This document is Amendment 3 to a Request for Information (RFI) for a Federally Funded Research and Development Center (FFRDC) Competitive Procurement at NASA's Jet Propulsion Laboratory (JPL), issued October 28, 2026, summarizing an industry engagement event held October 21-22, 2026.
The amendment provides a general summary of twelve questions and answers, an attendee listing from the industry day, and presentation materials from NASA leadership. Key information disclosed includes: a Draft RFP is estimated for Q1 2027 with a Final RFP in Q2 2027; NASA expects the successor contractor to develop transition plans for existing Caltech/JPL subcontracts and identify appropriate novation agreements to ensure mission continuity; NASA is emphasizing efficiency and speed in mission delivery within cost constraints; scope elements with clearly defined high technical readiness level deliverables and short studies may be candidates for firm-fixed-price contracts; the successor contractor will manage JPL's role supporting NASA's emphasis on robotics and deep-space exploration while evolving to leverage commercial best practices; and NASA is establishing a transition team and conducting workforce messaging to mitigate cultural impacts. The facility overview materials indicate JPL operates a 177-acre federally owned campus in Pasadena, California, with approximately 140 buildings supporting ~5,000 personnel and ~40 active missions. JPL is designated as NASA's only FFRDC and houses two National Historic Landmarks (Space Flight Operations Facility and 25-Foot Space Simulator) plus specialized facilities including cleanrooms, electric propulsion laboratories, radiation testing capabilities, and the Mars Yard. The site carries active Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) obligations with ongoing groundwater remediation requiring contractor coordination with NASA's environmental program.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026 09 29 FFRDC SOW - Draft.docx | DOCX document | |
| 2026 09 29 FFRDC Draft SOW for Feedback.pdf | ||
| 2026 09 10 FFRDC Industry Event at JPL.pdf | ||
| 2026 08 03 FFRDC RFI-SSN.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federally Funded Research and Development Center (FFRDC) Competitive Procurement Amendment 3 to FFRDC-26-RFI-SSN
October 28, 2026
Summary of Industry Engagement Event at NASA’s Jet Propulsion Laboratory October 21-22, 2026
The purpose of this amendment to the subject notice is to provide the following information from the Industry Engagement Event:
1. General summary of questions and answers.
2. Listing of all attendees.
3. Copies of all presentations.
General Summary of Questions and Answers
1. Question: Does NASA plan to issue a draft RFP with opportunity for questions/comments before the final RFP is published? When is the RFP coming out?
Answer: Per the procurement website (https://www.nasa.gov/ffrdc/), the release of the Draft RFP is currently estimated for the 1st Quarter of calendar year (CY) 2027 and the Final RFP in the 2nd Quarter of
CY 2027.
2. Question: Please clarify NASA’s anticipated approach for existing Caltech/JPL major subcontracts whose periods of performance extend beyond, or overlap with, the current Caltech contract with NASA.
Examples may include Deep Space Network support, Information Technology Infrastructure Services, IT Management Services, Facilities Maintenance and Operations, and Temporary Support Services.
Specifically, how does NASA anticipate these existing contractual arrangements [to] be addressed or potentially impacted by the future operating model and transition?
Answer: In general, we expect that the successor Contractor will identify an overall plan and will collaborate with the predecessor Contractor during the transition period to identify the appropriate agreements for novation/transition to the successor Contractor to ensure mission continuity. Any potential scope changes, as noted in the draft statement of work that was released for comment on September 29, 2026, will be defined in the solicitation.
3. Question: What specific improvements is NASA seeking through this competition, and what would success look like during the first three to five years of the new contract?
Answer: NASA is emphasizing efficiency and speed in mission delivery, within cost, across the Agency;
this especially includes mission continuity for the work at JPL. The exact strategy and procurement approach is still under development, and the draft solicitation will contain further details on what is important to NASA for both the procurement evaluation/selection and performance under the new contract.
4. Question: Which scope elements does NASA currently consider candidates for FFP?
Answer: At this time, NASA envisions the transition/phase-in period could be firm-fixed-price (FFP).
Further, efforts with clearly defined high technical readiness level (TRL) deliverables and short studies and concepts could be candidates for FFP. The solicitation will provide further details regarding any elements that will be FFP.
https://www.nasa.gov/ffrdc/
5. Question: How does NASA envision JPL’s role in the broader space ecosystem evolving over the next 5–
10 years?
Answer: JPL has a critical role in supporting NASA’s emphasis on speed and efficiency in mission delivery, while ensuring that critical cost constraints are met and not exceeded. JPL will continue to be NASA’s center of excellence for robotics and deep-space exploration. However, as the space ecosystem evolves and moves towards more commercial-first approaches, JPL will also need to ensure it evolves to not only leverage these commercial best practices but to also focus its expertise on innovation and accelerating the growth of this broader U.S. space ecosystem.
6. Question: Will an attendee list be made available following the industry day?
Answer: Yes, the attendee listing is being published with this notice.
7. Question: Traditional competitions tend to create improvements in Efficiency, Risk, Innovation, and Cost.
Does this competition request more than these to include proposed improvements in Policy, Partnerships, Access to Capital, [and the] implementation of new Data Science & AI tools?
Answer: The draft solicitation will contain the evaluation factors and clarity on what is important to NASA for both the procurement evaluation/selection and performance under the successor contract.
NASA encourages feedback on the draft solicitation once it’s released.
8. Question: In the presentations this morning, it appeared that partnerships are part of NASA's role. What are the FFRDC's responsibilities in establishing and managing partnerships? Related, beyond effective laboratory management, what strategic value does NASA want the managing organization to bring through its capabilities, research relationships, and partnerships?
Answer: Partnering is critical to drive success for all of the missions and projects at JPL, and delivering on current commitments is critical to maintaining confidence in the NASA mission. NASA and the JPL Contractor will continue to collaborate on partnerships to ensure consistency with the role of NASA as the Nation’s civil space Agency and to ensure no conflicts with existing and future NASA needs.
