FIO_Drawings_B4511 Tower Camp Courtney_2of2.pdf

PDF 14 MB Posted

Attached to
FY26 CABT184709 Renovate MFH Tower 4511, Camp Courtney, Okinawa, Japan
Solicitation number
W912HV25Z0007
Issued by

About this file

These are technical engineering drawings related to a renovation project for Tower 4511 at Camp Courtney, Okinawa, Japan, prepared by the US Army Corps of Engineers. The drawings specifically detail plumbing system modifications for a comprehensive multi-floor housing renovation, showing demolition and new installation plans for plumbing infrastructure across the building's first floor through penthouse levels. The technical documents include detailed floor plans, piping schematics, demolition notes, and new installation specifications for domestic water systems, sewer lines, vent pipes, and associated plumbing equipment like water heaters, pumps, and fixtures. The drawings indicate a complete replacement of existing plumbing systems, with careful documentation of pipe routing, equipment locations, and specific removal and installation instructions for each floor and area of the building.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3

E

F

BEDROOM 2

BEDROOM 3

MASTER BEDROOM

HALLWAY

DINING

KITCHEN

LIVING

LAUNDRY&IBS

ENTRY

BATHROOM 2

MASTER BATH

CLOSET

210A

CLOSET

205C

PANTRY CL

CLOSET

209A

CLOSET

206A

CLOSET

205A

BALCONY

BALCONY

3 4

F

G

H

BEDROOM 2

MASTER

BEDROOM

BEDROOM 3

CLOSET

230A

HALLWAY

CLOSET

225A

CLOSET

226A

CLOSET

220A

BATH 2

MASTER BATH

DINING

LIVING

KITCHEN

222 ENTRY

LAUNDRY&IBS

CLOSET 2

225C

BALCONY

BALCONY

PANTRY CL

STAIRS 1

STAIR (1)

MECH & ELEC RM

L07

ELEV

ELEV

JAN CLOSET

L06

TOILET

L08

D V

D

D C

W

D H

W S

D C

W

D

Ø

0Ø

100Ø

65Ø

Ø

Ø

Ø

D H

W R

D C

W

D H

W S

D D

150Ø 65Ø

D D65Ø

D

20Ø

20Ø

150Ø

20Ø 32Ø

25Ø

DHWR

DHWS

DCW

D

V

D

D

V

V

D150Ø

75Ø

75Ø

D

DHWS

DCW

DHWR

D

V

D

80Ø

20Ø

0Ø

D

Ø

Ø

Ø

D H

W R

D H

W S

D C

W

D

V

DD

V

V

D

0Ø

Ø75

Ø

Ø D

C W

RISER (SEWER)

RISER (VENT)

D

EXISTING DHWS RISER

EXISTING DHWR RISER

EXISTING DCW RISER

EXISTING VENT RISER

EXISTING SEWER RISER

RISER (VENT)

RISER (SEWER)

PD4010 0.5 1mSCALE 1:50

1ST FLOOR PLAN CORE AREAA1

EN

LA

R G

ED

D

W

EL

LI

N

G U

N

IT

ST

F

LO

O R

P

LA

N

TY

PE

A

, B

C O

R E

AR

EA

D

EM

O

LI

TI

O N

0 0.5 1mSCALE 1:50

1ST FLOOR TYP UNIT PLAN TYPE AB1

0 0.5 1mSCALE 1:50

1ST FLOOR TYP UNIT PLAN TYPE BB4

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

KEY PLAN

AREA

A

AREA

B

AREA

C

AREA

D

AREA

E

PLAN NORTH

SHEET KEY NOTESGENERAL NOTES

1. REMOVE DCW PIPES.

2. REMOVE DHWS & DHWR PIPES.

3. REMOVE SEWER PIPES.

4. REMOVE VENT PIPES.

5. REMOVE EXISTING LAVATORY SINK WITH FAUCET.

6. REMOVE EXISTING BATHTUB WITH SHOWER SET AND

FAUCET.

7. REMOVE EXISTING SHOWER SET.

8. REMOVE EXISTING WATER CLOSET.

9. REMOVE EXISTING WASHER FAUCETS.

10. REMOVE EXISTING LAVATORY AND WATER CLOSET.

11. REMOVE EXISTING SERVICE SINK WITH FAUCET.

1. PIPING SHOWN ARE UNDER THE FLOOR OR

UNDERGROUND UNLESS OTHERWISE NOTED.

2. EXISTING KITCHEN SINK WITH FAUCET AND

GARBAGE DISPOSER WITH INSIDE CABINET

DRAIN PIPE AND P-TRAP TO REMAIN AS EXISTING

IN ALL UNITS.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

N O

NLY

BEDROOM 2

BEDROOM 3

MASTER BEDROOM

HALLWAY

DINING

KITCHEN

LIVING

LAUNDRY&IBS

ENTRY

CLOSET

210A

CLOSET

205C

PANTRY CL

CLOSET

209A

CLOSET

206A

CLOSET

205A

BALCONY

BALCONY

BEDROOM 2

MASTER BEDROOM

BEDROOM 3

CLOSET

230A

HALLWAY

CLOSET

225A

CLOSET

226ACLOSET

220A

MASTER BATH

DINING

LIVING

KITCHEN

ENTRY

LAUNDRY&IBS

CLOSET 2

225C

BALCONY

BALCONY

PANTRY CL

1 2 3

E

F

3 4

F

G

H

D H

W R

D C

W

D H

W S

25Ø

20Ø

20Ø 32Ø

25Ø

DHWR

DHWS

DCW

MASTER BATH

BATHROOM 2

D

V

75Ø

75Ø

D

D

Ø

Ø

Ø

D H

W R

D H

W S

D C

W

D

V

Ø

Ø

D

BATHROOM 2

40Ø

Ø

40Ø

Ø

DHWS

DCW

DHWR

D

V

20Ø 32Ø

20Ø

RISER (SEWER)

RISER (VENT)

1 20Ø

20Ø

PD402

EN

LA

R G

ED

D

W

EL

LI

N

G U

N

IT

N

D -9

TH

F

LO

O

R

PL

AN

T

YP

E

A

B

- D

EM

O

LI

TI

O N

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

KEY PLAN

0 0.5 1mSCALE 1:50

2ND - 9TH FLOOR TYP UNIT PLAN TYPE AB1

0 0.5 1mSCALE 1:50

2ND - 9TH FLOOR TYP UNIT PLAN TYPE BB4

AREA

A

AREA

B

AREA

C

AREA

D

AREA

E

PLAN NORTH

SHEET KEY NOTESGENERAL NOTES

1. REMOVE DCW PIPES.

2. REMOVE DHWS & DHWR PIPES.

3. REMOVE SEWER PIPES.

4. REMOVE VENT PIPES.

5. REMOVE EXISTING LAVATORY SINK WITH FAUCET.

6. REMOVE EXISTING BATHTUB WITH SHOWER SET AND

FAUCET.

7. REMOVE EXISTING SHOWER SET.

8. REMOVE EXISTING WATER CLOSET.

9. REMOVE EXISTING WASHER FAUCETS.

1. PIPING SHOWN ARE UNDER THE FLOOR OR

UNDERGROUND UNLESS OTHERWISE NOTED.

2. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE

DISPOSER WITH INSIDE CABINET DRAIN PIPE AND

P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

20Ø

M

M

100Ø 100Ø

50Ø

0Ø

0Ø

Ø

100Ø

100Ø

100Ø

100Ø

100Ø

80Ø

DN

5 6

C B

A

MECHANICAL RM

L20

STORAGE

L09

HWS

HWR

HWS

H W

R

POD

DCW

D H

W R

D H

W S

D C

W

D C

W

EXISTING CONCRETE

FOUNDATION TO REMAIN

Ø

D C

W

EXISTING CONCRETE

PAD TO REMAIN

EXISTING HWS&HWR PIPES

TO BE ABANDONED

D H

W S

D C

W

2 1

80Ø 4

POD AT VALVE

EXISTING LAVATORY

TO BE REMAINED

PD403

0 0.5 1mSCALE 1:50

ENLARGED MECH ROOM PLAN - DEMOLITIONA2

EN

LA

R G

ED

M

EC

H

R O

O M

P

LA

N

D

EM

O

LI

TI

O

N

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

KEY PLAN

AREA

A

AREA

B

AREA

C

AREA

D

AREA

E

SHEET KEY NOTES

PLAN NORTH

GENERAL NOTES

1. REMOVE EXISTING DCW PIPES.

2. REMOVE EXISTING DHWS & DHWR PIPES.

3. REMOVE EXISTING HWS & HWR PIPES.

4. REMOVE EXISTING DRAINAGE PUMP.

5. REMOVE EXISTING LIFT PUMP.

6. REMOVE EXISTING RECEIVER TANK AND ITS ACCESSORIES.

7. REMOVE EXISTING HOT WATER CIRCULATION PUMP.

8. REMOVE EXISTING HOT WATER GENERATOR TANK AND

ITS ACCESSORIES.

1. EXISTING ABANDONED HWS & HWR PIPES SHALL BE

CAPPED OR PLUGGED.

2. EXISTING LAVATORY AND ITS ACCESSORIES TO BE

REMAINED.

