Final Feasibility Study Addendum.pdf
PDF 5 MB Posted
- Solicitation number
- 25001
- Issued by
- Bristol County, Rhode Island
About this file
This document is a feasibility study addendum prepared by Gale Associates, Inc. for the Barrington Public Schools (BPS) regarding the Barrington High School Stadium Field renovations. The study updates a previous feasibility report from 2015 and provides a comprehensive review of potential improvements to the stadium field and track facility. The proposed project involves expanding the field and track radius from 97' to 118', adding a centerfield logo, incorporating men's and women's lacrosse striping, removing one sandpit and pole vault runway, and modifying the overall field layout to meet National Federation of State High School Associations (NFHS) and Rhode Island Interscholastic League (RIIL) guidelines.
The conceptual cost estimate for the project is approximately $4.6 million, with a recommended contingency fund of 25% due to ongoing cost increases in the athletic facilities construction industry. The project site is located entirely within the 100-year FEMA floodplain of the Barrington River and a Natural Heritage Area, which will require careful consideration of earthwork and potential approvals from the Rhode Island Department of Environmental Management (RIDEM). The proposed improvements include synthetic turf construction, track resurfacing, drainage improvements, fencing, safety netting, athletic lighting upgrades, and site amenities. The design also accounts for fire safety requirements and maintains proximity to existing structures while addressing potential zoning considerations, such as the need for a variance for athletic lighting that may exceed the 35-foot height restriction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| #25001 Design Plans and Engineering for an Athletic Complex and Track.pdf | ||
| Q_A RFP #250001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gale Associates, Inc.
300 Ledgewood Place | Suite 300 | Rockland, MA 02370 P 781.335.6465 F 781.335.6467 www.galeassociates.com
Addendum to Barrington High School Stadium Field Renovations Feasibility Study Barrington, RI
M a y 2 8 , 2 0 2 4
Section 1.0 Additions to Existing Feasibility Study
Section 2.0 Conceptual Plan
Enclosure 1 – Facility Evaluations Enclosure 2 – 100-Year FEMA Floodplain Map Enclosure 3 – National Heritage Area Map Enclosure 4 – Conceptual Plan Enclosure 5 – Conceptual Plan Cost Estimate
Gale JN 716591 table of contents enclosures
SECTION 1.0 – ADDITIONS TO EXISTING FEASIBILITY STUDY
Gale Associates, Inc. (Gale) was engaged by Barrington Public Schools (BPS) to assist with updating the Stadium Field Feasibility Study for Barrington High School (BHS). The original Feasibility Study was completed by Gale in 2015. Gale completed a site visit on April 9th, 2024, to update the facility evaluations as shown in Enclosure 1. Certain upgrades have been completed by BHS since the original Feasibility Study improvement recommendations were made including the addition of an access drive off Federal Road, and restriping of the track.
Gale confirmed the site remains entirely within the 100-year FEMA floodplain (Enclosure 2) of the Barrington River as noted in the original Feasibility Study. The Barrington River is a tidal water body, which connects directly with the Providence River and Narragansett Bay to the south. Work within a floodplain requires incremental flood storage, by law, on a one-to-one basis. This is to prevent any net displacement of flood storage within the floodplain and will require careful consideration of earthwork (cutting and filling) proposed for the improvements. Also, according to the Rhode Island Geographic Information System (RIGIS) the site also lies within a Natural Heritage Area (Enclosure 3). Due to this, approval from the Rhode Island Department of Environmental Management (RIDEM) and a Notice of Intent (NOI) may be required upon further design. No other resource areas appear to be impacted by any of the proposed improvements, however because the site is within the floodplain it is under RIDIM freshwater jurisdiction. Although it is our understanding that the field has not flooded, should it flood with salt water from the Barrington River, rinsing with freshwater should be adequate. BrockFill, the alternate infill currently proposed, absorbs water and gains weight therefore making it less prone to float and migrate. In addition, the Rhode Island Pollutant Discharge Elimination System (RIPDES) General Construction Permit may also be required for stormwater discharge associated with construction activity. This permit would include a Stormwater Management Plan, Soil Erosion and Sedimentation Control (SESC) Plan, and a Post Construction Operation and Maintenance Plan.
