This document contains the Contract Documents and Technical Specifications for the Farmington City Shepard Creek Well House project. The project involves the construction of a well house, including a full water treatment system, concrete and asphalt work, and utility lines. Bids for the construction of the project are due on Thursday, November 21, 2024 at 2:00 p.m. local time, and a mandatory pre-bid conference will be held on Thursday, November 7, 2024 at 2:00 p.m. at Farmington City Hall. The work is to be substantially complete within 275 days after the start of the contract, and completed and ready for final payment within 300 days.
The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Pricing is based on a combination of lump sum and unit prices, with the total bid price consisting of the sum of the lump sum and unit price items. The contract documents provide details on the bidding requirements, contract forms, contract conditions, and technical specifications for the various components of the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20241029 Farmington Shepard Creek Well House Drawings.pdf | ||
| 1266635-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UDOT | SR-30 Bridge Hydraulics Report 1
CONTRACT DOCUMENTS and
TECHNICAL SPECIFICATIONS
Farmington City
Shepard Creek Well House
October 2024
Prepared by CRS Engineers 4246 S. Riverboat Rd, Ste 200| Salt Lake City, UT 84123 O. (801) 359-5565 | F. 801.359.4272
CRS Engineers PN 2021-0001 4246 S. Riverboat Rd, Ste 200, Salt Lake City, UT 84123
Farmington City – Shepard Creek Well House
Project Location:
1799 South Maint St., Farmington, UT 84025
O ct ob er
CONTRACT DOCUMENTS and
TECHNICAL SPECIFICATIONS
CONTENTS
00 00 01 Title PageINTRODUCTORY INFORMATION 00 00 30 Table of Contents
00 10 00 Advertisement for BidBIDDING REQUIREMENTS 00 20 00 Instructions to Bidders 00 41 00 Bid Form 00 43 00 Bid Bond (Penal Sum)
CONTRACT FORMS 00 51 00 Notice of Award 00 52 00 Agreement 00 55 00 Notice to Proceed 00 61 00 Performance Bond 00 61 50 Payment Bond 00 62 00 Payment Application 00 62 50 Certificate of Substantial Completion 00 62 60 Notice of Acceptability
CONTRACT CONDITIONS 00 70 00 General Conditions 00 80 00 Supplementary Conditions
ADDENDA 00 90 00 Addenda and Modifications
CONTRACT ADMINISTRATION FORMS 00 94 00 Work Change Directive 00 94 10 Change Order 00 94 20 Field Order
DIVISION 1 01 00 50 Administrative Provisions
GENERAL REQUIREMENTS 01 02 50 Measurement and Payment 01 45 00 Quality Control 01 55 50 Traffic Control 01 57 00 Construction Facilities and Temporary Controls 01 78 50 Closeout Procedures
DIVISION 2 02 41 00 Site Preparation and Selective Demolition
EXISTING CONDITIONS
DIVISION 3 03 30 00 Cast-In-Place Concrete
CONCRETE 03 61 00 Cementitious Concrete
DIVISION 4 04 05 16 Masonry Mortar and Grout
MASONRY 04 22 00 Concrete Unit Masonry
DIVISION 5 05 05 10 Metal Galvanizing
METALS 05 05 23 Bolts, Nuts and Accessories
05 56 00 Metal Castings
DIVISION 6 06 61 00 Rough Carpentry
WOOD, PLASTICS, AND COMPOSITES
DIVISION 7 07 19 00 Water Repellant
THERMAL AND MOISTURE PROTECTION 07 21 00 Insulation 07 26 16 Under-Slab Vapor Barrier 07 41 13 Metal Roof Panels 07 60 00 Flashing and Sheet 07 71 23 Manufactured Gutters and Downspouts 07 92 13 Elastomeric Joint Sealants
DIVISION 8 08 12 13 Hollow Metal Frames
OPENINGS 08 13 13 Hollow Metal Doors 08 70 00 General Hardware Requirements
SECTION 9 09 29 00 Gypsum Wallboard
FINISHES 09 91 00 Painting 09 96 56 High Humidity Interior Epoxy Painted Gypsum Board
SECTION 10 10 00 00 Building Safety Equipment
SPECIALITIES
SECTION 13 13 34 19 Metal Building
SPECIAL CONSTRUCTION
SECTION 15 15 10 10 Joint Gaskets
MECHANICAL AND PLUMBING 15 13 50 Gages and Meters 15 55 10 Heating Units 15 99 20 Piping Systems Testing
SECTION 22 22 05 01 General Plumbing Requirements
PLUMBING 22 05 29 Hangers and Supports for Plumbing Piping and Equipment 22 11 13 Facility Water Distribution Piping 22 11 23 Vertical Turbine, Motor, and Appurtenances 22 40 00 Plumbing Fixtures and Accessories 22 45 16 Heated Safety Station with Eyewash
