This document is a Scope of Work (SOW) for Energy Control Procedures (ECP)/Lockout Tagout (LOTO) procedures at two VA Medical Centers in New York. The firm fixed-price contract requires the contractor to implement a new Brady Link360 application for managing lockout procedures at the Bath and Canandaigua VA Medical Centers, covering 459 total equipment energy control points across both locations. The scope includes software implementation, procedure development, installation of detailed lockout procedure signs, equipment labeling, and training for up to 15 personnel.
Key requirements include creating comprehensive lockout procedures with specific details like equipment names, energy sources, disconnect locations, verification steps, and safety warnings. The procedures must be inputted into the Brady Link360 platform, printed in full color on aluminum signs with 6-ring binders, laminated, and installed near equipment. The contractor must also create custom aluminum identification tags for lockout points and provide training on procedure creation and software usage. The contract is for one base year with four option years, and all work must comply with OSHA and ANSI safety standards, with careful coordination required to minimize disruption to the critical healthcare facility's operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226Q0197 0001.pdf | ||
| WD 2015-4161 - Ontario County.pdf | ||
| 36C24226Q0197 Pricing Worksheet.xlsx | XLSX spreadsheet | |
| Limitations on Subcontracting.pdf | ||
| 36C24226Q0197.pdf | ||
| WD 2015-4181 - Steuben County.pdf | ||
| 2020-02-24_VHA Directive 1028_Facility Electrical Power Systems.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B.3 SCOPE OF WORK (SOW)
B.3.1 Summary
A. This firm fixed-price requirement is for Energy Control Procedures (ECP)/lockout tagout (LOTO) procedures, including installation, incorporation, program integration, training, and testing of a new Brady Link360 application at the Bath VA Medical Center located at 76 Veterans Avenue, Bath, NY 14810, and the Canandaigua VA Medical Center, 400 Fort Hill Avenue, Canandaigua, NY 14424 from one base year from date of award plus the provision of four (4) option years. Contractor shall provide all personnel, materials, tools, labor, and travel necessary to complete the work and training to implement LOTO program to meet or exceed compliance with OSHA 1910.147, and ANSI/ASSE 244.1 guidance.
B.3.2 General
A. Contractor shall identify equipment and/or energy sources that require LOTO procedures, currently approximated at 459 ECPs (243 in Bath, 216 in Canandaigua), all categorized using the following options:
1.Multi-Energy Source (Electric, Steam, Water, Gas, etc.)
2.Single Energy Source located within employee control and supervision 3.Single Energy source located outside employee control and supervision
B. Contractor shall provide software, development, and implementation of all ECPs identified.
1.All ECPs shall be inputted and configured into the Brady Link360 platform. Contractor shall give COR access to the Brady Link360 account prior to printing to review/verify the accuracy of each procedure.
2.Contractor shall submit draft lockout procedures digitally for approval before publishing to software or printing.
C. All procedures shall include at minimum:
1. Name of equipment and EE number if applicable.
2. Location of equipment.
3. Primary and secondary types of hazardous energy (electrical, steam, water, thermal, stored pressure, etc.)
4. Magnitude of energy source (volts, psi, etc.)
5. Specific location of each disconnects (north side, front side, etc.)
6. Method of LOTO isolation techniques.
7. Type of LOTO device required (padlock, clamshell, circuit breaker, lockout device, etc.)
8. Verification step to ensure the LOTO was performed correctly.
9. Photos of the isolation points for clear identification.
10. Graphic illustrations of an overhead layout of the equipment, identifying the location of all primary and secondary energy source.
i. Graphic illustrations shall be printed on an aluminum sign base with a 6-ring binder attached to it housing the procedures. (See section B.3.6 below).
11. Authorized department to perform LOTO procedures.
12. Description of steps to restore equipment to service.
13. The specific department required to be notified before shutdown and startup.
14. Personal Protective Equipment (PPE) to be donned.
15. Hazardous warnings such as confined space areas or ladders.
16. Specific location of each disconnect.
17. QR code linked to Brady Link360 for digital procedure retrieval using mobile device.
D. Contractor shall correct/re-perform any discrepancies found or integration errors found by COR before final acceptance of work.
E. Approved LOTO procedures shall be printed in full color and laminated using anti-UV 5mm lamination.
F. Final procedures shall be installed on or near equipment. In addition, a binder containing LOTO procedures shall be provided for each campus and tabulated by location and equipment type.
1.Equipment-specific aluminum energy source identification labels shall be placed that identify the lockout point and contain the following: equipment name, energy type, energy icon, energy magnitude, and VA logo. Labels shall be installed using aircraft stainless steel safety wire when attached to pipes and 3M double-sided tape on flat surfaces.
2.See section B.3.6 below for sample.
G. Contractor shall provide initial training on software, program, system, etc., for up to 15 personnel, delegated by COR, prior to final acceptance of work.
1.Training shall include ability to created new procedures for future equipment and updating existing procedures due to equipment modifications.
2.Training shall cover identifying energy sources and the data needed to write a lockout procedure.
3.Training shall include instructions on using the software program.
B.3.3 Schedule
A. Contractor shall provide a proposed performance schedule/checklist with their quote proposal. The schedule/checklist shall be in the form of a progress chart of suitable scale to indicate the work scheduled for completion by any given date during the work period.
The proposed schedule/checklist shall be reviewed by the COR. Any requirements for adjusting the schedule (e.g., to minimize disruption to the VA) shall be incorporated by the Contractor. No work shall be performed without 72 hours’ notice to the COR.
1. The following are Federal Holidays observed by the facility and the Contractor shall not expect access to the VA Facility of VA employees on these dates unless notified otherwise by the COR.
a) https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
B. The facility is a health care facility providing critical care 24 hours a day, as such, disruptions in operations are not feasible and will need to be coordinated closely with the COR. Electrical work requiring shutdown may not be feasible and work may have to be conducted live. All electrical work requiring an electrical shutdown will be conducted on weekends and/or outside of normal hours. Shutdowns will be minimized to as short of duration as possible. All shutdown requests will require detailed work plans and scheduling prior to approval. Work not requiring an electrical shutdown may take place during normal duty hours: Monday-Friday, 7:00am to 5:00pm. Requests to conduct work on weekends and outside of normal duty hours must be submitted in writing at least five
(5) working days in advance of the anticipated work to the COR. If this new schedule is agreed upon, work can begin. The original written request will remain with all test documents along with any written agreements relative to the original requests.
B.3.4 Contractor Qualifications
A. All work shall comply with OSHA Control of Hazardous Energy (Lockout/ Tagout) Standard, 29 Code of Federal Regulations (CFR) 1910.147.
B. Contractor employees shall perform work with a VA staff escort, photo ID will be required to sign-in as a visitor and then a temporary contractor badge will be provided.
C. All Contractor employees working on-site shall always wear their issued Contractor badge above the waist while on the VAMC campus’.
D. All Contractor employees working on-site shall have experience working on Energy Control Procedures.
B.3.5 Safety
A. At no time shall the fire alarm, nurse call, or other vital system be out of service. The contractor shall ensure they do not compromise any of these systems or other elements of the life safety system such as removal of a ceiling tile.
B. No tools or equipment shall be left unattended.
C. All work areas must be clean at the close of the day and shall be left in the same condition as before work started.
D. Contractor shall obtain all necessary New York State and Federal licenses and/or permits associated with this procurement. Contractor shall take all precautions necessary to protect persons and property from injury or damage.
B.3.6 Sample LOTO Procedures and Energy Source Labeling Requirements https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
| B.3 SCOPE OF WORK (SOW) |
| B.3.1 Summary |
| B.3.2 General |
| 1. Name of equipment and EE number if applicable. |
| 2. Location of equipment. |
| 3. Primary and secondary types of hazardous energy (electrical, steam, water, thermal, stored pressure, etc.) |
| 4. Magnitude of energy source (volts, psi, etc.) |
| 5. Specific location of each disconnects (north side, front side, etc.) |
| 6. Method of LOTO isolation techniques. |
| 7. Type of LOTO device required (padlock, clamshell, circuit breaker, lockout device, etc.) |
| 8. Verification step to ensure the LOTO was performed correctly. |
| 9. Photos of the isolation points for clear identification. |
| 10. Graphic illustrations of an overhead layout of the equipment, identifying the location of all primary and secondary energy source. |
| i. Graphic illustrations shall be printed on an aluminum sign base with a 6-ring binder attached to it housing the procedures. (See section B.3.6 below). |
| 11. Authorized department to perform LOTO procedures. |
| 12. Description of steps to restore equipment to service. |
| 13. The specific department required to be notified before shutdown and startup. |
| 14. Personal Protective Equipment (PPE) to be donned. |
| 15. Hazardous warnings such as confined space areas or ladders. |
| 16. Specific location of each disconnect. |
| 17. QR code linked to Brady Link360 for digital procedure retrieval using mobile device. |
| B.3.3 Schedule |
| A. Contractor shall provide a proposed performance schedule/checklist with their quote proposal. The schedule/checklist shall be in the form of a progress chart of suitable scale to indicate the work scheduled for completion by any given date during t... |
| 1. The following are Federal Holidays observed by the facility and the Contractor shall not expect access to the VA Facility of VA employees on these dates unless notified otherwise by the COR. |
| a) https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ |
| B. The facility is a health care facility providing critical care 24 hours a day, as such, disruptions in operations are not feasible and will need to be coordinated closely with the COR. Electrical work requiring shutdown may not be feasible and work... |
| B.3.5 Safety |