Barrington High School lies within the Open Space – Active Recreation District (OS-A).
According to the Barrington Zoning Ordinance, the maximum height for a principal structure is 35 feet. Therefore, a variance from the Zoning Board of Review may be required for the installation of new athletic lighting which usually rises 70-80 feet in height.
SECTION 2.0 – CONCEPTUAL PLAN
Based on the site evaluation and discussion with George Finn, the Athletic Director, Gale refined the Conceptual Plan to reflect the current uses of the Stadium Field at Barrington High School (Enclosure 4). Plan revisions include the addition of a centerfield logo and tufted men’s and women’s lacrosse striping. Other revisions include the removal of one sandpit, one pole vault runway, and one pole vault pad. Due to the proposed expansion to widen the field and track radius from 97’ to 118’, it should be noted the impacts to the width of the JV Baseball field and dugout near first base. At the suggestion of the Athletic Director, Gale considered the idea of switching the location of the JV Baseball field with the
Softball field to eliminate the impacts to the JV Baseball first base dugout and proximity to the track. However, after assessing the available area due to the constraints of the property line, sidewalk along Federal Road, access drive off Federal Road, and the minimum required outfield distance, it would not be feasible to move the JV Baseball to the existing location of the Softball field. The Stadium Field has been shifted to accommodate a 20’ clearance between the building and the track to account for fire safety. Any future phases of design should revisit this to confirm the exact location of the track and suitable distance from the building. The proposed field dimensions will meet the recommended National Federation of State High School Associations (NFHS) and Rhode Island Interscholastic League (RIIL) guidelines for football, soccer, men’s lacrosse, and women’s lacrosse. If desired, the proposed field layout could also accommodate NFHS and RIIL field hockey recommendations. To account for the loss of storage behind the grandstand bleachers due to the proposed modifications, an additional storage shed has been proposed.
The conceptual cost estimate was updated to include the additional scope and to reflect the increase in unit prices in the athletic facilities construction industry today. The estimated construction cost is approximately $4.6 million (Enclosure 5). Note that the cost estimate provided in this report is based on the updated conceptual plan and is for initial planning purposes. Conceptual cost estimates are subject to change upon completion of a detailed site investigation and final design. ENG/CPS Services capture the design efforts and are estimated at ten percent (10%) of the total construction costs. Additionally, due to the conceptual level of the cost estimate BPS should plan for a contingency fund, recommended at twenty-five percent (25%) of the total construction cost for each project due to the ongoing cost increases Gale has observed through the athletic facilities industry.
G:\716591\01 Evaluation\report\Feasibility Study Addendum.doc
ENCLOSURE 1
FACILITY EVALUATIONS
Summary Form Barrington High School Stadium Field 2.6
220 Lincoln Ave, Barrington, RI 02806
5.3 Acres
4/9/2024
Facility Type and Grades: Grading Legend
2.40 1 = Poor
2.56 2 = Fair
2.80 3 = Good
- 4 = Excellent
2.59
Site Inventory:
X
X X X
General Site Conditions:
N/A Fair (2)
Good (3)
Excellent (4)
X
X
X
X
X
RECOMMENDATIONS:
1. See individual facility recommendations.
Date of Evaluation:
Score
2.4
Tennis Courts Lighting Designated Parking
Average Score =
Safety and Security (site lighting, fencing, play surfacing/structures, etc.)
Appearance (Welcoming entrance, landscaping/natural surface, special element, e.g. spray park, social gathering space, etc.)
General Accessibility (condition of walkways, legibility of signage, clarity of rules, trip hazards, bike corrals)
ADA Compliance (walkways, ramps at appropriate grades, ADA Parking, gates restrooms and equipment accessible)
Equipment & Serviceability (furnishings, play structures, water fountain, buildings, restrooms, furnishings, trash and recycling bins, sports equipment, site drainage, athletic lighting.