SECTION 23 23 37 14 Louvers and Vents
HEATING, VENTILATING, AND AIRE
CONDITIONING
SECTION 26 26 05 00 Common Work Results for Electrical
ELECTRICAL 26 05 05 Electrical Equipment
26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding 26 05 29 Hangers and Supports for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 26 05 53 Identification of Electrical Systems 26 05 73 Short-Circuit/Coordination/Arc Flash Hazard 26 08 00 Commissioning of Electrical Systems 26 22 13 Low-Voltage General Purpose Transformers 26 24 16 Panelboards 26 27 26 Wiring Devices 26 28 13 Fuses 26 28 16 Enclosed Switches and Circuit Breakers 26 29 23 Variable Frequency Drives 26 32 13.13
Diesel-Engine Generator Sets
26 50 00 Lighting
DIVISION 31 31 22 00 Grading
EARTH WORK 31 23 00 Excavation, Backfilling and Compaction 32 05 00 Restoration of Existing Improvements 32 11 23 Base Course 32 12 16 Asphaltic Concrete Paving 32 17 23 Pavement Markings
DIVISION 33 33 11 00 Water Distribution and Transmission
UTILITIES 33 13 00 Disinfection of Water Distribution Systems 33 31 00 Sanitary Sewer Systems 33 41 00 Storm Drainage Systems
DIVISION 43 43 41 43 Polyethylene Double Wall Tanks
PROCESS GAS AND LIQUID HANDLING
This page is left blank intentionally.
CRS Engineers PN 2021-0001 Farmington City
October 2024 Shepard Creek Well House
Advertisement for Bid
00 10 00 Page 1 of 2
DOCUMENT 00 10 00
ADVERTISEMENT FOR BIDS
GENERAL NOTICE
Farmington City is requesting Bids for the construction of the following Project:
Shepard Creek Well House-
Bids for the construction of the Project will be received at Farmington City located at 160 South Main St., Farmington, UT 84025 until Thursday, November 21, 2024 at 2:00 p.m. local time. Alternatively, bids may be mailed to 160 South Main St., Farmington, UT 84025. At that time the Bids received will be publicly opened and read.
The Work generally consists of Construction of the well house, piping, and all other appurtenances required to supply to water from this source into the system.
OBTAINING THE BIDDING DOCUMENTS
Information and Bidding Documents for the Project can be found at the following designated website:
https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=StateOfUtah
Event Number: FSCWH2024
Project: Farmington Shepard Creek Well House
Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding
Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.
PRE-BID CONFERENCE
A mandatory pre-bid conference for the Project will be held on Thursday, November 7, 2024 at 2:00 p.m. at
Farmington City Hall, 160 South Main St., Farmington, UT 84025. Bids will not be accepted from Bidders that do not attend the mandatory pre-bid conference.
INSTRUCTIONS TO BIDDERS
For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
THIS ADVERTISEMENT IS ISSUED BY:
Owner: Farmington City
By: Chad Boshell
Title: City Engineer
Date: Wednesday, October 30, 2024
END OF DOCUMENT
Advertisement for Bid
00 10 00 Page 2 of 2
EJCDC® C-111, Advertisement for Bids for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Instruction to Bidders
00 20 00 Page 1 of 10
DOCUMENT 00 20 00
INSTRUCTIONS TO BIDDERS
Table of Contents
Page
Article 1— Defined Terms
Article 2— Bidding Documents
Article 3— Qualifications of Bidders
Article 4— Pre-Bid Conference
Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program; Other
Work at the Site
Article 6— Bidder’s Representations and Certifications
Article 7— Interpretations and Addenda
Article 8— Bid Security
Article 9— Contract Times
Article 10— Substitute and “Or Equal” Items
Article 11— Subcontractors, Suppliers, and Others
Article 12— Preparation of Bid
Article 13— Basis of Bid
Article 14— Submittal of Bid
Article 15— Modification and Withdrawal of Bid
Article 16— Opening of Bids
Article 17— Bids to Remain Subject to Acceptance
Article 18— Evaluation of Bids and Award of Contract
Article 19— Bonds and Insurance
Article 20— Signing of Agreement
00 20 00 Page 2 of 10
ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.
