20241029 Farmington Shepard Creek Well House Drawings.pdf
PDF 24 MB Posted
- Attached to
- Farmington Shepard Creek Well House
- Solicitation number
- FSCWH2024
- Issued by
- Utah
About this file
The document is a set of drawings for the Farmington Shepard Creek Well House project, which is a state and local contract opportunity in Utah. The scope of work includes the construction of a well house, a full water treatment system, concrete and asphalt work, and utility line installation. The project overview, item quantities, response dates, due dates, site visits, bidder's meetings and conferences, award dates, and the term of the contract, including any renewal options, are not provided in the drawings.
The pricing terms, set asides, incumbents, current environment, funding requirements and sources, amounts and sources, and any other salient information are also not included in the drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Farmington Shepard Creek Well House Contract and Specifications.pdf | ||
| 1266635-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
160 S MAIN ST,
FARMINGTON, UT 84025
P: 801.451.2383
No.
11-25-20
PRETTYMAN
AARON
9637735-2202
JOSHUA
:4
PM
T
UE
SD
A
Y
O C
TO
BE
R
H
PR
O
JE
C
TS
\2
1-
F A
RM
IN
G
TO
N -S
HE
PA
RD
C
RE
EK
W
EL
L
HO
US
E\
D
RA
W
IN
G S\
SH
EE
TS
\G
1-
T
ITL
E
N
O
TE
S.
D
W G
SHEPARD CREEK WELL HOUSE
ISSUED: 29 OCTOBER 2024
FARMINGTON CITY
PROJECT LOCATION
VICINITY MAP
CONTACT INFORMATION
4246 S RIVERBOAT RD., STE 200
SALT LAKE CITY, UT 84123
P: 801.359.5565
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE PROPERTY OF CRS
ENGINEERS AND IS NOT TO BE
REPRODUCED, MODIFIED, OR USED FOR
ANY OTHER PROJECT OR EXTENSION OF
THIS PROJECT EXCEPT BY AGREEMENT
WITH CRS ENGINEERS.
PRINCIPAL :
MANAGER:
REVIEWER :
DRAFTER :