3. REPLACEMENT WORK FOR DCW MAIN PIPING UP TO

SERVICE VALVE SHALL BE INCLUDED IN PLUMBING

WORK.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

75Ø 100Ø

75Ø 100Ø

100Ø 75Ø

20Ø 100Ø 20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

20Ø 100Ø 20Ø 75Ø

75Ø 100Ø

75Ø 100Ø

20Ø

Ø

Ø

Ø

20Ø

EWH

EWH

40Ø 40Ø

75Ø

EXISTING ELECTRIC

WATER HEATER

1 10

0Ø

Ø

75Ø

150Ø

0Ø

0Ø

0Ø

0Ø

100Ø

100Ø

RUNNING AT

1ST FLR

HIGH LEVEL

75Ø 75Ø

Ø

0Ø

0Ø

0Ø

0Ø

0Ø

0Ø

0Ø

0Ø

100Ø100Ø

0Ø

Ø

0Ø

0Ø

0Ø

Ø

150Ø

150Ø

150Ø

150Ø

150Ø

25Ø

32Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

25Ø

32Ø

32Ø

25Ø

20Ø

20Ø

20Ø

20Ø

Ø

Ø

Ø

Ø

HB

HB

HB

HB

HB

HB

125Ø

125Ø

50Ø

100Ø

32Ø50Ø

50Ø

32Ø

100Ø

32Ø

Ø

0Ø

FLOOR DRAIN

RISER(SEWER)

RISER(DCW)

GV 20

20Ø

D D

V

Ø

0Ø

80Ø

80Ø

D C

W

Ø

PIPE

SPACE 4

PIPE

SPACE 6

PIPE

SPACE 3

PIPE

SPACE 5

PIPE

SPACE 1

PIPE

SPACE 2

PIPE

SPACE 7

PIPE

SPACE 8

DN

DN

DN

U P

U P

UP

UP

EBS

L10C

EBS

L10D

TOILET

L08

EBS

L10A

MECH & ELEC

L07 ELEV

ELEV

JAN CL

L06

EBS

L10B

PIPE

SPACE

L05

PIPE

SPACE

L02

ENTRANCE PORCH

L11

STAIR (2)

MECH

RM

L18

STORAGE

L09

STAIR (1)

STAIR (2)

ELECTRICAL RM

L17

TRASH STORAGE

L10

STAIR (2)

STORAGE

L16

STORAGE

L13

STAIR (2)

STORAGE

L14

STORAGE

L12

COMMUNITY ROOM

L15

PIPE

SPACE

L04

DN

DN

EXISTING

ADA RAMP

U P

PIPE

SPACE

L03

STAIR (2)

MECH

RM

L18

STORAGE

L09

ELEV

LOBBY

L01

HB

TYPE A

TYPE A

TYPE B

TYPE B

SK

HB

5 x2

PP101

0 1.5 3mSCALE 1:150

PLUMBING SYSTEM 1ST FLOOR PLAN - NEWA2

PL

U

M

BI

N G

S

YS

TE

M

ST

F

LO

O R

P

LA

N

N

EW

%PRODUCTION DATA 1%%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

KEY PLAN

AREA

A

AREA

B

AREA

C

AREA

D

AREA

E

530570208220 7540 5305 7020 8220 8000

56630

421 5 6 7 8 9

H

G

F

E

D

C

B

A

PP106

A2

PP105

A2

ROOM SCHEDULE

NO. RM NAME

L01 ELEV LOBBY

L02 PIPE SPACE

L03 PIPE SPACE

L04 PIPE SPACE

L05 PIPE SPACE

L06 JANITOR'S CLOSET

L07 MECHANICAL & ELECTRICAL

L08 TOILET

L09 STORAGE

L10 TRASH STORAGE

L10A EBS

L10B EBS

L10C EBS

L10D EBS

L11 ENTRANCE PORCH

L12 STORAGE

L13 STORAGE ROOM

L14 STORAGE

L15 COMMUNITY ROOM

L16 STORAGE

L17 ELECTRICAL RM

L18 MECHANICAL RM

SHEET KEY NOTES

PLAN NORTH

GENERAL NOTES

1. PROVIDE DCW PIPES.

2. PROVIDE DHWS PIPES.

3. PROVIDE SEWER PIPES.

4. PROVIDE VENT PIPES.

5. PROVIDE HOSE BIBBS.

6. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN ALL

UNITS.

7. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.

8. PROVIDE SERVICE SINK IN JANITOR CLOSET, L06.

9. PROVIDE LAVATORY AND WATER CLOSET IN TOILET, L08.

10. PROVIDE ELECTRIC HOT WATER HEATER.

11. PROVIDE TWO-WAY CLEANOUT.

1. PLUMBING WORK COVERS THE PIPE PORTION UNTIL

1.5M THE EXTERIOR WALL UNLESS OTHERWISE

NOTED OR SHOWN ON PLAN.

2. REFER TO ARCHITECTURAL DRAWINGS FOR THE

EXCAVATION WORK AREA OF THE FLOOR.

3. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE

DISPOSER WITH INSIDE CABINET DRAIN PIPE AND

P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

75Ø 100Ø

100Ø 75Ø

20Ø 100Ø 20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

20Ø 100Ø 20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 100Ø

75Ø 100Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

100Ø 75Ø

75Ø 100Ø

75Ø 100Ø

75Ø 100Ø

100Ø 75Ø

80Ø

32Ø 32Ø

75Ø

EWH

EWH

EWH

EWH

75Ø

(1FL ABOVE CEILING)

(2ND FLOOR UNDER SLAB ONLY)

(2ND FLOOR UNDER SLAB ONLY)

25Ø

32Ø

32Ø

25Ø

20Ø

20Ø

20Ø

20Ø

25Ø

32Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

25Ø

32Ø

25Ø

25Ø

32Ø

32Ø

25Ø

20Ø

20Ø

20Ø

20Ø

25Ø

32Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

25Ø

32Ø

25Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

SK

PIPE

SPACE 4

PIPE

SPACE 6

PIPE

SPACE 3

PIPE

SPACE 5

PIPE

SPACE 1

PIPE

SPACE 2

PIPE

SPACE 15

PIPE

SPACE 16

PIPE

SPACE 7

PIPE

SPACE 8

PIPE

SPACE 9

PIPE

SPACE 10

PIPE

SPACE 14

PIPE

SPACE 12

PIPE

SPACE 13

PIPE

SPACE 11

DN

ELEV LOBBY

C01

MECH & ELEC

C08

ELEV

JAN CL

C06

PIPE SPACE

C03

EBS

C10C

EBS

C10D

STORAGE

C09

UP

U P

U P

UP

ELEV

PIPE SPACE

C04

PIPE SPACE

C05

PIPE SPACE

C02

6 6

TYPE A

TYPE A

TYPE B

TYPE B

TYPE A

TYPE A

TYPE B

TYPE B

PP102

0 1.5 3mSCALE 1:150

PLUMBING SYSTEM 2ND-8TH FLOOR PLAN - NEWA2

PL

U

M

BI

N G

S

YS

TE

M

N

D -8

TH

F

LO

O

R P

LA

N

N

EW

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

KEY PLAN

AREA

A

AREA

B

AREA

C

AREA

D

AREA

E

530570208220 7540 5305 7020 8220 8000

56630

421 5 6 7 8 9

H

G

F

E

D

C

B

A

PP108

A2

PP107

A2

ROOM SCHEDULE

NO. RM NAME

C01 ELEV LOBBY

C06 JAN CL

C07 STORAGE

C08 MECH & ELEC ROOM

C09 STORAGE

SHEET KEY NOTES

PLAN NORTH

GENERAL NOTES

1. PROVIDE DCW PIPES.

2. PROVIDE DHWS PIPES.

3. PROVIDE SEWER PIPES.

4. PROVIDE VENT PIPES.

5. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN

ALL UNITS.

6. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.

7. PROVIDE SERVICE SINK IN JANITOR CLOSET C06.

8. PROVIDE ELECTRIC HOT WATER HEATER.

1. PIPING SHOWN ARE UNDER THE FLOOR UNLESS

OTHERWISE NOTED.

2. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE

DISPOSER WITH INSIDE CABINET DRAIN PIPE AND

P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

75Ø 100Ø

100Ø 75Ø

20Ø 100Ø 20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

20Ø 100Ø 20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 100Ø

75Ø 100Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

100Ø 75Ø

75Ø 100Ø

75Ø 100Ø

75Ø 100Ø

100Ø 75Ø

75Ø 100Ø 100Ø

75Ø

65Ø 65Ø65Ø

Ø

65Ø 65Ø 65Ø

Ø

80Ø80Ø

80Ø

80Ø

40Ø 40Ø

75Ø

EWH

EWH

EWH

EWH

75Ø

25Ø

32Ø

32Ø

25Ø

20Ø

20Ø

20Ø

20Ø

25Ø

32Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

25Ø

32Ø

25Ø

25Ø

32Ø

32Ø

25Ø

20Ø

20Ø

20Ø

20Ø

25Ø

32Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

25Ø

32Ø

25Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

SK

PIPE

SPACE 4

PIPE

SPACE 6

PIPE

SPACE 3

PIPE

SPACE 5

PIPE

SPACE 1

PIPE

SPACE 2

PIPE

SPACE 15

PIPE

SPACE 16

PIPE

SPACE 7

PIPE

SPACE 8

PIPE

SPACE 9

PIPE

SPACE 10

PIPE

SPACE 14

PIPE

SPACE 12

PIPE

SPACE 13

PIPE

SPACE 11

UP

DN

ELEV LOBBY

C01

MECH & ELEC

C08

ELEV

JAN CL

C06

PIPE SPACE

C03

EBS

C10C

EBS

C10D

STORAGE

C09

UP

U P

U P

UP

ELEV

PIPE SPACE

C04

PIPE SPACE

C02

PIPE SPACE

C05

6 6

TYPE A

TYPE A

TYPE B

TYPE B

TYPE A

TYPE A

TYPE B

TYPE B

(9FL ABOVE CEILING)

(9FL ABOVE CEILING)

(9FL ABOVE CEILING)(9FL ABOVE CEILING)

PP103

0 1.5 3mSCALE 1:150

PLUMBING SYSTEM 9TH FLOOR PLAN - NEWA2

PL

U

M

BI

N G

S

YS

TE

M

TH

F

LO

O R

P

LA

N

N

EW

KEY PLAN

AREA

A

AREA

B

AREA

C

AREA

D

AREA

E

530570208220 7540 5305 7020 8220 8000

56630

421 5 6 7 8 9

H

G

F

E

D

C

B

A

PP110

A2

PP109

A2

ROOM SCHEDULE

NO. RM NAME

C01 ELEV LOBBY

C06 JAN CL

C07 STORAGE

C08 MECH & ELEC ROOM

C09 STORAGE

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

SHEET KEY NOTES

PLAN NORTH

GENERAL NOTES

1. PIPING SHOWN ARE UNDER THE FLOOR UNLESS

OTHERWISE NOTED.

2. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE

DISPOSER WITH INSIDE CABINET DRAIN PIPE AND

P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.

1. PROVIDE DCW PIPES.

2. PROVIDE DHWS PIPES.

3. PROVIDE SEWER PIPES.

4. PROVIDE VENT PIPES.

5. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN

ALL UNITS.

6. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.

7. PROVIDE SERVICE SINK IN JANITOR CLOSET C06.

8. PROVIDE ELECTRIC HOT WATER HEATER.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

DN

UP

40Ø 40Ø

75Ø

80Ø

80Ø40Ø

EWH

80Ø

80Ø

75Ø

80Ø

40Ø 75Ø

VENT

CAP

VENT

THRU

ROOF

PIPE

SPACE 4

PIPE

SPACE 6

PIPE

SPACE 2

PIPE

SPACE 16

PIPE

SPACE 8

PIPE

SPACE 10

PIPE

SPACE 14

PIPE

SPACE 12

VENT

THRU

ROOF

VENT

THRU

ROOF

LOBBY

P01

MECH & ELEC

P08

ELEV

007MECH RM

P06

STORAGE

P09

ELEV

PIPE SPACE

P04

PIPE SPACE

P05 PIPE SPACE

P02

PIPE SPACE

P03

STAIR (1)

VENT

THRU

ROOF

VENT

CAP

VENT

CAP

1 VENT

CAP

VENT

CAP

1 VENT

CAP

VENT

CAP

VENT

CAP

80Ø

100Ø 40Ø

40Ø 80Ø

Ø

Ø

VENT

THRU

ROOF

PS

DN

ELEV MECH ROOM

L19

OPEN TO

BELOW

STAIR (1)

TW

80Ø

100Ø 40Ø

Ø

100Ø

40Ø

OPEN TO

BELOW

INSECT

SCREEN

GV50

PP104

0 1.5 3mSCALE 1:150

PLUMBING SYSTEM PH1, PH2, PH RF & ROOF FLOOR PLAN - NEWA2

PL

U

M

BI

N G

S

YS

TE

M

P H

1, P

H 2, P H

R F

R

O O

F

FL

O O

R P

LA

N

N

EW

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

KEY PLAN

AREA

A

AREA

B

AREA

C

AREA

D

AREA

E

530570208220 7540 5305 7020 8220 8000

56630 421 5 6 7 8 9

H

G

F

E

D

C

B

A

PP112

A2

PP111

A2

PP111

C3

4 5

E

D

4 5

E

D

PP111

C4

0 1.5 3mSCALE 1:150

PLUMBING SYSTEM PH 2F PLAN - NEWA3

0 1.5 3mSCALE 1:150

PLUMBING SYSTEM PH RF PLAN - NEWC3

ROOM SCHEDULE

NO. RM NAME

001 STAIR (1)

P01 LOBBY

P02 PIPE SPACE

P03 PIPE SPACE

P04 PIPE SPACE

P05 PIPE SPACE

P06 MECH ROOM

P08 MECH & ELEC ROOM

P09 STORAGE

L19 ELEV MECH ROOM

SHEET KEY NOTES

PLAN NORTH

GENERAL NOTES

1. PROVIDE VENT PIPES.

2. PROVIDE DCW PIPES.

3. PROVIDE ELEVATED TANK AND ACCESSORIES.

4. PROVIDE ELECTRIC HOT WATER HEATER.

1. THE CONCRETE FOUNDATION OF THE ELEVATED

WATER TANK SHALL BE REUSED.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

20Ø 100Ø 20Ø 75Ø

75Ø 100Ø

75Ø 100Ø

Ø

Ø

EWH

EWH

40Ø 40Ø

75Ø

EXISTING ELECTRIC

WATER HEATER

1 10

0Ø

Ø

75Ø

150Ø

0Ø

0Ø

0Ø

0Ø

100Ø

100Ø

RUNNING AT

1ST FLR

HIGH LEVEL

75Ø 75Ø

Ø

0Ø

0Ø

100Ø100Ø

0Ø

Ø

150Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

HB

HB

HB

125Ø

32Ø

Ø

0Ø

FLOOR DRAIN

RISER(SEWER)

RISER(DCW)

GV 20

D D

V

Ø

0Ø

80Ø

80Ø

D C

W

Ø

PIPE

SPACE 1

PIPE

SPACE 2

PIPE

SPACE 7

DN

DN

U P

UP

UP

EBS

L10C

EBS

L10D

TOILET

L08

EBS

L10A

MECH & ELEC

L07 ELEV

ELEV

JAN CL

L06

EBS

L10B

PIPE

SPACE

L05

PIPE

SPACE

L02

ENTRANCE PORCH

L11

STORAGE

L09

STAIR (1)

STAIR (2)

ELECTRICAL RM

L17

TRASH STORAGE

L10

STORAGE

L16

STORAGE

L13

STAIR (2)

STORAGE

L14

STORAGE

L12

COMMUNITY ROOM

L15

PIPE

SPACE

L04

DN

EXISTING

ADA RAMP

PIPE

SPACE

L03

STORAGE

L09

ELEV

LOBBY

L01

HB

6TYPE B

SK

HB

5 x2

PP1050 1 2mSCALE 1:100

PLUMBING SYSTEM 1ST FLOOR PLAN AREA B, C & E - NEWA2

PL

U

M

BI

N G

S

YS

TE

M

ST

F

LO

O R

P

LA

N

AR

EA

B

, C

E

N

EW

%PRODUCTION DATA 1%%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

4 7 9

3 5 6

7020 8000

5305 7540 8220

F

G

H

C

D

E

F

G

H

KEY PLAN

AREA

B

AREA

C

AREA

E

AREA

A

AREA

D

PP401

A1

SHEET KEY NOTES

PLAN NORTH

GENERAL NOTES

PP401

B4

ROOM SCHEDULE

NO. RM NAME

L01 ELEV LOBBY

L02 PIPE SPACE

L03 PIPE SPACE

L04 PIPE SPACE

L05 PIPE SPACE

L06 JANITOR'S CLOSET

L07 MECHANICAL & ELECTRICAL

L08 TOILET

L10 TRASH STORAGE

L10A EBS

L10B EBS

L10C EBS

L10D EBS

L11 ENTRANCE PORCH

L12 STORAGE

L13 STORAGE ROOM

L14 STORAGE

L15 COMMUNITY ROOM

L16 STORAGE

L17 ELECTRICAL RM

1. PROVIDE DCW PIPES.

2. PROVIDE DHWS PIPES.

3. PROVIDE SEWER PIPES.

4. PROVIDE VENT PIPES.

5. PROVIDE HOSE BIBBS.

6. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN ALL

UNITS.

7. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.

8. PROVIDE SERVICE SINK IN JANITOR CLOSET L06.

9. PROVIDE LAVATORY AND WATER CLOSET IN TOILET L08.

10. PROVIDE ELECTRIC HOT WATER HEATER.

11. PROVIDE TWO-WAY CLEANOUT.

1. PLUMBING WORK COVERS THE PIPE PORTION UNTIL

1.5M THE EXTERIOR WALL UNLESS OTHERWISE

NOTED OR SHOWN ON PLAN.

2. REFER TO ARCHITECTURAL DRAWINGS FOR THE

EXCAVATION WORK AREA OF THE FLOOR.

3. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE

DISPOSER WITH INSIDE CABINET DRAIN PIPE AND

P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.

PP404

B1

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

75Ø 100Ø

100Ø 75Ø

20Ø 100Ø 20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

20Ø 100Ø 20Ø 75Ø

75Ø 100Ø

20Ø

Ø

20Ø

EWH

EWH

40Ø 40Ø

75Ø

EXISTING ELECTRIC

WATER HEATER

1 10

75Ø

150Ø

100Ø

100Ø

RUNNING AT

1ST FLR

HIGH LEVEL

75Ø 75Ø

Ø

0Ø

0Ø

0Ø

0Ø

0Ø

0Ø

0Ø

0Ø

100Ø100Ø

0Ø

Ø

0Ø

0Ø

0Ø

Ø

150Ø

150Ø

150Ø

150Ø

150Ø

25Ø

32Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

25Ø

32Ø

32Ø

25Ø

20Ø

20Ø

20Ø

20Ø

Ø

Ø

Ø

Ø

HB

HB

HB

125Ø

125Ø

50Ø

100Ø

32Ø50Ø

50Ø

32Ø

100Ø

32Ø

20Ø

D D

V

Ø

0Ø

80Ø

80Ø

D C

W

Ø

PIPE

SPACE 4

PIPE

SPACE 6

PIPE

SPACE 3

PIPE

SPACE 5

PIPE

SPACE 1

PIPE

SPACE 7

PIPE

SPACE 8

DN

DN

U P

UP

EBS

L10C

EBS

L10D

TOILET

L08

EBS

L10A

MECH & ELEC

L07 ELEV

ELEV

JAN CL

L06

EBS

L10B

PIPE

SPACE

L05

PIPE

SPACE

L02

ENTRANCE PORCH

L11

STAIR (2)

MECH

RM

L18

STORAGE

L09

STAIR (1)

TRASH STORAGE

L10

STAIR (2)

PIPE

SPACE

L04

DN

DN

EXISTING

ADA RAMP

U P

PIPE

SPACE

L03

STAIR (2)

MECH

RM

L18

STORAGE

L09

ELEV

LOBBY

L01

HB

TYPE A

TYPE A

TYPE B

SK

HB

5 x2

PP106

0 1 2mSCALE 1:100

PLUMBING SYSTEM 1ST FLOOR PLAN AREA A & D - NEWA2

PL

U

M

BI

N G

S

YS

TE

M

ST

F

LO

O R

P

LA

N

AR

EA

A

D

N

EW

%PRODUCTION DATA 1%%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

1 2 3 4 5 6

8220 7020 5305 7540 5305

A

B

C

D

E

F

KEY PLAN

AREA

B

AREA

C

AREA

E

AREA

A

AREA

D

ROOM SCHEDULE

NO. RM NAME

L09 STORAGE

L18 MECHANICAL RM

SHEET KEY NOTES

PLAN NORTH

GENERAL NOTES

1. PROVIDE DCW PIPES.

2. PROVIDE DHWS PIPES.

3. PROVIDE SEWER PIPES.

4. PROVIDE VENT PIPES.

5. PROVIDE HOSE BIBBS.

6. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN

ALL UNITS.

7. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.

PP403

A1

PP401

B1

1. PLUMBING WORK COVERS THE PIPE PORTION UNTIL

1.5M THE EXTERIOR WALL UNLESS OTHERWISE

NOTED OR SHOWN ON PLAN.

2. REFER TO ARCHITECTURAL DRAWINGS FOR THE

EXCAVATION WORK AREA OF THE FLOOR.

3. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE

DISPOSER WITH INSIDE CABINET DRAIN PIPE AND

P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

20Ø 100Ø 20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 100Ø

75Ø 100Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

75Ø 100Ø

75Ø 100Ø

75Ø 100Ø

100Ø 75Ø

80Ø

32Ø 32Ø

75Ø

EWH

EWH

EWH

EWH

75Ø

(1FL ABOVE CEILING)

(2ND FLOOR UNDER SLAB ONLY)

25Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

25Ø

25Ø

32Ø

32Ø

25Ø

20Ø

20Ø

20Ø

20Ø

25Ø

32Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

25Ø

32Ø

25Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

Ø

Ø

SK

PIPE

SPACE 3

PIPE

SPACE 5

PIPE

SPACE 1

PIPE

SPACE 2

PIPE

SPACE 15

PIPE

SPACE 16

PIPE

SPACE 7

PIPE

SPACE 9

PIPE

SPACE 14

PIPE

SPACE 12

PIPE

SPACE 13

PIPE

SPACE 11

DN

ELEV LOBBY

C01

MECH & ELEC

C08

ELEV

JAN CL

C06

PIPE SPACE

C03

EBS

C10C

EBS

C10D

STORAGE

C09

U P

UP

ELEV

PIPE SPACE

C04

PIPE SPACE

C05

PIPE SPACE

C02

TYPE B

TYPE A

TYPE A

TYPE B

PP107

0 1 2mSCALE 1:100

PLUMBING SYSTEM 2ND-8TH FLOOR PLAN AREA B, C & E - NEWA2

PL

U

M

BI

N G

S

YS

TE

M

N

D -8

TH

F

LO

O

R P

LA

N

AR

EA

B , C

E

N

EW

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

C

D

E

F

G

H

C

D

E

F

G

H

C

D

E

F

G

H

C

D

E

F

G

H

C

D

E

F

G

H

C

D

E

F

G

H

KEY PLAN

AREA

B

AREA

C

AREA

E

AREA

A

AREA

D

4 7 9

3 5 6

7020 8000

5305 7540 8220

PP404

B1

ROOM SCHEDULE

NO. RM NAME

C01 ELEV LOBBY

C06 JAN CL

C07 STORAGE

C08 MECH & ELEC ROOM

C09 STORAGE SHEET KEY NOTES

PLAN NORTH

GENERAL NOTES

PP402

B4

1. PROVIDE DCW PIPES.

2. PROVIDE DHWS PIPES.

3. PROVIDE SEWER PIPES.

4. PROVIDE VENT PIPES.

5. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN

ALL UNITS.

6. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.

7. PROVIDE SERVICE SINK IN JANITOR CLOSET L06

8. PROVIDE ELECTRIC HOT WATER HEATER.

1. PIPING SHOWN ARE UNDER THE FLOOR UNLESS

OTHERWISE NOTED.

2. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE

DISPOSER WITH INSIDE CABINET DRAIN PIPE AND

P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

75Ø 100Ø

100Ø 75Ø

20Ø 100Ø 20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

20Ø 100Ø 20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

100Ø 75Ø

75Ø 100Ø

100Ø 75Ø

80Ø

32Ø 32Ø

75Ø

EWH

EWH

EWH

EWH

75Ø

(2ND FLOOR UNDER SLAB ONLY)

25Ø

32Ø

32Ø

25Ø

20Ø

20Ø

20Ø

20Ø

25Ø

32Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

25Ø

32Ø

25Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

25Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

SK

PIPE

SPACE 4

PIPE

SPACE 6

PIPE

SPACE 3

PIPE

SPACE 5

PIPE

SPACE 1

PIPE

SPACE 15

PIPE

SPACE 7

PIPE

SPACE 8

PIPE

SPACE 9

PIPE

SPACE 10

PIPE

SPACE 13

PIPE

SPACE 11

DN

ELEV LOBBY

C01

MECH & ELEC

C08

ELEV

JAN CL

C06

PIPE SPACE

C03

EBS

C10C

EBS

C10D

STORAGE

C09

UP

U P

UP

ELEV

PIPE SPACE

C04

PIPE SPACE

C05

PIPE SPACE

C02

6 6

TYPE A

TYPE A

TYPE B TYPE B

PP108

0 1 2mSCALE 1:100

PLUMBING SYSTEM 2ND-8TH FLOOR PLAN AREA A & D - NEWA2

PL

U

M

BI

N G

S

YS

TE

M

N

D -8

TH

F

LO

O

R P

LA

N

AR

EA

A

D

N

EW

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

1 2 3 4 5 6

8220 7020 5305 7540 5305

A

B

C

D

E

F

KEY PLAN

AREA

B

AREA

C

AREA

E

AREA

A

AREA

D

SHEET KEY NOTES

PLAN NORTH

GENERAL NOTES

PP402

B1

1. PROVIDE DCW PIPES.

2. PROVIDE DHWS PIPES.

3. PROVIDE SEWER PIPES.

4. PROVIDE VENT PIPES.

5. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN

ALL UNITS.

6. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.

1. PIPING SHOWN ARE UNDER THE FLOOR UNLESS

OTHERWISE NOTED.

2. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE

DISPOSER WITH INSIDE CABINET DRAIN PIPE AND

P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

20Ø 100Ø 20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 100Ø

75Ø 100Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

75Ø 100Ø

75Ø 100Ø

75Ø 100Ø

100Ø 75Ø

75Ø 100Ø 100Ø

75Ø

65Ø 65Ø65Ø

Ø

65Ø 65Ø 65Ø

Ø

80Ø80Ø

80Ø

80Ø

40Ø 40Ø

75Ø

EWH

EWH

EWH

EWH

75Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

25Ø

25Ø

32Ø

32Ø

25Ø

20Ø

20Ø

20Ø

20Ø

25Ø

32Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

25Ø

32Ø

25Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

Ø

Ø

SK

PIPE

SPACE 3

PIPE

SPACE 5

PIPE

SPACE 1

PIPE

SPACE 2

PIPE

SPACE 15

PIPE

SPACE 16

PIPE

SPACE 7

PIPE

SPACE 9

PIPE

SPACE 14

PIPE

SPACE 12

PIPE

SPACE 13

PIPE

SPACE 11

UP

DN

ELEV LOBBY

C01

MECH & ELEC

C08

ELEV

JAN CL

C06

PIPE SPACE

C03

EBS

C10C

EBS

C10D

STORAGE

C09

U P

UP

ELEV

PIPE SPACE

C04

PIPE SPACE

C02

PIPE SPACE

C05

6TYPE B

TYPE A

TYPE A

TYPE B

(9FL ABOVE CEILING)

(9FL ABOVE CEILING)

(9FL ABOVE CEILING)(9FL ABOVE CEILING)

PP109

0 1 2mSCALE 1:100

PLUMBING SYSTEM 9TH FLOOR PLAN AREA B, C & E - NEWA2

PL

U

M

BI

N G

S

YS

TE

M

TH

F

LO

O R

P

LA

N

AR

EA

B

, C

E

N

EW

D

E

C

D

F

G

H

KEY PLAN

AREA

B

AREA

C

AREA

E

AREA

A

AREA

D

4 7 9

3 5 6

7020 8000

5305 7540 8220

PP404

B1

ROOM SCHEDULE

NO. RM NAME

C01 ELEV LOBBY

C06 JAN CL

C07 STORAGE

C08 MECH & ELEC ROOM

C09 STORAGE

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

SHEET KEY NOTES

PLAN NORTH

GENERAL NOTES

1. PROVIDE DCW PIPES.

2. PROVIDE DHWS PIPES.

3. PROVIDE SEWER PIPES.

4. PROVIDE VENT PIPES.

5. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN

ALL UNITS.

6. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.

7. PROVIDE SERVICE SINK IN JANITOR CLOSET L06.

8. PROVIDE ELECTRIC HOT WATER HEATER.

PP402

B4

1. PIPING SHOWN ARE UNDER THE FLOOR UNLESS

OTHERWISE NOTED.

2. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE

DISPOSER WITH INSIDE CABINET DRAIN PIPE AND

P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

75Ø 100Ø

100Ø 75Ø

20Ø 100Ø 20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

20Ø 100Ø 20Ø 75Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

75Ø 20Ø 100Ø 20Ø

100Ø 75Ø

75Ø 100Ø

100Ø 75Ø

75Ø 100Ø 100Ø

75Ø

65Ø 65Ø65Ø

Ø

65Ø 65Ø 65Ø

Ø

80Ø80Ø

80Ø

80Ø

40Ø 40Ø

75Ø

EWH

EWH

EWH

EWH

75Ø

25Ø

32Ø

32Ø

25Ø

20Ø

20Ø

20Ø

20Ø

25Ø

32Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

25Ø

32Ø

25Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

32Ø

25Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

Ø

Ø

Ø

Ø

25Ø

32Ø

Ø

Ø

SK

PIPE

SPACE 4

PIPE

SPACE 6

PIPE

SPACE 3

PIPE

SPACE 5

PIPE

SPACE 1

PIPE

SPACE 15

PIPE

SPACE 7

PIPE

SPACE 8

PIPE

SPACE 9

PIPE

SPACE 10

PIPE

SPACE 13

PIPE

SPACE 11

DN

ELEV LOBBY

C01

MECH & ELEC

C08

ELEV

JAN CL

C06

PIPE SPACE

C03

EBS

C10C

EBS

C10D

STORAGE

C09

UP

U P

UP

ELEV

PIPE SPACE

C04

PIPE SPACE

C02

PIPE SPACE

C05

6 6

TYPE A

TYPE A

TYPE B TYPE B

(9FL ABOVE CEILING)

(9FL ABOVE CEILING)

(9FL ABOVE CEILING)(9FL ABOVE CEILING)

PP110

0 1 2mSCALE 1:100

PLUMBING SYSTEM 9TH FLOOR PLAN AREA A & D - NEWA2

PL

U

M

BI

N G

S

YS

TE

M

TH

F

LO

O R

P

LA

N

AR

EA

A

D

N

EW

1 2 3 4 5 6

8220 7020 5305 7540 5305

A

B

C

D

E

F

KEY PLAN

AREA

B

AREA

C

AREA

E

AREA

A

AREA

D

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

SHEET KEY NOTES

PLAN NORTH

GENERAL NOTES

1. PROVIDE DCW PIPES.

2. PROVIDE DHWS PIPES.

3. PROVIDE SEWER PIPES.

4. PROVIDE VENT PIPES.

5. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN

ALL UNITS.

6. REINSTALL EXISTING WATER CLOSET IN BATHROOMS IN

ALL UNITS.

PP402

B1

1. PIPING SHOWN ARE UNDER THE FLOOR UNLESS

OTHERWISE NOTED.

2. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE

DISPOSER WITH INSIDE CABINET DRAIN PIPE AND

P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

40Ø 40Ø

75Ø

80Ø

80Ø40Ø

EWH

80Ø

80Ø

75Ø

80Ø

40Ø 75Ø

VENT

CAP

VENT

THRU

ROOF

PIPE

SPACE 2

PIPE

SPACE 16

PIPE

SPACE 14

PIPE

SPACE 12

VENT

THRU

ROOF

VENT

THRU

ROOF

LOBBY

P01

MECH & ELEC

P08

ELEV

007MECH RM

P06

STORAGE

P09

ELEV

PIPE SPACE

P04

PIPE SPACE

P05 PIPE SPACE

P02

PIPE SPACE

P03

STAIR (1)

VENT

THRU

ROOF

VENT

CAP

VENT

CAP

1 VENT

CAP

80Ø

100Ø 40Ø

40Ø

80Ø TW

80Ø

100Ø 40Ø

Ø

Ø

Ø

100Ø

40Ø

VENT

THRU

ROOF

PS

DN

ELEV MECH ROOM

L19

OPEN TO

BELOW

STAIR (1)

OPEN TO

BELOW

INSECT

SCREEN

GV50

PP111

0 1 2mSCALE 1:100

PLUMBING SYSTEM PH1, PH2, PH RF & ROOF FLOOR PLAN AREA B, C & E- NEWA2

PL

U

M

BI

N G

S

YS

TE

M

P H

1, P

H 2, P H

R F

R

O O

F

FL

O O

R P

LA

N

A R

EA

B

, C

E

- N

EW

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

3 4 5 6 7 8 9

5305 7540 5305 7020 8220 8000

F

G

H

C

D

E

F

G

H

KEY PLAN

AREA

B

AREA

C

AREA

E

AREA

A

AREA

D

0 1 2mSCALE 1:100

PH 2F PLANC3 0 1 2mSCALE 1:100

PH RF PLANC4

4 5

E

D

4 5

E

D

SHEET KEY NOTES

PLAN NORTH

GENERAL NOTES

1. PROVIDE VENT PIPES.

2. PROVIDE DCW PIPES.

3. PROVIDE ELEVATED TANK.

4. PROVIDE ELECTRIC HOT WATER HEATER.

1. THE CONCRETE FOUNDATION OF THE ELEVATED

WATER TANK SHALL BE REUSED.

ROOM SCHEDULE

NO. RM NAME

001 STAIR (1)

P01 LOBBY

P02 PIPE SPACE

P03 PIPE SPACE

P04 PIPE SPACE

P05 PIPE SPACE

P06 MECH ROOM

P08 MECH & ELEC ROOM

P09 STORAGE

L19 ELEV MECH ROOM

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

40Ø 40Ø

75Ø

80Ø

80Ø40Ø

EWH

80Ø

80Ø

75Ø

80Ø

40Ø 75Ø

VENT

THRU

ROOF

PIPE

SPACE 4

PIPE

SPACE 6

PIPE

SPACE 8

PIPE

SPACE 10

VENT

THRU

ROOF

VENT

THRU

ROOF

LOBBY

P01

MECH & ELEC

P08

ELEV

007MECH RM

P06

STORAGE

P09

ELEV

PIPE SPACE

P04

PIPE SPACE

P05 PIPE SPACE

P02

PIPE SPACE

P03

STAIR (1)

VENT

THRU

ROOF

VENT

CAP

1 VENT

CAP

VENT

CAP

VENT

CAP

PP112

0 1 2mSCALE 1:100

PLUMBING SYSTEM ROOF FLOOR PLAN AREA A & D - NEWA2

PL

U

M

BI

N G

S

YS

TE

M

R O

O F

FL

O

O R

P

LA

N

AR

EA

A

D

N

EW

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

2 3 4 5 6

8229 7020 5305 7540 5305

A

B

C

D

E

F

KEY PLAN

AREA

B

AREA

C

AREA

E

AREA

A

AREA

D

SHEET KEY NOTES

PLAN NORTH

GENERAL NOTES

1. PROVIDE VENT PIPES.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

STAIRS 1

1 2 3

70208220

3 4

F

G

H

D V

D

D C

W

D C

W

D

Ø

0Ø

100Ø

65Ø

Ø

Ø

BEDROOM 2

BEDROOM 3

MASTER BEDROOM

HALLWAY

DINING

KITCHEN

LIVING

LAUNDRY&IBS

ENTRY

BATHROOM 2

MASTER BATH

CLOSET

210A

CLOSET

205C

PANTRY CL

CLOSET

209A

CLOSET

206A

CLOSET

205A

BALCONY

BALCONY

D C

W

D H

W S

D D

150Ø 65Ø

D D65Ø

D

25Ø

150Ø

32Ø

25ØDHWS

DCW

D

V

D

D

V

V

D150Ø

75Ø

75Ø

D

E

F

BEDROOM 2

MASTER

BEDROOM

BEDROOM 3

CLOSET

230A

HALLWAY

CLOSET

225A

CLOSET

226A

CLOSET

220A

BATH 2

MASTER BATH

DINING

LIVING

KITCHEN

ENTRY

LAUNDRY&IBS

CLOSET 2

225C

BALCONY

BALCONY

PANTRY CL

DHWS

DCW

D C

W

D

V

D

80Ø

32Ø

0Ø

D

Ø

Ø

D H

W S

D C

W

D

V

DD

V

V

D

0Ø

Ø

Ø

Ø

25Ø 32Ø

Ø

Ø

Ø

150Ø

20Ø

20Ø

20Ø 20Ø

25Ø 20Ø

80Ø

40Ø

40Ø

65Ø

150Ø

20Ø

20Ø

20Ø

80Ø

40Ø

Ø

Ø20

Ø

Ø

Ø

0Ø

20Ø 20Ø

25Ø

WC

LA

LA

LA

LA

LA

SH

BS

SH

BS

SH

SH

HB

SK

EWH

x2

8 5

HB

x2

PP4010 0.5 1mSCALE 1:50

1ST FLOOR TYP FLOOR PLAN CORE AREAA1

EN

LA

R G

ED

D

W

EL

LI

N

G U

N

IT

ST

F

LO

O R

P

LA

N

TY

PE

A

, B

C O

R E

AR

EA

N

EW

0 0.5 1mSCALE 1:50

1ST FLOOR TYP UNIT PLAN TYPE AB1

0 0.5 1mSCALE 1:50

1ST FLOOR TYP UNIT PLAN TYPE BB4

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

KEY PLAN

AREA

A

AREA

B

AREA

C

AREA

D

AREA

E

PLAN NORTH

SHEET KEY NOTESGENERAL NOTES

1. PROVIDE DCW PIPES.

2. PROVIDE DHWS & DHWR PIPES.

3. PROVIDE SEWER PIPES.

4. PROVIDE VENT PIPES.

5. PROVIDE LAVATORY SINK WITH FAUCET.

6. PROVIDE BATHTUB WITH SHOWER SET AND FAUCET.

7. PROVIDE SHOWER SET.

8. PROVIDE WATER CLOSET.

9. PROVIDE WASHER FAUCETS.

10. PROVIDE LAVATORY AND WATER CLOSET.

11. PROVIDE SERVICE SINK WITH FAUCET.

12. PROVIDE COMPACT TYPE ELECTRICAL HOT WATER HEATER.

1. PIPING SHOWN ARE UNDER THE FLOOR OR

UNDERGROUND UNLESS OTHERWISE NOTED.

