This is a price sheet and bidding document for the City of Detroit Construction and Demolition Program's Fill Removal and Replacement Group 9.14.2026 D project, involving 20 DLBA-owned residential properties across Detroit, Michigan. The scope of work encompasses excavation and load-out of fill material and debris, backfill installation, grading, site finalization, and sidewalk flag replacement. Respondents must submit pricing for seven cost categories: excavation mobilization fees (per occurrence), non-hazardous disposal rates (per ton), backfill mobilization fees (per occurrence), below 12-inch backfill rates (per ton), topfill rates (per ton), sidewalk flag replacement fees (per flag), and site finalization/seed and straw costs. All 20 properties are currently listed with survey quantities of 8 tons each for disposal and backfill materials, with varying property sizes ranging from approximately 3,000 to 7,000 square feet. Respondents must submit the completed Excel (.xlsx) document with every yellow-highlighted cell populated; blank cost fields are unacceptable and may result in rejection of the submittal. Bonds are required for this bid.

Pricing must be submitted as unit rates for each service category, as actual material quantities may vary from the estimated survey quantities provided. Respondents are eligible for only one mobilization per property unless directed otherwise by the City. All unit rates must include personnel, materials, transportation, administrative costs, and overhead and profit. The City reserves the right to assign work in whole or in part to single or multiple vendors, reject incomplete submissions, request clarification on pricing or documentation, and waive immaterial irregularities at its sole discretion. If subcontractors will be utilized, respondents must submit detailed sub-contractor quotes with cost breakdowns. Compensation will be based on actual material removed and replaced using the submitted unit rates, although total amounts will be calculated for evaluation purposes only.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab 1. Instructions_Notes

Please read these instructions and notes in their entirety before completing Tab 2. Interested vendors must submit any questions related to a specific site before the deadline stipulated by the City.

The Respondent must submit this document in Excel (.xlsx) format.

Instructions

Respondents must complete every cell highlighted in yellow. If a particular service is not required for a given site, the Respondent must submit $0.00 in the cell. Respondents may not use a blank cost field as a substitute for a zero-dollar ($0.00) input. Respondents must enter a value for each of the following columns unless otherwise specified:
Tab 2.
1. Fee per mobilization for excavation (Section IV. of the Scope of Services)
2. Fee per ton for Non-Haz Disposal: Fill Material & Other Debris (Section IV. of the Scope of Services)
3. Fee per mobilization for backfill (Section V. of the Scope of Services)
4. Fee per ton for below 12" backfill (Section V. of the Scope of Services)
5. Fee per ton for topfill (Section V. of the Scope of Services)
6. Fee per sidewalk flag replaced (Section VI.A of the Scope of Services)
7. Fee for Site Finalization (Section VI.C of the Scope of Services)

If a respondent fails to submit a price, the City will consider the submittal as non-responsive and determine that the vendor is ineligible for award.

1-Per occurence defined as when heavy equipment is mobilized only. Contractors are only eligible for one occurrence per property, unless otherwise directed by the City.

2-Unit rate includes all personnel, material, transportation to/from the assigned site(s), adminstrative costs and overhead and profit.

3-City reserves to right to assign this work in whole, or in part, and the City reserves the right to assign different aspects of the scope of services to another vendor(s).

4-All units provided in the Fee Schedule are estimates, the actual quantity of material that needs to be removed and replaced may vary.

5- The total amounts in Column P, including the Grand Total, will be used for evaluation purpose only. The successful vendor will only be compensated for actual amounts of material removed and/or replaced using the unit rates.

Tab 2.
Under the BID QUANTITIES, the Respondent must enter the "Material Description" and the "Survey Quantity" (including unit of measure, i.e. square feet or linear feet) exactly as it's listed in the most current version of the hazardous/regulated materials report the site. The Respondent must list every hazardous/regulated material identified in the most current report for the site. Where the Respondent lists a material from the report, the Respondent must provide a "Bid Quantity". If a Respondent does not expect to abate/remove any of that material, the Respondent must enter "0". A blank "Bid Quantity" cell for a listed material is an unacceptable response and may result in the rejection of the submittal.

Column J: the Respondent must select from the dropdown list one of the following reasons for why your bid quantity differs from the survey quantity:

1. Dumped Material

2. Inaccessible

3. Material is no longer present

4. Other

Notes

At its sole discretion, the City reserves the right to:

1. Reject any incomplete document. The City shall determine the completeness of any required form or document. If a respondent submits (an) incomplete form(s) or document(s), the City may consider the form(s) or document(s) non-responsive
2. Request clarification on any required form or document at any time. This includes, but is not limited to, clarification of any cost for any site included in this QQ. The respondent must respond to any request for clarification within the time frame stipulated by the City.
3. Request additional information or documentation on any service(s)
4. Waive any reasonable, immaterial irregularity or deficiency

Where required on a given residential site, the City will only approve more than one (1) mobilization for post-abatement air monitoring in very rare and unique circumstances.

