FIO_Drawings_B4511 Tower Camp Courtney_2of2.pdf
PDF 14 MB Posted
- Solicitation number
- W912HV25Z0007
About this file
These are technical engineering drawings related to a renovation project for Tower 4511 at Camp Courtney, Okinawa, Japan, prepared by the US Army Corps of Engineers. The drawings specifically detail plumbing system modifications for a comprehensive multi-floor housing renovation, showing demolition and new installation plans for plumbing infrastructure across the building's first floor through penthouse levels. The technical documents include detailed floor plans, piping schematics, demolition notes, and new installation specifications for domestic water systems, sewer lines, vent pipes, and associated plumbing equipment like water heaters, pumps, and fixtures. The drawings indicate a complete replacement of existing plumbing systems, with careful documentation of pipe routing, equipment locations, and specific removal and installation instructions for each floor and area of the building.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FIO_Specifications_B4511 Tower Camp Courtney.pdf | ||
| FIO_Drawings_B4511 Tower Camp Courtney_1of2.pdf | ||
| W912HV25Z00007_Sources Sought Capabilities Survey Questions (2).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3
E
F
BEDROOM 2
BEDROOM 3
MASTER BEDROOM
HALLWAY
DINING
KITCHEN
LIVING
LAUNDRY&IBS
ENTRY
BATHROOM 2
MASTER BATH
CLOSET
210A
CLOSET
205C
PANTRY CL
CLOSET
209A
CLOSET
206A
CLOSET
205A
BALCONY
BALCONY
3 4
F
G
H
BEDROOM 2
MASTER
BEDROOM
BEDROOM 3
CLOSET
230A
HALLWAY
CLOSET
225A
CLOSET
226A
CLOSET
220A
BATH 2
MASTER BATH
DINING
LIVING
KITCHEN
222 ENTRY
LAUNDRY&IBS
CLOSET 2
225C
BALCONY
BALCONY
PANTRY CL
STAIRS 1
STAIR (1)
MECH & ELEC RM
L07
ELEV
ELEV
JAN CLOSET
L06
TOILET
L08
D V
D
D C
W
D H
W S
D C
W
D
Ø
0Ø
100Ø
65Ø
Ø
Ø
Ø
D H
W R
D C
W
D H
W S
D D
150Ø 65Ø
D D65Ø
D
20Ø
20Ø
150Ø
20Ø 32Ø
25Ø
DHWR
DHWS
DCW
D
V
D
D
V
V
D150Ø
75Ø
75Ø
D
DHWS
DCW
DHWR
D
V
D
80Ø
20Ø
0Ø
D
Ø
Ø
Ø
D H
W R
D H
W S
D C
W
D
V
DD
V
V
D
0Ø
Ø75
Ø
Ø D
C W
RISER (SEWER)
RISER (VENT)
D
EXISTING DHWS RISER
EXISTING DHWR RISER
EXISTING DCW RISER
EXISTING VENT RISER
EXISTING SEWER RISER
RISER (VENT)
RISER (SEWER)
PD4010 0.5 1mSCALE 1:50
1ST FLOOR PLAN CORE AREAA1
EN
LA
R G
ED
D
W
EL
LI
N
G U
N
IT
ST
F
LO
O R
P
LA
N
TY
PE
A
, B
C O
R E
AR
EA
D
EM
O
LI
TI
O N
0 0.5 1mSCALE 1:50
1ST FLOOR TYP UNIT PLAN TYPE AB1
0 0.5 1mSCALE 1:50
1ST FLOOR TYP UNIT PLAN TYPE BB4
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
KEY PLAN
AREA
A
AREA
B
AREA
C
AREA
D
AREA
E
PLAN NORTH
SHEET KEY NOTESGENERAL NOTES
1. REMOVE DCW PIPES.
2. REMOVE DHWS & DHWR PIPES.
3. REMOVE SEWER PIPES.
4. REMOVE VENT PIPES.
5. REMOVE EXISTING LAVATORY SINK WITH FAUCET.
6. REMOVE EXISTING BATHTUB WITH SHOWER SET AND
FAUCET.
7. REMOVE EXISTING SHOWER SET.
8. REMOVE EXISTING WATER CLOSET.
9. REMOVE EXISTING WASHER FAUCETS.
10. REMOVE EXISTING LAVATORY AND WATER CLOSET.
11. REMOVE EXISTING SERVICE SINK WITH FAUCET.
1. PIPING SHOWN ARE UNDER THE FLOOR OR
UNDERGROUND UNLESS OTHERWISE NOTED.
2. EXISTING KITCHEN SINK WITH FAUCET AND
GARBAGE DISPOSER WITH INSIDE CABINET
DRAIN PIPE AND P-TRAP TO REMAIN AS EXISTING
IN ALL UNITS.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
N O
NLY
BEDROOM 2
BEDROOM 3
MASTER BEDROOM
HALLWAY
DINING
KITCHEN
LIVING
LAUNDRY&IBS
ENTRY
CLOSET
210A
CLOSET
205C
PANTRY CL
CLOSET
209A
CLOSET
206A
CLOSET
205A
BALCONY
BALCONY
BEDROOM 2
MASTER BEDROOM
BEDROOM 3
CLOSET
230A
HALLWAY
CLOSET
225A
CLOSET
226ACLOSET
220A
MASTER BATH
DINING
LIVING
KITCHEN
ENTRY
LAUNDRY&IBS
CLOSET 2
225C
BALCONY
BALCONY
PANTRY CL
1 2 3
E
F
3 4
F
G
H
D H
W R
D C
W
D H
W S
25Ø
20Ø
20Ø 32Ø
25Ø
DHWR
DHWS
DCW
MASTER BATH
BATHROOM 2
D
V
75Ø
75Ø
D
D
Ø
Ø
Ø
D H
W R
D H
W S
D C
W
D
V
Ø
Ø
D
BATHROOM 2
40Ø
Ø
40Ø
Ø
DHWS
DCW
DHWR
D
V
20Ø 32Ø
20Ø
RISER (SEWER)
RISER (VENT)
1 20Ø
20Ø
PD402
EN
LA
R G
ED
D
W
EL
LI
N
G U
N
IT
N
D -9
TH
F
LO
O
R
PL
AN
T
YP
E
A
B
- D
EM
O
LI
TI
O N
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
KEY PLAN
0 0.5 1mSCALE 1:50
2ND - 9TH FLOOR TYP UNIT PLAN TYPE AB1
0 0.5 1mSCALE 1:50
2ND - 9TH FLOOR TYP UNIT PLAN TYPE BB4
AREA
A
AREA
B
AREA
C
AREA
D
AREA
E
PLAN NORTH
SHEET KEY NOTESGENERAL NOTES
1. REMOVE DCW PIPES.
2. REMOVE DHWS & DHWR PIPES.
3. REMOVE SEWER PIPES.
4. REMOVE VENT PIPES.
5. REMOVE EXISTING LAVATORY SINK WITH FAUCET.
6. REMOVE EXISTING BATHTUB WITH SHOWER SET AND
FAUCET.
7. REMOVE EXISTING SHOWER SET.
8. REMOVE EXISTING WATER CLOSET.
9. REMOVE EXISTING WASHER FAUCETS.
1. PIPING SHOWN ARE UNDER THE FLOOR OR
UNDERGROUND UNLESS OTHERWISE NOTED.
2. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE
DISPOSER WITH INSIDE CABINET DRAIN PIPE AND
P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
20Ø
M
M
100Ø 100Ø
50Ø
0Ø
0Ø
Ø
100Ø
100Ø
100Ø
100Ø
100Ø
80Ø
DN
5 6
C B
A
MECHANICAL RM
L20
STORAGE
L09
HWS
HWR
HWS
H W
R
POD
DCW
D H
W R
D H
W S
D C
W
D C
W
EXISTING CONCRETE
FOUNDATION TO REMAIN
Ø
D C
W
EXISTING CONCRETE
PAD TO REMAIN
EXISTING HWS&HWR PIPES
TO BE ABANDONED
D H
W S
D C
W
2 1
80Ø 4
POD AT VALVE
EXISTING LAVATORY
TO BE REMAINED
PD403
0 0.5 1mSCALE 1:50
ENLARGED MECH ROOM PLAN - DEMOLITIONA2
EN
LA
R G
ED
M
EC
H
R O
O M
P
LA
N
D
EM
O
LI
TI
O
N
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
KEY PLAN
AREA
A
AREA
B
AREA
C
AREA
D
AREA
E
SHEET KEY NOTES
PLAN NORTH
GENERAL NOTES
1. REMOVE EXISTING DCW PIPES.
2. REMOVE EXISTING DHWS & DHWR PIPES.
3. REMOVE EXISTING HWS & HWR PIPES.
4. REMOVE EXISTING DRAINAGE PUMP.
5. REMOVE EXISTING LIFT PUMP.
6. REMOVE EXISTING RECEIVER TANK AND ITS ACCESSORIES.
7. REMOVE EXISTING HOT WATER CIRCULATION PUMP.
8. REMOVE EXISTING HOT WATER GENERATOR TANK AND
ITS ACCESSORIES.
1. EXISTING ABANDONED HWS & HWR PIPES SHALL BE
CAPPED OR PLUGGED.
2. EXISTING LAVATORY AND ITS ACCESSORIES TO BE
REMAINED.
