QA_10-21-2020.pdf
PDF 99 KB Posted
- Solicitation number
- 69056720B000026
About this file
This document contains answers to technical questions regarding federal solicitation number 69056720B000026 for vault toilet construction at Big Bend issued by the Department of Transportation Federal Highway Administration. The questions and answers clarify requirements for excavation depths around the vault location, address whether bedrock will be considered a changed condition given geotechnical survey limitations, and specify slope stabilization and restoration standards. Bidders are directed to perform their own site visits and review all solicitation documents and plans to fully understand existing site conditions and contractual obligations prior to bid submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary_Big Bend Vault Toilet Construction.pdf | ||
| Amendment A002.pdf | ||
| Amendment A001.pdf | ||
| Sol - IFB B07C3595_r10-21-2020.pdf | ||
| FINAL glac01046_Plans.pdf | ||
| GM 38-20 Big Bend Toilet.pdf | ||
| glac01046_SurveyControl.xlsx | XLSX spreadsheet | |
| Sol - IFB B07C3595.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT PRA GLAC 10(46)
GTSR ‐Big Bend Vault Toilet Construction
# General Technical Question Answer Date
1 X
This solicitation has various references to a vault at St. Mary Falls Turn Out. Bid item A0260 requires traffic control at that location. Will all references to “St. Mary Falls Turn Out” be removed from this solicitation.
No. 10/21/20
2 X
What is the correct estimated price range for this project? The presolicitation says the estimated price range is less than $500,000, and the solicitation says the estimated price range is between $500,000 and $1,000,000.
The Presolicitation Information for this project that’s shown on beta.sam is only a preliminary notification of upcoming contract work. Submit bids according to the Solicitation Information for this project.
10/21/20
3 X
From the preliminary drawings, it looks like we would be required to excavate about 8’ feet below existing pavement 40 feet north of the road.
The Plans posted under the Presolicitation Information for this project that’s shown on beta.sam is only preliminary to give bidders an idea of the upcoming contract work.
Submit bids according to the Plans posted under the Solicitation Information for this project.
10/21/20
4 X
It looks like we would be required to excavate about 8’ feet below existing pavement 40 feet north of the road. The bore pits do not appear to extend into the steep slope sufficiently to determine if bedrock is likely at the depth required for the vault installation. Will bedrock excavation in that area be considered an unforeseen or changed condition as the bore pits do not cover the entire excavation zone?
The Geotechnical physical data presents the existing conditions observed based on the scope of the investigation performed.
Perform a site visit to evaluate the geotechnical information presented, and the existing site conditions.
10/21/20
Check General or Technical
5 X
What slope stabilization and restoration will be required in the slope area above the “Rockery Wall”? The plans show a 2/1 slope which exceeds OSHA standards without shoring. The excavation at the edge of the footing could be in excess of 26’ deep when you take into account the overburden of the sloping hillside. This could result in a massive upslope excavation.
Please clarify the requirements.
Perform work according to FP‐14 Section
252. Also see FP‐14 Subsection 209.01, and conform to the requirements of FP‐14 Section 209 for excavating and backfilling behind the rockery.