A B C D E F G H I J K L M
A B C D E F G H I J K L M
N
N
O P
O P
LEGAL NOTICE
REVISIONS
DESIGN
PROJECT
G
O F
C
O V
ER
S
HE
ET
IN
D
EX
SHEPARD CREEK
WELL HOUSE
2021-0001
29 OCTOBER 2024
1799 SOUTH MAIN ST FARMINGTON,
UT 84025
M. CHANDLER, P.E.
J. PRETTYMAN, P.E.
J. PRETTYMAN, P.E.
J. DEMANN
COUNTY MAP
PROJECT LOCATION
SO
MERSET S
T
MAIN ST
900 WEST
SHEET LIST TABLE
SHEET CODE TITLE
1 G001 COVER & SHEET INDEX
2 G002 GENERAL NOTES
3 G003 STRUCTURAL NOTES
4 V101 SURVEY CONTROL
5 CG101 SITE PLAN
6 CU101 UTILITY PLAN & PROFILE
7 CU102 UTILITY PLAN & PROFILE
8 CU103 UTILITY PLAN & PROFILE
9 CU104 UTILITY PLAN & PROFILE
10 CU501 CIVIL DETAILS
11 CU502 CIVIL DETAILS
12 CU503 CIVIL DETAILS
13 CU504 CIVIL DETAILS
14 CU505 CIVIL DETAILS
15 CU506 CIVIL DETAILS
16 CU507 CIVIL DETAILS
17 CU508 CIVIL DETAILS
18 CU509 CIVIL DETAILS
19 P101 PIPING PLAN
20 P102 PIPING PLAN
21 P301 PIPING SECTIONS
22 P501 PIPING DETAILS
23 P502 PIPING DETAILS
24 P503 BULK AND DAY TANK DETAILS
25 M101 HVAC PLAN
26 A101 FLOOR PLAN
27 A201 ELEVATION VIEWS
28 A202 ELEVATION VIEWS
29 A301 BUILDING SECTION & DETAILS
30 A302 BUILDING SECTION & DETAILS
31 S101 FOOTING & FOUNDATION PLAN
32 S102 ROOF FRAMING PLAN
33 S501 STRUCTURAL DETAILS
34 S502 STRUCTURAL DETAILS
35 S503 STRUCTURAL DETAILS
36 S504 STRUCTURAL DETAILS
37 S505 STRUCTURAL DETAILS
STATE MAP
PROJECT LOCATION
SHEET LIST TABLE
SHEET CODE TITLE
38 E101 ELECTRICAL LEGEND
39 E102 ELECTRICAL TABLES AND TAG LIST
40 E201 ELECTRICAL POWER ONE-LINE
DIAGRAM
41 E202 ELECTRICAL INST. & CONTROL
ONE-LINE DIAGRAM
42 E203 ELECTRICAL DIAGRAMS, SHT.1
43 E204 ELECTRICAL DIAGRAMS, SHT.2
44 E205 ELECTRICAL TYPICAL VFD CONTROL
DIAGRAM
45 E206 ELECTRICAL CP-1 TYPICAL CONTROL
DIAGRAM, SHT. 1
46 E207 ELECTRICAL CP-1 TYPICAL CONTROL
DIAGRAM, SHT. 2
47 E208 ELECTRICAL CP-2 WIRING DIAGRAM
48 E209 ELECTRICAL CP-3 WIRING DIAGRAM
49 E301 ELECTRICAL SHCEDULES, SHT. 1
50 E302 ELECTRICAL SCHEDULES, SHT. 2
51 E401 ELECTRICAL SITE PLAN
52 E402 ELECTRICAL POWER PLAN
53 E403 ELECTRICAL INST. AND CONTROL
PLAN
54 E404 ELECTRICAL LIGHTING PLAN
55 E405 ELECTRICAL HVAC PLAN
56 E406 ELECTRICAL SECURITY PLAN
57 E407 PHOTOMETRICS
58 E501 CP-1 ARRANGEMENT AND I_O LIST
59 E502 ROOM CONTROL PANELS, SHT.1
60 E503 ROOM CONTROL PANELS, SHT. 2
61 E601 ELECTRICAL DETAILS, SHT. 1
62 E602 ELECTRICAL DETAILS, SHT. 2
63 E603 ELECTRICAL DETAILS, SHT. 3
64 E604 ELECTRICAL DETAILS, SHT. 4
65 E701 COMCHECK
66 E702 COMCHECK CONT.
1075 W
EST
P: 801.451.2383
No.
11-25-20
PRETTYMAN
AARON
9637735-2202
JOSHUA
:4
PM
T
UE
SD
A
Y
O C
TO
BE
R
H
PR
O
JE
C
TS
\2
1-
F A
RM
IN
G
TO
N -S
HE
PA
RD
C
RE
EK
W
EL
L
HO
US
E\
D
RA
W
IN
G S\
SH
EE
TS
\G
1-
T
ITL
E
N
O
TE
S.
D
W G
THE CONTRACTOR SHALL CAREFULLY READ ALL OF THE NOTES AND SPECIFICATIONS. THE
CONTRACTOR SHALL BE SATISFIED AS TO THEIR TRUE MEANING AND INTENT AND SHALL BE
RESPONSIBLE FOR COMPLYING WITH EACH.
GENERAL NOTES:
1) ALL IMPROVEMENTS SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH ALL JURISDICTIONAL
AUTHORITIES.
2) CONTRACTOR SHALL COMPLY WITH THE STANDARDS INDICATED ABOVE AND WITHIN THE CONSTRUCTION
DOCUMENTS. THE CONTRACTOR SHALL NOTIFY ALL AGENCIES, OWNERS, ENGINEERS, AND UTILITY
COMPANIES 5 DAYS PRIOR TO A PRE-CONSTRUCTION MEETING:
OWNER: FARMINGTON CITY
160 SOUTH MAIN STREET
FARMINGTON, UT 84025
PHONE: (801) 451-2383
CONTACT: CHAD BOSHELL
ENGINEER: CRS ENGINEERS
4246 RIVERBOAT ROAD SUITE #200
SALT LAKE CITY, UT 84123
PHONE: 801-359-5565
CONTACT: J. PRETTYMAN, P.E.
3) IT IS INTENDED THAT THESE PLANS AND SPECIFICATIONS REQUIRE ALL LABOR AND MATERIALS NECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND THAT THE WORK BE COMPLETED IN ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY REGARDING ANY DISCREPANCIES OR AMBIGUITIES WHICH MAY EXIST IN THE PLANS OR SPECIFICATIONS.
THE ENGINEER'S INTERPRETATION THEREOF SHALL BE CONCLUSIVE.
4) WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE WORK IN GENERAL TERMS BUT NOT IN COMPLETE DETAIL, IT IS UNDERSTOOD THAT ONLY THE BEST GENERAL PRACTICE IS TO PREVAIL AND THAT
ONLY MATERIALS AND WORKMANSHIP OF THE FIRST QUALITY ARE TO BE USED.
5) THE CONTRACTOR SHALL BE SKILLED AND REGULARLY ENGAGED IN THE GENERAL CLASS AND TYPE OF WORK CALLED FOR IN THE PROJECT PLANS AND SPECIFICATIONS. THEREFORE, THE OWNER IS RELYING UPON THE EXPERIENCE AND EXPERTISE OF THE CONTRACTOR, IT SHALL BE EXPECTED THAT PRICES PROVIDED WITHIN THE CONTRACT DOCUMENTS SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND THAT THE WORK BE COMPLETED IN ACCORDANCE WITH THEIR TRUE
INTENT AND PURPOSE.
6) THE CONTRACTOR SHALL BE COMPETENT, KNOWLEDGEABLE, AND HAVE SPECIAL SKILLS ON THE NATURE, EXTENT, AND INHERENT CONDITIONS OF THE WORK TO BE PERFORMED. CONTRACTOR SHALL ALSO
ACKNOWLEDGE THAT THERE ARE CERTAIN PECULIAR AND INHERENT CONDITIONS EXISTENT IN
CONSTRUCTION OF PARTICULAR FACILITIES, WHICH MAY CREATE, DURING THE CONSTRUCTION PROGRAM, UNUSUAL OR PECULIAR SAFETY CONDITIONS, WHICH CONDITIONS COULD BE HAZARDOUS TO PERSONS, PROPERTY AND THE ENVIRONMENT. CONTRACTOR SHALL BE AWARE OF SUCH PECULIAR RISKS AND HAVE THE SKILL AND EXPERIENCE TO FORESEE AND TO ADOPT PROTECTIVE MEASURES TO ADEQUATELY AND
SAFELY PERFORM THE CONSTRUCTION WORK WITH RESPECT TO SUCH HAZARDS.
7) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITS AND LICENSES REQUIRED FOR THE CONSTRUCTION AND COMPLETION OF THE PROJECT, AND SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE REQUIREMENTS AND CONDITIONS OF ALL PERMITS AND APPROVALS APPLICABLE TO THIS PROJECT. THE CONTRACTOR SHALL ENSURE THAT THE NECESSARY RIGHTS-OF-WAY, EASEMENTS, AND/OR
PERMITS ARE SECURED PRIOR TO CONSTRUCTION.
8) CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT WHERE APPLICABLE FOR ANY WORK DONE WITHIN RIGHTS-OF-WAY OR EASEMENTS FROM FARMINGTON CITY. CONTRACTOR SHALL NOTIFY CITY, COUNTY, AND/OR STATE, 24 HOURS IN ADVANCE OF COMMENCING THE WORK, OR AS REQUIRED BY SAID
PERMITS.
9) THE CONTRACTOR SHALL, AT THE TIME OF BIDDING, AND, THROUGHOUT THE PERIOD OF THE CONTRACT, BE LICENSED IN THE STATE OF UTAH AND SHALL BE BONDABLE FOR AN AMOUNT EQUAL TO OR GREATER THAN THE AMOUNT BID AND TO DO THE TYPE OF WORK CONTEMPLATED IN THE PLANS AND SPECIFICATIONS.
10) CONTRACTOR SHALL INSPECT THE SITE OF THE WORK PRIOR TO BIDDING TO SATISFY THEMSELVES BY PERSONAL EXAMINATION OR BY SUCH OTHER MEANS AS THEY MAY PREFER, OF THE LOCATION OF THE PROPOSED WORK, AND OF THE ACTUAL CONDITIONS OF, AND AT, THE SITE OF WORK. IF, DURING THE COURSE OF THEIR EXAMINATION, A BIDDER FINDS FACTS OR CONDITIONS WHICH APPEAR TO THEM TO BE IN CONFLICT WITH THE LETTER OR SPIRIT OF THE PROJECT PLANS AND SPECIFICATIONS, THEY SHALL CONTACT THE ENGINEER FOR ADDITIONAL INFORMATION AND EXPLANATION BEFORE SUBMITTING THEIR BID. SUBMISSION OF A BID BY THE CONTRACTOR SHALL CONSTITUTE ACKNOWLEDGMENT THAT, IF AWARDED THE CONTRACT, THEY HAVE RELIED AND ARE RELYING ON THEIR OWN EXAMINATION OF (1) THE SITE OF THE WORK, (2) ACCESS TO THE SITE, AND (3) ALL OTHER DATA AND MATTERS REQUISITE TO THE FULFILLMENT OF THE WORK AND ON THEIR OWN KNOWLEDGE OF EXISTING FACILITIES ON AND IN THE VICINITY OF THE SITE OF THE WORK TO BE CONSTRUCTED UNDER THIS CONTRACT. THE INFORMATION PROVIDED BY THE OWNER OR THE ENGINEER IS NOT INTENDED TO BE A SUBSTITUTE FOR, OR A SUPPLEMENT
TO THE INDEPENDENT VERIFICATION BY THE CONTRACTOR TO THE EXTENT SUCH INDEPENDENT
INVESTIGATION OF SITE CONDITIONS IS DEEMED NECESSARY OR DESIRABLE BY THE CONTRACTOR.
CONTRACTOR SHALL ACKNOWLEDGE THAT THEY HAVE NOT RELIED SOLELY UPON OWNER OR ENGINEER FURNISHED INFORMATION REGARDING SITE CONDITIONS IN PREPARING AND SUBMITTING THEIR BID.
11) THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, BARRICADES, SIGNS, FLAGMEN OR OTHER DEVICES
NECESSARY FOR PUBLIC SAFETY.
12) THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL WATER, POWER, SANITARY FACILITIES AND
TELEPHONE SERVICES AS REQUIRED FOR THE CONTRACTORS USE DURING CONSTRUCTION.
13) THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT PRIOR WRITTEN
AUTHORIZATION FROM THE OWNER AND/OR ENGINEER.
14) THE CONTRACTOR SHALL EXERCISE DUE CAUTION AND SHALL CAREFULLY PRESERVE BENCH MARKS, CONTROL POINTS, SECTION CORNERS, REFERENCE POINTS AND ALL SURVEY STAKES, AND SHALL BEAR ALL EXPENSES FOR REPLACEMENT AND/OR ERRORS CAUSED BY UNNECESSARY LOSS OR DISTURBANCE.
15) THE CONTRACTOR AGREES THAT:
A) THEY SHALL BE RESPONSIBLE TO CLEAN THE JOB SITE AT THE END OF EACH DAY.
B) THEY SHALL BE RESPONSIBLE TO REMOVE AND DISPOSE OF ALL TRASH, SCRAP AND UNUSED
MATERIAL AT THEIR OWN EXPENSE IN A TIMELY MANNER.
C) THEY SHALL BE RESPONSIBLE TO MAINTAIN THE SITE IN A NEAT, SAFE AND ORDERLY MANNER AT ALL
TIMES.
D) THEY SHALL BE RESPONSIBLE TO KEEP MATERIALS, EQUIPMENT, AND TRASH OUT OF THE WAY OF
OTHER CONTRACTORS SO AS NOT TO DELAY THE JOB. FAILURE TO DO SO WILL RESULT IN A
DEDUCTION FOR THE COST OF CLEAN UP FROM THE FINAL PAYMENT.
E) THEY SHALL BE RESPONSIBLE FOR THEIR OWN SAFETY, TRAFFIC CONTROL, PERMITS, RETESTING AND
RE-INSPECTIONS AT THEIR OWN EXPENSE.
16) THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOBSITE CONDITIONS DURING
THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY.
THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE AND GROSS NEGLIGENCE OF THE OWNER OR
THE ENGINEER.
