receipt of such notice from the County nor less than thirty (30) days nor more than sixty (60) days after receipt by the County from the contractor. Receipt of notice by one party to terminate the contract will nullify any subsequent reciprocal notice by the receiving party prior to the announced termination date. In the event of termination, the County shall be responsible to pay the contractor only for work satisfactorily completed upon the effective date of termination and shall not be responsible for any other charges.

9.21. Termination for Convenience:

Greenville County may terminate for convenience any contract resulting from this solicitation by providing sixty (60) calendar days advance written notice to the vendor.

9.22. Non-Appropriation:

Any contract entered into by the County resulting from this solicitation shall be…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .