Fill Removal and Replacement Group 9.14.2026 C.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
Planned Residential Removal and Replacement of fill material Group 9. 14. 2026 C o
Solicitation number
300000152568305
Issued by
Michigan

About this file

This is a bid specification document from the State of Michigan for the planned residential removal and replacement of fill material across 20 properties, designated as Group 9 and scheduled for completion by September 14, 2026. The project involves the extraction of existing fill material from residential sites and its replacement with new fill material meeting specified standards. The document outlines detailed line-item specifications for each of the 20 properties, including quantity requirements, material specifications, and site-specific considerations. Bonds are required for all bidders submitting proposals for this work. The spreadsheet format presents a comprehensive breakdown of the work scope, allowing for transparent pricing and evaluation across all project sites.

The pricing structure requires bidders to provide unit costs and total costs for fill removal and replacement at each property location, with the cumulative bid amount determining overall project cost. The file serves as the primary bidding document that establishes the baseline requirements and specifications for interested contractors. All bidders must provide a performance bond to secure contract performance. The document does not specify response dates, site visit requirements, or award timelines within the visible content, but the September 14, 2026 completion date indicates a defined project timeline from the bid award through final project completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab 1. Instructions_Notes

Please read these instructions and notes in their entirety before completing Tab 2. Interested vendors must submit any questions related to a specific site before the deadline stipulated by the City.

The Respondent must submit this document in Excel (.xlsx) format.

Instructions

Respondents must complete every cell highlighted in yellow. If a particular service is not required for a given site, the Respondent must submit $0.00 in the cell. Respondents may not use a blank cost field as a substitute for a zero-dollar ($0.00) input. Respondents must enter a value for each of the following columns unless otherwise specified:
Tab 2.
1. Fee per mobilization for excavation (Section IV. of the Scope of Services)
2. Fee per ton for Non-Haz Disposal: Fill Material & Other Debris (Section IV. of the Scope of Services)
3. Fee per mobilization for backfill (Section V. of the Scope of Services)
4. Fee per ton for below 12" backfill (Section V. of the Scope of Services)
5. Fee per ton for topfill (Section V. of the Scope of Services)
6. Fee per sidewalk flag replaced (Section VI.A of the Scope of Services)
7. Fee for Site Finalization (Section VI.C of the Scope of Services)

If a respondent fails to submit a price, the City will consider the submittal as non-responsive and determine that the vendor is ineligible for award.

1-Per occurence defined as when heavy equipment is mobilized only. Contractors are only eligible for one occurrence per property, unless otherwise directed by the City.

2-Unit rate includes all personnel, material, transportation to/from the assigned site(s), adminstrative costs and overhead and profit.

3-City reserves to right to assign this work in whole, or in part, and the City reserves the right to assign different aspects of the scope of services to another vendor(s).

4-All units provided in the Fee Schedule are estimates, the actual quantity of material that needs to be removed and replaced may vary.

5- The total amounts in Column P, including the Grand Total, will be used for evaluation purpose only. The successful vendor will only be compensated for actual amounts of material removed and/or replaced using the unit rates.

Tab 2.
Under the BID QUANTITIES, the Respondent must enter the "Material Description" and the "Survey Quantity" (including unit of measure, i.e. square feet or linear feet) exactly as it's listed in the most current version of the hazardous/regulated materials report the site. The Respondent must list every hazardous/regulated material identified in the most current report for the site. Where the Respondent lists a material from the report, the Respondent must provide a "Bid Quantity". If a Respondent does not expect to abate/remove any of that material, the Respondent must enter "0". A blank "Bid Quantity" cell for a listed material is an unacceptable response and may result in the rejection of the submittal.

Column J: the Respondent must select from the dropdown list one of the following reasons for why your bid quantity differs from the survey quantity:

1. Dumped Material

2. Inaccessible

3. Material is no longer present

4. Other

Notes

At its sole discretion, the City reserves the right to:

1. Reject any incomplete document. The City shall determine the completeness of any required form or document. If a respondent submits (an) incomplete form(s) or document(s), the City may consider the form(s) or document(s) non-responsive
2. Request clarification on any required form or document at any time. This includes, but is not limited to, clarification of any cost for any site included in this QQ. The respondent must respond to any request for clarification within the time frame stipulated by the City.
3. Request additional information or documentation on any service(s)
4. Waive any reasonable, immaterial irregularity or deficiency

Where required on a given residential site, the City will only approve more than one (1) mobilization for post-abatement air monitoring in very rare and unique circumstances.