17) DUST CONTROL SHALL BE PROVIDED AT ALL TIMES, AT THE CONTRACTOR'S EXPENSE, TO MINIMIZE ANY DUST
NUISANCE AND SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF FARMINGTON CITY.
18) WHEN CONSTRUCTION STAKING IS REQUIRED THE CONTRACTOR SHALL NOTIFY THE ENGINEER/LAND
SURVEYOR 1 WEEK IN ADVANCE OF THE NEED FOR STAKING. ANY STAKING REQUESTED BY THE
CONTRACTOR OR THEIR SUBCONTRACTORS THAT IS ABOVE AND BEYOND STANDARD STAKING NEEDS, INCLUDING RE-STAKING WILL BE SUBJECT TO A CONTRACTOR CHANGE ORDER AND THE IMPACT COSTS OF
WORK PERFORMED
19) FOR ALL WORK WITHIN PUBLIC RIGHTS-OF-WAYS OR EASEMENTS, THE CONTRACTOR SHALL PRESERVE THE
INTEGRITY AND LOCATION OF ANY AND ALL PUBLIC UTILITIES AND PROVIDE THE NECESSARY
CONSTRUCTION TRAFFIC CONTROL. CONTRACTOR SHALL, THROUGH THE ENCROACHMENT PERMIT
PROCESS, VERIFY WITH THE NECESSARY REGULATORY AGENCIES, THE NEED FOR ANY TRAFFIC ROUTING PLAN. IF PLAN IS REQUIRED, CONTRACTOR SHALL PROVIDE PLAN AND RECEIVE PROPER APPROVALS
PRIOR TO BEGINNING CONSTRUCTION.
20) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY SCHEDULING INSPECTION AND TESTING OF ALL FACILITIES CONSTRUCTED UNDER THIS CONTRACT. ALL TESTING SHALL CONFORM TO THE REGULATORY AGENCY'S STANDARD SPECIFICATIONS. ALL RE-TESTING AND/OR RE-INSPECTION SHALL BE PAID FOR BY THE
CONTRACTOR.
21) IF EXISTING FEATURES NEED TO BE DISTURBED AND/OR REMOVED FOR THE PROPER PLACEMENT OF IMPROVEMENTS TO BE CONSTRUCTED BY THESE PLANS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING FEATURES FROM DAMAGE. COST OF REPLACING OR REPAIRING EXISTING FEATURES SHALL BE INCLUDED IN THE BID PRICE FOR ITEMS REQUIRING REMOVAL AND/OR REPLACEMENT.
22) THE CONTRACTOR SHALL MAINTAIN A NEATLY MARKED SET OF FULL-SIZE AS-BUILT DRAWINGS SHOWING THE FINAL LOCATION AND LAYOUT OF ALL FACILITIES. AS-BUILT DRAWINGS SHALL REFLECT CHANGE ORDERS, ACCOMMODATIONS, AND ADJUSTMENTS TO ALL IMPROVEMENTS CONSTRUCTED. WHERE NECESSARY, SUPPLEMENTAL DRAWINGS SHALL BE PREPARED AND SUBMITTED BY THE CONTRACTOR. PRIOR TO ACCEPTANCE OF THE PROJECT, THE CONTRACTOR SHALL DELIVER TO THE ENGINEER, ONE SET OF NEATLY MARKED AS-BUILT DRAWINGS SHOWING THE INFORMATION REQUIRED ABOVE. AS-BUILT DRAWINGS SHALL BE REVIEWED AND THE COMPLETE AS-BUILT DRAWING SET SHALL BE CURRENT WITH ALL CHANGES AND DEVIATIONS REDLINED AS A PRECONDITION TO THE FINAL PROGRESS PAYMENT APPROVAL AND/OR FINAL
ACCEPTANCE.
23) WORK IN EASEMENT AND/OR RIGHTS-OF-WAY IS SUBJECT TO THE APPROVAL AND ACCEPTANCE OF THE
REGULATORY AGENCY RESPONSIBLE FOR OPERATION AND/OR MAINTENANCE OF SAID EASEMENT
AND/OR RIGHTS-OF-WAY.
24) NO ALLOWANCE WILL BE MADE FOR DISCREPANCIES OR OMISSIONS THAT CAN BE EASILY OBSERVED.
VERIFY ALL EXISTING CONDITIONS BEFORE BIDDING, AND ANSWER ANY QUESTIONS BEFORE
CONSTRUCTION.
25) FURNISH, MAINTAIN, AND RESTORE ALL MONUMENTS AND MONUMENT REFERENCE MARKS WITHIN THE
PROJECT SITE. CONTACT THE CITY OR COUNTY SURVEYOR FOR MONUMENT LOCATIONS AND
CONSTRUCTION DETAILS.
26) PROVIDE A CONSTRUCTION SCHEDULE IN ACCORDANCE WITH CITY, COUNTY, AND STATE REGULATIONS
FOR WORKING IN THE PUBLIC WAY.
27) FURNISH ALL MATERIALS TO COMPLETE THE PROJECT.
28) TRAFFIC CONTROL IS TO CONFORM TO THE CURRENT MUTCD AND UDOT STANDARDS.
29) CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO ADJACENT SURFACE IMPROVEMENTS.
30) ALL EXISTING ASPHALT WILL BE SAW CUT IN NEAT STRAIGHT LINES BY THE CONTRACTOR PRIOR TO
EXCAVATION.
31) STRIPING WILL BE PER THE PLANS AND/OR AS DIRECTED BY THE OWNER'S REPRESENTATIVE. STRIPING TO
INCLUDE HANDICAP INSIGNIAS, SIGNS, CROSS-HATCHING, DIRECTION ARROWS, ETC. AS SHOWN OR AS
DIRECTED.