Poor (1)
Overall Grade:
Playground
Community Garden Open Space
Dog Park (Off-Leash)
General Site Conditions
Hard Courts Baseball/Softball Field
Multi-Purpose Rectangular Field
Skate Park
Average Score
Rectangular Field
Address:
General Description:
Size:
Barrington High School Stadium Field consists of a multipurpose rectanglar (MPR) natural turf field with a 6-lane running track.
Open Space
Table and Chairs
Track
Dog Park (On-Leash)Baseball / Softball Field Pool Dog Valet
Community Garden Spray Park
Restrooms / Porta Potty Playground
Bike Parking Monument
Basketball Court Building/Structure
Athletic Field Evaluation Form Barrington High School Stadium Field 2.6
Length:
360'
N/A Poor (1)
Fair (2)
Good (3)
Excellent (4)
X
X
X
X
X
X
X
X
X
X
X
X
160' 16'
Field Grade:
Date of Evaluation 4/9/2024 Type of Field: Multi-Purpose Rectangular (MPR) Number of Fields: 1 Typical age of users: High School MPR Field Dimensions: Width Run-Out
Average Score = 2.6
Planarity (playing surface - lack of dips, heaves, holes, etc.)
Striping (Completeness, visibility, condition)
Fencing (Perimeter fencing, gates, etc.)
Irrigation (condition, coverage, reported adequacy)
Safety (Run-outs, lack of obstructions, etc.).
Support Equipment (goals, players benches, etc.)
Athletic Lighting (reported adequacy, lack of spill / glare, general condition, etc.)
Site Lighting
Spectator Seating (condition, size, accessibility, etc.)
Drainage
Geometry
Stand of Turf
Comments
4. MUSCO Athletic lighting in good condition however it is an old system installed in 1995.
9. Short safety run-out widths for soccer and lacrosse.
5. Scoreboard fairly new and in good condition. 10. Long/triple jump and pole vault runways in poor condition.
1. Barrington High School stated slight drainage issues at the northwest D area of the field.
6. Natural turf field does not fit regulation soccer and lacrosse.
2. Barrington High School stated pole vault pad sits on the natural turf effecting the longevity of the pad.
7. Natural turf in fair condition with multiple overused spots and ruts.
3. Stadium bleachers in good conditon with minor upgrades since installed in 1995.
8. Uneven natural turf field in areas of seeding and turf blanket protection.
Athletic Field Evaluation Form Barrington High School Running Track 2.8
N/A Poor (1)
Fair (2)
Good (3)
Excellent (4)
X
X
X
X
X
X
X
X
X
X
X
X
Number of Running Lanes:
RadiusStraigthaway
Width of Running Lanes:
Type of Surfacing:
3.5'
Polyurethane
Length of Track Straightaway: 263'
2. Overall fair condition with multiple patches and wear along the outer edge of the track surface.
1. Track has recently been restriped.
Fencing
Safety (Run-outs, lack of obstructions, etc.).
Support Equipment (hurtles, high jump, etc.)
Athletic Lighting (reported adequacy, lack of spill / glare, general condition, etc.)
Site Lighting
Spectator Seating (condition, size, accessibility, etc.)
Drainage (trench drain, slot drain, etc.)
Average Score = 2.8
Comments
Site Amenities (restrooms, entrance area, ticket booth, etc.)
Geometry / Solar Orientation
Condition of Structure (cracks, depressions, etc.)
Striping (Completeness, visibility, condition)
Condition of Surfacing (wear and tear, patches etc.)
Field Grade:
Date of Evaluation 4/9/2024
Original Construction Date:
Last Resurfacing Date:
Approximate Track Radius: 97'
Site Photos Barrington High School Feasibility Study Update April 9, 2024
STADIUM FIELD
Photo 1: Stadium field playing surface. Photo 2: View of overused playing surface.
Photo 3: Scoreboard in good condition. Photo 4: Stadium field fencing overall in good condition with some disrepair.
Photo 5: View of worn spots in the field playing surface.
Photo 6: View of spectator seating, press box, filming tower and athletic lighting in good condition.