3. REPLACEMENT WORK FOR DCW MAIN PIPING UP TO
SERVICE VALVE SHALL BE INCLUDED IN PLUMBING
WORK.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
75Ø 100Ø
75Ø 100Ø
100Ø 75Ø
20Ø 100Ø 20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
20Ø 100Ø 20Ø 75Ø
75Ø 100Ø
75Ø 100Ø
20Ø
Ø
Ø
Ø
20Ø
EWH
EWH
40Ø 40Ø
75Ø
EXISTING ELECTRIC
WATER HEATER
1 10
0Ø
Ø
75Ø
150Ø
0Ø
0Ø
0Ø
0Ø
100Ø
100Ø
RUNNING AT
1ST FLR
HIGH LEVEL
75Ø 75Ø
Ø
0Ø
0Ø
0Ø
0Ø
0Ø
0Ø
0Ø
0Ø
100Ø100Ø
0Ø
Ø
0Ø
0Ø
0Ø
Ø
150Ø
150Ø
150Ø
150Ø
150Ø
25Ø
32Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
25Ø
32Ø
32Ø
25Ø
20Ø
20Ø
20Ø
20Ø
Ø
Ø
Ø
Ø
HB
HB
HB
HB
HB
HB
125Ø
125Ø
50Ø
100Ø
32Ø50Ø
50Ø
32Ø
100Ø
32Ø
Ø
0Ø
FLOOR DRAIN
RISER(SEWER)
RISER(DCW)
GV 20
20Ø
D D
V
Ø
0Ø
80Ø
80Ø
D C
W
Ø
PIPE
SPACE 4
PIPE
SPACE 6
PIPE
SPACE 3
PIPE
SPACE 5
PIPE
SPACE 1
PIPE
SPACE 2
PIPE
SPACE 7
PIPE
SPACE 8
DN
DN
DN
U P
U P
UP
UP
EBS
L10C
EBS
L10D
TOILET
L08
EBS
L10A
MECH & ELEC
L07 ELEV
ELEV
JAN CL
L06
EBS
L10B
PIPE
SPACE
L05
PIPE
SPACE
L02
ENTRANCE PORCH
L11
STAIR (2)
MECH
RM
L18
STORAGE
L09
STAIR (1)
STAIR (2)
ELECTRICAL RM
L17
TRASH STORAGE
L10
STAIR (2)
STORAGE
L16
STORAGE
L13
STAIR (2)
STORAGE
L14
STORAGE
L12
COMMUNITY ROOM
L15
PIPE
SPACE
L04
DN
DN
EXISTING
ADA RAMP
U P
PIPE
SPACE
L03
STAIR (2)
MECH
RM
L18
STORAGE
L09
ELEV
LOBBY
L01
HB
TYPE A
TYPE A
TYPE B
TYPE B
SK
HB
5 x2
PP101
0 1.5 3mSCALE 1:150
PLUMBING SYSTEM 1ST FLOOR PLAN - NEWA2
PL
U
M
BI
N G
S
YS
TE
M
ST
F
LO
O R
P
LA
N
N
EW
%PRODUCTION DATA 1%%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
KEY PLAN
AREA
A
AREA
B
AREA
C
AREA
D
AREA
E
530570208220 7540 5305 7020 8220 8000
56630
421 5 6 7 8 9
H
G
F
E
D
C
B
A
PP106
A2
PP105
A2
ROOM SCHEDULE
NO. RM NAME
L01 ELEV LOBBY
L02 PIPE SPACE
L03 PIPE SPACE
L04 PIPE SPACE
L05 PIPE SPACE
L06 JANITOR'S CLOSET
L07 MECHANICAL & ELECTRICAL
L08 TOILET
L09 STORAGE
L10 TRASH STORAGE
L10A EBS
L10B EBS
L10C EBS
L10D EBS
L11 ENTRANCE PORCH
L12 STORAGE
L13 STORAGE ROOM
L14 STORAGE
L15 COMMUNITY ROOM
L16 STORAGE
L17 ELECTRICAL RM
L18 MECHANICAL RM
SHEET KEY NOTES
PLAN NORTH
GENERAL NOTES
1. PROVIDE DCW PIPES.
2. PROVIDE DHWS PIPES.
3. PROVIDE SEWER PIPES.
4. PROVIDE VENT PIPES.
5. PROVIDE HOSE BIBBS.
6. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN ALL
UNITS.
7. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.
8. PROVIDE SERVICE SINK IN JANITOR CLOSET, L06.
9. PROVIDE LAVATORY AND WATER CLOSET IN TOILET, L08.
10. PROVIDE ELECTRIC HOT WATER HEATER.
11. PROVIDE TWO-WAY CLEANOUT.
1. PLUMBING WORK COVERS THE PIPE PORTION UNTIL
1.5M THE EXTERIOR WALL UNLESS OTHERWISE
NOTED OR SHOWN ON PLAN.
2. REFER TO ARCHITECTURAL DRAWINGS FOR THE
EXCAVATION WORK AREA OF THE FLOOR.
3. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE
DISPOSER WITH INSIDE CABINET DRAIN PIPE AND
P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
75Ø 100Ø
100Ø 75Ø
20Ø 100Ø 20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
20Ø 100Ø 20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 100Ø
75Ø 100Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
100Ø 75Ø
75Ø 100Ø
75Ø 100Ø
75Ø 100Ø
100Ø 75Ø
80Ø
32Ø 32Ø
75Ø
EWH
EWH
EWH
EWH
75Ø
(1FL ABOVE CEILING)
(2ND FLOOR UNDER SLAB ONLY)
(2ND FLOOR UNDER SLAB ONLY)
25Ø
32Ø
32Ø
25Ø
20Ø
20Ø
20Ø
20Ø
25Ø
32Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
25Ø
32Ø
25Ø
25Ø
32Ø
32Ø
25Ø
20Ø
20Ø
20Ø
20Ø
25Ø
32Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
25Ø
32Ø
25Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
SK
PIPE
SPACE 4
PIPE
SPACE 6
PIPE
SPACE 3
PIPE
SPACE 5
PIPE
SPACE 1
PIPE
SPACE 2
PIPE
SPACE 15
PIPE
SPACE 16
PIPE
SPACE 7
PIPE
SPACE 8
PIPE
SPACE 9
PIPE
SPACE 10
PIPE
SPACE 14
PIPE
SPACE 12
PIPE
SPACE 13
PIPE
SPACE 11
DN
ELEV LOBBY
C01
MECH & ELEC
C08
ELEV
JAN CL
C06
PIPE SPACE
C03
EBS
C10C
EBS
C10D
STORAGE
C09
UP
U P
U P
UP
ELEV
PIPE SPACE
C04
PIPE SPACE
C05
PIPE SPACE
C02
6 6
TYPE A
TYPE A
TYPE B
TYPE B
TYPE A
TYPE A
TYPE B
TYPE B
PP102
0 1.5 3mSCALE 1:150
PLUMBING SYSTEM 2ND-8TH FLOOR PLAN - NEWA2
PL
U
M
BI
N G
S
YS
TE
M
N
D -8
TH
F
LO
O
R P
LA
N
N
EW
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
KEY PLAN
AREA
A
AREA
B
AREA
C
AREA
D
AREA
E
530570208220 7540 5305 7020 8220 8000
56630
421 5 6 7 8 9
H
G
F
E
D
C
B
A
PP108
A2
PP107
A2
ROOM SCHEDULE
NO. RM NAME
C01 ELEV LOBBY
C06 JAN CL
C07 STORAGE
C08 MECH & ELEC ROOM
C09 STORAGE
SHEET KEY NOTES
PLAN NORTH
GENERAL NOTES
1. PROVIDE DCW PIPES.
2. PROVIDE DHWS PIPES.
3. PROVIDE SEWER PIPES.
4. PROVIDE VENT PIPES.
5. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN
ALL UNITS.
6. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.
7. PROVIDE SERVICE SINK IN JANITOR CLOSET C06.
8. PROVIDE ELECTRIC HOT WATER HEATER.
1. PIPING SHOWN ARE UNDER THE FLOOR UNLESS
OTHERWISE NOTED.
2. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE
DISPOSER WITH INSIDE CABINET DRAIN PIPE AND
P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
75Ø 100Ø
100Ø 75Ø
20Ø 100Ø 20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
20Ø 100Ø 20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 100Ø
75Ø 100Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
100Ø 75Ø
75Ø 100Ø
75Ø 100Ø
75Ø 100Ø
100Ø 75Ø
75Ø 100Ø 100Ø
75Ø
65Ø 65Ø65Ø
Ø
65Ø 65Ø 65Ø
Ø
80Ø80Ø
80Ø
80Ø
40Ø 40Ø
75Ø
EWH
EWH
EWH
EWH
75Ø
25Ø
32Ø
32Ø
25Ø
20Ø
20Ø
20Ø
20Ø
25Ø
32Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
25Ø
32Ø
25Ø
25Ø
32Ø
32Ø
25Ø
20Ø
20Ø
20Ø
20Ø
25Ø
32Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
25Ø
32Ø
25Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
SK
PIPE
SPACE 4
PIPE
SPACE 6
PIPE
SPACE 3
PIPE
SPACE 5
PIPE
SPACE 1
PIPE
SPACE 2
PIPE
SPACE 15
PIPE
SPACE 16
PIPE
SPACE 7
PIPE
SPACE 8
PIPE
SPACE 9
PIPE
SPACE 10
PIPE
SPACE 14
PIPE
SPACE 12
PIPE
SPACE 13
PIPE
SPACE 11
UP
DN
ELEV LOBBY
C01
MECH & ELEC
C08
ELEV
JAN CL
C06
PIPE SPACE
C03
EBS
C10C
EBS
C10D
STORAGE
C09
UP
U P
U P
UP
ELEV
PIPE SPACE
C04
PIPE SPACE
C02
PIPE SPACE
C05
6 6
TYPE A
TYPE A
TYPE B
TYPE B
TYPE A
TYPE A
TYPE B
TYPE B
(9FL ABOVE CEILING)
(9FL ABOVE CEILING)
(9FL ABOVE CEILING)(9FL ABOVE CEILING)
PP103
0 1.5 3mSCALE 1:150
PLUMBING SYSTEM 9TH FLOOR PLAN - NEWA2
PL
U
M
BI
N G
S
YS
TE
M
TH
F
LO
O R
P
LA
N
N
EW
KEY PLAN
AREA
A
AREA
B
AREA
C
AREA
D
AREA
E
530570208220 7540 5305 7020 8220 8000
56630
421 5 6 7 8 9
H
G
F
E
D
C
B
A
PP110
A2
PP109
A2
ROOM SCHEDULE
NO. RM NAME
C01 ELEV LOBBY
C06 JAN CL
C07 STORAGE
C08 MECH & ELEC ROOM
C09 STORAGE
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
SHEET KEY NOTES
PLAN NORTH
GENERAL NOTES
1. PIPING SHOWN ARE UNDER THE FLOOR UNLESS
OTHERWISE NOTED.
2. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE
DISPOSER WITH INSIDE CABINET DRAIN PIPE AND
P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.
1. PROVIDE DCW PIPES.
2. PROVIDE DHWS PIPES.
3. PROVIDE SEWER PIPES.
4. PROVIDE VENT PIPES.
5. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN
ALL UNITS.
6. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.
7. PROVIDE SERVICE SINK IN JANITOR CLOSET C06.
8. PROVIDE ELECTRIC HOT WATER HEATER.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
DN
UP
40Ø 40Ø
75Ø
80Ø
80Ø40Ø
EWH
80Ø
80Ø
75Ø
80Ø
40Ø 75Ø
VENT
CAP
VENT
THRU
ROOF
PIPE
SPACE 4
PIPE
SPACE 6
PIPE
SPACE 2
PIPE
SPACE 16
PIPE
SPACE 8
PIPE
SPACE 10
PIPE
SPACE 14
PIPE
SPACE 12
VENT
THRU
ROOF
VENT
THRU
ROOF
LOBBY
P01
MECH & ELEC
P08
ELEV
007MECH RM
P06
STORAGE
P09
ELEV
PIPE SPACE
P04
PIPE SPACE
P05 PIPE SPACE
P02
PIPE SPACE
P03
STAIR (1)
VENT
THRU
ROOF
VENT
CAP
VENT
CAP
1 VENT
CAP
VENT
CAP
1 VENT
CAP
VENT
CAP
VENT
CAP
80Ø
100Ø 40Ø
40Ø 80Ø
Ø
Ø
VENT
THRU
ROOF
PS
DN
ELEV MECH ROOM
L19
OPEN TO
BELOW
STAIR (1)
TW
80Ø
100Ø 40Ø
Ø
100Ø
40Ø
OPEN TO
BELOW
INSECT
SCREEN
GV50
PP104
0 1.5 3mSCALE 1:150
PLUMBING SYSTEM PH1, PH2, PH RF & ROOF FLOOR PLAN - NEWA2
PL
U
M
BI
N G
S
YS
TE
M
P H
1, P
H 2, P H
R F
R
O O
F
FL
O O
R P
LA
N
N
EW
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
KEY PLAN
AREA
A
AREA
B
AREA
C
AREA
D
AREA
E
530570208220 7540 5305 7020 8220 8000
56630 421 5 6 7 8 9
H
G
F
E
D
C
B
A
PP112
A2
PP111
A2
PP111
C3
4 5
E
D
4 5
E
D
PP111
C4
0 1.5 3mSCALE 1:150
PLUMBING SYSTEM PH 2F PLAN - NEWA3
0 1.5 3mSCALE 1:150
PLUMBING SYSTEM PH RF PLAN - NEWC3
ROOM SCHEDULE
NO. RM NAME
001 STAIR (1)
P01 LOBBY
P02 PIPE SPACE
P03 PIPE SPACE
P04 PIPE SPACE
P05 PIPE SPACE
P06 MECH ROOM
P08 MECH & ELEC ROOM
P09 STORAGE
L19 ELEV MECH ROOM
SHEET KEY NOTES
PLAN NORTH
GENERAL NOTES
1. PROVIDE VENT PIPES.
2. PROVIDE DCW PIPES.
3. PROVIDE ELEVATED TANK AND ACCESSORIES.
4. PROVIDE ELECTRIC HOT WATER HEATER.
1. THE CONCRETE FOUNDATION OF THE ELEVATED
WATER TANK SHALL BE REUSED.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
20Ø 100Ø 20Ø 75Ø
75Ø 100Ø
75Ø 100Ø
Ø
Ø
EWH
EWH
40Ø 40Ø
75Ø
EXISTING ELECTRIC
WATER HEATER
1 10
0Ø
Ø
75Ø
150Ø
0Ø
0Ø
0Ø
0Ø
100Ø
100Ø
RUNNING AT
1ST FLR
HIGH LEVEL
75Ø 75Ø
Ø
0Ø
0Ø
100Ø100Ø
0Ø
Ø
150Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
HB
HB
HB
125Ø
32Ø
Ø
0Ø
FLOOR DRAIN
RISER(SEWER)
RISER(DCW)
GV 20
D D
V
Ø
0Ø
80Ø
80Ø
D C
W
Ø
PIPE
SPACE 1
PIPE
SPACE 2
PIPE
SPACE 7
DN
DN
U P
UP
UP
EBS
L10C
EBS
L10D
TOILET
L08
EBS
L10A
MECH & ELEC
L07 ELEV
ELEV
JAN CL
L06
EBS
L10B
PIPE
SPACE
L05
PIPE
SPACE
L02
ENTRANCE PORCH
L11
STORAGE
L09
STAIR (1)
STAIR (2)
ELECTRICAL RM
L17
TRASH STORAGE
L10
STORAGE
L16
STORAGE
L13
STAIR (2)
STORAGE
L14
STORAGE
L12
COMMUNITY ROOM
L15
PIPE
SPACE
L04
DN
EXISTING
ADA RAMP
PIPE
SPACE
L03
STORAGE
L09
ELEV
LOBBY
L01
HB
6TYPE B
SK
HB
5 x2
PP1050 1 2mSCALE 1:100
PLUMBING SYSTEM 1ST FLOOR PLAN AREA B, C & E - NEWA2
PL
U
M
BI
N G
S
YS
TE
M
ST
F
LO
O R
P
LA
N
AR
EA
B
, C
E
N
EW
%PRODUCTION DATA 1%%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
4 7 9
3 5 6
7020 8000
5305 7540 8220
F
G
H
C
D
E
F
G
H
KEY PLAN
AREA
B
AREA
C
AREA
E
AREA
A
AREA
D
PP401
A1
SHEET KEY NOTES
PLAN NORTH
GENERAL NOTES
PP401
B4
ROOM SCHEDULE
NO. RM NAME
L01 ELEV LOBBY
L02 PIPE SPACE
L03 PIPE SPACE
L04 PIPE SPACE
L05 PIPE SPACE
L06 JANITOR'S CLOSET
L07 MECHANICAL & ELECTRICAL
L08 TOILET
L10 TRASH STORAGE
L10A EBS
L10B EBS
L10C EBS
L10D EBS
L11 ENTRANCE PORCH
L12 STORAGE
L13 STORAGE ROOM
L14 STORAGE
L15 COMMUNITY ROOM
L16 STORAGE
L17 ELECTRICAL RM
1. PROVIDE DCW PIPES.
2. PROVIDE DHWS PIPES.
3. PROVIDE SEWER PIPES.
4. PROVIDE VENT PIPES.
5. PROVIDE HOSE BIBBS.
6. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN ALL
UNITS.
7. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.
8. PROVIDE SERVICE SINK IN JANITOR CLOSET L06.
9. PROVIDE LAVATORY AND WATER CLOSET IN TOILET L08.
10. PROVIDE ELECTRIC HOT WATER HEATER.
11. PROVIDE TWO-WAY CLEANOUT.
1. PLUMBING WORK COVERS THE PIPE PORTION UNTIL
1.5M THE EXTERIOR WALL UNLESS OTHERWISE
NOTED OR SHOWN ON PLAN.
2. REFER TO ARCHITECTURAL DRAWINGS FOR THE
EXCAVATION WORK AREA OF THE FLOOR.
3. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE
DISPOSER WITH INSIDE CABINET DRAIN PIPE AND
P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.
PP404
B1
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
75Ø 100Ø
100Ø 75Ø
20Ø 100Ø 20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
20Ø 100Ø 20Ø 75Ø
75Ø 100Ø
20Ø
Ø
20Ø
EWH
EWH
40Ø 40Ø
75Ø
EXISTING ELECTRIC
WATER HEATER
1 10
75Ø
150Ø
100Ø
100Ø
RUNNING AT
1ST FLR
HIGH LEVEL
75Ø 75Ø
Ø
0Ø
0Ø
0Ø
0Ø
0Ø
0Ø
0Ø
0Ø
100Ø100Ø
0Ø
Ø
0Ø
0Ø
0Ø
Ø
150Ø
150Ø
150Ø
150Ø
150Ø
25Ø
32Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
25Ø
32Ø
32Ø
25Ø
20Ø
20Ø
20Ø
20Ø
Ø
Ø
Ø
Ø
HB
HB
HB
125Ø
125Ø
50Ø
100Ø
32Ø50Ø
50Ø
32Ø
100Ø
32Ø
20Ø
D D
V
Ø
0Ø
80Ø
80Ø
D C
W
Ø
PIPE
SPACE 4
PIPE
SPACE 6
PIPE
SPACE 3
PIPE
SPACE 5
PIPE
SPACE 1
PIPE
SPACE 7
PIPE
SPACE 8
DN
DN
U P
UP
EBS
L10C
EBS
L10D
TOILET
L08
EBS
L10A
MECH & ELEC
L07 ELEV
ELEV
JAN CL
L06
EBS
L10B
PIPE
SPACE
L05
PIPE
SPACE
L02
ENTRANCE PORCH
L11
STAIR (2)
MECH
RM
L18
STORAGE
L09
STAIR (1)
TRASH STORAGE
L10
STAIR (2)
PIPE
SPACE
L04
DN
DN
EXISTING
ADA RAMP
U P
PIPE
SPACE
L03
STAIR (2)
MECH
RM
L18
STORAGE
L09
ELEV
LOBBY
L01
HB
TYPE A
TYPE A
TYPE B
SK
HB
5 x2
PP106
0 1 2mSCALE 1:100
PLUMBING SYSTEM 1ST FLOOR PLAN AREA A & D - NEWA2
PL
U
M
BI
N G
S
YS
TE
M
ST
F
LO
O R
P
LA
N
AR
EA
A
D
N
EW
%PRODUCTION DATA 1%%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
1 2 3 4 5 6
8220 7020 5305 7540 5305
A
B
C
D
E
F
KEY PLAN
AREA
B
AREA
C
AREA
E
AREA
A
AREA
D
ROOM SCHEDULE
NO. RM NAME
L09 STORAGE
L18 MECHANICAL RM
SHEET KEY NOTES
PLAN NORTH
GENERAL NOTES
1. PROVIDE DCW PIPES.
2. PROVIDE DHWS PIPES.
3. PROVIDE SEWER PIPES.
4. PROVIDE VENT PIPES.
5. PROVIDE HOSE BIBBS.
6. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN
ALL UNITS.
7. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.
PP403
A1
PP401
B1
1. PLUMBING WORK COVERS THE PIPE PORTION UNTIL
1.5M THE EXTERIOR WALL UNLESS OTHERWISE
NOTED OR SHOWN ON PLAN.
2. REFER TO ARCHITECTURAL DRAWINGS FOR THE
EXCAVATION WORK AREA OF THE FLOOR.
3. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE
DISPOSER WITH INSIDE CABINET DRAIN PIPE AND
P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
20Ø 100Ø 20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 100Ø
75Ø 100Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
75Ø 100Ø
75Ø 100Ø
75Ø 100Ø
100Ø 75Ø
80Ø
32Ø 32Ø
75Ø
EWH
EWH
EWH
EWH
75Ø
(1FL ABOVE CEILING)
(2ND FLOOR UNDER SLAB ONLY)
25Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
25Ø
25Ø
32Ø
32Ø
25Ø
20Ø
20Ø
20Ø
20Ø
25Ø
32Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
25Ø
32Ø
25Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
Ø
Ø
SK
PIPE
SPACE 3
PIPE
SPACE 5
PIPE
SPACE 1
PIPE
SPACE 2
PIPE
SPACE 15
PIPE
SPACE 16
PIPE
SPACE 7
PIPE
SPACE 9
PIPE
SPACE 14
PIPE
SPACE 12
PIPE
SPACE 13
PIPE
SPACE 11
DN
ELEV LOBBY
C01
MECH & ELEC
C08
ELEV
JAN CL
C06
PIPE SPACE
C03
EBS
C10C
EBS
C10D
STORAGE
C09
U P
UP
ELEV
PIPE SPACE
C04
PIPE SPACE
C05
PIPE SPACE
C02
TYPE B
TYPE A
TYPE A
TYPE B
PP107
0 1 2mSCALE 1:100
PLUMBING SYSTEM 2ND-8TH FLOOR PLAN AREA B, C & E - NEWA2
PL
U
M
BI
N G
S
YS
TE
M
N
D -8
TH
F
LO
O
R P
LA
N
AR
EA
B , C
E
N
EW
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
C
D
E
F
G
H
C
D
E
F
G
H
C
D
E
F
G
H
C
D
E
F
G
H
C
D
E
F
G
H
C
D
E
F
G
H
KEY PLAN
AREA
B
AREA
C
AREA
E
AREA
A
AREA
D
4 7 9
3 5 6
7020 8000
5305 7540 8220
PP404
B1
ROOM SCHEDULE
NO. RM NAME
C01 ELEV LOBBY
C06 JAN CL
C07 STORAGE
C08 MECH & ELEC ROOM
C09 STORAGE SHEET KEY NOTES
PLAN NORTH
GENERAL NOTES
PP402
B4
1. PROVIDE DCW PIPES.
2. PROVIDE DHWS PIPES.
3. PROVIDE SEWER PIPES.
4. PROVIDE VENT PIPES.
5. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN
ALL UNITS.
6. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.
7. PROVIDE SERVICE SINK IN JANITOR CLOSET L06
8. PROVIDE ELECTRIC HOT WATER HEATER.
1. PIPING SHOWN ARE UNDER THE FLOOR UNLESS
OTHERWISE NOTED.
2. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE
DISPOSER WITH INSIDE CABINET DRAIN PIPE AND
P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
75Ø 100Ø
100Ø 75Ø
20Ø 100Ø 20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
20Ø 100Ø 20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
100Ø 75Ø
75Ø 100Ø
100Ø 75Ø
80Ø
32Ø 32Ø
75Ø
EWH
EWH
EWH
EWH
75Ø
(2ND FLOOR UNDER SLAB ONLY)
25Ø
32Ø
32Ø
25Ø
20Ø
20Ø
20Ø
20Ø
25Ø
32Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
25Ø
32Ø
25Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
25Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
SK
PIPE
SPACE 4
PIPE
SPACE 6
PIPE
SPACE 3
PIPE
SPACE 5
PIPE
SPACE 1
PIPE
SPACE 15
PIPE
SPACE 7
PIPE
SPACE 8
PIPE
SPACE 9
PIPE
SPACE 10
PIPE
SPACE 13
PIPE
SPACE 11
DN
ELEV LOBBY
C01
MECH & ELEC
C08
ELEV
JAN CL
C06
PIPE SPACE
C03
EBS
C10C
EBS
C10D
STORAGE
C09
UP
U P
UP
ELEV
PIPE SPACE
C04
PIPE SPACE
C05
PIPE SPACE
C02
6 6
TYPE A
TYPE A
TYPE B TYPE B
PP108
0 1 2mSCALE 1:100
PLUMBING SYSTEM 2ND-8TH FLOOR PLAN AREA A & D - NEWA2
PL
U
M
BI
N G
S
YS
TE
M
N
D -8
TH
F
LO
O
R P
LA
N
AR
EA
A
D
N
EW
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
1 2 3 4 5 6
8220 7020 5305 7540 5305
A
B
C
D
E
F
KEY PLAN
AREA
B
AREA
C
AREA
E
AREA
A
AREA
D
SHEET KEY NOTES
PLAN NORTH
GENERAL NOTES
PP402
B1
1. PROVIDE DCW PIPES.
2. PROVIDE DHWS PIPES.
3. PROVIDE SEWER PIPES.
4. PROVIDE VENT PIPES.
5. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN
ALL UNITS.
6. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.
1. PIPING SHOWN ARE UNDER THE FLOOR UNLESS
OTHERWISE NOTED.
2. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE
DISPOSER WITH INSIDE CABINET DRAIN PIPE AND
P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
20Ø 100Ø 20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 100Ø
75Ø 100Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
75Ø 100Ø
75Ø 100Ø
75Ø 100Ø
100Ø 75Ø
75Ø 100Ø 100Ø
75Ø
65Ø 65Ø65Ø
Ø
65Ø 65Ø 65Ø
Ø
80Ø80Ø
80Ø
80Ø
40Ø 40Ø
75Ø
EWH
EWH
EWH
EWH
75Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
25Ø
25Ø
32Ø
32Ø
25Ø
20Ø
20Ø
20Ø
20Ø
25Ø
32Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
25Ø
32Ø
25Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
Ø
Ø
SK
PIPE
SPACE 3
PIPE
SPACE 5
PIPE
SPACE 1
PIPE
SPACE 2
PIPE
SPACE 15
PIPE
SPACE 16
PIPE
SPACE 7
PIPE
SPACE 9
PIPE
SPACE 14
PIPE
SPACE 12
PIPE
SPACE 13
PIPE
SPACE 11
UP
DN
ELEV LOBBY
C01
MECH & ELEC
C08
ELEV
JAN CL
C06
PIPE SPACE
C03
EBS
C10C
EBS
C10D
STORAGE
C09
U P
UP
ELEV
PIPE SPACE
C04
PIPE SPACE
C02
PIPE SPACE
C05
6TYPE B
TYPE A
TYPE A
TYPE B
(9FL ABOVE CEILING)
(9FL ABOVE CEILING)
(9FL ABOVE CEILING)(9FL ABOVE CEILING)
PP109
0 1 2mSCALE 1:100
PLUMBING SYSTEM 9TH FLOOR PLAN AREA B, C & E - NEWA2
PL
U
M
BI
N G
S
YS
TE
M
TH
F
LO
O R
P
LA
N
AR
EA
B
, C
E
N
EW
D
E
C
D
F
G
H
KEY PLAN
AREA
B
AREA
C
AREA
E
AREA
A
AREA
D
4 7 9
3 5 6
7020 8000
5305 7540 8220
PP404
B1
ROOM SCHEDULE
NO. RM NAME
C01 ELEV LOBBY
C06 JAN CL
C07 STORAGE
C08 MECH & ELEC ROOM
C09 STORAGE
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
SHEET KEY NOTES
PLAN NORTH
GENERAL NOTES
1. PROVIDE DCW PIPES.
2. PROVIDE DHWS PIPES.
3. PROVIDE SEWER PIPES.
4. PROVIDE VENT PIPES.
5. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN
ALL UNITS.
6. PROVIDE WATER CLOSET IN BATHROOMS IN ALL UNITS.
7. PROVIDE SERVICE SINK IN JANITOR CLOSET L06.
8. PROVIDE ELECTRIC HOT WATER HEATER.
PP402
B4
1. PIPING SHOWN ARE UNDER THE FLOOR UNLESS
OTHERWISE NOTED.
2. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE
DISPOSER WITH INSIDE CABINET DRAIN PIPE AND
P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
75Ø 100Ø
100Ø 75Ø
20Ø 100Ø 20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
20Ø 100Ø 20Ø 75Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
75Ø 20Ø 100Ø 20Ø
100Ø 75Ø
75Ø 100Ø
100Ø 75Ø
75Ø 100Ø 100Ø
75Ø
65Ø 65Ø65Ø
Ø
65Ø 65Ø 65Ø
Ø
80Ø80Ø
80Ø
80Ø
40Ø 40Ø
75Ø
EWH
EWH
EWH
EWH
75Ø
25Ø
32Ø
32Ø
25Ø
20Ø
20Ø
20Ø
20Ø
25Ø
32Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
25Ø
32Ø
25Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
32Ø
25Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
Ø
Ø
Ø
Ø
25Ø
32Ø
Ø
Ø
SK
PIPE
SPACE 4
PIPE
SPACE 6
PIPE
SPACE 3
PIPE
SPACE 5
PIPE
SPACE 1
PIPE
SPACE 15
PIPE
SPACE 7
PIPE
SPACE 8
PIPE
SPACE 9
PIPE
SPACE 10
PIPE
SPACE 13
PIPE
SPACE 11
DN
ELEV LOBBY
C01
MECH & ELEC
C08
ELEV
JAN CL
C06
PIPE SPACE
C03
EBS
C10C
EBS
C10D
STORAGE
C09
UP
U P
UP
ELEV
PIPE SPACE
C04
PIPE SPACE
C02
PIPE SPACE
C05
6 6
TYPE A
TYPE A
TYPE B TYPE B
(9FL ABOVE CEILING)
(9FL ABOVE CEILING)
(9FL ABOVE CEILING)(9FL ABOVE CEILING)
PP110
0 1 2mSCALE 1:100
PLUMBING SYSTEM 9TH FLOOR PLAN AREA A & D - NEWA2
PL
U
M
BI
N G
S
YS
TE
M
TH
F
LO
O R
P
LA
N
AR
EA
A
D
N
EW
1 2 3 4 5 6
8220 7020 5305 7540 5305
A
B
C
D
E
F
KEY PLAN
AREA
B
AREA
C
AREA
E
AREA
A
AREA
D
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
SHEET KEY NOTES
PLAN NORTH
GENERAL NOTES
1. PROVIDE DCW PIPES.
2. PROVIDE DHWS PIPES.
3. PROVIDE SEWER PIPES.
4. PROVIDE VENT PIPES.
5. PROVIDE LAVATORY AND BATHTUB IN BATHROOMS IN
ALL UNITS.
6. REINSTALL EXISTING WATER CLOSET IN BATHROOMS IN
ALL UNITS.
PP402
B1
1. PIPING SHOWN ARE UNDER THE FLOOR UNLESS
OTHERWISE NOTED.
2. EXISTING KITCHEN SINK WITH FAUCET AND GARBAGE
DISPOSER WITH INSIDE CABINET DRAIN PIPE AND
P-TRAP TO REMAIN AS EXISTING IN ALL UNITS.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
40Ø 40Ø
75Ø
80Ø
80Ø40Ø
EWH
80Ø
80Ø
75Ø
80Ø
40Ø 75Ø
VENT
CAP
VENT
THRU
ROOF
PIPE
SPACE 2
PIPE
SPACE 16
PIPE
SPACE 14
PIPE
SPACE 12
VENT
THRU
ROOF
VENT
THRU
ROOF
LOBBY
P01
MECH & ELEC
P08
ELEV
007MECH RM
P06
STORAGE
P09
ELEV
PIPE SPACE
P04
PIPE SPACE
P05 PIPE SPACE
P02
PIPE SPACE
P03
STAIR (1)
VENT
THRU
ROOF
VENT
CAP
VENT
CAP
1 VENT
CAP
80Ø
100Ø 40Ø
40Ø
80Ø TW
80Ø
100Ø 40Ø
Ø
Ø
Ø
100Ø
40Ø
VENT
THRU
ROOF
PS
DN
ELEV MECH ROOM
L19
OPEN TO
BELOW
STAIR (1)
OPEN TO
BELOW
INSECT
SCREEN
GV50
PP111
0 1 2mSCALE 1:100
PLUMBING SYSTEM PH1, PH2, PH RF & ROOF FLOOR PLAN AREA B, C & E- NEWA2
PL
U
M
BI
N G
S
YS
TE
M
P H
1, P
H 2, P H
R F
R
O O
F
FL
O O
R P
LA
N
A R
EA
B
, C
E
- N
EW
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
3 4 5 6 7 8 9
5305 7540 5305 7020 8220 8000
F
G
H
C
D
E
F
G
H
KEY PLAN
AREA
B
AREA
C
AREA
E
AREA
A
AREA
D
0 1 2mSCALE 1:100
PH 2F PLANC3 0 1 2mSCALE 1:100
PH RF PLANC4
4 5
E
D
4 5
E
D
SHEET KEY NOTES
PLAN NORTH
GENERAL NOTES
1. PROVIDE VENT PIPES.
2. PROVIDE DCW PIPES.
3. PROVIDE ELEVATED TANK.
4. PROVIDE ELECTRIC HOT WATER HEATER.
1. THE CONCRETE FOUNDATION OF THE ELEVATED
WATER TANK SHALL BE REUSED.
ROOM SCHEDULE
NO. RM NAME
001 STAIR (1)
P01 LOBBY
P02 PIPE SPACE
P03 PIPE SPACE
P04 PIPE SPACE
P05 PIPE SPACE
P06 MECH ROOM
P08 MECH & ELEC ROOM
P09 STORAGE
L19 ELEV MECH ROOM
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
40Ø 40Ø
75Ø
80Ø
80Ø40Ø
EWH
80Ø
80Ø
75Ø
80Ø
40Ø 75Ø
VENT
THRU
ROOF
PIPE
SPACE 4
PIPE
SPACE 6
PIPE
SPACE 8
PIPE
SPACE 10
VENT
THRU
ROOF
VENT
THRU
ROOF
LOBBY
P01
MECH & ELEC
P08
ELEV
007MECH RM
P06
STORAGE
P09
ELEV
PIPE SPACE
P04
PIPE SPACE
P05 PIPE SPACE
P02
PIPE SPACE
P03
STAIR (1)
VENT
THRU
ROOF
VENT
CAP
1 VENT
CAP
VENT
CAP
VENT
CAP
PP112
0 1 2mSCALE 1:100
PLUMBING SYSTEM ROOF FLOOR PLAN AREA A & D - NEWA2
PL
U
M
BI
N G
S
YS
TE
M
R O
O F
FL
O
O R
P
LA
N
AR
EA
A
D
N
EW
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
2 3 4 5 6
8229 7020 5305 7540 5305
A
B
C
D
E
F
KEY PLAN
AREA
B
AREA
C
AREA
E
AREA
A
AREA
D
SHEET KEY NOTES
PLAN NORTH
GENERAL NOTES
1. PROVIDE VENT PIPES.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
STAIRS 1
1 2 3
70208220
3 4
F
G
H
D V
D
D C
W
D C
W
D
Ø
0Ø
100Ø
65Ø
Ø
Ø
BEDROOM 2
BEDROOM 3
MASTER BEDROOM
HALLWAY
DINING
KITCHEN
LIVING
LAUNDRY&IBS
ENTRY
BATHROOM 2
MASTER BATH
CLOSET
210A
CLOSET
205C
PANTRY CL
CLOSET
209A
CLOSET
206A
CLOSET
205A
BALCONY
BALCONY
D C
W
D H
W S
D D
150Ø 65Ø
D D65Ø
D
25Ø
150Ø
32Ø
25ØDHWS
DCW
D
V
D
D
V
V
D150Ø
75Ø
75Ø
D
E
F
BEDROOM 2
MASTER
BEDROOM
BEDROOM 3
CLOSET
230A
HALLWAY
CLOSET
225A
CLOSET
226A
CLOSET
220A
BATH 2
MASTER BATH
DINING
LIVING
KITCHEN
ENTRY
LAUNDRY&IBS
CLOSET 2
225C
BALCONY
BALCONY
PANTRY CL
DHWS
DCW
D C
W
D
V
D
80Ø
32Ø
0Ø
D
Ø
Ø
D H
W S
D C
W
D
V
DD
V
V
D
0Ø
Ø
Ø
Ø
25Ø 32Ø
Ø
Ø
Ø
150Ø
20Ø
20Ø
20Ø 20Ø
25Ø 20Ø
80Ø
40Ø
40Ø
65Ø
150Ø
20Ø
20Ø
20Ø
80Ø
40Ø
Ø
Ø20
Ø
Ø
Ø
0Ø
20Ø 20Ø
25Ø
WC
LA
LA
LA
LA
LA
SH
BS
SH
BS
SH
SH
HB
SK
EWH
x2
8 5
HB
x2
PP4010 0.5 1mSCALE 1:50
1ST FLOOR TYP FLOOR PLAN CORE AREAA1
EN
LA
R G
ED
D
W
EL
LI
N
G U
N
IT
ST
F
LO
O R
P
LA
N
TY
PE
A
, B
C O
R E
AR
EA
N
EW
0 0.5 1mSCALE 1:50
1ST FLOOR TYP UNIT PLAN TYPE AB1
0 0.5 1mSCALE 1:50
1ST FLOOR TYP UNIT PLAN TYPE BB4
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
KEY PLAN
AREA
A
AREA
B
AREA
C
AREA
D
AREA
E
PLAN NORTH
SHEET KEY NOTESGENERAL NOTES
1. PROVIDE DCW PIPES.
2. PROVIDE DHWS & DHWR PIPES.
3. PROVIDE SEWER PIPES.
4. PROVIDE VENT PIPES.
5. PROVIDE LAVATORY SINK WITH FAUCET.
6. PROVIDE BATHTUB WITH SHOWER SET AND FAUCET.
7. PROVIDE SHOWER SET.
8. PROVIDE WATER CLOSET.
9. PROVIDE WASHER FAUCETS.
10. PROVIDE LAVATORY AND WATER CLOSET.
11. PROVIDE SERVICE SINK WITH FAUCET.
12. PROVIDE COMPACT TYPE ELECTRICAL HOT WATER HEATER.
1. PIPING SHOWN ARE UNDER THE FLOOR OR
UNDERGROUND UNLESS OTHERWISE NOTED.