GENERAL CLEARING AND GRADING NOTES:
1) CLEARING, GRUBBING AND DISPOSAL OF VEGETATIVE MATERIAL NEEDS TO BE IN ACCORDANCE WITH
STATE AND COUNTY REGULATIONS, WHICH APPLY TO SOLID WASTE.
2) CONTRACTOR SHALL PERFORM EARTHWORK IN ACCORDANCE WITH FARMINGTON CITY STANDARD
SPECIFICATIONS AND CONSTRUCTION STANDARDS, EROSION, SEDIMENT, RE-VEGETATION REQUIREMENTS, AND THE SWPP PLAN AS REQUIRED BY THE STATE OF UTAH, DEPARTMENT OF ENVIRONMENTAL QUALITY AND
DIVISION OF AIR QUALITY.
3) THE CONTRACTOR WILL PERFORM EARTHWORK IN ACCORDANCE WITH TECHNICAL SPECIFICATIONS OUTLINED IN THE CONSTRUCTION STANDARDS AND THE RECOMMENDED EARTHWORK SPECIFICATIONS
4) SEDIMENTATION BMP'S SHOWN ON THE EROSION CONTROL AND SEDIMENT CONTROL PLANS (STORM WATER POLLUTION PREVENTION PLAN) TO BE INSTALLED WITHIN THE SAME WORKING DAY THE LAND
DISTURBANCE OCCURS.
5) DUST CONTROL BMP'S ARE TO BE ON SITE AND IMPLEMENTED AS SOON AS LAND DISTURBANCE OCCURS.
6) THE EXISTING TOPOGRAPHY SHOWN ON THESE PLANS IS BASED ON DRAWINGS AND A TOPOGRAPHIC
SURVEY PERFORMED BY CRS ENGINEERS. IF THE EXISTING GRADE IS DIFFERENT FROM WHAT IS SHOWN ON THE GRADING PLAN, STOP WORK AND CONTACT CRS ENGINEERS. WORK IS TO REMAIN STOPPED UNTIL THE
ENGINEER PROVIDES A WRITTEN NOTICE TO RESUME WORK.
7) THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE STREETS, STORM DRAINS, CHANNELS, DITCHES, AND SWALES FREE FROM DEBRIS, SOIL, MUD, OR OTHER MATERIAL THAT WOULD CAUSE A PUBLIC SAFETY
CONCERN OR VIOLATE ANY CITY, STATE, OR FEDERAL LAWS.
8) BMP'S ARE TO BE IN PLACE AND MAINTAINED UNTIL WRITTEN NOTIFICATION IS RECEIVED FROM
FARMINGTON CITY.
9) IF DISTURBANCE OCCURS OUTSIDE THE LIMITS OF DISTURBANCE, WORK WILL STOP AND REMAIN STOPPED
UNTIL A WRITTEN RESPONSE IS RECEIVED FROM THE ENGINEER.
10) THE CONTRACTOR SHALL REMOVE ALL VEGETATION AND DELETERIOUS MATERIALS FROM THE SITE UNLESS
NOTED OTHERWISE.
11) NATURAL VEGETATION AND SOIL COVER SHALL NOT BE DISTURBED PRIOR TO ACTUAL CONSTRUCTION OF A REQUIRED FACILITY OR IMPROVEMENT. MASS CLEARING OF THE SITE IN ANTICIPATION OF CONSTRUCTION SHALL BE AVOIDED. CONSTRUCTION TRAFFIC SHALL BE LIMITED TO ONE APPROACH TO SITE. THE
APPROACH SHALL BE DESIGNATED BY THE OWNER.
GENERAL UTILITY NOTES
1) THE LOCATIONS OF UNDERGROUND FACILITIES SHOWN ON THESE PLANS ARE BASED ON FIELD SURVEYS
AND LOCAL UTILITY COMPANY RECORDS. IT SHALL BE THE CONTRACTORS FULL RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY COMPANIES TO LOCATE THEIR FACILITIES PRIOR TO PROCEEDING WITH CONSTRUCTION. NO ADDITIONAL COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR DAMAGE
AND REPAIR TO THESE FACILITIES CAUSED BY CONTRACTORS WORK FORCE.
2) START AT THE LOW END OF ALL GRAVITY FED LINES AND WORK UPHILL. FAILURE TO COMPLY WITH THIS NOTE
SHALL RELEASE THE CIVIL ENGINEER OF ALL LIABILITY.
3) CONTRACTOR SHALL LAYOUT AND POTHOLE FOR ALL POTENTIAL CONFLICTS WITH UTILITY LINES ON OR OFF
SITE AS REQUIRED PRIOR TO ANY CONSTRUCTION.
4) STORM DRAIN - SEE FARMINGTON CITY STANDARDS & SPECIFICATIONS FOR ALL DETAILS & SPECIFICATIONS GOVERNING THE CONSTRUCTION & INSPECTION OF THE STORM DRAIN & APPURTENANCES WITHIN THE PUBLIC RIGHT-OF-WAY AS SHOWN ON THIS PLAN. SEE THE DETAILS PROVIDED ON THIS SET OF DRAWINGS FOR ALL OTHER STORM DRAIN CONSTRUCTION. APWA STANDARDS WILL BE USED IN THE ABSENCE OF ANY
STANDARDS AND DETAILS.
5) ALL DIMENSIONS AND GRADES OF EXISTING STORM DRAIN PIPES, BOX CULVERTS, STRUCTURES, ETC. SHOWN ON THE PLANS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. NOTIFY THE ENGINEER IF ANY DISCREPANCIES EXIST, PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR WORK HAVING TO BE REDONE DUE TO THE DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS, IF SUCH
NOTIFICATION HAS NOT BEEN GIVEN.
6) THESE PLANS SHOW THE LOCATION OF POWER, NATURAL GAS, AND COMMUNICATIONS UTILITIES, BUT ARE NOT DESIGN DRAWINGS FOR THE RELOCATION OR REMOVAL OF EXISTING DRY UTILITIES, NOR FOR ANY NEW DRY UTILITY STUBS. CONTRACTOR IS TO SUBMIT SITE PLAN TO DRY UTILITIES FOR DESIGN OF SERVICE CONNECTIONS TO BUILDING. ACTUAL CONSTRUCTION OF SAID SERVICES TO BE DONE BY RESPECTIVE
UTILITY PROVIDERS.
7) VERIFY DEPTHS OF UTILITIES IN THE FIELD BY POT HOLING A MINIMUM OF 300 FEET AHEAD OF PIPELINE CONSTRUCTION TO AVOID CONFLICTS WITH DESIGNED PIPELINE GRADE AND ALIGNMENT. IF A CONFLICT ARISES RESULTING FROM THE CONTRACTOR'S NEGLIGENCE TO POTHOLE UTILITIES THE CONTRACTOR WILL BE REQUIRED TO RESOLVE THE CONFLICT WITHOUT ADDITIONAL COST OR CLAIM TO THE OWNER OR
ENGINEER.
8) ALL DIMENSIONS, GRADES, AND UTILITY DESIGNS SHOWN ON THE PLANS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. NOTIFY THE ENGINEER IF ANY DISCREPANCIES EXIST, PRIOR TO
PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA
COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR WORK HAVING TO BE REDONE DUE TO THE DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS, IF SUCH NOTIFICATION HAS NOT BEEN
GIVEN.
9) NO CHANGE IN DESIGN LOCATION OR GRADE WILL BE MADE BY THE CONTRACTOR WITHOUT THE WRITTEN
APPROVAL OF THE PROJECT ENGINEER.
10) ALL EXISTING MANHOLES, WATER VALVES, CLEAN OUTS, ETC., ARE TO BE RAISED OR LOWERED TO GRADE.
ABBREVIATIONS
APPROX APPROXIMATE
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APWA AMERICAN PUBLIC WORKS ASSOCIATION
AWWA AMERICAN WATER WORKS ASSOCIATION
BF BLIND FLANGE
BLDG BUILDING
C CHORD LENGTH
C TO C CENTER TO CENTER
CB CHORD BEARING
CI CAST IRON
CL CLASS
CLR CLEAR
CMP CORRUGATED METAL PIPE
CO CLEANOUT
CONC CONCRETE
DI DUCTILE IRON
DIM DIMENSION
E EAST
EA EDGE OF ASPHALT
EG EXISTING GRADE
EL ELEVATION
ELEV ELEVATION
EP EDGE OF PAVEMENT
EW EACH WAY
EX EXISTING
FF FINISH FLOOR
FG FINISH GRADE
FH FIRE HYDRANT
FL FLANGE
FT FEET
HDPE HIGH DENSITY POLYETHYLENE PIPE
HORIZ HORIZONTAL
HP HIGH POINT
ID INSIDE DIAMETER
IE INVERT ELEVATION
INV INVERT
IR IRON ROD
IRR IRRIGATION
LT LEFT
L LENGTH
LBS POUNDS
LF LINEAR FEET
LP LOW POINT
MAX MAXIMUM
MEG MATCH EXISTING GRADE
MIN MINIMUM
MJ MECHANICAL JOINT
N NORTH
N/A NOT APPLICABLE
NIC NOT IN CONTACT
NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OSHA OCCUPATIONAL SAFETY & HEALTH
ADMINISTRATION
PE PLAIN END
PG PAGE
PI POINT OF INTERSECTION
PJ PUSH-ON JOINT
DI DUCTILE IRON
PSF POUNDS PER FOOT
PSI POUNDS PER SQUARE INCH
PUE PUBLIC UTILITY EASEMENT
PVC POLYVINYL CHLORIDE
RCP REINFORCED CONCRETE PIPE
R RADIUS
RT RIGHT
RJ RESTRAINED JOINT
S SOUTH
SEC SECTION
SS SANITARY SEWER
STA STATION
T TOP
TB THRUST BLOCK
TBA TO BE ABANDONED
TBC TOP BACK CURB
TOC TOP OF CONCRETE
TYP TYPICAL
UDOT UTAH DEPARTMENT OF TRANSPORTATION
VERT VERTICAL
WTR WATER
W WEST
W/ WITH
WWF WELDED WIRE FABRIC
CONTACT INFORMATION
4246 S RIVERBOAT RD., STE 200
SALT LAKE CITY, UT 84123
P: 801.359.5565
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE PROPERTY OF CRS
ENGINEERS AND IS NOT TO BE
REPRODUCED, MODIFIED, OR USED FOR
ANY OTHER PROJECT OR EXTENSION OF
THIS PROJECT EXCEPT BY AGREEMENT
WITH CRS ENGINEERS.
PRINCIPAL :
MANAGER:
REVIEWER :
DRAFTER :
A B C D E F G H I J K L M
A B C D E F G H I J K L M
N
N
O P
O P
LEGAL NOTICE
REVISIONS
DESIGN
PROJECT
G
O F
G
EN
ER
A L
N O
TE
S
SHEPARD CREEK
WELL HOUSE
2021-0001
29 OCTOBER 2024
1799 SOUTH MAIN ST
FARMINGTON, UT 84025
M. CHANDLER, P.E.
J. PRETTYMAN, P.E.
J. PRETTYMAN, P.E.
J. DEMANN
P: 801.451.2383
No.