If the Respondent will utilize a sub-contractor to perform any aspect of these services, the Respondent must submit a copy of the sub-contractor quote with this document. The sub-contractor quote must contain information and a detailed cost breakdown on the specific services they will provide.

&"-,Bold"&14CITY OF DETROIT

CONSTRUCTION AND DEMOLITION PROGRAM

FILL REMOVAL AND REPLACEMENT GROUP

&"-,Bold"&10Page &P of &N

Tab 2. Price Sheet

Quick Quote
Organization Name:
Business Address:
Point(s)-of-Contact:
E-Mail Address(es):
Phone #(s):
Excavation and Load OutBackfill, Grade & Site FinalizationTotals
NumberAddressExcavation Mobilization Fee (per Mobilization)1Tonnage of Non-Haz Disposal: Fill Material & Other Debris 4Non-Haz Disposal Rate (Per Ton) 2Backfill Mobiliziation Fee 1Backfill Material (Below 12) QTY4Below 12" Rate (Per Ton)Backfill Material (Topfill 12) QTY 4Topfill Rate (Per Ton)Sidewalks To Replace 3Price Per Flag 3Seed & Straw/Site Clean-upExcavation/Loadout CostBackfill, Grade & Site FinalizationTotal Cost
112505 Hampshire361.00282.0079.008$ - 0$ - 0$ - 0
212544 Hampshire449.00334.80114.208$ - 0$ - 0$ - 0
312598 Hampshire545.80431.60114.208$ - 0$ - 0$ - 0
412636 Hampshire431.40308.40123.008$ - 0$ - 0$ - 0
513539 Fleming485.00390.0095.008$ - 0$ - 0$ - 0
613616 Sorrento342.78264.7878.008$ - 0$ - 0$ - 0
713894 Fleming527.78414.78113.008$ - 0$ - 0$ - 0
814211 Hazelridge468.80385.4083.408$ - 0$ - 0$ - 0
914221 Young449.00326.00123.008$ - 0$ - 0$ - 0
1014246 Young398.40293.00105.408$ - 0$ - 0$ - 0
1114424 Hazelridge466.60356.80109.808$ - 0$ - 0$ - 0
1214450 Seymour546.00414.00132.008$ - 0$ - 0$ - 0
1314695 Seymour528.40396.40132.008$ - 0$ - 0$ - 0
1414815 Parkside358.06274.8683.208$ - 0$ - 0$ - 0
1514907 Hazelridge527.30448.1079.208$ - 0$ - 0$ - 0
1615033 Parkside459.72368.7291.008$ - 0$ - 0$ - 0
1718117 Hamburg385.47335.0950.388$ - 0$ - 0$ - 0
183936 St Clair588.00408.00180.008$ - 0$ - 0$ - 0
199624 Bessemore449.00334.80114.208$ - 0$ - 0$ - 0
2014694 Spring Garden350.00300.0050.008$ - 0$ - 0$ - 0
Total$ - 0$ - 0$ - 0

&"-,Bold"&14CITY OF DETROIT

CONSTRUCTION AND DEMOLITION PROGRAM

Fill Removal and Replacement Group 9.14.2026 C

&"-,Bold"&10 Page &P of &N

Tab 3. Property Information

Account NameParcel IDZIP CodeParcel Square FootageProperty Ownership
12505 Hampshire21005557.482134792DLBA Owned
12544 Hampshire21005549.482133180DLBA Owned
12598 Hampshire21005540.482132919DLBA Owned
12636 Hampshire21005535.482133964DLBA Owned
13539 Fleming09014979.482123006DLBA Owned
13616 Sorrento22023482.482273920DLBA Owned
13894 Fleming09014459.482123006DLBA Owned
14211 Hazelridge21016166.482053833DLBA Owned
14221 Young21015899.482053833DLBA Owned
14246 Young21015508.482053768DLBA Owned
14424 Hazelridge21016067.482053833DLBA Owned
14450 Seymour21016932.482053659DLBA Owned
14694 Spring Garden21017201-2482054487DLBA Owned
14695 Seymour21017068.482053615DLBA Owned
14815 Parkside12011627.482383441DLBA Owned
14907 Hazelridge21016226.482054400DLBA Owned
15033 Parkside12011604.482383441DLBA Owned
18117 Hamburg21034018.482055543DLBA Owned
3936 St Clair21038623.482143659DLBA Owned
9624 Bessemore19002131.482133006DLBA Owned

&"-,Bold"CITY OF DETROIT

CONSTRUCTION AND DEMOLITION PROGRAM

Property Information Sheet Fill Removal and Replacement Group 9.14.2026 C

File details come from the government source that posted it. Updated .