ARTICLE 2—BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents
(together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is
Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or invitation to bid. Owner recommends that Bidder register as a plan holder with the Issuing Office at such website, and obtain a complete set of the Bidding Documents from such website. Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by
Owner.
2.04 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding
Documents are available, such documents will be made available to the Bidders as Electronic
Documents in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in
Paragraph 2.06.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.
00 20 00 Page 3 of 10
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within five days of Owner’s request, Bidder must submit the Bidder Qualification Statement with supporting data.
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
ARTICLE 4—PRE-BID CONFERENCE
4.01 A mandatory pre-Bid conference will be held at the time and location indicated in the
Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project. Proposals will not be accepted from Bidders who do not attend the conference. It is each Bidder’s responsibility to sign in at the pre-bid conference to verify its participation. Bidders must sign in using the name of the organization that will be submitting a Bid. A list of qualified
Bidders that attended the pre-bid conference and are eligible to submit a Bid for this Project will be issued in an Addendum.
4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S SAFETY
PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.
b. Those drawings known to Owner of existing physical conditions at or adjacent to the
Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.
c. Reports and drawings known to Owner relating to Hazardous Environmental
Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any
Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the
00 20 00 Page 4 of 10
Supplementary Conditions. Bidder is responsible for any interpretation or conclusion
Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of
Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in
Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.
5.03 Other Site-related Documents
A. No other Site-related documents are available.
5.04 Site Visit and Testing by Bidders
A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.
B. A Site visit is scheduled following the pre-bid conference. Maps to the Site will be available at the pre-Bid conference.
C. Bidders visiting the Site are required to arrange their own transportation to the Site.
D. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
E. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by
Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
F. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
5.05 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions.
5.06 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the
Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will submit contains express representations regarding the
Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.
00 20 00 Page 5 of 10
ARTICLE 7—INTERPRETATIONS AND ADDENDA
7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the
Bidding Documents.
7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows:
A. Submit questions via the Bidding Documents Website and in writing to Joshua Prettyman, P.E.
Horrocks at Joshua.prettyman@horrocks.com.
7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Question are due Tuesday
November 19th, 2024. Questions received after this data may not be answered. Answers will be provided to the questions on Wednesday, November 20th, 2024.
7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract
Documents unless set forth in an Addendum that expressly modifies or supplements the Contract
Documents.
ARTICLE 8—BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of
Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General
Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required
Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the
Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.
ARTICLE 9—CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.
9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial
Completion, or completion of the Work in readiness for final payment, are set forth in the
Agreement.
ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS
10.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract
00 20 00 Page 6 of 10 award process of possible substitute or “or-equal” items. In cases in which the Contract allows the
Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
10.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 A Bidder must be prepared to retain specific Subcontractors and Suppliers for the performance of the Work if required to do so by the Bidding Documents or in the Specifications. If a prospective
Bidder objects to retaining any such Subcontractor or Supplier and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
11.02 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the Subcontractors or Suppliers proposed for the following portions of the Work within five days after Bid opening:
A. Iron/Manganese treatment filter, backwash vault, vertical turbine pump, and the backwash submersible pump.
11.03 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such
Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent
Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.
11.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the
Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers.
Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to
Owner and Engineer subject to subsequent revocation of such acceptance as provided in
Paragraph 7.07 of the General Conditions.
ARTICLE 12—PREPARATION OF BID
12.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink. Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
12.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the
Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the
Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally
00 20 00 Page 7 of 10 vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.
12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown. The corporate seal must be affixed and attested by the corporate secretary or an assistant corporate secretary.
12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.
12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.
12.06 A Bid by an individual must show the Bidder’s name and official address.
12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
12.08 All names must be printed in ink below the signatures.
12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.
12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.
12.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the
Project is located, the Bid must contain evidence of Bidder’s licensure. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.
ARTICLE 13—BASIS OF BID
13.01 Lump Sum
A. Bidders must submit a Bid on a lump sum basis as set forth in the Bid Form.
13.02 Unit Price
A. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity”, which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by
Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
00 20 00 Page 8 of 10
ARTICLE 14—SUBMITTAL OF BID
14.01 The Bidding Documents include a Bid Form, and, if required, the Bid Bond Form. An unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form.
14.02 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid and must be enclosed in a plainly marked package with the
Project title, and, if applicable, the designated portion of the Project for which the Bid is submitted, the name and address of Bidder, and must be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid must be addressed to the location designated in the
Advertisement.