Site Photos Barrington High School Feasibility Study Update April 9, 2024
STADIUM FIELD - RUNNING TRACK
Photo 1: View of worn track surfacing. Photo 2: View of wear and tear and patches in pole vault runway.
Photo 3: Long/Triple jump sand pit in fair condition with uneven abutting field.
Photo 4: View of the storage space under the grandstand.
Photo 5: View of close proximity of the track to the building.
Photo 6: Running track overall in fair condition with multiple patches and uneven surface with abutting field.
ENCLOSURE 2
100-YEAR FEMA FLOODPLAIN MAP
National Flood Hazard Layer FIRMette
0 500 1,000 1,500 2,000250 Feet
Ü
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE) Zone A, V, A99
With BFE or DepthZone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mileZone X
Future Conditions 1% Annual Chance Flood HazardZone X
Area with Reduced Flood Risk due to Levee. See Notes.Zone X
Area with Flood Risk due to LeveeZone D
NO SCREENArea of Minimal Flood HazardZone X
Area of Undetermined Flood HazardZone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline Profile Baseline Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap accuracy standards
The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 4/9/2024 at 3:14 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time.
This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
B 20.2
The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location.
1:6,000
71°19'34"W 41°45'2"N
71°18'57"W 41°44'35"N
Basemap Imagery Source: USGS National Map 2023
ENCLOSURE 3
NATURAL HERITAGE AREA MAP
Records: 217
Natural Heritage Areas (2023)
City of East Providence, MassGIS, Esri, HERE, Garmin, GeoTechnologies, Inc., USGS, EPA | Rhode Island Department… Powered by Esri
Legend
Menu
4/25/24, 11:08 AM Natural Heritage Areas (2023) | Natural Heritage Areas (2023) | RIGIS https://www.rigis.org/datasets/6fb8a82288324a68ba5b1856806ddfe7_0/explore?location=41.747642%2C-71.315418%2C17.14 1/2
Barrington High School http://www.esri.com/ https://www.rigis.org/
ENCLOSURE 4
CONCEPTUAL PLAN
UNDER BLEACHER FENCE AND GATE (TYP. OF 2)
UNDER BLEACHER WALK
FINISH LINE
8' BITUMINOUS WALK
10' X 30' STORAGE SHED
16' WIDE ORNAMENTAL DOUBLE GATE
AND STONE ENTRY COLUMNS (TYP. OF 2)
NEW ASPHALT PAVEMENT HIGH JUMP AREA
POLE VAULT RUNWAY
POLE VAULT LANDING
20' BALL SAFETY NETTING
40' BALL SAFETY NETTING
RECONSTRUCTED CHAIN LINK
DUGOUT (8' X 24')
20' BALL SAFETY NETTING
FOOTBALL/SOCCER COMBINATION
GOAL(TYP. OF 2)
LONG JUMP/TRIPLE JUMP
RUNWAY
LONG JUMP/TRIPLE JUMP
SAND PIT EXISTING JV BASEBALL BACKSTOP
CENTERFIELD LOGO
GREEN MULTI-PURPOSE
SYNTHETIC TURF FIELD
210' X 360' SOCCER
190' X 360' WOMEN'S LACROSSE
180' X 330' MEN'S LACROSSE
160' X 360' FOOTBALL
MOVE EXISTING
ATHLETIC LIGHTING (TYP. OF 2)
EXISTING AMENITIES BUILDING AND PRESS BOX
EXISTING BITUMINOUS DRIVE
12' DOUBLE SWING GATE (TYP. OF 4)
TRACK FENCING TO COINCIDE WITH FACE OF BLEACHER
MODIFIED BLEACHERS (VOMITORY STAIRS TYP. OF 2)
100M START
110M START
EXISTING GRAVEL PATH
ATHLETIC LIGHTING TO
REMAIN (TYP. OF 2)
R118
EGRESS STAIRS AT END
EXISTING WALKWAY
C
1 2
A
B
3 4 5 6
D
E
This drawing and the design and construction features disclosed are proprietary to Gale Associates, Inc. and shall not be altered or reused in whole or part without the express written permission of
Gale Associates, Inc. Copyright©2023
PR
OJ
EC
T
OW
NE
R
DATENO. DESCRIPTION BY
SHEET TITLE
DRAWING SCALE
GRAPHIC SCALE
CHECKED BY
PROJECT NO.