9. Question: What is JPL’s future role with UNNO? Specifically on technological and scientific support.
Answer: In general, the Unified Network and Navigation Operations (UNNO) procurement will encompass the operations and maintenance (O&M) functions of the Deep Space Network (DSN) (at Goldstone), including engineering operations oversight. However, certain functions, such as research and development, and science, will remain within the JPL effort. A collaborative, integrated approach between the two contracts will be necessary to ensure a smooth and effective working relationship.
10. Question: What is NASA most concerned regarding transition and continuity?
Answer: Retaining the overall JPL employee culture and incumbent workforce/total compensation, and ensuring mission continuity.
11. Question: What is NASA preemptively doing to ensure the JPL culture is not adversely impacted by this contract activity?
Answer: NASA is not waiting until the formal contract transition period to address this. For example, there are ongoing messaging and townhall activities to help keep the workforce informed and to emphasize the importance of their work to the future of NASA. NASA is also establishing a transition team now to ensure overlap with the procurement activities and ample preparation time for this critical activity.
12. Question: Will NASA release information about the incumbent Contractor’s indirect overhead rate structure?
Answer: No, NASA will not be releasing such proprietary information about the incumbent Contractor.
However, NASA does intend to continue releasing information to the virtual Procurement Library (https://www.nasa.gov/ffrdc/) to assist potential Offerors with the procurement process.
https://www.nasa.gov/ffrdc/
Company Name Title Email All Points Logistics John Hall SVP Business Development Jhall@allpointsllc.com All Points Logistics (Excentium) Fatemeh Corlett Chief Growth Officer fcorlett@excentium.com All Points Logistics (Peraton) Kristen Todd Director of Growth & Strategy kristen.todd@peraton.com Altech Solutions, LLC Ralph Thomas Master Solutions Architect ralph.c.thomas@outlook.com Amazon Business Jacob Acosta Sr Account Executive jlacosta@amazon.com
Amentum Bret Laws Senior Vice President, Business Development, Engineering & Technology bret.laws@us.amentum.com
Amentum Alexander Maguire Senior Director, High Value Captures alex.maguire@amentum.com Amentum John Brasfield Client Account Lead, Space Solutions john.brasfield@us.amentum.com Amentum Christopher Hansen Vice President and Program Manager, Space Solutions chris.hansen@us.amentum.com Analytical Mechanics Associates (AMA) David Cornelius VP California Operations/ASSESS PM cornelius@ama-inc.com ANRE Technologies Inc. Eugean Hacopians CTO eugean@anretech.com ASRC Federal System Solutions, LLC Jacqueline Rybacki Sr. Director, Business Development Jrybacki@asrcfederal.com ASRC Federal System Solutions, LLC Pedro Medelius Program Manager PJMedelius@asrcfederal.com Associated Universities, Inc. (AUI) David Curren Director of Sponsored Projects dcurren@aui.edu Associated Universities, Inc. (AUI) Erika White BD Operations Manager ewhite@aui.edu Bastion Technologies Jeffery Cardenas Operations Manager jcardenas@bastiontechnologies.com
Battelle Memorial Institute Trisha Mosser Vice President, Business Development and Strategic Growth mossert@battelle.org
Battelle Memorial Institute Douglas Burns Nuclear Energy Deployment Business Leader burnsd1@battelle.org Bay Systems Consulting, Inc. Jasmine Ali President & CEO jasmine@baysystemsinc.com BWX Technologies, Inc. (BWXT) Dave Swale Business Development Director djswale@bwxt.com
Caltech Jennifer Jackson William E. Leonhard Professor of Mineral Physics; Vice Provost jacksonj@caltech.edu
Caltech John Eiler Robert P. Sharp Professor of Geology and Geochemistry; Ted and Ginger Jenkins Leadership Chair, Division of Geological and Planetary Sciences eiler@caltech.edu
Caltech David Oh Proposal Manager dyoh@caltech.edu Caltech Kevin Doran Proposal Strategist kdoran@caltech.edu HII Jake Berrena Capture Management II jake.a.berrena@hii.com Jada Systems Inc. Troy Davis President and CEO troy@jadasys.com Jada Systems Inc. David Maxwell Project Manager david@jadasys.com KBR Tracy Dorsey VP Advanced Engineering and Operations tracy.dorsey@us.kbr.com KBR Geoff Wawrzyniak Chief Engineer Geoffrey.Wawrzyniak@us.kbr.com KBR Michael Dawson Capture Manager Michael.Dawson@us.kbr.com KBR Darin Skelly Business Development and Growth Darin.Skelly@us.kbr.com Leidos Carlos Aguilar Customer Advocate carlos.a.aguilar@leidos.com Leidos Michael Hess NASA Account Lead michael.hess@leidos.com Mantech Yvette Elizondo Program Director yvette.hardingelizondo@mantech.com
Company Name Title Email Mantech Jonathan Cole Director Program Control jonathan.cole3@mantech.com MITRE Corporation Charles Clancy Senior Vice President, Chief Technical Officer tcc@mitre.org MITRE Corporation Maeghan Welford Director, Strategic Finance mwelford@mitre.org
MITRE Corporation Kevin Toner Vice President, Center for Government Effectiveness and Modernization (CGEM) FFRDC ktoner@mitre.org
MITRE Corporation Glenn Daly Vice President, Center for Engineering and Analysis gdaly@mitre.org MORI Associates, Inc. Blake Hershey Chief Growth Officer bhershey@moriassociates.com Noblis Sharad Bhaskaran Division Director, Civil Space Programs sharad.bhaskaran@noblis.org Peraton Vida Beard Director, Technical Integrator vbeard@peraton.com Peraton Henry Giroux NASA Portfolio Lead hgiroux@peraton.com Peraton Robert Rosenberger Director, Capture Mgmt. robert.rosenberger@peraton.com Peraton Voleak Roeum Technology Program Mgmt., SME voleak.roeum@peraton.com Red Hat Mark Schoonmaker Account Executive schoons@redhat.com Red Hat Jason Cadmus Solution Architect cadmus@redhat.com Science and Technology Corporation Hal Bloom Vice President hbloom@stcnet.com Science and Technology Corporation Andrew Fischer Program Manager afischer@stcnet.com Southwest Research Institute (SwRI) James Burch Senior Vice-President, Space Sector jburch@swri.edu Texas A&M University Robert Ambrose TEES Director for Space and Robotics Initiatives rambrose@tamu.edu
University of California Brett Henrikson Senior Director for Strategy & Governance & Chief of Staff, UC National Laboratories University of California, Office of the President
Brett.Henrikson@ucop.edu
University of California John Falle Senior Advisor, UC National Laboratories gary.falle@ucop.edu University of California Robert Thomas Manager Business Development & Proposals rthomas@thom-adv.com University of Southern California Jeri Muniz Vice President of Research Administration and Operations jeri.muniz@usc.edu University of Southern California Andrew Wilson Vice President for Strategic Partnerships and Innovation andy.wilson@usc.edu University of Southern California Gregory Condell Vice President, Finance condell@usc.edu University of Southern California Randall Hill Executive Director, USC Institute for Creative Technologies hill@ict.usc.edu www.nasa.gov
Antti Pulkkinen, NASA Office of JPL Management and Oversight
(NOJMO) Director October 21, 2026
NASA FFRDC Industry Engagement Day
Agenda
Q&A https://nasa.cnf.io/sessions/pwwx/#!/dashboard
Logistics
Tours Given the number of Industry Day participants, two facility tour groups will be required. To ensure equitable treatment, participants have been assigned to the groups in alphabetical order. Both groups will receive the same tour and information, with equal opportunities for engagement. Any information of potential relevance to all attendees will be shared with all participants through SAM.gov.