2. EXISTING KITCHEN SINK WITH FAUCET AND

GARBAGE DISPOSER WITH INSIDE CABINET

DRAIN PIPE AND P-TRAP TO REMAIN AS EXISTING

IN ALL UNITS.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

DW

W

D

1 2 3 3 4

F

G

H

D C

W

D H

W S

32Ø

25ØDHWS

DCW

D

V

75Ø

75Ø

D

D

40Ø

Ø 32

Ø

Ø

D H

W S

D C

W

D

V

Ø

Ø

D

40Ø

Ø

DHWS

DCW

D

V

32Ø

25Ø

25Ø 32Ø

20Ø

20Ø

20Ø

25Ø 20Ø

Ø

Ø

50Ø

Ø

Ø

Ø

20Ø

20Ø

50Ø 65 Ø

50Ø

40Ø

20Ø 20Ø

Ø20

Ø

25Ø20 Ø

75Ø 75Ø

LA

LA

SH

BS

SH

LA

LA

SH

BS

SH

HB

x2

HB

x2

BEDROOM 2

209 BEDROOM 3

MASTER BEDROOM

HALLWAY

DINING

KITCHEN

LIVING

LAUNDRY&IBS

ENTRY

BATHROOM 2

MASTER BATH

CLOSET

210A

CLOSET

205C

PANTRY CL

CLOSET

209A

CLOSET

206A

CLOSET

205A

PIPE SPACE

EBS

C10G

BALCONY

BALCONY

BEDROOM 2

229 MASTER BEDROOM

BEDROOM 3

CLOSET

230A

HALLWAY

CLOSET

225A

CLOSET

226A

CLOSET

220A

BATH 2

228 MASTER BATH

DINING

LIVING

KITCHEN

ENTRY

LAUNDRY&IBS

PIPE SPACE

C05

EBS

C10F

CLOSET 2

225C

BALCONY

BALCONY

PANTRY CL

C05

PP402

EN

LA

R G

ED

D

W

EL

LI

N

G U

N

IT

N

D -9

TH

F

LO

O

R

PL

AN

T

YP

E

A

B

- N

EW

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

KEY PLAN

AREA

A

AREA

B

AREA

C

AREA

D

AREA

E

0 0.5 1mSCALE 1:50

2ND - 9TH FLOOR TYP UNIT PLAN TYPE AB1

0 0.5 1mSCALE 1:50

2ND - 9TH FLOOR TYP UNIT PLAN TYPE BB4

PLAN NORTH

SHEET KEY NOTESGENERAL NOTES

1. PROVIDE DCW PIPES.

2. PROVIDE DHWS PIPES.

3. PROVIDE SEWER PIPES.

4. PROVIDE VENT PIPES.

5. PROVIDE LAVATORY SINK WITH FAUCET.

6. PROVIDE BATHTUB WITH SHOWER SET AND FAUCET.

7. PROVIDE SHOWER SET.

8. PROVIDE WATER CLOSET.

9. PROVIDE WASHER FAUCETS.

1. PIPING SHOWN ARE UNDER THE FLOOR OR

UNDERGROUND UNLESS OTHERWISE NOTED.

2. EXISTING KITCHEN SINK WITH FAUCET AND

GARBAGE DISPOSER WITH INSIDE CABINET

DRAIN PIPE AND P-TRAP TO REMAIN AS EXISTING

IN ALL UNITS.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

25Ø

20Ø 80Ø

DN

5 6

C B

A

MECHANICAL RM

L20

STORAGE

L09

5 6

D C B A

3475 1830

615 2975 4630

900 2500 900

1250 1250

C B

1830 5190

B

B

A

A

PW

TW

TW

659 1476

AMI WATER METER

80Ø

GV

ST

GV

GV

ST

GV

CV

GV

CV

GV

FJ

FJ

GV

GV

EWH3

INDIRECT DRAIN

INDIRECT DRAIN

REUSED CONCRETE

FOUNDATION

REUSED CONCRETE

FOUNDATION

ABANDONED EXISTING

HWS & HWR PIPES

FJ

CV

GV

FJ

CV

GV

BACKFLOW PREVENTER 80Ø

65GV

65CV

GVCVSTGV

POC AT VALVE

EXISTING LAVATORY

TO BE REMAINED

ABANDONED EXISTING

HWS & HWR PIPES6

FJ

CV

GV

FJ

CV

GV

80 80

PW 4

PD

PP403

0 0.5 1mSCALE 1:50

ENLARGED MECH ROOM PLAN - NEWA1

EN

LA

R G

ED

M

EC

H

R M

P

LA

N

S

EC

TI

O

N

N

EW

0 0.5 1mSCALE 1:50

A-A SECTION PLAN - NEWC3

0 0.5 1mSCALE 1:50

B-B SECTION PLAN - NEWA3

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

KEY PLAN

AREA

A

AREA

B

AREA

C

AREA

D

AREA

E

PLAN NORTH

SHEET KEY NOTESGENERAL NOTES

1. PROVIDE DCW PIPES.

2. PROVIDE DHWS PIPES.

3. PROVIDE COMPACT TYPE ELECTRIC HOT WATER HEATER.

4. PROVIDE LIFT PUMP AND ITS ACCESSORIES.

5. PROVIDE RECEIVER TANK AND ITS ACCESSORIES.

6. PROVIDE DRAINAGE PUMP.

7. PROVIDE BLIND FLANGE.

1. AMI WATER METER SHALL BE PROVIDED FOR FUTURE

MONITORING AND CONNECTION TO TELECOM ROOM. AMI

WATER METER SHALL BE IN ACCORDANCE WITH KADENA

HOUSING GUIDE REQUIREMENTS.

2. 600MM MAINTENANCE AND INSPECTION SPACE SHALL BE

PROVIDED AROUND THE WATER TANK.

3. EXISTING LAVATORY AND ITS ACCESSORIES TO BE

REMAINED.

4. REPLACEMENT WORK FOR DCW MAIN PIPING UP TO

SERVICE VALVE SHALL BE INCLUDED IN PLUMBING WORK.

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

65Ø CW(RISER MAIN)

32Ø CW

65Ø SEWER DRAIN

50Ø VENT

H=1530, 610Ø

.0

.0

.0

25Ø HW

32Ø CW

25Ø HW

150Ø EX

65Ø CW(RISER MAIN)

CEILING CEILING

H=1530, 610Ø

65Ø SEWER DRAIN

50Ø VENT

25Ø CW

25Ø HW

65 X 50 INDIRECT DRAIN

.0

.0

5 305

3 4

25Ø CW

25Ø HW

65Ø CW(RISER MAIN)

65 X 50 INDIRECT DRAIN

RANGE HOOD

CEILING

CEILING

(MAX)

25Ø HW

25Ø HW

0Ø

E X

0.0

[DESCRIPTION OF CONTROL]

1. HOT WATER IS MAINTAINED AT 60°C IN THE TANK.

2. HOT WATER IS MIXED WITH WATER THROUGH A MIXING

VALVE AND SUPPLIED TO THE DWELLING UNITS AT

APPROXIMATELY43.0°C.

DCW DCW

DHWSTEMPERATURE MIXING VALVE

EHWT

(MANUALLY SET TO 43.0°C)

0.0

H=1530, 610Ø

EWH

EWH3

EWH3

FD VD

400 x 400 RISER DUCT

(MAX)

750x250xH700

(AIR PLENUM)

VD

400 x 400 RISER DUCT

(UNDER CEILING LEVEL)

250 x 250 OA DUCT

150 X 100 OA DUCT(ABOVE DROP CEILING LEVEL)

150 x 100 OA DUCT

(MAX)

750x250xH700

(AIR PLENUM)

100 x 150 OA

400 x 400 RISER DUCT

(MAX)

300 x 150 OA DUCT

FD VD

VD FD

750x250xH700

(AIR PLENUM)

KITCHEN CABINET

SQUARE FLOOR DRAIN

(APPROX 250 X 250)

SQUARE FLOOR DRAIN

(APPROX 250 X 250)

SQUARE FLOOR DRAIN

(APPROX 250 X 250)

PP4040 0.5 1mSCALE 1:50

ENLARGED PIPE SPACE SECTION - NEWA1

EN

LA

R G

ED

P

IP

E

SP

AC

E

PL

U M

BI

N

G P

LA

N

SE

C

TI

O N

N

EW

0 0.5 1mSCALE 1:50

ENLARGED PIPE SPACE PLAN - NEWB1

0 0.5 1mSCALE 1:50

ENLARGED PIPE SPACE SECTION - NEWA3

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

KEY PLAN

AREA

A

AREA

B

AREA

C

AREA

D

AREA

E

0 0.5 1mSCALE 1:50

HOT WATER TEMPERATUER CONTROLB3

1. PROVIDE DCW PIPES.

2. PROVIDE DHWS PIPES.

3. PROVIDE ELECTRIC WATER HEATER TANK WITH DRAIN

PAN.

