FINAL glac01046_Plans.pdf
PDF 12 MB Posted
- Solicitation number
- 69056720B000026
About this file
This solicitation is for construction of a vault toilet at Big Bend in Montana. The Department of Transportation Federal Highway Administration is seeking bids for the MT PRA GLAC 10(46) GTSR project under solicitation number 69056720B000026. Interested parties should review the FINAL_Plans.pdf file for specifications. Bids are due by the date listed on SAM.gov and the contract will be awarded to the responsible bidder offering the lowest price technically acceptable proposal. The project involves building a new vault toilet to improve facilities for visitors to the Big Bend area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary_Big Bend Vault Toilet Construction.pdf | ||
| Amendment A002.pdf | ||
| Amendment A001.pdf | ||
| Sol - IFB B07C3595_r10-21-2020.pdf | ||
| QA_10-21-2020.pdf | ||
| GM 38-20 Big Bend Toilet.pdf | ||
| glac01046_SurveyControl.xlsx | XLSX spreadsheet | |
| Sol - IFB B07C3595.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRENT L COE Digitally signed by BRENT L COE Date: 2020.08.28 09:05:43 -07'00'
Sheet and Description
SECTION C SECTION D SECTION E SECTION F
BIG BEND
VAULT
TOILET
ST MARY FALLS
TURNOUT VAULT
TOILET
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 25210-0000 ROCKERY SQFT 640 10 650
A0140 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 10
A0160 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 18-INCH WIDTH HOUR 10
A0180 62301-0000 GENERAL LABOR HOUR 20
A0200 63302-0000 SIGN SYSTEM SQFT 16 16
A0220 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE) LNFT 1,400 50 1,450
A0240 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY
SYMBOL EACH 1 1
A0260 63501-0000 TEMPORARY TRAFFIC CONTROL (ST MARY FALLS
TURNOUT VAULT TOILET) LPSM All ALL
A0280 63501-0000 TEMPORARY TRAFFIC CONTROL (BIG BEND VAULT
TOILET) LPSM All ALL
A0300 64605-0000 FIXTURE (VAULT TOILET) LPSM All ALL
A0320 67001-0000 PROJECT LUMP SUM (VAULT TOILET) LPSM All ALL
MileStone: Signoff Date Completed: In Progress Report Date: 08/11/20
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-A ug
-2
4:
P
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
F:
\h ig hw ay s\
FH
W
A\
_g la c0
_G
TS
R _R oa d\
Es tim at e\
PS
E S ig no ff \B ig B en d\ [g la c0
_S ec tio nB
.x ls m ]S he et
STATE PROJECT
B.1PRA GLAC 10(46)MT
SHEET
NUMBER
NPS Drwg. No. GLAC 117 170507
N
CL
PL
CL CL
C L
CL CL
CL
PL
CL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
CL
GPK FILE DATED :
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
526 1659377.520 948003.064 5684.688 1.
527 1659952.073 949351.910 5774.623
528 1658829.117 949460.456 5848.829
529 1658260.088 949329.406 5884.583
23130 1639296.980 976795.320 4735.969
23132 1639458.911 978087.152 4730.023
PROJECT : GTSR - BIG BEND VAULT TOILET CONSTRUCTION
DATE OF FIELD WORK :
DATE OF FINAL ADJUSTMENT :
PROJECT UNITS : INTERNATIONAL FEET
COORDINATE SYSTEM : SPCS NAD83; MONTANA (2500)
EPOCH DATE :
VERTICAL DATUM : NAVD88
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
F:
\h ig hw ay s\
FH
W
A\
_g la c0
_G
TS
R _R oa d\
D es ig n\
M ap pi ng a nd
5-
A ug
-2
2:
P
M B
Th om ps on
8/
J.
K ey
8/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
C.26
SHEET
NUMBER
PRA GLAC 10(46)MT
NPS Drwg. No. 117 170507
SURVEY CONTROL
| Sheets |
| C.2 - SITE PLAN ENLARGED |
| C.3 - SITE PLAN |
| C.4 - STANDARDS |
| C.5 - GENERAL STRUCTURAL NOTES |
| C.6 - FOUNDATION PLAN |
| C.7 - FOUNDATION SLAB REINF. PLANS |
| C.8 - MAIN LEVEL FRAMING PLAN |
| C.9 - ROOF FRAMING PLAN |
| C.10 - WEST ELEVATION VIEW |
| C.11 - NORTH/SOUTH ELEVATION VIEWS |
| C.12 - BUILDING SECTION |
| C.13 - PRECAST WALL PANEL ELEVATIONS |
| C.14 - STANDARD CONCRETE DETAILS |
| C.15 - STANDARD CONCRETE DETAILS |
| C.16 - FOUNDATION DETAILS |
| C.17 - FOUNDATION DETAILS |
| C.18 - PRECAST FRAMING DETAILS |
| C.19 - PRECAST FRAMING DETAILS |
| C.20 - PRECAST FRAMING DETAILS |
| C.21 - VAULT DETAILS |
| C.22 - ROCKERY RETAINING WALL DETAIL |
| C.23 - ELECTRICAL PLANS |
| C.24 - SITE DETAILS |
| C.25 - SITE DETAILS |
File details come from the government source that posted it. Updated .