DESIGNED BY
DRAWN BY
CADD FILE
DRAWING NO.
OF
DATE
Gale Associates, Inc.
Engineers and Planners
300 LEDGEWOOD PLACE | SUITE 300
ROCKLAND, MA 02370
P 781.335.6465 F 781.335.6467 www.gainc.com
Boston Baltimore Orlando Hartford Bedford
FE
AS
IB
ILL
IT
Y
ST
UD
Y
BA
RR
IN
GT
ON
H
IG
H
SC
HO
OL
0 L
IN
CO
LN
A
VE
BA
RR
IN
GT
ON
, R I 0
BA
RR
IN
GT
ON
P
UB
LIC
S
CH
OO
LS
3 C
OU
NT
RY
R
OA
D
BA
RR
IN
GT
ON
, R
I 0
716591
5/15/2025
CONCEPTUAL
716591_C100
C100
STADIUM FIELD
CONCEPT PLAN
1" = 30'
KMR
KMR
LEGEND
BITUMINOUS PAVEMENT
CONCRETE
TRACK SURFACING
ATHLETIC LIGHTING
NORTH
SYNTHETIC TURF
AutoCAD SHX Text
100-YR FLOODPLAIN
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
100-YR FLOODPLAIN
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
ATHLETIC LIGHT TOWER
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
ATHLETIC LIGHT POLE
AutoCAD SHX Text
ATHLETIC LIGHT POLE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
ATHLETIC LIGHT POLE
AutoCAD SHX Text
EDGE OF PAVE
AutoCAD SHX Text
SEAT WALL
AutoCAD SHX Text
BATTING TUNNEL
AutoCAD SHX Text
STONE WALL MEMORIAL
AutoCAD SHX Text
GATE
AutoCAD SHX Text
BIT. PAVE
AutoCAD SHX Text
JV BASEBALL
AutoCAD SHX Text
VARSITY BASEBALL
AutoCAD SHX Text
MASONRY BLOCK BUILDING
AutoCAD SHX Text
VARSITY SOFTBALL
AutoCAD SHX Text
BARRINGTON HIGH SCHOOL
AutoCAD SHX Text
ASPHALT BASE RUNNING TRACK
AutoCAD SHX Text
ASPHALT WALK
AutoCAD SHX Text
FEDERAL ROAD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 30'
AutoCAD SHX Text
AutoCAD SHX Text 15'
AutoCAD SHX Text 60'
ENCLOSURE 5
CONCEPTUAL PLAN COST ESTIMATE
Item Description Unit Quantity Unit Cost Cost Total Cost
1 GENERAL CONDITIONS 252,908.57$
a Bonds and Insurance (2%) LS 1 67,636.19$ 67,636.19$ b General Conditions (4%) LS 1 135,272.38$ 135,272.38$ c Mobilization / Demobilization LS 1 50,000.00$ 50,000.00$
2 EROSION CONTROL / SITE PREPARATION / DEMOLITION 164,739.33$
a Site Protection LS 1 10,000.00$ 10,000.00$ b Remove Track Surfacing LS 1 15,000.00$ 15,000.00$ b Strip and Haul Topsoil (Assume 12") CY 6374 12.00$ 76,492.89$ c Rough Grading of Site Subgrade SY 19123 2.00$ 38,246.44$ d Remove and Dispose of Existing Fence LS 1 25,000.00$ 25,000.00$
3 SYNTHETIC TURF CONSTRUCTION 1,003,416.00$
a Prepare sub-base, shape and compact SY 9952 10.00$ 99,520.00$ b Geotextile Separation Layer SY 9952 2.00$ 19,904.00$ c Crushed Stone Base under Field TN 4147 60.00$ 248,800.00$ d Infilled Synthetic Turf (Brockfill) SF 89568 5.00$ 447,840.00$ e Shock Pad SF 89568 1.50$ 134,352.00$ f Turf Striping Sports (Tufted) EA 4 7,000.00$ 28,000.00$ g Inlaid Centerfield Logo LS 1 25,000.00$ 25,000.00$