The facility tour packet will be made available on SAM.gov.
Logistics
Moving around and October 22 All visitors have been issued escort badges and must be accompanied by an escort while at the Laboratory. You will be escorted during facility tours and visits to the cafeteria and Von Kármán Museum.
During the lunch break, you will be escorted to the cafeteria, where you can order food and pay by credit card at the kiosks. The group will gather in Room 151, near the main cafeteria.
For the one-on-one sessions on October 22, please bring your badge and arrive at the main gate turnstiles approximately 15 minutes before your scheduled appointment. An escort will meet you there and accompany you to the meeting room.
For questions, please contact Molly Stein at (202) 860-5912 or Sonja Johnson at (202) 754-5184.
NASA FFRDC
NASA FFRDC
• NASA is the sponsor of the FFRDC located at the Jet Propulsion
Laboratory (JPL) in Pasadena, California.
• The Laboratory fulfills NASA’s long-term, strategic technical needs that cannot be met as effectively by existing in-house or contractor resources.
• FFRDC is required to operate in the public interest with objectivity and independence, free from organizational conflicts of interest, and with full transparency to NASA.
• NOJMO serves as the NASA Headquarters (HQ) on-site Government organization responsible for contract management, institutional oversight, ensuring regulatory compliance of contractor operations, and active engagement with the stakeholders and the operator of the Laboratory.
NOJMO
Functional Area Practical Role
Contract Management Administer the JPL contract and related agreements. NOJMO awards, modifies, directs, and evaluates contract work; manages task orders, IAAs, Space Act Agreements, subcontract consent, OCI, CPARS, and strategic contract actions.
Institutional Management Provide on-site NASA oversight of JPL as an FFRDC. NOJMO ensures JPL operations align with NASA policy, technical requirements, regulatory expectations, and mission needs across institutional, technical, and operational domains.
Business Operations Ensure financial stewardship and business compliance. NOJMO manages funding execution, financial analysis, audits, reimbursables, G-Invoicing, funds control, FFRDC fees, and Agency Administrative Indirect (AAI), and award-payment administration.
Partnering Connect NASA needs with JPL capabilities. NOJMO helps NASA stakeholders and JPL work through issues, align expectations, streamline processes, and enable mission outcomes that benefit the Agency, the nation, and humanity.
NOJMO organization
Science Mission Directorate
National Aeronautics and Space Administration
Science Mission
Directorate Priorities
N A S A J P L F F R D I N D U S T R Y E N G A G E M E N T E V E N T , O c t o b e r 2 1 , 2 0 2 6
D R . N I C O L A “ N I C K Y ” F O X , A S S O C I AT E A D M I N I S T R A T O R , S C I E N C E M I S S I O N D I R E C T O R AT E
Image: NASA
Science Mission Directorate
National Aeronautics and Space Administration
NASA’s Science Fleet An integrated portfolio of 100+ missions to explore space and benefit Earth
EARTH SCIENCE
BIOLOGICAL &
PHYSICAL SCIENCEHELIOPHYSICS
PLANETARY
SCIENCE ASTROPHYSICSCREWED SCIENCE
I m p r o v e L i f e o n E a r t h
U n l o c k S e c r e t s o f t h e U n i v e r s e
S u s t a i n L i f e i n S p a c e S e a r c h f o r L i f e E l s e w h e r e
B u i l d t h e I n t e r p l a n e t a r y
S u r v i v a l G u i d e
National Aeronautics and Space Administration
M I S S I O N S U P P O R T D I R E C T O R AT E
E n a b l e s M i s s i o n S u c c e s s
Mission Support Directorate (MSD)
& FFRDC
JPL Institutional Scope Overview
MISSION SUPPORT D IRECTORATE
PROVIDING A SOLID
FOUNDATION FOR
MISSION SUCCESS
Operating JPL is a Collaboration Between NASA And The Site Contractor
Mission Support provides the enterprise framework and connections that enable JPL to operate as a critical NASA center.
N A S A M I S S I O N S U P P O R T D I R E C T O R AT E
JPL FACILITIES AT A GLANCE
BUILDINGS
CAMPUS SIZE
177 acres Main campus in Pasadena, CA
OFFICE SPACE
6.783M Sq. ft.
NON-OFFICE SPACE
906K Sq. ft.