14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the
Bidder unopened.
ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID
15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.
ARTICLE 16—OPENING OF BIDS
16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.
18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.
18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the
Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.
18.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.
18.05 Evaluation of Bids
00 20 00 Page 9 of 10
A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid
Form or prior to the Notice of Award.
B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the
Bid Form. To determine the Bid prices for purposes of comparison, Owner will announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them.
For comparison purposes alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.
C. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
18.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 19—BONDS AND INSURANCE
19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.
19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.
ARTICLE 20—SIGNING OF AGREEMENT
20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful
Bidder, together with printed and electronic copies of the Contract Documents as stated in
Paragraph 2.02 of the General Conditions.
END OF DOCUMENT
EJCDC® C-200, Instructions to Bidders for Construction Contracts.
Copyright © 2018 National Society of Professional Engineers, American Council of Engineering Companies, 00 20 00 Page 10 of 10
Bid Form for Construction Contract Page 1 of 8 00 41 00
DOCUMENT 00 41 00
BID FORM
Farmington City Shepard Creek Well House
Bids due and publicly read:
Thursday, November 21, 2024 at 2:00 p.m.
Farmington City
160 South Main St., Farmington, UT 84025
Bid Form for Construction Contract Page 2 of 8 00 41 00
ARTICLE 1—OWNER AND BIDDER
1.01 This Bid is submitted to: Farmington City.
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2—ATTACHMENTS TO THIS BID
2.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid security;
B. List of Proposed Subcontractors;
C. List of Proposed Suppliers;
D. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such authority within the time for acceptance of Bids;
E. Contractor’s license number as evidence of Bidder’s State Contractor’s License or a covenant by Bidder to obtain said license within the time for acceptance of Bids;
ARTICLE 3—BASIS OF BID—LUMP SUM BID AND UNIT PRICES
3.01 Unit Price Bids
A. Bidder will perform the following Work at the indicated unit prices:
Base Bid
Item No. Description Unit Estimated
Quantity Bid Unit
Price Bid Amount
1 Mobilization/Demobilization/Clean-up LS 1 $
2 Clearing & Grubbing LS 1 $
3 Complete Site Grading LS 1 $
4 Install Recycled Asphalt Pavement Provided by Farmington City CY 250 $
5 Furnish and Install Well House Structural/Mechanical Bldg LS 1 $
6 Furnish and Install Well House Piping and Appurtenances LS 1 $
7 Furnish and Install 72” Chemical Containment Manhole EA 1 $
8 Furnish and Install Fluoride Equipment LS 1 $
9 Furnish and Install Chlorine Equipment LS 1 $
Furnish and Install Pureflow Iron & Manganese Removal Filtration System
LS 1 $
11 Furnish and Install Exterior Electrical Conduit/Junction Boxes LS 1 $
12 Furnish and Install Diesel Generator & Reinforced Concrete Pad LS 1 $
Bid Form for Construction Contract Page 3 of 8 00 41 00
13 Furnish and Install 4” Thick Concrete Sidewalk CY 11 $
14 Furnish and Install Well House Electrical LS 1 $
15 Furnish and Install 8” C900 DR-18 PVC Waterline LF 192 $
16 Furnish and Install Fire Hydrant Assembly EA 1 $
17 Connect to Existing 12” HDPE Waterline EA 2 $
18 Furnish and Install 10” C900 DR-18 PVC Waterline LF 39 $
19 Furnish and Install 1” Water Service Lateral & Meter EA 1 $
20 Furnish and Install 2’×4’ Blow-Off Discharge Box EA 2 $
21 Furnish and Install 15” RCP Storm Drain Line LF 297 $
22 Furnish and Install 48” Manhole EA 4 $
23 Furnish and Install 16’×9’×9’-6” 9000 Gallon Backwash Tank LS 1 $
24 Furnish and Install 10” C900 DR-21 PVC Sewer Line LF 10 $
25 Furnish and Install 1.5” HDPE DR-11 (IPS) Sewer Force Main LF 400 $
26 Furnish and Install 4” C900 DR-21 PVC Sewer Lateral LF 105 $
27 Connect to Existing 10” Sewer Line EA 1 $
Total of All Unit Price Base Bid Items $
Total Unit Price Base Bid (in words): _______________________________________________________
Alternates
Item No. Description Unit Estimated
Quantity Bid Unit Price Bid Amount
Total of All Alternate Bid Items $
Total Alternate Bid Items (in words): _______________________________________________________
Base Bid + Alternates
Bid Form for Construction Contract Page 4 of 8 00 41 00
Total of All Unit Price Base Bid Items + Alternates $
Total All Unit Price Base Bid Items + Alternates (in words):___________________________________
B. Bidder acknowledges that:
1. each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item,
2. the Contractor or Owner shall be entitled to an adjustment in Unit Price as indicated in Section 00 80 00 - Supplementary Conditions, SC-13.03E, and
3. estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Work will be based on actual quantities, determined as provided in the Contract Documents.
3.02 Total Bid Price (Lump Sum and Unit Prices)
Total Bid Price (Total of all Lump Sum and Unit Price Bids) $
Total Bid Price (in words): _____________________________________________________________________
ARTICLE 4—TIME OF COMPLETION
4.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
4.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 5—BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND RECEIPT OF
ADDENDA
5.01 Bid Acceptance Period
A. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
5.02 Instructions to Bidders
A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security.
5.03 Receipt of Addenda
A. Bidder hereby acknowledges receipt of the following Addenda:
Addendum Number Addendum Date
Bid Form for Construction Contract Page 5 of 8 00 41 00
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Bidder’s Representations
A. In submitting this Bid, Bidder represents the following:
1. Bidder has examined and carefully studied the Bidding Documents, including Addenda.
2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
4. Bidder has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings.
5. Bidder has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, with respect to Technical Data in such reports and drawings.
6. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Technical Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and performance of the Work; (b) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, if selected as Contractor; and
(c) Bidder’s (Contractor’s) safety precautions and programs.
7. Based on the information and observations referred to in the preceding paragraph, Bidder agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.
8. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
9. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.
10. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
11. The submission of this Bid constitutes an incontrovertible representation by Bidder that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
6.02 Bidder’s Certifications
A. The Bidder certifies the following:
1. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation.
2. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
Bid Form for Construction Contract Page 6 of 8 00 41 00
3. Bidder has not solicited or induced any individual or entity to refrain from bidding.
4. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 8.02.A:
a. Corrupt practice means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process.
b. Fraudulent practice means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition.
c. Collusive practice means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels.
d. Coercive practice means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
Bid Form for Construction Contract Page 7 of 8 00 41 00
BIDDER hereby submits this Bid as set forth above:
Bidder:
(typed or printed name of organization)
By:
(individual’s signature)
Name:
(typed or printed)
Title:
(typed or printed)
Date:
(typed or printed)
If Bidder is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.
Attest:
(individual’s signature)
Name:
(typed or printed)
Title:
(typed or printed)
Date:
(typed or printed)
Address for giving notices:
Bidder’s Contact:
Name:
(typed or printed)
Title:
(typed or printed)
Phone:
Email:
Address:
Bidder’s Contractor License No.: (if applicable)
END OF DOCUMENT
EJCDC® C-410, Bid Form for Construction Contracts.
Copyright © 2018 National Society of Professional Engineers, American Council of Engineering Companies, Bid Form for Construction Contract Page 8 of 8 00 41 00
Bid Bond (Penal Sum Form) Page 1 of 2 00 43 00
DOCUMENT 00 43 00
BID BOND (PENAL SUM FORM)
Bidder Surety Name: Name:
Address (principal place of business): Address (principal place of business):
Owner Bid Project (name and location):
Name: Farmington City Shepard Creek Well House 1799 South Maint St.
Farmington, UT 84025
Address (principal place of business):
160 South Main St.
Farmington, UT 84025
Bid Due Date: Thursday, November 21, 2024
Bond Penal Sum Amount:
Date of Bond:
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth in this Bid Bond, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.
Bidder Surety
(Full formal name of Bidder) (Full formal name of Surety) (corporate seal)
By: By:
(Signature) (Signature) (Attach Power of
Attorney) Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Attest: Attest:
(Signature) (Signature)
Name: Name:
Title:
(Printed or typed)
Title:
(Printed or typed)
Notes: (1) Note: Addresses are to be used for giving any required notice.
(2) Provide execution by any additional parties, such as joint venturers, if necessary.
Bid Bond (Penal Sum Form) Page 2 of 2 00 43 00
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond will be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder occurs upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation will be null and void if:
3.1. Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents, or
3.2. All Bids are rejected by Owner, or
3.3. Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions does not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.
6. No suit or action will be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety, and in no case later than one year after the Bid due date.
7. Any suit or action under this Bond will be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder must be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Postal Service registered or certified mail, return receipt requested, postage pre-paid, and will be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and…