4 TRACK CONSTRUCTION 725,039.63$
a Prepare sub-base, shape and compact (Track and D-Areas) SY 6,130 10.00$ 61,303.33$ b Aggregate Base Course For Track and D-Areas (8") TN 2,043 70.00$ 143,041.11$ c Pavement (1.5" Binder Course, 1.5" Wearing Course) TN 996 215.00$ 214,178.52$ d Track Surfacing / Striping (RED BSS-100 Urethane) SY 6,130 50.00$ 306,516.67$
5 TURF FIELD DRAINAGE 100,000.00$
a Drainge Allowance LS 1 100,000.00$ 100,000.00$
6 CONCRETE CURBING 124,468.00$
a Cast-In-Place Concrete Anchor Curb LF 414 42.00$ 17,388.00$ b Cast-In-Place Concrete w/ ACO 2000 Slot Drains LF 452 80.00$ 36,160.00$ c Cast-In-Place Concrete w/ ACO 4000 Trench Drains LF 788 90.00$ 70,920.00$
8 FENCING / SAFETY NETTING 253,395.00$
a 4' Chain Link Fence LF 1425 75.00$ 106,875.00$ b 4' Single Leaf Swing Gate EA 6 1,200.00$ 7,200.00$ c 12' Swing Gate EA 4 3,500.00$ 14,000.00$ d 16' Ornamental Swing Gate EA 2 6,000.00$ 12,000.00$ e 20' Ball Safety Netting LF 380 160.00$ 60,800.00$ f 40' Ball Safety Netting LF 202 260.00$ 52,520.00$
9 TRACK EQUIPMENT (FIXED) 31,200.00$
a Sand Pit Forms and Catchers EA 1 25,000.00$ 25,000.00$ b Pole Vault Box EA 2 2,000.00$ 4,000.00$ c Protective Track Crossing Mat EA 1 2,200.00$ 2,200.00$
11 ATHLETIC EQUIPMENT 76,800.00$
a Combination Football/Soccer Goal EA 2 6,000.00$ 12,000.00$ b Player Benches (15' Each) EA 4 1,200.00$ 4,800.00$ c Retrofit Bleachers LS 1 60,000.00$ 60,000.00$
13 ATHLETIC LIGHTING 420,000.00$
a Upgrade and Relocate MUSCO Athletic Field Lighting System POLE 4 100,000.00$ 400,000.00$ b Misc. Electrical LS 1 20,000.00$ 20,000.00$
14 BITUMINOUS WALKWAYS 207,604.02$
a Prepare sub-base, shape and compact SY 3,041 10.00$ 30,408.89$
Conceptual Cost Estimate BARRINGTON HIGH SCHOOL - Stadium Field
GALE JN: 716591 (5/16/2024)
TRACK & FIELD
b Gravel Base TN 1,014 70.00$ 70,954.07$ c Pavement (1.5" Binder Course, 1.5" Wearing Course) TN 494 215.00$ 106,241.06$
15 SITE AMENITIES 32,000.00$
a Loam and Seed Disturbed Areas LS 1 10,000.00$ 10,000.00$ b 10' x 30' Storage Building EA 1 22,000.00$ 22,000.00$
3,138,661.98$
3,391,570.55$ 847,892.64$ 339,157.05$
4,578,620.24$ TOTAL:
TRACK & FIELD SUBTOTAL:
SUBTOTAL:
CONTINGENCY 25%:
*ENG/CPS SERVICES (10%):
| Feasibility Study Cover.pdf |
| table of contents |
| enclosures |
| Stadium Field Cost Estimate.pdf |
| BHS |
| 716591_C100.pdf |
| Sheets and Views |
| C100 |
| Evaluation Forms.pdf |
| SUMMARY FORM |
| ATHL. FIELD EVAL - MPR |
| TRACK |
| 716591_C101.pdf |
| Sheets and Views |
| C101 |
File details come from the government source that posted it. Updated .