Laboratory Facilities
SPECIALIZED AND MISSION CRITICAL
FACILITIES
Environmental Testing And Assembly
Deep Space Network Infrastructure
Specialized Technical Environments
FACILITIES ENABLE COMPLEX NASA SCIENCE AND EXPLORATION MISSIONS
MULTI-SITE FOOTPRINT
• Pasadena Main Campus
• Goldstone Deep Space Communications Complex, Fort Irwin
• Table Mountain Facility, Wrightwood
OPERATING WITHIN NASA’S ENTERPRISE FRAMEWORK
JPL’s Uniqueness Requires Both Site-level Operational Excellence And Deep
Integration With Nasa’s Enterprises
NASA Mission Support (Enterprise)
• Day-to-Day Operations
• Facilities O&M
• Logistics
• Environmental Compliance
• Workforce Management
• Site Safety
JPL Contractor (Execution)
• Policy
• Capital Investment Planning
• Strategic/Resilience Planning
• Cross-Center Coordination
• Performance Monitoring
• External Coordination
THE CONTRACT IS
THE FRAMEWORK
THAT ALIGNS SITE
EXECUTION WITH
NASA’S ENTERPRISE
PRIORITIES.
INSTITUTIONAL SCOPE
Institutional Services are Essential Enablers Of Science, Mission Success and Operational Resilience
Provide critical institutional service requirements across JPL and its associated facilities:
*Scope may be removed from this contract
FACILITIES & REAL ESTATE LOGISTICS & ENVIRONMENTAL
*PROTECTIVE SERVICES &
EMERGENCY MANAGEMENT
* INFORMATION TECHNOLOGY
ANCILLARY & SITE SERVICES
• Facility Operations, Master Planning, and Construction Management
• Utilities Acquisition and Management
• Logistics Management
• Environmental Management
• Information Technology
• Protective Services
• Fire Department/Emergency Response
• Emergency Management
• Ancillary Items and Activities
PRIORITIES IN FACILITIES & REAL ESTATE
• Government Owned/Contractor Operated Asset Management: Accurate property records and infrastructure accountability.
• Facility Operations and Maintenance: Demonstrated cost reductions and operational efficiency.
• Master Planning & Security: Alignment with NASA Critical Infrastructure and Operational Technology systems.
• Construction Oversight: Risk-managed, on-time Construction of Facilities (CoF)/ reimbursable project execution.
• Compliance & Reporting: Ensure adherence to federal laws, NASA policy, regulations, and timely reporting to NASA Headquarters.
Lifecycle Stewardship Of Nasa-owned Assets
PRIORITIES IN MAINTENANCE MANAGEMENT
• Mission Assurance: Maintain reliable, available infrastructure supporting JPL operations.
• Proactive Asset Management: Prevent failures through risk-based inspections, predictive maintenance, and lifecycle planning.
• Operational Performance: Manage work orders, response times, backlogs, and asset data to drive measurable results.
• Safety And Resilience: Maintain a safe, compliant operating environment and readiness for disruptions.
• Cost And Resource Optimization: Improve lifecycle value, energy efficiency, and water conservation without compromising mission needs.
Reliable Facilities Operations And Proactive Asset Management
PRIORITIES IN LOGISTICS & ENVIRONMENTAL
High Reliability Logistics And Proactive Environmental Compliance
• Supply, materials, and responsive inventory management.
• Equipment, fleet lifecycle tracking, and compliant property disposal.
• Zero enforcement actions (No NOVs) and integrated NEPA planning.
• Partnering to advance resiliency and reduce environmental risks and impacts.
Logistics Overview
Environmental Overview
THE PROTECTIVE SERVICES & IT ECOSYSTEM
NASA Sourcing Evaluation:
NASA is currently determining the optimal sourcing strategy for Protective and IT services—evaluating whether these functions will remain integrated within the prime contract, be provided directly by the Government, or be sourced via alternate enterprise vehicles.
Delivering 24/7 Physical, Emergency, and Technological Protection to Support Safe Mission Execution
• Access and Physical Security
• Institutional and IT Security
• Emergency Management
• Emergency and Uniformed Support
• Mission-critical IT Systems and Infrastructure
• Cybersecurity, Monitoring, and Incident Response
• Data Protection and Continuity/Recovery Support
INFORMATION TECHNOLOGY
PROTECTIVE SERVICES
DEFINING MISSION SUCCESS
Success Is Built On These Core Expectations:
• Mission Alignment & Enterprise Integration:
Site-level operations must seamlessly connect to and support NASA’s enterprise framework and evolving mission priorities.
• Strategic Integration: The contractor must be collaborative, forward-thinking, and disciplined in enterprise reporting and oversight.
• Operational Excellence & Resilience: Precision, compliance, transparency, and proactive risk management are key to day-to-day execution.
• Proven Execution: Future partners must show measurable performance, not just promises, across all domains.
Industry Engagement Event at NASA's Jet Propulsion Laboratory Dr. Lori Glaze Associate Administrator
Human Spaceflight Mission Directorate
OCT. 21, 2026
2H u m a n S p a c e f l i g h t M i s s i o n D i r e c t o r a t e
H U M A N S P A C E F L I G H T M I S S I O N D I R E C T O R A T E
Commercial Lunar Payload Services (CLPS) Missions MADCAP (Multimission Automated Deepspace Conjunction Assessment Process)
Human Spaceflight Utilization at NASA's Jet Propulsion Laboratory
Questions?
NASA Industry Engagement Day Research & Technology Mission Directorate
J O H N M C C U L L O U G H Director/Program Manager Space Communications and Navigation (SCaN) October 21, 2026
Advanced Research & Technology
Space Communications &
Navigation
Space ReactorsAeronautics
NASA’s Research and Technology Mission Directorate
Research and Technology Mission Directorate
Dr. Jimmy Kenyon, Associate Administrator
Dr. Wanda Peters, Deputy Associate Administrator
Office of the Associate Administrator
Aeronautics
Division
Laurie Grindle, Director
Research Innovation and
Technology Program
Flight Research and
Demonstrations Program
Aerospace Capabilities
Portfolio Office
Advanced Research and
Technology Division
Greg Stover, Director
Innovation Program Office
Space Transportation
Advanced Technology Office
Space Infrastructure
Advanced Technology Office
John McCullough, Acting Director
Philip Baldwin, Deputy Director
Space Communications and
Navigation (SCaN) Division
Network Operations
Capabilities Development
Mission and Stakeholder Engagement
Agency Spectrum Management
Systems Engineering and Integration
Network Integrity
Space Reactors
Division
Cynthia Simmons, Director
Space Reactor-1 Freedom
Lunar Reactor-1
Radioisotope Power
Systems Program Office
Advanced Nuclear
Technology Office
Business Management
Office
Bill Harrison, Office Chief
Resource Management
Business Operations
Updated Sep. 25, 2026
Space Communications and Navigation (SCaN)
Madrid, Spain (DSN)
Blossom Point, MD
WG1, WG2, Wallops Island, VA
Launch Range, FL
ASF, AK
NOAA, AK
MGS
McMurdo Ground Station, Antarctica
Guam Remote
Ground Terminal
White Sands
Complex, NM
North Pole, AK
SSC Hawaii
KSAT
TrollSat, Antarctica
SSC
Dongara, Australia
KSAT
Singapore
SSC
Hartebeesthoek, South Africa
KSAT, Norway
SSC Kiruna, Sweden
Hawaii
Table Mtn, CA White Sands, NM
Punta Arenas, Chile
Svalbard, Norway
*DAEP Ka-band Upgrades
LEGS 1, White Sands
LEGS 3,
Australia
LEGS 2,
Matjiesfontein, South Africa
SSC Santiago, Chile
NASA Deep Space Network (DSN)
NASA Near Space Network (NSN)
Commercial Assets Supporting NSN
Optical
Lunar Exploration Ground Sites (LEGS)
F6
F12
F13 F7
F8
F11
Canberra, Australia (DSN) *DAEP Ka-band Upgrades
Goldstone, CA (DSN) *DAEP Ka-band
Upgrade
Network Map
AS1, AS2, AS3
Fairbanks, AK
Lunar Relays
Mars Network (In Formulation)
Mars Relays
Perseverance Mars Rover
Curiosity Mars Rover
Mars Reconnaissance Orbiter Mars Orbiter
Juno Jupiter Orbiter
Voyager Interstellar Space
Psyche Astro Belt En Route
James Webb Space Telescope Deep Space Observatory
100+ Missions Supported by the Networks
Lunar Coordinated
Time
LunaNet
Lunar Relays
Lunar 5G
Optical Comm
Lunar mGNSS
LSP
Lunar
Surface Propagation
KaSTLE Ka-Steerable
Terminal For Lunar
Environments AutoNGC Autonomous
Navigation
MTN
LEGS
Lunar Exploration
Ground Sites
DAEP
DSN
Aperture Enhancement
Program
Moon to Mars
Artemis & Moon Base
SCaN is advancing cutting-edge technologies, collaborating with industry, and shaping global standards through Artemis and Moon Base to build a resilient, interoperable space future
Unified Network & Navigation Operations (UNNO)
Current State
• Multiple contracts across NSN and DSN
• Inconsistent approaches across sites
• Uneven governance and reporting
• Limited enterprise cost control
• Fragmented accountability
Shift
• One acquisition construct
• One common management framework
• Standardized expectations & implementation
• Better enterprise integration
• Improved visibility and control
Implementation
• Consistent cross-site management
• Common cost and performance framework
• Stronger enterprise accountability
• Modernization planned within one framework, not layered onto legacy fragments
Pre-decisional — for market research purposes only. This is not a solicitation.
Consolidated contract approach focused on Operations and Maintenance (O&M) management for Near Space Network and Deep Space Network services and scheduling. The O&M work out of Goldstone and Marovia facilities will transition to UNNO.
UNNO transitions from parallel cost-plus contracts to single hybrid contract
Unified Network & Navigation Operations (UNNO)
Objective Desired outcome
Unify Network while Maintaining Mission Continuity: Uninterrupted Network Operations
Service delivery is continuous, proficient, and resilient. No mission customer experiences a degradation of service as a consequence of contract transition, network unification, organizational change, or the introduction of new systems and providers.
Efficiency in Contract Execution and Network Operations
UNNO delivers credible, auditable baseline and method for quantifying efficiencies (cost per service hour, cost per supported event, labor hours per deliverable, mission onboarding cycle time, mean time to repair, discrepancy closure rate, and similar measures).
Safety Culture and Compliance with Safety Standards
No serious injuries, no preventable mishaps, and a workforce at every site that visibly owns safety as a personal and organizational value.
Best Practices and Skill Sharing Focus on O&M and facility support functions, with contractually required lessons learned, best practices communication, and skill sharing across networks and facilities.
Unified Cybersecurity Standards and Modern Cyber Compliance
A single, coherent, modern cybersecurity implementation spanning the unified network that protects mission-critical space and ground systems against evolving threats while maintaining operations.
Pre-decisional — for market research purposes only. This is not a solicitation.
Advanced Research & Technology Division
Lunar Exploration and Mars-Forward Preparation
First Human
Mission to Mars Sustained Mars Presence
Phase 1 Phase 2 Phase 3
Deep Space Communications and Navigation Concept Analysis
• One-year architecture definition and technology development prioritization effort with MIT Lincoln Lab and JPL
• Aims to define extensible communication and navigation architecture for human exploration activities
• Provide roadmap for evolving operational capabilities and recommend near-term technology investments
• Mars-forward analysis designed to inform current investments, including current lunar technology development activities
• Evaluate possible impacts on near-term lunar infrastructure development
Mars-forward focus building on exploration at the Moon
Mars
Segment Earth
Segment
DST
Mars Segment
• Mars orbiting trunk node(s) provide access links to surface and orbital users
• Moderate-rate high-availability radio links to/from Earth
• High-rate moderate-availability optical links to/from Earth
Enabling Technologies (examples)
• Large-aperture, high-power radio/optical terminals
• High-orthogonality space/ground optical transmitters and receivers
• Enhanced optical pointing/tracking capabilities
• Near-sun optical/radio techniques
• High-accuracy space-based clocks
Earth Segment
• Global ground radio and optical networks
• Earth leading/trailing space node(s) for continuous optical availability and solar conjunction mitigation
Extensible Deep Space Comm and Nav Architecture
Space Reactor Division
Powering the Future of Exploration
Nuclear technologies for deep-space transportation and sustained surface operations.
Space Reactor Freedom
• Target launch: late 2028
• First fission-powered interplanetary spacecraft
• Demonstrating nuclear electric propulsion en route to Mars
Lunar Reactor 1
• Target: launch-ready in 2030
• First fission surface-power system on the Moon
• Enables sustained operations through lunar darkness and in shadowed regions
Dependable electricity and heat for missions operating in cold, low-sunlight environments Power Beyond the Sun: Radioisotope Power Systems
Dragonfly
• Target launch: 2028
• Exploring Saturn’s moon, Titan
• One MMRTG and 24 radioisotope heater unit
ESA's Rosalind Franklin Mission
• Target Launch: Late 2028
• Mars rover seeking signs of life beneath the surface
• 24 lightweight radioisotope heater units
R E S E A R C H A N D T E C H N O L O G Y M I S S I O N D I R E C TO R AT E
S PA C E C O M M U N I C AT I O N S & N AV I G AT I O N
nasa.gov/SCaNscan@nasa.gov
N A S A J E T P R O P U L S I O N L A B O R A T O R Y
FFRDC Contract Competition Industry Engagement
Real Estate & Facilities Overview
AGENDA
01 Laboratory Overview Location, scale, and strategic context
02 Key Facilities Portfolio Mission-critical laboratories and historic assets
03 Key Facilities Deep Dive Assembly, Ops, Simulator, Mars Yard, MDL, EP Lab, Radiation Facilities
Environmental & Superfund Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) obligations and ongoing remediation
05 Real Estate Considerations Implications for prospective Contractors
Laboratory Overview
LABORATORY OVERVIEW
177+ Acres
Federal property
~140 Buildings
Labs, offices, support
~5,000+ Personnel
Staff & contractors
~40 Active Missions
Deep-space & robotics
4800 Oak Grove Drive La Cañada Flintridge / Pasadena, CA
NASA’s only FFRDC
Two National Historic Landmarks:
• Space Flight Operations Facility
• 25-Foot Space Simulator
Key Facilities Portfolio
KEY FACILITIES PORTFOLIO SNAPSHOT
Spacecraft Assembly Facility
High Bay 1 & 2 cleanrooms — final assembly of Voyager, Galileo, Cassini & all Mars rovers
Space Flight Operations Facility
National Historic Landmark; continuous deep-space mission control since 1963
25-Foot Space Simulator
National Historic Landmark; thermal-vacuum & solar simulation for flight hardware
Mars Yard & Rover Ops
Outdoor analog terrain + engineering models for mobility & autonomy testing
Microdevices Laboratory
13,000 SF multi-class cleanroom;
detectors, MEMS, e-beam lithography
Electric Propulsion Laboratory
Vacuum chambers for Hall & ion thrusters; Owens Facility;
micropropulsion
Key Facilities Deep Dive
SPACECRAFT ASSEMBLY FACILITY (BLDG 179)
Mission Heritage
Constructed 1961. High Bay 1 (~80 × 120 ft) and High Bay 2 (1976). Birthplace of Ranger, Mariner, Voyager, Galileo, Cassini, and every NASA Mars rover.
Capabilities
▸ Class 10,000 cleanrooms
▸ Viewing galleries for tours
▸ Integration & system checkout
▸ Wall of Fame of flight systems
SPACE FLIGHT OPERATIONS FACILITY (SFOF) (BLDG 230)
NATIONAL HISTORIC LANDMARK
Continuous deep-space operations since 1963. Primary interface for the Deep Space Network (Goldstone, Canberra, Madrid).
Mission Support Area Real-time commanding, spacecraft telemetry, & anomaly response for 40+ missions
Public Engagement
Regular tour stop; viewing gallery for historic moments
Facility Status
Ongoing renovations while maintaining 24/7 operations
25-FOOT SPACE SIMULATOR (BLDG 150)
Europa Clipper in the Space Simulator
National Historic Landmark Built 1961
Stainless-steel cylindrical chamber (25 ft diameter × 85 ft height) capable of extreme cold, high vacuum, and intense collimated solar radiation.
Flight Hardware Tested ▸ Ranger, Mariner, Voyager, Galileo, Cassini
▸ Perseverance rover & Ingenuity helicopter
▸ Europa Clipper thermal-vacuum campaign
MARS YARD
Outdoor Analog Terrain
>2,000 m² proving ground designed with geologists to replicate Martian and lunar surfaces. Variable-angle slopes, rock distributions matched to flight sites, and a modern robot garage housing engineering models of Curiosity and Perseverance.
Key Uses
▸ Mobility & sampling tests
▸ Autonomy software validation
▸ Side-by-side engineering models
▸ Viewing platform for observation
MICRODEVICES LABORATORY (MDL) (BLDG 302)
Institutional Micro/Nano Fabrication Facility
Operational since 1989. 13,000-square-foot multi-class cleanroom (Class 10 to Class 100,000) used by 70+ research scientists. Over 130 process tools supporting UV & e-beam lithography, materials growth, etching, deposition, and characterization.
Flexible shared-equipment model open to JPL and approved external users — enables rapid prototyping of flight microdevices not available commercially.
Detectors Mid-IR, UV-Visible, submillimeter & bolometer arrays for Earth, planetary & astrophysics instruments
Diffractive Optics E-beam fabricated gratings and nanostructures enabling unique spectrometer performance
MEMS & Nanosystems Sensors, actuators, and micro-instruments for extreme environments
Flight Heritage Devices flown on Mars rovers, Earth science missions, and deep-space observatories
ELECTRIC PROPULSION LABORATORY (BLDG 148)
Develop and qualify electric thrusters for deep-space missions The EP Lab maintains multiple cryopumped vacuum facilities for performance, lifetime, and integration testing of Hall, ion, and microthrusters — supporting Psyche, Gateway, and advanced concepts.
Owens Test Facility
3 m × 10 m long chamber. 30,000-hour NSTAR ion thruster life test. Hall & ion thrusters up to 20 kW. Flight qualification
TVAC.
High-Bay Test Facility
2.6 m × 5.2 m. Six cryogenic pumps; ~200 kl/s on xenon.
Performance and plume characterization.
MicroPropulsion Lab (MPL)
Class 10 cleanroom + UHV chambers. Nano-Newton thrust stand (<0.5 µN). Electrospray / colloid / FEEP testing.
Condensable Metal Facility
Unique national asset for high-power (0.1–1 MW) liquid-metal fueled thrusters. Water-cooled shrouds to 2.5 MW.
PROJECT FORMULATION (BLDG 301)
Mission Formulation & Concurrent Engineering
• State-of-the-art environment supporting rapid mission concept design, analysis and evaluation.
• Networked workstations, data infrastructure, large interactive displays, modeling and simulation tools, historical repositories and a shared project model.
• Supports pre-Phase A / Phase A design-team activities and real-time multidisciplinary trades.
Strategic Value Maintains concurrent engineering as a strategic JPL capability and a key element of increased attention to project formulation.
IN-SITU INSTRUMENT LABORATORY (BLDG 317)
The In-Situ Instrument Laboratory (ISIL) is a building that includes many different types of laboratories.
The main high bay in ISIL is a Mars-like environment for missions to Mars. The high bay is equipped with overhead lighting to simulate the Martian sunlight. This area allows missions to test their robotic instruments on a surface that can mimic the Martian surface.
The high bay was originally designed for the Pathfinder and Mars Exploration Rover Programs and their testbed rovers. Over the years it has also served as the Surface Testbed for the InSight Lander, and Mars 2020 Missions to Mars and their need to test various sequences such as Driving, Instrument Deployments, and Robotic Arm operations.
OPTICAL INTERFEROMETRY DEVELOPMENT LABORATORY (BLDG 318)
Precision Instrument Development
Building 318 was designed as a dedicated interferometry development facility with tightly controlled temperature, humidity, vibration, and noise for advanced space-instrument development.
Facility Characteristics
▸ 14,500-square-foot facility ▸ 4,930-square-foot high bay ▸ Vibration-isolated development environments ▸ Picometer-class control technology development
ROVER OPERATIONS CENTER (BLDG 230)
A center of excellence for current and future rover, aerial, and other surface missions, the Rover Operations Center at NASA’s Jet Propulsion Laboratory leverages JPL’s decades of experience in planetary rover operations. The ROC will support partnerships and technology transfer to catalyze the next generation of Moon and Mars surface missions.
The ROC offers tools, teams, processes training, and facilities for operations success, including systems engineering, integration, and test (SEIT). Other support includes onboard autonomy/AI, resources for orbital and interplanetary communications planning and scheduling, critical anomaly response capabilities, and surge staffing support.
RADIATION EFFECTS & PARTICLE TEST FACILITIES
Center for Space Radiation & Radiation Effects Group In-house radiation test capabilities and partnerships with external accelerator facilities to qualify electronics and materials for the space radiation environment.
Dynamitron (In-House)
▸ 3 MeV electron beam
▸ Internal charging characterization
▸ Materials & electronics testing
▸ Unique on-site capability
Total Ionizing Dose & SEE
▸ Cobalt-60 gamma sources (TID) ▸ Picosecond laser (Single Event
Effect (SEE) lab ▸ Parts evaluation & Radiation
Hardness support ▸ Radiation Effects Database
Proton & Heavy-Ion Testing
▸ Partner accelerators
▸ Proton SEE & displacement damage
▸ Heavy-ion facilities worldwide
▸ Board-level & component testing
MODERNIZATION & NEW ASSETS
Flight Electronics Integration Facility (FEIF) Completed in 2024, FEIF is JPL’s first completely new laboratory building in more than three decades — a 5-story, 88,000 SF LEED Gold facility for electronic and microelectronic engineering, fabrication, testing, and assembly.
Cleanrooms
Class 10K cleanrooms for critical electronics work
Labs & Prototyping Specialized spaces for research, fabrication & integration
Collaboration Offices and meeting spaces for multidisciplinary teams
Sustainability LEED Gold certification — modern energy & environmental standards
Environmental & Superfund
SUPERFUND / CERCLA SITE OBLIGATIONS
JPL is on the National Priorities List (NPL) under CERCLA. NASA is the lead federal agency for investigation and cleanup under a Federal Facilities Agreement with Environmental Protection Agency (EPA), Department of Toxic Substances Control (DTSC), and Regional Water Quality Control Board (RWQCB)
Status & Scope
Listed on NPL in 1992. Contaminants of concern: VOCs, perchlorate; PFAS under investigation. OU-2 (vadose zone soil) cleanup complete. Groundwater (OU-1 source area & OU-3 off-facility) remains active.
Ongoing Remedies
Three NASA-funded groundwater treatment systems (on-site source area, Lincoln Avenue Water Co., City of Pasadena Monk Hill). >97% reduction of chemicals beneath JPL. 2018 Record of Decision governs final remedy.
Institutional Controls
ICs restrict use of impacted groundwater without evaluation/treatment. Agreements with state/local agencies on new wells in the Raymond Basin. Five-year reviews required under CERCLA.
Implications
Any future FFRDC Contractor must coordinate with NASA’s CERCLA program, support access for remediation systems and monitoring wells, and ensure facility operations do not interfere with ongoing cleanup or institutional controls.
Real Estate Considerations
REAL ESTATE & FACILITIES CONSIDERATIONS
Implications for Prospective Contractors
Government-Owned Facilities The Laboratory is federally owned property with facilities capable of supporting both unclassified and classified projects.
The contractor assumes full responsibility for facility maintenance, modernization, environmental compliance, and mission readiness.
Historic Landmark Obligations
SFOF and 25-Foot Space Simulator carry National Historic Landmark status — stewardship and preservation requirements apply.
Specialized Infrastructure
Cleanrooms (MDL, SAF, FEIF), EP vacuum chambers, Dynamitron, cryogenic systems, and DSN interfaces require deep domain expertise.
CERCLA / Superfund
Ongoing groundwater remediation and institutional controls.
Contractor must support NASA’s lead-agency cleanup and avoid interference with treatment systems.
Workforce & Continuity
Facilities support ~5,000 on-site personnel. Institutional knowledge and 24/7 mission operations must be preserved.
Off-Site Assets
Contract scope includes facilities at Fort Irwin and Wrightwood in addition to the main Pasadena campus.
K E Y T A K E A W A Y S
01 NASA JPL’s 177+ acre campus houses irreplaceable national assets critical to deep-space exploration.
02 Two National Historic Landmarks plus unique cleanrooms, EP test facilities, and radiation capabilities.
03 Active CERCLA Superfund obligations require ongoing coordination with NASA’s environmental program.
04 Contractor must deliver uninterrupted mission support, continuity of workforce expertise, facility stewardship, and cost-effective modernization
Questions & Discussion
Industry Engagement Event • October 21–22, 2026 • JPL Pasadena Campus
Jet Propulsion Laboratory Group Tour Map
144 – Electric Propulsion Lab 150 – 25 ft Space Simulator 179 – Spacecraft Assembly Facility TBD – Mars Yard (MY) 230 – Spaceflight Operations Facility 230 – Rover Operations Center 301 – Project Formulation 302 – Microdevices Laboratory 317 – In-Situ Instrument Laboratory 318 – Optical Interferometry Dev Lab
= No egress off the bus = Internal building visit
MY
Start Time End Time Duration (min) Transit (min) Location 10:00 AM 10:05 AM 5 Load Members on to Bus
5 Drive to East Building 144 10:10 AM 10:13 AM 3 Electric Propulsion Laboratory
0 View Building 10:13 AM 10:16 AM 3 Environmental & Spacecraft Testing Facility
3 View Building, walk to Building 150 10:19 AM 10:29 AM 10 25-Foot Space Simulator
3 Drive to Mars Yard 10:32 AM 10:35 AM 3 View Outdoor Mars Yard
3 Drive to Building 230 (North Side) 10:38 AM 10:41 AM 3 Rover Operations Center
3 View Building, Drive to Building 302 10:44 AM 10:54 AM 10 MicroDevices Laboratory
3 Walk to Building 317 10:57 AM 11:07 AM 10 In-Situ Instrument Laboratory
3 View Building, Drive to Building 318 11:10 AM 11:13 AM 3 Optical & Interferometry Development Laboratory
3 Drive to Eastside of Building 179 11:16 AM 11:26 AM 10 Spacecraft Assembly Facility High Bay #1
3 View Building 301 11:29 AM 11:32 AM 3 A-Team, Team X & VividLab
3 Drive to Building 230 11:35 AM 11:45 AM 10 Space Flight Operations Facility
5 Drive to Main Gate 11:50 AM Tour Ends
= No egress off of bus
Group Tour #1 Itinerary
Group Tour #2 Itinerary
Start Time End Time Duration (min) Transit (min) Location 12:00 PM 12:05 PM 5 Load Members on to Bus
5 Drive to East Building 144 12:10 PM 12:13 PM 3 Electric Propulsion Laboratory
0 View Building 12:13 PM 12:16 PM 3 Environmental & Spacecraft Testing Facility
3 View Building, walk to Building 150 12:19 PM 12:29 PM 10 25-Foot Space Simulator
3 Drive to Mars Yard 12:32 PM 12:35 PM 3 View Outdoor Mars Yard
3 Drive to Building 230 (North Side) 12:38 PM 12:41 PM 3 Rover Operations Center
3 View Building, Drive to Building 302 12:44 PM 12:54 PM 10 MicroDevices Laboratory
3 Walk to Building 317 12:57 PM 1:07 PM 10 In-Situ Instrument Laboratory
3 View Building, Drive to Building 318 1:10 PM 1:13 PM 3 Optical & Interferometry Development Laboratory
3 Drive to Eastside of Building 179 1:16 PM 1:26 PM 10 Spacecraft Assembly Facility High Bay #1
3 View Building 301 1:29 PM 1:32 PM 3 A-Team, Team X & VividLab
3 Drive to Building 230 1:35 PM 1:45 PM 10 Space Flight Operations Facility
5 Drive to Main Gate 1:50 PM Tour Ends
= No egress off of bus
| FFRDC Industry Event Presentations.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| SMD Presentation - FFRDC Industry Event.pdf |
| Slide 1 |
| Slide 2 |
| MSD Presentation - FFRDC Industry Event.pdf |
| Mission Support Directorate (MSD) & FFRDC |
| PROVIDING A SOLID FOUNDATION FOR MISSION SUCCESS |
| JPL FACILITIES AT A GLANCE |
| OPERATING WITHIN NASA’S ENTERPRISE FRAMEWORK |
| INSTITUTIONAL SCOPE |
| PRIORITIES IN FACILITIES & REAL ESTATE |
| PRIORITIES IN MAINTENANCE MANAGEMENT |
| PRIORITIES IN LOGISTICS & ENVIRONMENTAL |
| THE PROTECTIVE SERVICES & IT ECOSYSTEM |
| DEFINING MISSION SUCCESS |
| HSMD Presentation - FFRDC Industry Event.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| RTMD Presentation - FFRDC Industry Event.pdf |
| Default Section |
| Slide 1: NASA Industry Engagement Day |
| Slide 2 |
| Slide 3 |
| Slide 4 |
| Slide 5 |
| Slide 6 |
| Slide 7 |
| Slide 8: Unified Network & Navigation Operations (UNNO) |
| Slide 9: Unified Network & Navigation Operations (UNNO) |
| Slide 10: Advanced Research & Technology Division |
| Slide 11 |
| Slide 12 |
| Slide 13 |
| Slide 14: Powering the Future of Exploration |
| Slide 15: Power Beyond the Sun: Radioisotope Power Systems |
| Slide 16 |
| Facilities Overview - FFRDC Industry Event.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
File details come from the government source that posted it. Updated .