Final Presentation.pdf

PDF 1 MB Posted

Attached to
J. Percy Priest Arc Flash Mitigation Federal contract opportunity
Solicitation number
W912P520B0011
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

About this file

This document provides details for a federal solicitation seeking arc flash mitigation services at the J. Percy Priest hydroelectric project. The solicitation was posted on August 10, 2020 by the U.S. Army Corps of Engineers Nashville District for removal and replacement of 480-volt equipment and unit auxiliary motor control centers. Questions are due by August 25, 2020 with proposals due on September 10, 2020. The work will take place at the J. Percy Priest Dam and involves field verification, removal of existing equipment, installation of new motor control centers and cabling, and testing. The NAICS code is 238210 for electric contractors with a small business size standard of $16.5 million. The basis for award will be lowest price from a technically acceptable offer.

The document outlines project background information on the J. Percy Priest facility, site logistics, performance requirements, and contact information. Specifications are provided in sections covering general conditions, automation, electrical, and power generation. The contractor must register in SAM and have representations and certifications completed. This is a 100% total small business set-aside with a firm fixed price construction contract type.

View the file

Other files for this federal contract opportunity

Other files attached to J. Percy Priest Arc Flash Mitigation, newest first.
File Type Posted
Bid Abstract.pdf PDF
W912P520B0011-0002 Amendment.pdf PDF
W912P520B0011-0001 Amendment.pdf PDF
Site Visit List beta.SAM.xlsx XLSX spreadsheet
Site Visit Agenda.pdf PDF
W912P520B0011 Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING STRONG®

UNCLASSIFIED//FOUO

UNCLASSIFIED//FOUO

Release of Information:

The contractor shall not make publicly disclose information contained herein.

Any inquiry received by the contractor for information concerning work performed under this contract and contract process shall be referred to the

Government for evaluation under the Freedom of Information Act of 1975, Public Law 93-502, 5 U.S.C., Section 552. The determination of whether this information will be released will remain with the Government. The contractor shall assist the COR in compiling information or records for submission upon request by the government. Reports, data and information generated under this contract shall become the property of the Government and distribution to any other source by the contractor, unless authorized is prohibited.

UNCLASSIFIED//FOUO

Joint Percy Priest (JPP) Arc Flash Mitigation PROJECT

USACE NASHVILLE DISTRICT

Solicitation # W912P520B0011

Virtual Site Visit MEETING

Date: 08/18/2020

Start Time: 0900 Central Time

Web Conference URL: https://www.webmeeting.att.com

Dial-in Number: 844-291-6362

Access Code: 3431425

Allen Steele: Hydropower Cadre

Jason (Jake) Kennedy / Kellen Cole: Operations POC’s

Eugenia (Genia) Corder: Contracting Officer

Reid Drewes: Contract Specialist

Jamie Nabakowski: Contracting Officer Representative (COR)

Emory Perkins Jr: Quality Assurance Representative (QAR) https://www.webmeeting.att.com/

UNCLASSIFIED//FOUO

Contract Clauses and Contract Issues

Contract Specialist: Reid Drewes

Contracting Officer: Eugenia Corder

This acquisition is for 100% Total Small Business.

Type of contract: Firm Fixed Price Construction Contract

NAICS code: The NAICS code for this project is 238210, entitled “Electric

Contractors and Other Wiring Installation Contractors”, which has a Small

Business Administration (SBA) Size Standard of $16,500,000.

UNCLASSIFIED//FOUO

Contract Clauses and Contract Issues, Cont.

Basis of Selection of Award: This is an invitation for bid

Questions are due no later than 25 August 2020 at 10:00 AM Central Time

Proposals are Due on 10 September 2020 at 10:00 AM Central Time.

UNCLASSIFIED//FOUO

Contract Clauses and Contract Issues, Cont.

SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION:

Contractors must be registered in the System for Award Management (SAM) database (www.sam.gov) to receive an award. Contractors shall have representations and certifications completed in SAM OR provide completed representation and certification applicable provisions as listed in 52.204-8 of this solicitation.

For SAM Customer Service contact:

Federal Service Desk URL: https://www.fsd.gov/fsd-gov/home.do

Hours: 8am - 8pm Eastern Time

US Calls: (866) 606-8220

International Calls: (334) 206-7828 https://www.fsd.gov/fsd-gov/home.do

UNCLASSIFIED//FOUO

Contract Clauses and Contract Issues, Cont.

We will address any questions to the best of our ability, however anything said today is not official unless it is in writing in the issued amendment to this solicitation. Questions shall be in writing and sent to Reid Drewes at email address Reid.A.Drewes@usace.army.mil no later than 25 August 2020 at

10:00 AM Central Time. Questions received after this deadline will not be addressed. If there is a discrepancy between what is said here today and what is written in the solicitation, the document governs.

