This is a technical specifications document from the Florida Department of Transportation (FDOT) detailing requirements for graded aggregate base course construction in roadway projects. The specifications establish material sourcing, gradation standards, and construction procedures for aggregate base layers that serve as foundational components in pavement systems. The document prescribes two aggregate material groups—Group 1 (limestone, marble, or dolomite) and Group 2 (granite, gneiss, or quartzite)—with contractors permitted to use either classification but only one group per contract. Materials must meet specific quality standards including a Limerock Bearing Ratio value of not less than 100, with soundness loss limits of 15 percent and wear percentages of 45 percent for Group 1 aggregates and 65 percent for Group 2 aggregates. Detailed sieve analysis requirements are provided in Table 204-1, specifying percentage passing requirements across eight sieve sizes from 2 inches down to No. 200. The specifications address equipment provision, aggregate transportation and spreading, compaction procedures requiring minimum density of 100 percent of maximum density per FM 1-T 180 Method D (98 percent for shoulder and shared-use paths), moisture content control, dust abatement measures, and surface testing protocols.
Payment for graded aggregate base work is calculated as square yardage of completed and accepted material at authorized normal thickness, with adjustments made for variations between calculated average thickness and specified normal thickness. Contractors must provide full compensation coverage including dust abatement, defect correction, crack removal, and additional aggregate requirements for crack elimination. The specification section references related sections 200, 285, and other FDOT standards for equipment, transporting, spreading, compacting, finishing, testing, priming, and maintaining procedures. This document functions as part of Florida's comprehensive highway construction specifications for FY 2026-27 and establishes binding technical requirements for any contractor performing graded aggregate base work on FDOT projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| On-Site_Concrete_Crushing_with_Multi-Size_Aggregate_Output_and_Contaminant_Removal_(Addendum_#1_Revision).pdf | ||
| ON_SITE_CONCRETE_CRUSHING_.pdf | ||
| On-Site_Concrete_Crushing_with_Multi-Size_Aggregate_Output_and_Contaminant_Removal.pdf | ||
| Contract_No._26-06.pdf | ||
| Corporate_Power_of_Attorney.docx | DOCX document | |
| Consent_of_Surety.docx | DOCX document | |
| Public_Construction_Bond.doc | DOC document | |
| FDOT_Specifications_Section_911.pdf | ||
| Public_Construction_Bond_(25).doc | DOC document | |
| CONSTRUCTION_CONTRACT.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 204
GRADED AGGREGATE BASE
204-1 Description.
Construct a base course composed of graded aggregate.
204-2 Materials.
Use graded aggregate material, produced from Department approved sources, which yields a satisfactory mixture meeting all the requirements of these Specifications after it has been crushed and processed as a part of the mining operations.
The Contractor may furnish the material in two sizes of such gradation that, when combined in a central mix plant pugmill, the resultant mixture meets the required specifications.
Use graded aggregate base material of uniform quality throughout, substantially free from vegetable matter, shale, lumps and clay balls, and having a Limerock Bearing Ratio value of not less than 100. Use material retained on the No. 10 sieve composed of aggregate meeting the following requirements:
Soundness Loss, Sodium, Sulfate: AASHTO T104 ...... 15%
Percent Wear: AASHTO T 96 (Grading A)
Group 1 Aggregates ....................................................... 45%
Group 2 Aggregates ....................................................... 65%
Group 1: This group of aggregates is composed of limestone, marble, or dolomite.
Group 2: This group of aggregates is composed of granite, gneiss, or quartzite.
Use graded aggregate base material meeting the following gradation:
Table 204-1
Sieve Size Percent by Weight Passing
2 inch 100
1-1/2 inch 95 to 100
3/4 inch 65 to 90
3/8 inch 45 to 75
No. 4 35 to 60
No. 10 25 to 45
No. 50 5 to 25
No. 200 0 to 10
For Group 1 aggregates, ensure that the fraction passing the No. 40 sieve has a Plasticity
Index (AASHTO T 90) of not more than 4.0 and a Liquid Limit (AASHTO T 89) of not more than 25, and contains not more than 67% of the weight passing the No. 200 sieve.
For Group 2 aggregates, ensure that the material passing the No. 10 sieve has a sand equivalent (AASHTO T 176) value of not less than 28.
The Contractor may use graded aggregate of either Group 1 or Group 2, but only use one group on any Contract. (Graded aggregate may be referred to hereinafter as “aggregate”.)
235 FY 2026-27Return to Table of Contents
204-3 Equipment.
Provide equipment meeting the requirements of 200-3.
204-4 Transporting Aggregate.
Transport aggregate as specified in 200-4.
204-5 Spreading Aggregate.
Spread aggregate as specified in 200-5.
204-6 Compacting and Finishing Base.
204-6.1 General: Meet the requirements of 200-7.1 with density requirements of
204-6.3.
204-6.1.1 Single-Course Base: Construct as specified in 200-6.1.1.
204-6.1.2 Multiple-Course Base: Construct as specified in 200-6.1.2.
204-6.2 Moisture Content: Meet the requirements of 200-6.2.
204-6.3 Density Requirements: After attaining the proper moisture conditions, uniformly compact the material to a density of not less than 100% of the maximum density as determined by FM 1-T 180, Method D. For shoulder only areas and shared use paths, obtain a minimum density of 98% of the maximum density as determined by FM 1-T 180, Method D.
204-6.4 Density Tests: Meet the requirements of 200-7.2.2.
204-6.5 Correction of Defects: Meet the requirements of 200-6.4.
204-6.6 Dust Abatement: Minimize the dispersion of dust from the base material during construction and maintenance operations by applying water or other dust control materials.
204-7 Testing Surface.
Test the surface in accordance with the requirements of 200-7.
204-8 Priming and Maintaining.
Meet the requirements of 200-8.
204-9 Thickness Requirements.
Meet the requirements of 285-6.
204-10 Calculations for Average Thickness of Base.
Calculations for determining the average thickness of base will be made in accordance with 285-7.
204-11 Method of Measurement.
204-11.1 General: The quantity to be paid for will be the plan quantity area, in square yards, completed and accepted.
204-11.2 Authorized Normal Thickness Base: The surface area of authorized normal thickness base will be the plan quantity area, omitting any areas not allowed for payment under the provisions of 204-9 and omitting areas which are to be included for payment under 204-11.3.
The area for payment, of authorized normal thickness base, will be the surface area determined as provided above, adjusted by adding or deducting, as appropriate, the area of base represented by the difference between the calculated average thickness, determined as provided in 204-10, and the specified normal thickness, converted to equivalent square yards of normal thickness base.
236 FY 2026-27Return to Table of Contents
204-11.3 Authorized Variable Thickness Base: As specified in 200-10.3.
204-12 Basis of Payment.
Price and payment will be full compensation for all work specified in this Section, including dust abatement, correcting all defective surface and deficient thickness, removing cracks and checks and the additional aggregate required for such crack elimination.
Payment will be made under:
Item No. 285- 7- Optional Base - per square yard.
237 FY 2026-27Return to Table of Contents
File details come from the government source that posted it. Updated .