2. EXISTING KITCHEN SINK WITH FAUCET AND
GARBAGE DISPOSER WITH INSIDE CABINET
DRAIN PIPE AND P-TRAP TO REMAIN AS EXISTING
IN ALL UNITS.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
DW
W
D
1 2 3 3 4
F
G
H
D C
W
D H
W S
32Ø
25ØDHWS
DCW
D
V
75Ø
75Ø
D
D
40Ø
Ø 32
Ø
Ø
D H
W S
D C
W
D
V
Ø
Ø
D
40Ø
Ø
DHWS
DCW
D
V
32Ø
25Ø
25Ø 32Ø
20Ø
20Ø
20Ø
25Ø 20Ø
Ø
Ø
50Ø
Ø
Ø
Ø
20Ø
20Ø
50Ø 65 Ø
50Ø
40Ø
20Ø 20Ø
Ø20
Ø
25Ø20 Ø
75Ø 75Ø
LA
LA
SH
BS
SH
LA
LA
SH
BS
SH
HB
x2
HB
x2
BEDROOM 2
209 BEDROOM 3
MASTER BEDROOM
HALLWAY
DINING
KITCHEN
LIVING
LAUNDRY&IBS
ENTRY
BATHROOM 2
MASTER BATH
CLOSET
210A
CLOSET
205C
PANTRY CL
CLOSET
209A
CLOSET
206A
CLOSET
205A
PIPE SPACE
EBS
C10G
BALCONY
BALCONY
BEDROOM 2
229 MASTER BEDROOM
BEDROOM 3
CLOSET
230A
HALLWAY
CLOSET
225A
CLOSET
226A
CLOSET
220A
BATH 2
228 MASTER BATH
DINING
LIVING
KITCHEN
ENTRY
LAUNDRY&IBS
PIPE SPACE
C05
EBS
C10F
CLOSET 2
225C
BALCONY
BALCONY
PANTRY CL
C05
PP402
EN
LA
R G
ED
D
W
EL
LI
N
G U
N
IT
N
D -9
TH
F
LO
O
R
PL
AN
T
YP
E
A
B
- N
EW
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
KEY PLAN
AREA
A
AREA
B
AREA
C
AREA
D
AREA
E
0 0.5 1mSCALE 1:50
2ND - 9TH FLOOR TYP UNIT PLAN TYPE AB1
0 0.5 1mSCALE 1:50
2ND - 9TH FLOOR TYP UNIT PLAN TYPE BB4
PLAN NORTH
SHEET KEY NOTESGENERAL NOTES
1. PROVIDE DCW PIPES.
2. PROVIDE DHWS PIPES.
3. PROVIDE SEWER PIPES.
4. PROVIDE VENT PIPES.
5. PROVIDE LAVATORY SINK WITH FAUCET.
6. PROVIDE BATHTUB WITH SHOWER SET AND FAUCET.
7. PROVIDE SHOWER SET.
8. PROVIDE WATER CLOSET.
9. PROVIDE WASHER FAUCETS.
1. PIPING SHOWN ARE UNDER THE FLOOR OR
UNDERGROUND UNLESS OTHERWISE NOTED.
2. EXISTING KITCHEN SINK WITH FAUCET AND
GARBAGE DISPOSER WITH INSIDE CABINET
DRAIN PIPE AND P-TRAP TO REMAIN AS EXISTING
IN ALL UNITS.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
25Ø
20Ø 80Ø
DN
5 6
C B
A
MECHANICAL RM
L20
STORAGE
L09
5 6
D C B A
3475 1830
615 2975 4630
900 2500 900
1250 1250
C B
1830 5190
B
B
A
A
PW
TW
TW
659 1476
AMI WATER METER
80Ø
GV
ST
GV
GV
ST
GV
CV
GV
CV
GV
FJ
FJ
GV
GV
EWH3
INDIRECT DRAIN
INDIRECT DRAIN
REUSED CONCRETE
FOUNDATION
REUSED CONCRETE
FOUNDATION
ABANDONED EXISTING
HWS & HWR PIPES
FJ
CV
GV
FJ
CV
GV
BACKFLOW PREVENTER 80Ø
65GV
65CV
GVCVSTGV
POC AT VALVE
EXISTING LAVATORY
TO BE REMAINED
ABANDONED EXISTING
HWS & HWR PIPES6
FJ
CV
GV
FJ
CV
GV
80 80
PW 4
PD
PP403
0 0.5 1mSCALE 1:50
ENLARGED MECH ROOM PLAN - NEWA1
EN
LA
R G
ED
M
EC
H
R M
P
LA
N
S
EC
TI
O
N
N
EW
0 0.5 1mSCALE 1:50
A-A SECTION PLAN - NEWC3
0 0.5 1mSCALE 1:50
B-B SECTION PLAN - NEWA3
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
KEY PLAN
AREA
A
AREA
B
AREA
C
AREA
D
AREA
E
PLAN NORTH
SHEET KEY NOTESGENERAL NOTES
1. PROVIDE DCW PIPES.
2. PROVIDE DHWS PIPES.
3. PROVIDE COMPACT TYPE ELECTRIC HOT WATER HEATER.
4. PROVIDE LIFT PUMP AND ITS ACCESSORIES.
5. PROVIDE RECEIVER TANK AND ITS ACCESSORIES.
6. PROVIDE DRAINAGE PUMP.
7. PROVIDE BLIND FLANGE.
1. AMI WATER METER SHALL BE PROVIDED FOR FUTURE
MONITORING AND CONNECTION TO TELECOM ROOM. AMI
WATER METER SHALL BE IN ACCORDANCE WITH KADENA
HOUSING GUIDE REQUIREMENTS.
2. 600MM MAINTENANCE AND INSPECTION SPACE SHALL BE
PROVIDED AROUND THE WATER TANK.
3. EXISTING LAVATORY AND ITS ACCESSORIES TO BE
REMAINED.
4. REPLACEMENT WORK FOR DCW MAIN PIPING UP TO
SERVICE VALVE SHALL BE INCLUDED IN PLUMBING WORK.
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
65Ø CW(RISER MAIN)
32Ø CW
65Ø SEWER DRAIN
50Ø VENT
H=1530, 610Ø
.0
.0
.0
25Ø HW
32Ø CW
25Ø HW
150Ø EX
65Ø CW(RISER MAIN)
CEILING CEILING
H=1530, 610Ø
65Ø SEWER DRAIN
50Ø VENT
25Ø CW
25Ø HW
65 X 50 INDIRECT DRAIN
.0
.0
5 305
3 4
25Ø CW
25Ø HW
65Ø CW(RISER MAIN)
65 X 50 INDIRECT DRAIN
RANGE HOOD
CEILING
CEILING
(MAX)
25Ø HW
25Ø HW
0Ø
E X
0.0
[DESCRIPTION OF CONTROL]
1. HOT WATER IS MAINTAINED AT 60°C IN THE TANK.
2. HOT WATER IS MIXED WITH WATER THROUGH A MIXING
VALVE AND SUPPLIED TO THE DWELLING UNITS AT
APPROXIMATELY43.0°C.
DCW DCW
DHWSTEMPERATURE MIXING VALVE
EHWT
(MANUALLY SET TO 43.0°C)
0.0
H=1530, 610Ø
EWH
EWH3
EWH3
FD VD
400 x 400 RISER DUCT
(MAX)
750x250xH700
(AIR PLENUM)
VD
400 x 400 RISER DUCT
(UNDER CEILING LEVEL)
250 x 250 OA DUCT
150 X 100 OA DUCT(ABOVE DROP CEILING LEVEL)
150 x 100 OA DUCT
(MAX)
750x250xH700
(AIR PLENUM)
100 x 150 OA
400 x 400 RISER DUCT
(MAX)
300 x 150 OA DUCT
FD VD
VD FD
750x250xH700
(AIR PLENUM)
KITCHEN CABINET
SQUARE FLOOR DRAIN
(APPROX 250 X 250)
SQUARE FLOOR DRAIN
(APPROX 250 X 250)
SQUARE FLOOR DRAIN
(APPROX 250 X 250)
PP4040 0.5 1mSCALE 1:50
ENLARGED PIPE SPACE SECTION - NEWA1
EN
LA
R G
ED
P
IP
E
SP
AC
E
PL
U M
BI
N
G P
LA
N
SE
C
TI
O N
N
EW
0 0.5 1mSCALE 1:50
ENLARGED PIPE SPACE PLAN - NEWB1
0 0.5 1mSCALE 1:50
ENLARGED PIPE SPACE SECTION - NEWA3
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
KEY PLAN
AREA
A
AREA
B
AREA
C
AREA
D
AREA
E
0 0.5 1mSCALE 1:50
HOT WATER TEMPERATUER CONTROLB3
1. PROVIDE DCW PIPES.
2. PROVIDE DHWS PIPES.
3. PROVIDE ELECTRIC WATER HEATER TANK WITH DRAIN
PAN.