► An amendment will be posted with the information and questions from today’s meeting.

UNCLASSIFIED//FOUO

Field verify all the equipment connections, wiring, and all other features of the existing 480 Volt Equipment and 480 Volt Unit Auxiliary motor control centers.

Remove existing and provide a new 480 Volt Equipment motor control center.

Remove existing and provide a new 480 Volt Unit Auxiliary motor control center.

Provide optional Solid-state overload relays, communications, and draw-out unit test provisions for each motor control center.

All cabling associated with the motor control centers shall be replaced to the first point of termination outside of the motor control centers.

Provide temporary power for the critical loads fed by equipment being replaced.

CONTRACT SCOPE

UNCLASSIFIED//FOUO

CONTRACT DOCUMENTS

https://beta.sam.gov

Solicitation W912P520B0011 was posted on 10 August 2020

W912P520B0011 Solicitation.pdf

W912P520B0011 Tplans.pdf

W912P520B0011 Tspecs.pdf

TECHNICAL SPECIFICATIONS

Division 01 – General Requirements

Division 25 – Integrated Automation

Division 26 – Electrical

Division 48 – Electrical Power Generation

Solicitation Document

NOTE: PARTIAL PAYMENTS ARE AUTHORIZED

https://beta.sam.gov/opp/4b80fc9224b741f28a67a3aba0eca19a/view?keywords=W912P519R0004&sort=-relevance&index=opp&is_active=true&page=1 https://beta.sam.gov/

UNCLASSIFIED//FOUO

PROJECT BACKGROUND

The J. Percy Priest Project was authorized by the Flood Control Act of 1946 under the title “Stewarts Ferry Reservoir”. Construction of the J. Percy Priest Dam Project began in

June of 1963 and was completed in 1968.

The project is located at mile 6.8 on the

Stones River which flows into the

Cumberland River at mile 205.8, approximately 15 miles upstream of downtown Nashville, TN. The geographical area in which the project is to be performed is located at 3736 Bell Rd. Nashville, TN

37214-2660.

The dam is 2,716 feet long and 130 feet high and consists of concrete-gravity power plant and spillway section along with a rolled earth embankment.

There are 17 Corps operated recreation areas (including three campgrounds), five marinas, a state park, a water park, and two group camps on J. Percy Priest Lake.

UNCLASSIFIED//FOUO

Access Road Gate

JPP ARC Flash Project Site Location

UNCLASSIFIED//FOUO

Craine Equipment Entrance Location (Approx 20ft Above Project Site Location)

Approx. 10ft Clearance

Mobilization Site Location / Equipment Staging Area

Stairwell Access (Approx. 31 stairs)Bay Area Entrance Door

Line of Sight Location

Cable Trays 480v ARC Flash

UNCLASSIFIED//FOUO

Crane and operator will be provided by USACE LRN District. The Contractor shall be responsible for the availability of utilities for use on the project. Raw water is available with no charge at the site. The contractor shall supply any other utilities needed at his cost. The Contractor shall carefully conserve any utilities furnished without charge. This includes restroom and hand-washing stations at mobilization site location. The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines. Before final acceptance of the work by the Government, the

Contractor shall remove all the temporary connections, distribution lines, and associated paraphernalia.

Demolition and removal of the existing 480v equipment MCC and installation of the new 480v equipment MCC.

Acceptance testing of the new 480v MCC’s

Demolition and removal of the existing 480v MCC’s

Installment of the new 480v MCC’s

Final acceptance testing of the new 480v MCC’s

Overall Technical Summary

UNCLASSIFIED//FOUO

Section 1.2 Identifies work and deliveries, Period of Performance (PoP), and point of contact information.

paragraph 1.2 Coordination Conferences:

Routine coordination conferences will be scheduled by the Contracting Officer (KO) throughout the life of this project.

paragraph 1.3 Submittals:

Government approval is required for submittals with a “G” designation.

paragraph 1.4 Contractor’s Staging Area:

The contractor will be assigned an area within or near the project site for use as a staging area.

The building of structures, the erection of tents or other forms of protection point of protection will be permitted only at such places as the Government shall approve, and the sanitary conditions of the grounds in or about such structures shall at times be maintained in a satisfactory manner.

paragraph 1.5 Daily Cleanup and disposal:

The existing facilities shall be protected whether or not shown on the drawings. Upon completion of the work, existing facilities, not included as a portion of the work, shall be left in a condition equal to the original condition prior to the contract. The point of contact for material deliveries and mobilization will be Jake Kennedy at 615-824-5820.

Specifications Onsite Performance

UNCLASSIFIED//FOUO

Questions

Questions must be submitted by email to Reid Drewes at

Reid.A.Drewes@usace.army.mil.

Questions are Due by Tuesday 25 August 2020 at 10:00

AM Central Time.

mailto:Reid.A.Drewes@usace.army.mil