4. PROVIDE SEWER PIPES.

5. PROVIDE VENT PIPES.

SHEET KEY NOTES

PLAN NORTH

GENERAL NOTES

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

RF

9F

8F

7F

6F

5F

4F

3F

2F

1F

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

32 25

32 25

32 25

32 25

32 25

32 25

32 25

32 25

32 25

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

32 25

32 25

32 25

32 25

32 25

32 25

32 25

32 25

32 25

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

32 25

32 25

32 25

32 25

32 25

32 25

32 25

32 25

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

32 25

32 25

32 25

32 25

32 25

32 25

32 25

32 25

EWH

EWH

EWH

EWH

EWH

EWH

EWH

EWH

GV80

CV80

FJ80GV80 20

80GV

80Ø

80Ø ST

INSULATING PIPE

FITTINGx2

80Ø LEVEL

REGULATING

VALVE

INCOMING WATER

20Ø BT

20Ø, 50Ø FJ

AMI METER

INSULATING PIPE FITTING

80Ø FJ

TW

PW

EWH

PH RF

PH 2F

65 6565 65 65

TW

INSULATING PIPE

GV100

FJ100

FITTING, TYP

ELECTRODE CONTROL (5P)

GVCVSTGV

80Ø GV

POC

LA

LA

SH

BS

HB

EXST KITCHEN SINK

DISH WASHER

TYPICAL DWELLING UNIT

ANGLE STOP VALVE

HB

PIPE SPACE

C-05

PIPE SPACE

C-04

PIPE SPACE

C-03

PIPE SPACE

C-02

JAN CL

C-06

STORAGE

C-09

MASTER BATH BATHROOM 2 LAUNDRY&IBS KITCHEN

SH

20 20 20 20 20 20 20 20 20 20 20 20 20 WITH INSECT SCREEN

80Ø BACKFLOW

PREVENTER

EXST WATER

CLOSET

EXST WATER

CLOSET

ELECTRODE CONTROL (4P)

FJ40

GV40

GV50

PP601

NOT TO SCALE

DOMESTIC COLD AND HOT WATER SYSTEM SCEMATIC DIAGRAMA2

D O

M

ES

TI

C

C O

LD

A

N D

H O

T W

AT

ER

P

IP

IN

G

SC

H

EM

AT

IC

D

IA

G

R

AM

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

RF

9F

8F

7F

6F

5F

4F

3F

2F

1F

PH RF

PH 2F

VC100

VC100VC100

VC100

VC100

VC100

VC100VC100

VC100

VC100

VC100

VC100 VC100

VC100

VC100

VC100

VC100 VC100

VC100

VC100

100 100 100 100 100 100

100 100 100 100 100 100

100 100 100

100 100 100

PD

TO MANHOLE

(TYPICAL)

TO MANHOLE

(TYPICAL)

TO MANHOLE

(TYPICAL)

TO MANHOLE

(TYPICAL)

TO MANHOLE

(TYPICAL)

TOILET JANITOR

PIPE SPACE

C-05

PIPE SPACE

C-04

PIPE SPACE

C-03

PIPE SPACE

C-02

MECH RM

P-01

PIPE SPACE

PIPE SPACE

PIPE SPACE

PIPE SPACE

PIPE SPACE

PIPE SPACE

PIPE SPACE

PIPE SPACE

PIPE SPACE

PIPE SPACE

PIPE SPACE

PIPE SPACE

PIPE SPACE

PIPE SPACE

PIPE SPACE

PIPE SPACE

TYPICAL DWELLING UNIT

MASTER BATH BATHROOM 2 LAUNDRY&IBS

LA

LA

SH

BS

HB

EXST KITCHEN SINK

DISH WASHER

HB

SH

FCO FCO FCO

KITCHEN

FCO

507550 505075 5050

65 65

VC100

EXST WATER

CLOSET

EXST WATER

CLOSET

PP602

NOT TO SCALE

SEWER & VENT PIPING SYSTEM SCHEMATIC DIAGRAMA2

SE

W

ER

V

EN

T

PI

PI

N

G S

C H

EM

AT

IC

D

IA

G

R

AM

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

CAULKING ALL AROUND

ALUMINUM COUNTER

FLASHING

CAULK (TYP.)

PIPE SLEEVE

CONTINUOUS WELDING

STEEL PLATE

FIBERGLASS PACK

VENT PIPE

SINGLE OPERATING LEVER TO REMAIN

EXIST MIXING TYPE FAUCET WITH

CONNECTION (TYP TO 2)

13 INLET x 9 OUTLET

300L FLEXIBLE

EXST FOOD WASTE DISPOSER

FLOOR LINE LOCATION OF DISHWASHER

SUIT LEFT OR RIGHT SIDE

FLEXIBLE HOSE LENGTH TO

13Ø ANGLE VALVE 13

INLETx13 OUTLET

DISHWASHER

EXST STRAINER CAP TO REMAIN

EXIST 2 EQUAL COMPARTMENT

KITCHEN SINK TO REMAIN

AIR GAP

EXST TOP MOUNTED PLATE TO REMAIN

EXST HOSE SPRAY TO REMAIN

CONNECTOR BOX

WASHING MACHINE

WATER HAMMER

ARRESTOR

BALL VALVE

FACE PLATE

20MMØ CWS

DRAIN HOSE FROM

WASHING MACHINE

20MMØ HWS

50MMØ WASHER

STANDPIPE

50MMØ WP

FINISHED FLOOR

COMPRESSION

CHAMBER

SHELL

BELLOWS

NIPPLE

WATER HAMMER ARRESTOR SCHEDULE

RATING

SYMBOL

PDI

RATING

UNIT

FIXTURE

(mm)

PIPE

CONN.

"A" 1-11 20

PIPE

COB

P-TRAP 65A

150Ø

FINISH/TILE FLOOR

WATERPROOF MEMBRANE

EXST STRUCTURAL SLAB

CEMENT FILL/BED

FINISH/TILE FLOOR

WATERPROOF MEMBRANE

EXST STRUCTURAL SLAB

CEMENT FILL/BED

FD FL.

P-TRAP 65A

150Ø

FL.

PIPE

COA

NON-WATERPROOF TYPE

WATERPROOF TYPE

NON-WATERPROOF TYPEWATERPROOF TYPE

0M

M

POC

POC

POC

DCWS

DRAIN

HWS

STAINLESS STEEL METAL JACKET

(OUTSIDE)

DOMESTIC COLD WATER PIPE,

DOMESTIC HOT WATER PIPE,

SOIL PIPE

BINDER

VAPOR BARRIER

(REQUIREMENT AS

PER SPECS)

PIPE GLASS

WOOL INSULATION

(PER SPECS)

NOTE:

1. GFCI APPLIANCES SHALL BE INSTALLED

IN ACCORDANCE WITH MANUFACTURERS

INSTALLATION REQUIREMENT.

2. EXISTING ITEMS TO BE THOROUGHLY

CLEANED BY THE CONSTRUCTION

CONTRACTOR.

ST

AN

D

PI

PE

S

H

AL

L N

O T

BE

L

ES

S

TH

AN

M M

B U

T N

O T

G R

EA

TE

R T

H

AN

M M

A

BO

VE

T

H E

TR

AP

W

EI

R

WHA

LOCATION:

- 2-9FL BATHROOM

- 2-9FL MASTER BATHROOM

- 2-9FL KITCHEN

LOCATION:

- 1FL BATHROOM

- 1FL MASTER BATHROOM

- 1FL LAUNDRY

- 1FL KITCHEN

- 1FL MECH & ELEC RM

LOCATION:

- SHOWER ROOM

INSIDE THE CABINET TO REMAIN

EXST KITCHEN SINK PVC DRAIN PIPING

LOCATION:

- ELECTRICAL ROOM

- MECHANICAL ROOM

TO REMAIN

NOTE:

MINIMUM DIAMETER FOR A STANDPIPE DRAINS: 2" (51 MM). MINIMUM

CARRY-AWAY CAPACITY: 17 GAL. (64 L) PER MINUTE. TOP OF STANDPIPE

MUST BE AT LEAST 39" (990 MM) HIGH; INSTALL NO HIGHER THAN 96" (2.44

M) FROM BOTTOM OF WASHER. IF YOU MUST INSTALL HIGHER THAN 96"

(2.44 M), YOU WILL NEED A SUMP PUMP SYSTEM.

WHA : WATER HAMMER ARRESTER

P-501

PL

U

M

BI

N G

D

ET

AI

LS

-1

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

NOT TO SCALE

VENT THRU ROOFC4NOT TO SCALE

KITCHEN SINKC2NOT TO SCALE

WASHING MACHINE BOX ASSEMBLYC1

NOT TO SCALE

CLEANOUT DETAILB1 NOT TO SCALE

CLEANOUT DETAILB2 NOT TO SCALE

WATER HAMMER ARRESTER SCHEDULEB4

NOT TO SCALE

FLOOR DRAIN DETAILA4NOT TO SCALE

FLOOR DRAIN DETAILA2NOT TO SCALE

PIPE INSULATION DETAILA1

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

PIPE INCREASER

FITTING

PIPE REDUCER

FITTING (TYP)

TEMPERATURE MIXING

VALVE

DHWS FROM CW SUPPLY

TEMPERED DHWS (43.0 °C)

TO PLUMBING FIXTURES

EHWT

VOLUME CONTROL

AND SHUTOFF VALVE

NOTE: DETAIL SHOWN IS FOR GUIDANCE ONLY, INSTALLATION OF

THERMOSTATIC MIXING VALVE AND PIPING ACCESSORIES

SHALL BE IN ACCORDANCE WITH MFR'S STANDARD RECOMMENDATION.

DOMESTIC COLD WATER PIPE

DOMESTIC COLD WATER LIFT PUMP

FLEX PIPE CONNECTOR (TYP)

CHECK VALVE (NON-SLAM)

GATE VALVE (TYP FOR 2EA)

MOTOR

EXST CONC PAD

EXST CONC FL

PRESSURE GAGE (TYP)

Y-STRAINER

SST EXPANSION BOLT (TYP)

PUMP MANUFACTURERS

STANDARD

20 THK NEOPRENE PAD

75Ø WATER CLOSET FLANGE

20ØCW

STOP VALVE

FIN FLOOR

TANK

SEAT AND COVER

20Ø CW LINE

15Ø HW LINE

EXISTING 50Ø DRAIN TO REMAIN

VALVE TO REMAIN

EXISTING ANGLE STOP

EXISTING P-TRAP TO REMAIN

EXST FLOOR

EXISTING FAUCET TO REMAIN

EXISTING LAVATORY TO REMAIN

DRAIN PIPE

BATHTUB

SHOWER HEAD

15Ø

20Ø CW LINE AND

20Ø HW LINE

FAUCET

SHOWER CONTROL

VALVE

PIPE SLEEVE

CONC FLOOR

SINK FAUCET

PIPE SLEEVE

FINISH FLOOR

80 CIP TRAP65Ø DRAIN

POC

EHWT

SEE INTERIOR PLANS FOR COUNTER INFORMATION

40Ø

FIN FLOOR

LAVATORY

COUNTER TOP

EXST MEDICINE CABINET

20 DCW

20 DHWS

LAVATORY FAUCET

ANGLE STOP VALVE

32 P-TRAP

OFF LEVEL

ON LEVEL

65 CHECK VALVE

65 GATE VALVE

65 DISCHARGE PIPE (EACH PUMP)

80 GATE VALVE

EXISTING SUMP PIT

65 DISCHARGE PIPE

65 DISCHARGE PIPE

80 DISCHARGE PIPE

80 DISCHARGE PIPE

80 GATE VALVE

EXISTING SUMP PIT

PLAN SECTION

300mm(MIN) 760mm(MAX)

FL

CONCRETE WALL

150mm(MIN)

PLAN

SECTION

BACKFLOW PREVENTER

SHALL COMPLY WITH NSF 61.