If the Respondent will utilize a sub-contractor to perform any aspect of these services, the Respondent must submit a copy of the sub-contractor quote with this document. The sub-contractor quote must contain information and a detailed cost breakdown on the specific services they will provide.

&"-,Bold"&14CITY OF DETROIT

CONSTRUCTION AND DEMOLITION PROGRAM

FILL REMOVAL AND REPLACEMENT GROUP

&"-,Bold"&10Page &P of &N

Tab 2. Price Sheet

Quick Quote
Organization Name:
Business Address:
Point(s)-of-Contact:
E-Mail Address(es):
Phone #(s):
Excavation and Load OutBackfill, Grade & Site FinalizationTotals
NumberAddressExcavation Mobilization Fee (per Mobilization)1Tonnage of Non-Haz Disposal: Fill Material & Other Debris 4Non-Haz Disposal Rate (Per Ton) 2Backfill Mobiliziation Fee 1Backfill Material (Below 12) QTY4Below 12" Rate (Per Ton)Backfill Material (Topfill 12) QTY 4Topfill Rate (Per Ton)Sidewalks To Replace 3Price Per Flag 3Seed & Straw/Site Clean-upExcavation/Loadout CostBackfill, Grade & Site FinalizationTotal Cost
111363 Ohio600.00420.00180.008$ - 0$ - 0$ - 0
211378 Ohio544.70430.50114.208$ - 0$ - 0$ - 0
311775 Findlay345.43295.0150.428$ - 0$ - 0$ - 0
411784 Minden551.00433.00118.008$ - 0$ - 0$ - 0
511817 Chelsea500.00361.00139.008$ - 0$ - 0$ - 0
612105 Cloverlawn556.07504.0752.008$ - 0$ - 0$ - 0
712283 Ward453.28418.2835.008$ - 0$ - 0$ - 0
812395 Northlawn333.50245.7087.808$ - 0$ - 0$ - 0
914655 Cloverlawn540.00420.00120.008$ - 0$ - 0$ - 0
1015361 Petoskey376.47298.4778.008$ - 0$ - 0$ - 0
1115496 Roselawn133.9355.9378.008$ - 0$ - 0$ - 0
122575 Fullerton592.01499.7192.308$ - 0$ - 0$ - 0
133761 Clairmount410.89306.89104.008$ - 0$ - 0$ - 0
1441 W Hollywood392.70313.5079.208$ - 0$ - 0$ - 0
154629 Lovett225.1489.94135.208$ - 0$ - 0$ - 0
167661 Sherwood408.00298.00110.008$ - 0$ - 0$ - 0
178717 Dayton340.20257.0083.208$ - 0$ - 0$ - 0
188967 Petoskey475.40361.20114.208$ - 0$ - 0$ - 0
198998 Petoskey475.40361.20114.208$ - 0$ - 0$ - 0
209914 Petoskey237.80176.4061.408$ - 0$ - 0$ - 0
Total$ - 0$ - 0$ - 0

&"-,Bold"&14CITY OF DETROIT

CONSTRUCTION AND DEMOLITION PROGRAM

Fill Removal and Replacement Group 9.14.2026 D

&"-,Bold"&10 Page &P of &N

Tab 3. Property Information

Account NameParcel IDZIP CodeParcel Square FootageProperty Ownership
11363 Ohio18015130.482043485DLBA Owned
11378 Ohio18015091.482043659DLBA Owned
11775 Findlay21013075.482054051DLBA Owned
11784 Minden21013334.482053920DLBA Owned
11817 Chelsea21008097.482134221DLBA Owned
12105 Cloverlawn16031532.482043790DLBA Owned
12283 Ward22025351.482277057DLBA Owned
12395 Northlawn16032509.482043659DLBA Owned
14655 Cloverlawn16031367.482383703DLBA Owned
15361 Petoskey12013040.482383615DLBA Owned
15496 Roselawn16030321.482383006DLBA Owned
2575 Fullerton10003788.482064182DLBA Owned
3761 Clairmount14003301.482063485DLBA Owned
41 W Hollywood01006622.482034443Former Property of Interest
4629 Lovett14010801.482104400DLBA Owned
7661 Sherwood15012371.482113680DLBA Owned
8717 Dayton20009874.482103311DLBA Owned
8967 Petoskey14007097.482044008DLBA Owned
8998 Petoskey14006945.482044008DLBA Owned
9914 Petoskey14007005.482043093DLBA Owned

&"-,Bold"CITY OF DETROIT

CONSTRUCTION AND DEMOLITION PROGRAM

Property Information Sheet Fill Removal and Replacement Group 9.14.2026 D