4. PROVIDE SEWER PIPES.
5. PROVIDE VENT PIPES.
SHEET KEY NOTES
PLAN NORTH
GENERAL NOTES
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
RF
9F
8F
7F
6F
5F
4F
3F
2F
1F
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
32 25
32 25
32 25
32 25
32 25
32 25
32 25
32 25
32 25
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
32 25
32 25
32 25
32 25
32 25
32 25
32 25
32 25
32 25
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
32 25
32 25
32 25
32 25
32 25
32 25
32 25
32 25
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
32 25
32 25
32 25
32 25
32 25
32 25
32 25
32 25
EWH
EWH
EWH
EWH
EWH
EWH
EWH
EWH
GV80
CV80
FJ80GV80 20
80GV
80Ø
80Ø ST
INSULATING PIPE
FITTINGx2
80Ø LEVEL
REGULATING
VALVE
INCOMING WATER
20Ø BT
20Ø, 50Ø FJ
AMI METER
INSULATING PIPE FITTING
80Ø FJ
TW
PW
EWH
PH RF
PH 2F
65 6565 65 65
TW
INSULATING PIPE
GV100
FJ100
FITTING, TYP
ELECTRODE CONTROL (5P)
GVCVSTGV
80Ø GV
POC
LA
LA
SH
BS
HB
EXST KITCHEN SINK
DISH WASHER
TYPICAL DWELLING UNIT
ANGLE STOP VALVE
HB
PIPE SPACE
C-05
PIPE SPACE
C-04
PIPE SPACE
C-03
PIPE SPACE
C-02
JAN CL
C-06
STORAGE
C-09
MASTER BATH BATHROOM 2 LAUNDRY&IBS KITCHEN
SH
20 20 20 20 20 20 20 20 20 20 20 20 20 WITH INSECT SCREEN
80Ø BACKFLOW
PREVENTER
EXST WATER
CLOSET
EXST WATER
CLOSET
ELECTRODE CONTROL (4P)
FJ40
GV40
GV50
PP601
NOT TO SCALE
DOMESTIC COLD AND HOT WATER SYSTEM SCEMATIC DIAGRAMA2
D O
M
ES
TI
C
C O
LD
A
N D
H O
T W
AT
ER
P
IP
IN
G
SC
H
EM
AT
IC
D
IA
G
R
AM
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
RF
9F
8F
7F
6F
5F
4F
3F
2F
1F
PH RF
PH 2F
VC100
VC100VC100
VC100
VC100
VC100
VC100VC100
VC100
VC100
VC100
VC100 VC100
VC100
VC100
VC100
VC100 VC100
VC100
VC100
100 100 100 100 100 100
100 100 100 100 100 100
100 100 100
100 100 100
PD
TO MANHOLE
(TYPICAL)
TO MANHOLE
(TYPICAL)
TO MANHOLE
(TYPICAL)
TO MANHOLE
(TYPICAL)
TO MANHOLE
(TYPICAL)
TOILET JANITOR
PIPE SPACE
C-05
PIPE SPACE
C-04
PIPE SPACE
C-03
PIPE SPACE
C-02
MECH RM
P-01
PIPE SPACE
PIPE SPACE
PIPE SPACE
PIPE SPACE
PIPE SPACE
PIPE SPACE
PIPE SPACE
PIPE SPACE
PIPE SPACE
PIPE SPACE
PIPE SPACE
PIPE SPACE
PIPE SPACE
PIPE SPACE
PIPE SPACE
PIPE SPACE
TYPICAL DWELLING UNIT
MASTER BATH BATHROOM 2 LAUNDRY&IBS
LA
LA
SH
BS
HB
EXST KITCHEN SINK
DISH WASHER
HB
SH
FCO FCO FCO
KITCHEN
FCO
507550 505075 5050
65 65
VC100
EXST WATER
CLOSET
EXST WATER
CLOSET
PP602
NOT TO SCALE
SEWER & VENT PIPING SYSTEM SCHEMATIC DIAGRAMA2
SE
W
ER
V
EN
T
PI
PI
N
G S
C H
EM
AT
IC
D
IA
G
R
AM
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
CAULKING ALL AROUND
ALUMINUM COUNTER
FLASHING
CAULK (TYP.)
PIPE SLEEVE
CONTINUOUS WELDING
STEEL PLATE
FIBERGLASS PACK
VENT PIPE
SINGLE OPERATING LEVER TO REMAIN
EXIST MIXING TYPE FAUCET WITH
CONNECTION (TYP TO 2)
13 INLET x 9 OUTLET
300L FLEXIBLE
EXST FOOD WASTE DISPOSER
FLOOR LINE LOCATION OF DISHWASHER
SUIT LEFT OR RIGHT SIDE
FLEXIBLE HOSE LENGTH TO
13Ø ANGLE VALVE 13
INLETx13 OUTLET
DISHWASHER
EXST STRAINER CAP TO REMAIN
EXIST 2 EQUAL COMPARTMENT
KITCHEN SINK TO REMAIN
AIR GAP
EXST TOP MOUNTED PLATE TO REMAIN
EXST HOSE SPRAY TO REMAIN
CONNECTOR BOX
WASHING MACHINE
WATER HAMMER
ARRESTOR
BALL VALVE
FACE PLATE
20MMØ CWS
DRAIN HOSE FROM
WASHING MACHINE
20MMØ HWS
50MMØ WASHER
STANDPIPE
50MMØ WP
FINISHED FLOOR
COMPRESSION
CHAMBER
SHELL
BELLOWS
NIPPLE
WATER HAMMER ARRESTOR SCHEDULE
RATING
SYMBOL
PDI
RATING
UNIT
FIXTURE
(mm)
PIPE
CONN.
"A" 1-11 20
PIPE
COB
P-TRAP 65A
150Ø
FINISH/TILE FLOOR
WATERPROOF MEMBRANE
EXST STRUCTURAL SLAB
CEMENT FILL/BED
FINISH/TILE FLOOR
WATERPROOF MEMBRANE
EXST STRUCTURAL SLAB
CEMENT FILL/BED
FD FL.
P-TRAP 65A
150Ø
FL.
PIPE
COA
NON-WATERPROOF TYPE
WATERPROOF TYPE
NON-WATERPROOF TYPEWATERPROOF TYPE
0M
M
POC
POC
POC
DCWS
DRAIN
HWS
STAINLESS STEEL METAL JACKET
(OUTSIDE)
DOMESTIC COLD WATER PIPE,
DOMESTIC HOT WATER PIPE,
SOIL PIPE
BINDER
VAPOR BARRIER
(REQUIREMENT AS
PER SPECS)
PIPE GLASS
WOOL INSULATION
(PER SPECS)
NOTE:
1. GFCI APPLIANCES SHALL BE INSTALLED
IN ACCORDANCE WITH MANUFACTURERS
INSTALLATION REQUIREMENT.
2. EXISTING ITEMS TO BE THOROUGHLY
CLEANED BY THE CONSTRUCTION
CONTRACTOR.
ST
AN
D
PI
PE
S
H
AL
L N
O T
BE
L
ES
S
TH
AN
M M
B U
T N
O T
G R
EA
TE
R T
H
AN
M M
A
BO
VE
T
H E
TR
AP
W
EI
R
WHA
LOCATION:
- 2-9FL BATHROOM
- 2-9FL MASTER BATHROOM
- 2-9FL KITCHEN
LOCATION:
- 1FL BATHROOM
- 1FL MASTER BATHROOM
- 1FL LAUNDRY
- 1FL KITCHEN
- 1FL MECH & ELEC RM
LOCATION:
- SHOWER ROOM
INSIDE THE CABINET TO REMAIN
EXST KITCHEN SINK PVC DRAIN PIPING
LOCATION:
- ELECTRICAL ROOM
- MECHANICAL ROOM
TO REMAIN
NOTE:
MINIMUM DIAMETER FOR A STANDPIPE DRAINS: 2" (51 MM). MINIMUM
CARRY-AWAY CAPACITY: 17 GAL. (64 L) PER MINUTE. TOP OF STANDPIPE
MUST BE AT LEAST 39" (990 MM) HIGH; INSTALL NO HIGHER THAN 96" (2.44
M) FROM BOTTOM OF WASHER. IF YOU MUST INSTALL HIGHER THAN 96"
(2.44 M), YOU WILL NEED A SUMP PUMP SYSTEM.
WHA : WATER HAMMER ARRESTER
P-501
PL
U
M
BI
N G
D
ET
AI
LS
-1
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
NOT TO SCALE
VENT THRU ROOFC4NOT TO SCALE
KITCHEN SINKC2NOT TO SCALE
WASHING MACHINE BOX ASSEMBLYC1
NOT TO SCALE
CLEANOUT DETAILB1 NOT TO SCALE
CLEANOUT DETAILB2 NOT TO SCALE
WATER HAMMER ARRESTER SCHEDULEB4
NOT TO SCALE
FLOOR DRAIN DETAILA4NOT TO SCALE
FLOOR DRAIN DETAILA2NOT TO SCALE
PIPE INSULATION DETAILA1
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
PIPE INCREASER
FITTING
PIPE REDUCER
FITTING (TYP)
TEMPERATURE MIXING
VALVE
DHWS FROM CW SUPPLY
TEMPERED DHWS (43.0 °C)
TO PLUMBING FIXTURES
EHWT
VOLUME CONTROL
AND SHUTOFF VALVE
NOTE: DETAIL SHOWN IS FOR GUIDANCE ONLY, INSTALLATION OF
THERMOSTATIC MIXING VALVE AND PIPING ACCESSORIES
SHALL BE IN ACCORDANCE WITH MFR'S STANDARD RECOMMENDATION.
DOMESTIC COLD WATER PIPE
DOMESTIC COLD WATER LIFT PUMP
FLEX PIPE CONNECTOR (TYP)
CHECK VALVE (NON-SLAM)
GATE VALVE (TYP FOR 2EA)
MOTOR
EXST CONC PAD
EXST CONC FL
PRESSURE GAGE (TYP)
Y-STRAINER
SST EXPANSION BOLT (TYP)
PUMP MANUFACTURERS
STANDARD
20 THK NEOPRENE PAD
75Ø WATER CLOSET FLANGE
20ØCW
STOP VALVE
FIN FLOOR
TANK
SEAT AND COVER
20Ø CW LINE
15Ø HW LINE
EXISTING 50Ø DRAIN TO REMAIN
VALVE TO REMAIN
EXISTING ANGLE STOP
EXISTING P-TRAP TO REMAIN
EXST FLOOR
EXISTING FAUCET TO REMAIN
EXISTING LAVATORY TO REMAIN
DRAIN PIPE
BATHTUB
SHOWER HEAD
15Ø
20Ø CW LINE AND
20Ø HW LINE
FAUCET
SHOWER CONTROL
VALVE
PIPE SLEEVE
CONC FLOOR
SINK FAUCET
PIPE SLEEVE
FINISH FLOOR
80 CIP TRAP65Ø DRAIN
POC
EHWT
SEE INTERIOR PLANS FOR COUNTER INFORMATION
40Ø
FIN FLOOR
LAVATORY
COUNTER TOP
EXST MEDICINE CABINET
20 DCW
20 DHWS
LAVATORY FAUCET
ANGLE STOP VALVE
32 P-TRAP
OFF LEVEL
ON LEVEL
65 CHECK VALVE
65 GATE VALVE
65 DISCHARGE PIPE (EACH PUMP)
80 GATE VALVE
EXISTING SUMP PIT
65 DISCHARGE PIPE
65 DISCHARGE PIPE
80 DISCHARGE PIPE
80 DISCHARGE PIPE
80 GATE VALVE
EXISTING SUMP PIT
PLAN SECTION
300mm(MIN) 760mm(MAX)
FL
CONCRETE WALL
150mm(MIN)
PLAN
SECTION
BACKFLOW PREVENTER
SHALL COMPLY WITH NSF 61.