NOTE :

ANGLE SUPPORT

ANGLE SUPPORT

EXPANSION BOLT

TEST COCK(TYP)

TEST COCK(TYP)

DUCTILE IRONMAIN BODY :

STAINLESS STEELINTERNALS :

MATERIALS

POC

P-502

PL

U

M

BI

N G

D

ET

AI

LS

-2

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

NOT TO SCALE

SHOWER SET & BATHTUBB3

NOT TO SCALE

WATER CLOSETC1

NOT TO SCALE

THERMOSTATIC MIXING VALVEB4

NOT TO SCALE

PUMP MOUNTINGC4NOT TO SCALE

SERVICE SINK DETAILC3

NOT TO SCALE

LAVATORY(MECH RM)B1

NOT TO SCALE

COUNTER TOP LAVATORYA1 NOT TO SCALE

SUMP PIT DETAILSA3 NOT TO SCALE

BACKFLOW PREVENTER DETAILSA4

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

(5994)

50 50

50 50

400400 a

10631002502100210021063

B

A

A

A

5060 25

12 PARTITION FRP

11 OUTSIDE LADDER SUS W385 HOT-DIP GALVANIZED

10 INSIDE LADDER PVC W300

9 WIDE ELECTRODE ABS PF2 COVER AND BREAKWATER PIPE

8 VENTS ABS 100A INSECT SCREEN

7 DRAIN

6 OVERFLOW

5 OUTLET

4 INLET

3 INLET

2 MANHOLE FRP Ø600 REMOVABLE TYPE WITH INNER COVER

1 TANK BODY FRP

ITEM NO. NAME MATERIAL SIZE QTY. REMARKS

BILL OF MATERIALS

A [ -150 X 75 X 6.5

B [ - 75 X 40 X 5.0

CHEMICAL ANCHOR (SUS) M16X180L

MIDDLE PARTITION

INSTALLATION SUPPORT DETAIL

[-150 x 75 x 6.5

4 - Ø18

TANK SUPPORT

ANCHOR BOLT M16

BOTTOM PANEL

SIDE PANEL

a - DETAIL ENLARGED

REFERENCE FOR ANCHOR BOLT POSITION MAP

FLAT PLATFORM

SECTION VIEW

TOP VIEW

BOTTOM PANEL

MOUNTING BRACKET

P-503

PL

U

M

BI

N G

D

ET

AI

LS

-3

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

NOT TO SCALE

RECEIVING WATER STORAGE TANK DETAILS(TW-1)A1

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

(5272) a

10531002100210021053

B

A

6771002100210021002427

A

A

400400

11 OUTSIDE LADDER SUS W385 HOT-DIP GALVANIZED

10 INSIDE LADDER PVC W300

9 WIDE ELECTRODE ABS PF2 COVER AND BREAKWATER PIPE

8 VENTS ABS 100A INSECT SCREEN

7 DRAIN

6 OVERFLOW

5 OUTLET

4 INLET

3 INLET

2 MANHOLE FRP Ø600 REMOVABLE TYPE WITH INNER COVER

1 TANK BODY FRP

ITEM NO. NAME MATERIAL SIZE QTY. REMARKS

BILL OF MATERIALS

A [ -125 X 65 X 6.0

B [ - 75 X 40 X 5.0

INSTALLATION SUPPORT DETAIL

SIDE PANEL

a - DETAIL ENLARGED

REFERENCE FOR ANCHOR BOLT POSITION MAP

FLAT PLATFORM

SECTION VIEW

TOP VIEW

CHEMICAL ANCHOR (SUS) M16X180L

Ø18

[-65 x 65 x 6.0

BOTTOM PANEL

BOTTOM PANEL

MOUNTING BRACKET

ANCHOR BOLT M16

P-504

PL

U

M

BI

N G

D

ET

AI

LS

-4

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

1 2 3 4 5

B

A

C

D

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

IS

O

A

EX

P

FE

D

ER

AL

FY

F

SR

M R

EN

O

VA

TE

M

FH

T O

W

ER

C

AM

P

C O

U R

TN

EY

, O

KI

N

AW

A, J

AP

AN

C

AB

T1

R

TA

S U

BM

IT

TA

L

JA

PA

N D

IS

TR

IC

T, O

KI

N

AW

A

AR

EA

O

FF

IC

E U

SA

ED

-J , U

N

IT

, A

PO

A

P

4-

AP

O

, A P

3-

M

AR

C H

C H

I-2

0- A0

C

AB

T1

9_

A.

rv t

US Army Corps of Engineers

IS

EC

K.

N

AK

AM

A

E.

H

O N

D A

PL

U

M

BI

N G

NOT TO SCALE

ELEVATED WATER STORAGE TANK DETAILS(TW-2)A1

R

T A

S U

B M

IT

T

A L

/2

/2

S O

L

IC

IT

A

T

IO

N N

O

-S O

L

IC

IT

A

T

IO

N N

O

W H

V -2

-B

-0

FOR IN

FORMATIO

SYMBOL ITEM DESCRIPTION ELECTRIC CAP. QTY REMARKS

ELECTRIC HOT WATER HEATER 68

PLUMBING EQUIPMENT SCHEDULE

VERTICAL TYPE, STAINLESS STEEL FABRICATED PLATE

CAPACITY 310 LITERS DIMENSION 610 Ø x 1530 H

HEATING CAP 2 Nos. 4500 kW (15-c to 60-c)

4.50 kW, 208 V, 1Φ, 60 HzEWH

TW

TW

DRAINAGE PUMP SUBMERSIBLE PUMP WITH FLOAT CONTROL 2OPERATION: DUTY, ALTERNATING135 L/min x 3mAq 0.25 kW, 200 V, 3Φ, 60 Hz

LIFT PUMP MULTI-STAGE CENTRIFUGAL PUMP 440 L/min x 50mAq

W/ PRESSURE GAUGE,

27.5 kW, 200V, 3Φ, 60 HzSPRING VIBRATION ISOLATION TYPE BASEPW

PD

OPERATION: DUTY, ALTERNATING

ELECTRIC HOT WATER HEATER

VERTICAL TYPE, STAINLESS STEEL FABRICATED PLATE

CAPACITY 310 LITERS DIMENSION 610 Ø x 1530 H

HEATING CAP 2 Nos. 4500 kW (15-c to 60-c)EWH

ELECTRIC HOT WATER HEATER

WALL MOUNTED TYPE

CAPACITY 3.0 LITERS DIMENSION 204 W X 292 H X 150 D

HEATING CAP 0.6 KW (15-c to 60-c)EWH

4.50 kW, 208 V, 1Φ, 60 Hz

0.60 kW, 208 V, 1Φ, 60 Hz

WC-1 WATER CLOSET

MASTER BATHROOM

LA-1 LAVATORY 136

SH-1 SHOWER SET 68

HB-1 HOSE BIB -

HB-2 LAUNDRY HOSE BIB 68

SK-1 SERVICE SINK -

CW HW D V

20 20

15 32

FIXTURES SCHEDULE

CONNECTION PIPE SIZE

(mm)

SUB-TOTAL

TOTAL

(DWELLING

UNITS)

WHITE VITREOUS CHINA, FLOOR MOUNTED, FLOOR OUTLET,

FLUSH-TANK

WHITE VITREOUS CHINA WITH CABINET, SINGLE LEVER

CENTERESET FAUCET

BUILT-IN SHUTOFF VALVE, SHOWER HEAD (HANDHELD TYPE),

SLIDE BAR, MANUAL MIXING FAUCET AND SHOWER SWITCH

FAUCET

HOSE CONNECTION W/VACUUM BREAKER

HOSE CONNECTION W/ WASHER CONNECTION BOX

MFR'S STANDARD WHITE COLOR ENAMELED CAST-IRON WITH

CAST-IRON P-TRAP, CW AND HW FAUCETS, SPLASH BACK AND

RIM GUARD

ELONGATED BOWL WITH WHITE

CLOSED FRONT SHEET COVER,

WATER-CONSERVING TYPE,

4.8 L/F

REMARKDESCRIPTIONFIXTURESSYMBOL

PER UNIT

BATHROOM 2

LAUNDRY & IBS

65 -15 15

COMMON TOILET

MECHANICAL ROOM

TRASH STORAGE

TOTAL

COMMON AREAS

JANITOR'S ROOM

AROUND THE BUILDING

2 7

- 9

WATER-CONSERVING TYPE,

NOT EXCEED 5.7L/M AT 414 kPa

WATER-CONSERVING TYPE,

4.73L/M OR LESS

BS-1 BATHTUB 68-- -40BATHTUB WITH WHITE ENAMELED STEEL 1 681

SH-2 SHOWER SET 68--1515

BUILT-IN SHUTOFF VALVE, SHOWER HEAD (HANDHELD TYPE),

SLIDE BAR, MANUAL MIXING FAUCET…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .