Fee_Proposal_Tables.docx
DOCX document 42 KB Posted
- Solicitation number
- 2024-RFP-00262
- Issued by
- San Mateo County, California
About this file
The document is a Fee Proposal Table for San Mateo County's Request for Proposals (RFP No. 2024-RFP-00262) to operate the Pescadero Transfer Station and Materials Recovery Facility (TS/MRF). The county seeks a qualified contractor to manage the facility for an initial five-year term, with the option to extend the agreement for up to three additional one-year periods. The required tasks include collection and handling of materials, transport, maintenance, compliance, customer service, and emergency response. The contract will cover operations ranging from 3 to 5 days per week, with potential variations in service frequency.
The fee proposal table provides a comprehensive pricing structure for various waste and recyclable materials, including municipal solid waste, single-stream recyclables, scrap metal, appliances, yard waste, electronic waste, and other specialized items. The proposal requires detailed pricing per unit or per ton, with separate columns for transfer costs, disposal fees, and total rates to the county. Contractors must break down fixed operating costs, including labor, equipment, maintenance, overhead, and profit. The document includes a year-over-year fee proposal section for the five-year contract term, allowing for potential cost adjustments and financial planning.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fee Proposal Tables
Fixed Operating Costs
| Service |
| Unit |
| 3 Day/Week Operation |
(Fri-Sun) 4 Day/Week Operation (Th-Sun) 5 Day/Week Operation (Th-M) Comments
Rate to County (Per Year) Rate to County (Per Year) Rate to County (Per Year)
Fixed Operating Costs (Please break down in the following lines: labor, equipment, maintenance, overhead and profit, etc.)
Per Year
(i.e., Labor)
(i.e., Maintenance)
Preference of Operations (Rank 1-3. 1 being your preferred operations. Put N/A if unfeasible) 1-3
Variable Transfer and Processing Costs If a specific material type is unavailable for collection, please mark it as N/A.
| Material |
| Unit |
| Transfer Cost |
| Disposal Cost (Gate Fee) |
| Other Transfer and Processing Cost |
| Total Rate to County |
(Per Unit Cost)
| Name of the facility the material will be taken to |
| Comments |
| Non-compacted Municipal Solid Waste |
| Per Ton |
Commingled Single Stream Recyclables
Per Ton
| Scrap Metal |
| Each or Per Ton |
Appliances (Washer, Dryers, Dishwasher, Stoves, Ovens, Microwave)
Each or Per Ton
| Water Heaters |
| Each Unit |
| Refrigerators |
| Each Unit |
| Heaters / AC Units |
| Each or Per Ton |
| Mattress / Box Springs* |
| Each or Per Ton |
| Sofa / Upholstered Furniture |
| Each or Per Ton |
| Yard Waste |
| Per Ton |
| Food Scraps (residential and commercial) |
| Per Ton |
| Inerts (Dirt, Concrete, Rock, Asphalt) |
| Per Ton |
| Electronic Waste |
| Per Ton |
| Universal Waste (Fluorescent Tubes & Batteries) |
| Per Ton |
| Waste Oil / Filters |
| Each |
| Latex Paint Cans (Empty)* |
| Lb. |
| Tires |
| Each |
| Other Recyclables? |
| Per Ton |
Contract Total
The Year-over-year fee proposal (Years 1 through 5) will become the Contract Total (Section below).
Year-Over-Year Summary, presented in summary as listed below:
| Year |
| Fee Proposal Calculations |
| 1 |
| $ |
| 2 |
| $ |
| 3 |
| $ |
| 4 |
| $ |
| 5 |
| $ |
| Contract Total |
| $ |
File details come from the government source that posted it. Updated .