NOTE :
ANGLE SUPPORT
ANGLE SUPPORT
EXPANSION BOLT
TEST COCK(TYP)
TEST COCK(TYP)
DUCTILE IRONMAIN BODY :
STAINLESS STEELINTERNALS :
MATERIALS
POC
P-502
PL
U
M
BI
N G
D
ET
AI
LS
-2
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
NOT TO SCALE
SHOWER SET & BATHTUBB3
NOT TO SCALE
WATER CLOSETC1
NOT TO SCALE
THERMOSTATIC MIXING VALVEB4
NOT TO SCALE
PUMP MOUNTINGC4NOT TO SCALE
SERVICE SINK DETAILC3
NOT TO SCALE
LAVATORY(MECH RM)B1
NOT TO SCALE
COUNTER TOP LAVATORYA1 NOT TO SCALE
SUMP PIT DETAILSA3 NOT TO SCALE
BACKFLOW PREVENTER DETAILSA4
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
(5994)
50 50
50 50
400400 a
10631002502100210021063
B
A
A
A
5060 25
12 PARTITION FRP
11 OUTSIDE LADDER SUS W385 HOT-DIP GALVANIZED
10 INSIDE LADDER PVC W300
9 WIDE ELECTRODE ABS PF2 COVER AND BREAKWATER PIPE
8 VENTS ABS 100A INSECT SCREEN
7 DRAIN
6 OVERFLOW
5 OUTLET
4 INLET
3 INLET
2 MANHOLE FRP Ø600 REMOVABLE TYPE WITH INNER COVER
1 TANK BODY FRP
ITEM NO. NAME MATERIAL SIZE QTY. REMARKS
BILL OF MATERIALS
A [ -150 X 75 X 6.5
B [ - 75 X 40 X 5.0
CHEMICAL ANCHOR (SUS) M16X180L
MIDDLE PARTITION
INSTALLATION SUPPORT DETAIL
[-150 x 75 x 6.5
4 - Ø18
TANK SUPPORT
ANCHOR BOLT M16
BOTTOM PANEL
SIDE PANEL
a - DETAIL ENLARGED
REFERENCE FOR ANCHOR BOLT POSITION MAP
FLAT PLATFORM
SECTION VIEW
TOP VIEW
BOTTOM PANEL
MOUNTING BRACKET
P-503
PL
U
M
BI
N G
D
ET
AI
LS
-3
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
NOT TO SCALE
RECEIVING WATER STORAGE TANK DETAILS(TW-1)A1
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
(5272) a
10531002100210021053
B
A
6771002100210021002427
A
A
400400
11 OUTSIDE LADDER SUS W385 HOT-DIP GALVANIZED
10 INSIDE LADDER PVC W300
9 WIDE ELECTRODE ABS PF2 COVER AND BREAKWATER PIPE
8 VENTS ABS 100A INSECT SCREEN
7 DRAIN
6 OVERFLOW
5 OUTLET
4 INLET
3 INLET
2 MANHOLE FRP Ø600 REMOVABLE TYPE WITH INNER COVER
1 TANK BODY FRP
ITEM NO. NAME MATERIAL SIZE QTY. REMARKS
BILL OF MATERIALS
A [ -125 X 65 X 6.0
B [ - 75 X 40 X 5.0
INSTALLATION SUPPORT DETAIL
SIDE PANEL
a - DETAIL ENLARGED
REFERENCE FOR ANCHOR BOLT POSITION MAP
FLAT PLATFORM
SECTION VIEW
TOP VIEW
CHEMICAL ANCHOR (SUS) M16X180L
Ø18
[-65 x 65 x 6.0
BOTTOM PANEL
BOTTOM PANEL
MOUNTING BRACKET
ANCHOR BOLT M16
P-504
PL
U
M
BI
N G
D
ET
AI
LS
-4
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
1 2 3 4 5
B
A
C
D
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
IS
O
A
EX
P
FE
D
ER
AL
FY
F
SR
M R
EN
O
VA
TE
M
FH
T O
W
ER
C
AM
P
C O
U R
TN
EY
, O
KI
N
AW
A, J
AP
AN
C
AB
T1
R
TA
S U
BM
IT
TA
L
JA
PA
N D
IS
TR
IC
T, O
KI
N
AW
A
AR
EA
O
FF
IC
E U
SA
ED
-J , U
N
IT
, A
PO
A
P
4-
AP
O
, A P
3-
M
AR
C H
C H
I-2
0- A0
C
AB
T1
9_
A.
rv t
US Army Corps of Engineers
IS
EC
K.
N
AK
AM
A
E.
H
O N
D A
PL
U
M
BI
N G
NOT TO SCALE
ELEVATED WATER STORAGE TANK DETAILS(TW-2)A1
R
T A
S U
B M
IT
T
A L
/2
/2
S O
L
IC
IT
A
T
IO
N N
O
-S O
L
IC
IT
A
T
IO
N N
O
W H
V -2
-B
-0
FOR IN
FORMATIO
SYMBOL ITEM DESCRIPTION ELECTRIC CAP. QTY REMARKS
ELECTRIC HOT WATER HEATER 68
PLUMBING EQUIPMENT SCHEDULE
VERTICAL TYPE, STAINLESS STEEL FABRICATED PLATE
CAPACITY 310 LITERS DIMENSION 610 Ø x 1530 H
HEATING CAP 2 Nos. 4500 kW (15-c to 60-c)
4.50 kW, 208 V, 1Φ, 60 HzEWH
TW
TW
DRAINAGE PUMP SUBMERSIBLE PUMP WITH FLOAT CONTROL 2OPERATION: DUTY, ALTERNATING135 L/min x 3mAq 0.25 kW, 200 V, 3Φ, 60 Hz
LIFT PUMP MULTI-STAGE CENTRIFUGAL PUMP 440 L/min x 50mAq
W/ PRESSURE GAUGE,
27.5 kW, 200V, 3Φ, 60 HzSPRING VIBRATION ISOLATION TYPE BASEPW
PD
OPERATION: DUTY, ALTERNATING
ELECTRIC HOT WATER HEATER
VERTICAL TYPE, STAINLESS STEEL FABRICATED PLATE
CAPACITY 310 LITERS DIMENSION 610 Ø x 1530 H
HEATING CAP 2 Nos. 4500 kW (15-c to 60-c)EWH
ELECTRIC HOT WATER HEATER
WALL MOUNTED TYPE
CAPACITY 3.0 LITERS DIMENSION 204 W X 292 H X 150 D
HEATING CAP 0.6 KW (15-c to 60-c)EWH
4.50 kW, 208 V, 1Φ, 60 Hz
0.60 kW, 208 V, 1Φ, 60 Hz
WC-1 WATER CLOSET
MASTER BATHROOM
LA-1 LAVATORY 136
SH-1 SHOWER SET 68
HB-1 HOSE BIB -
HB-2 LAUNDRY HOSE BIB 68
SK-1 SERVICE SINK -
CW HW D V
20 20
15 32
FIXTURES SCHEDULE
CONNECTION PIPE SIZE
(mm)
SUB-TOTAL
TOTAL
(DWELLING
UNITS)
WHITE VITREOUS CHINA, FLOOR MOUNTED, FLOOR OUTLET,
FLUSH-TANK
WHITE VITREOUS CHINA WITH CABINET, SINGLE LEVER
CENTERESET FAUCET
BUILT-IN SHUTOFF VALVE, SHOWER HEAD (HANDHELD TYPE),
SLIDE BAR, MANUAL MIXING FAUCET AND SHOWER SWITCH
FAUCET
HOSE CONNECTION W/VACUUM BREAKER
HOSE CONNECTION W/ WASHER CONNECTION BOX
MFR'S STANDARD WHITE COLOR ENAMELED CAST-IRON WITH
CAST-IRON P-TRAP, CW AND HW FAUCETS, SPLASH BACK AND
RIM GUARD
ELONGATED BOWL WITH WHITE
CLOSED FRONT SHEET COVER,
WATER-CONSERVING TYPE,
4.8 L/F
REMARKDESCRIPTIONFIXTURESSYMBOL
PER UNIT
BATHROOM 2
LAUNDRY & IBS
65 -15 15
COMMON TOILET
MECHANICAL ROOM
TRASH STORAGE
TOTAL
COMMON AREAS
JANITOR'S ROOM
AROUND THE BUILDING
2 7
- 9
WATER-CONSERVING TYPE,
NOT EXCEED 5.7L/M AT 414 kPa
WATER-CONSERVING TYPE,
4.73L/M OR LESS
BS-1 BATHTUB 68-- -40BATHTUB WITH WHITE ENAMELED STEEL 1 681
SH-2 SHOWER SET 68--1515
BUILT-IN SHUTOFF VALVE, SHOWER HEAD (HANDHELD TYPE),
SLIDE BAR, MANUAL MIXING FAUCET…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .