Final_RFB_785_2300000220_1_SO_FORM.PDF

PDF 552 KB Posted

Attached to
RFB-126-23 Mike Baker HP Drainage AMLRP Letcher Co 40 AG MA
Solicitation number
RFB-785-2300000220-3
Issued by
Letcher County, Kentucky

About this file

This document is a Solicitation (RFB 785 2300000220) issued by the Commonwealth of Kentucky for the Mike Baker HP Drainage AMLRP Letcher Co 40 AG MA project. The project involves addressing drainage issues caused by a clogged 30" diameter HDPE pipe, including cleaning out the pipe, removing sediment from the yard, installing a headwall and drop boxes on the pipe, and implementing silt control measures. The project site is located in Letcher County, Kentucky, and the solicitation has a closing date of October 25, 2022, at 10:30 AM. A site visit is scheduled for October 13, 2022, at 2:30 PM Eastern Time. The contract will be awarded to the successful bidder.

The solicitation does not provide specific pricing information. However, it outlines the various bid items, including earthwork, roadway stone, and a combination flex-a-mat ditch and subdrain. Funding for the project is from the Division of Abandoned Mine Lands, and contractors must submit their bids electronically through the Commonwealth of Kentucky's eCommunications system.

View the file

Other files

File Type Posted
Addendum Two.pdf PDF
Final_RFB_785_2300000220_3_SO_FORM.PDF PDF
Final_RFB_785_2300000220_2_SO_FORM.PDF PDF
Addendum One.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document ID: RFB 785 2300000220 Page: 1

Commonwealth of Kentucky

SOLICITATION

Modification: No Version #:

TITLE: RFB-126-23 Mike Baker HP Drainage AMLRP Letcher Co 40 AG MA

Date Issued:

10/06/2022 Record Date:

10/06/2022

Solicitation Closes Date:

10/25/2022 Time:

10:30

Solicitation No:

RFB 785 2300000220

Online Bidding Prohibited: Yes For Information Call:

Tammy Miller 502-782-6710

Bid Receiving Location:

Bid Receiving

See Terms & Conditions for Bid Submission Instructions

Other KY

Vendor Customer Number:

Vendor Name:

Phone Number:

Fax Number:

Email Address:

Ordering

Address:

City, State, Zip:

Contact Name:

Contact Email:

Contact Phone Number:

Payment

Address:

City, State, Zip:

Contact Name:

Contact Email:

Contact Phone Number:

Ownership Type

__ Sole Proprietorship __ Partnership __ Corporation __ Other_________________________

SIGNATURE OF AUTHORIZED AGENT IS REQUIRED UNLESS RESPONSE

IS SUBMITTED ELECTRONICALLY. FAILURE TO SIGN SHALL RENDER

THE BID INVALID.

Signature X_________________________________________ FEIN#____________________ Date____________

All offers subject to all terms and conditions contained in this solicitation.

Document ID: RFB 785 2300000220 Page: 2

Line Items

Commodity Group: Default Commodity Group

Line CL Description Quantity UOM Unit Cost Line Total or Contract Amnt

1 RFB-126-23 Mike Baker HP Drainage AMLRP Letcher Co 40 AG

Comm Code Comm Description Manufacturer Model # Manuf Part #

912 CONSTRUCTION SERVICES, GENERAL

(INCL. MAINTENANCE AND REPAIR

Extended Description 22AML017 - Mike Baker HP AML Reclamation Project Letcher County The project consist of a site that is experiencing drainage issues due to a clogged pipe. An off-site waste area will be used to receive excess material from the site.

Site Location: Latitude: 3711'1.85"N Longitude: 8242'13.19"W. It can be access traveling eastward 0.8 miles on highway 805 from Fleming-Neon, from the intersection highway 317 / 805. Site is on the right.

Site: Project involves a clogged 30" Dia. HDPE pipe, which in currently diverting surface drainage into the Baker side yard, and home. Pipe cleaned out bid item is included and yard area will have sediment removed from the yard; this work will be done under the Earthwork Lump Sum bid item. Also, a headwall will be installed on the inlet end of the existing pipes, and two drop boxes will be installed in the existing 30" Dia. HDPE thereby breaking it into 3 segments. This will provide for better long-term maintenance and increased drainage control in the yard. Silt Control Fence will be installed to prevent sediment from leaving the site during construction activities. Residential seeding is included to reseed the yard area. Site prep is setup as well to prep the yard for reseeding. Dense Grade is included to backfill around the existing pipe/headwall/drop box as needed. Roadway stone is included if needed for access. A combination flex-a-mat ditch and subdrain is included to eliminate sub surface saturation.

Waste Area: The waste area is a previously disturbed area, that is currently being used as a waste area for flood cleanup.

Shipping Information Division of Abandoned Mine Lands Travis Trent 300 Sower Blvd, 2nd Floor

Frankfort KY 40601

Billing Information Division of Abandoned Mine Lands Travis Trent 300 Sower Blvd, 2nd Floor

Frankfort KY 40601

Document ID: RFB 785 2300000220 Page: 3

Submission Checklist

The following items will be required to be submitted with bid:

Item

There will be a site visit meeting on this project. Interested contractors are encouraged to attend. The site visit will be held on 10/13/2022 at 2:30 P.M. Eastern Time. Bob Jones with The Division of Abandoned Mine Lands will meet contractors at ON SITE- 3750 HWY 805 Neon KY 41840 Coordinates: 37°11'1.85"N 82°42'13.19"W.

Please follow current state COVID guidelines for all Commonwealth of Kentucky construction projects. See Notice to Contractors/Advertisement for Bids for further COVID information.

Bob Jones, Division of Abandoned Mine Lands, Phone: (502) 782-2599, bob.jones@ky.gov

Susan Ward, Division of Contract Administration, Phone: (502) 226-0335, Susan.Ward@ky.gov https://www.stateofkyplanroom.com .

For customer service you may contact Lynn Imaging, Phone:

1-800-888-0693. There is no charge for plans and specifications.

Contractors will need to download bid documents, specifications and drawings. If contractors want a hard copy, they can choose to pay for this option. Contractors that receive plans and specifications from other sources as a planholder and

. . For all other project information you must visit the State Plan Room.

Document Description Page 4

2300000220 RFB-126-23 Mike Baker HP Drainage AMLRP Letcher Co 40 AG MA mailto:SUSAN.WARD@KY.GOV mailto:bob.jones@ky.gov mailto:Susan.Ward@ky.gov https://www.stateofkyplanroom.com

All documents related to this project shall be submitted, transmitted, transferred, reviewed, approved or rejected, and/or otherwise processed using the Owner's Document Collaboration System ( eCommunications) which is the Owner's web-based document collaboration system that shall be used by all project participants. No submission, transmittal, transfer, review, approval or processing shall be deemed Official without the use of this system.

It is important that requesting firms identify the position of their firm as to the PRIME BIDDER, MISC. SUBCONTRACTOR, MATERIAL

SUPPLIER OR OTHER.

to the Bush Building. All forms in your bid document shall be completely filled out when your bid is submitted.

Instructions are included in the solicitation.

I

Bidders are encouraged to take a screen shot verifying bid submittal. This is a secure website, no one can see these bids but the buyers. They are date and time stamped when submitted.

Please note that the instructions for MOVEit state that contractors will be notified when their bid is received. Buyers will NOT be notifying contractors.

All results will be posted to Lynn Imaging planroom after the bid opening and review. If additional information is needed from the

Document Description Page 5

2300000220 RFB-126-23 Mike Baker HP Drainage AMLRP Letcher Co 40 AG MA successful bidder the buyer will be in contact.

THE

UPLOAD TIME MAY VARY DUE TO THE SIZE OF YOUR BID/PROPOSAL

AND/OR INTERNET SPEED. NO LATE BIDS WILL BE ACCEPTED.

Bidder assumes full responsibility for timely delivery of the bid in compliance with the above described procedures and conditions.

Bidder assumes full responsibility for timely delivery of the bid in compliance with the above described procedures and conditions.

Document Description Page 6

2300000220 RFB-126-23 Mike Baker HP Drainage AMLRP Letcher Co 40 AG MA

File details come from the government source that posted it. Updated .