11-25-20
PRETTYMAN
AARON
9637735-2202
JOSHUA
UT
-C F
:4
PM
T
UE
SD
A Y
O
C
TO
BE
R
H
PR
O
JE
C
TS
\2
1-
F
A
RM
IN
G
TO
N
-S
HE
PA
RD
C
RE
EK
W
EL
L
HO
US
E\ D
RA
W
IN
G
S\
SH
EE
TS
\3 G
3.
D W
G
CONTACT INFORMATION
4246 S RIVERBOAT RD., STE 200
SALT LAKE CITY, UT 84123
P: 801.359.5565
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE PROPERTY OF CRS
ENGINEERS AND IS NOT TO BE
REPRODUCED, MODIFIED, OR USED FOR
ANY OTHER PROJECT OR EXTENSION OF
THIS PROJECT EXCEPT BY AGREEMENT
WITH CRS ENGINEERS.
PRINCIPAL :
MANAGER:
REVIEWER :
DRAFTER :
A B C D E F G H I J K L M
A B C D E F G H I J K L M
N
N
O P
O P
LEGAL NOTICE
REVISIONS
DESIGN
PROJECT
G
O F
ST
RU
C
TU
RA
L N
O
TE
S
SHEPARD CREEK
WELL HOUSE
2021-0001
29 OCTOBER 2024
1799 SOUTH MAIN ST FARMINGTON, UT
84025
M. CHANDLER, P.E.
J. PRETTYMAN, P.E.
J. PRETTYMAN, P.E.
J. DEMANN
ABBREVIATIONS
APPROX APPROXIMATE
ASTM AMERICAN SOCIETY FOR
TESTING AND MATERIALS
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
BLDG BUILDING
C TO C CENTER TO CENTER
CLR CLEAR
CO CLEANOUT
CONC CONCRETE
DIM DIMENSION
EG EXISTING GRADE
EL ELEVATION
EW EACH WAY
EX EXISTING
FG FINISH GRADE
FH FIRE HYDRANT
FX FIRE EXTINGUISHER
HORIZ HORIZONTAL
L LENGTH
LBS POUNDS
MAX MAXIMUM
MIN MINIMUM
N/A NOT APPLICABLE
NTS NOT TO SCALE
OC ON CENTER
OSHA OCCUPATIONAL SAFETY &
HEALTH ADMINISTRATION
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
R RADIUS
SS SANITARY SEWER
VERT VERTICAL
W WATER
W/ WITH
WWF WELDED WIRE FABRIC
BUILDING CODE:
1. 2018 INTERNATIONAL BUILDING CODE AND STANDARDS REFERENCED THEREIN, AND ANY OTHER CODES OR
RULES ADOPTED BY FARMINGTON CITY.
FOUNDATIONS:
1. A GEOTECHNICAL REPORT FOR THIS SITE HAS BEEN PREPARED BY SPEEDIE AND ASSOCIATES. THE REPORT
REFERENCED IS SPEEDIE AND ASSOCIATES PROJECT NUMBER 160809SA.
2. ISOLATED AND CONTINUOUS FOOTINGS ARE TO BE PLACED ON COMPACTED SUBGRADE SOILS A
MINIMUM OF 18 INCHES BELOW FINISHED GRADE AS RECOMMENDED IN THE GEOTECHNICAL REPORT.
3. DESIGN BEARING PRESSURE IS 1500 PSF
4. THE CONTRACTOR IS TO BE FAMILIAR WITH ALL RECOMMENDATIONS OF THE GEOTECHNICAL REPORT, PRIOR TO WORK COMMENCING. ALL RECOMMENDATIONS IN THE GEOTECHNICAL REPORT ARE TO BE
FOLLOWED.
5. THE GEOTECHNICAL ENGINEER IS TO VISUALLY VERIFY THAT THE RECOMMENDATIONS THE GEOTECHNICAL
REPORT ARE BEING FOLLOWED PRIOR TO PLACEMENT OF CONCRETE.
CONCRETE:
1. CONCRETE FOR FOOTINGS IS TO REACH A MINIMUM COMPRESSIVE STRENGTH OF 4,500 PSI AT 28 DAYS.
2. CONCRETE USED IN SLABS ON GRADE IS TO REACH A MINIMUM COMPRESSIVE STRENGTH OF 3,000 PSI
FOR INTERIOR SLABS AND 4,500 PSI FOR EXTERIOR SLABS AT 28 DAYS.
GENERAL:
1. ALL CAST IN PLACE CONCRETE CONSTRUCTION IS TO CONFORM TO ACI 318 LATEST EDITION
2. ALL CONCRETE IS TO BE MECHANICALLY VIBRATED WHEN PLACED UNLESS NOTED OTHERWISE.
3. ADMIXTURES CONTAINING CHLORIDES ARE NOT TO BE USED.
4. ADMIXTURES ARE NOT PERMITTED WITHOUT PRIOR APPROVAL FROM THE ENGINEER.
5. CONCRETE TEST DATA IS TO BE SUBMITTED TO THE ENGINEER FOR REVIEW IN ACCORDANCE WITH ACI 318
CHAPTER 5.
SLABS ON GRADE:
1. CONCRETE SLUMP IS NOT TO EXCEED 5 INCHES.
2. NOMINAL MAXIMUM AGGREGATE SIZE IS NOT TO BE LESS THAN 3 4 INCH NOR MORE THAN 13 THE DEPTH OF
THE SLAB.
3. SLABS ARE TO BE PLACED ON WELL GRADED ENGINEERED FILL THAT IS COMPACTED TO 95% MAXIMUM
DRY DENSITY.
4. SLABS ON GRADE ARE TO BE VIBRATED ONLY AT TRENCHES, FLOOR DUCTS, TURNDOWNS, OR OTHER
AREAS THICKER THAN 8 INCHES.
5. CONTROL JOINTS ARE TO BE SAW CUT AFTER THE SLAB HAS CURED AND SPACED AT A MAXIMUM OF 15
FEET ON CENTER IN EACH DIRECTION.
6. FILL CONTROL JOINTS WITH FLEXIBLE, SILICONE BASED JOINT FILLER.
7. A 6 MIL VAPOR BARRIER IS TO BE PLACED OVER THE SUBGRADE AND INSTALLED PER THE
MANUFACTURER'S SPECIFICATIONS.
REINFORCING:
1. ALL CONCRETE REINFORCEMENT IS TO BE GRADE 60 STEEL DEFORMED BARS.
2. CONCRETE COVER OVER REINFORCEMENT IS TO BE AS FOLLOWS:
2.1. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3"
2.2. EXPOSED TO EARTH OR WEATHER
2.2.1. #6 OR LARGER: 2"
2.2.2. #5 AND SMALLER: 1 12"
3. CONCRETE COVER IS MEASURED FROM THE EDGE OF THE CONCRETE TO THE EDGE OF THE REINFORCING
BAR.
4. ALL REINFORCING IS TO BE CHAIRED TO ENSURE PROPER CLEARANCES.
5. FIELD BENDING OF REINFORCEMENT IS LIMITED TO #5 REBAR AND SMALLER.
LAP SPLICES IN CONCRETE:
1. ALL SPLICE LOCATIONS ARE SUBJECT TO APPROVAL BY THE ENGINEER.
2. PROVIDE BENT CORNER BARS TO MATCH HORIZONTAL REBAR. LAP AT EACH CORNER AND INTERSECTION.
3. REINFORCEMENT SPACING SHOWN ON THE PLANS ARE MAXIMUM SPACING.
4. VERTICAL REINFORCEMENT IN THE FOUNDATION IS TO BE PLACED WITH A STANDARD 90 DEGREE HOOK.
5. PLACING REINFORCEMENT INTO WET CONCRETE IS NOT ALLOWED. ALL REINFORCEMENT MUST BE TIED
PRIOR TO CONCRETE PLACEMENT.
6. LAP SPLICES ARE TO BE CLASS "B" TENSION LAP SPLICES PER ACI 318.
ANCHORING TO CONCRETE:
ANCHOR BOLTS:
1. ALL STEEL BASE PLATES ARE TO BE ANCHORED TO CONCRETE USING ASTM F1554 GRADE 36 ANCHOR
BOLTS OF THE SIZE AND LENGTH SPECIFIED IN THE PLANS.
2. ANCHOR BOLTS INCLUDE HOOKED, HEADED AND THREADED AND NUTTED ANCHORS.
3. ALL ANCHOR BOLTS ARE TO BE INSTALLED WITH STEEL WASHERS AT OVERSIZED ROUND HOLES USING
SNUG TIGHT INSTALLATION UNLESS NOTED OTHERWISE.
POST INSTALLED ANCHORS:
1. POST INSTALLED ANCHORS ARE NOT TO BE USED UNTIL WRITTEN APPROVAL HAS BEEN OBTAINED BY THE
ENGINEER.
2. POST INSTALLED ANCHORS MAY NOT BE INSTALLED UNTIL CONCRETE HAS REACHED ITS DESIGN
STRENGTH AND IS FULLY CURED FOR A MINIMUM OF 21 DAYS.
CONCRETE CONSTRUCTION
1. CONCRETE
1.1. DURING THE TAKING OF TEST SPECIMENS.
1.2. CONTINUOUS INSPECTION DURING THE PLACEMENT OF ALL REINFORCED CONCRETE, UNLESS
NOTED OTHERWISE
1.3. CONTINUOUS INSPECTION OF BOLTS TO BE INSTALLED IN CONCRETE PRIOR TO AND DURING THE
PLACEMENT OF CONCRETE AROUND BOLTS. (EXCEPTION: NO INSPECTION IS REQUIRED FOR
PLACEMENT OF CONCRETE AROUND FOUNDATION ANCHOR BOLTS.)
1.4. NO INSPECTION IS REQUIRED FOR PLACEMENT OF SLAB ON GRADE CONCRETE. INSPECTION OF
SLAB ON GRADE REINFORCING IS REQUIRED PER "REINFORCING STEEL" SECTION BELOW.
2. REINFORCING STEEL - INSPECTION OF IN-PLACE REINFORCING FOR CONFORMANCE PRIOR TO THE
CLOSING OF FORMS OR THE DELIVERY OF CONCRETE TO THE JOBSITE FOR THE FOLLOWING:
2.1. REINFORCING FOR ALL CONCRETE REQUIRED TO HAVE INSPECTION NOTED ABOVE.
2.2. REINFORCING FOR CONCRETE FOUNDATIONS.
2.3. REINFORCING FOR SLABS ON GRADE.
2.4. REINFORCING FOR ALL MASONRY REQUIRED TO HAVE INSPECTION NOTED BELOW.
DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR
1. THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK ASSIGNED TO BE CERTAIN IT CONFORMS TO THE
APPROVED DESIGN DRAWINGS AND SPECIFICATION.
2. THE SPECIAL INSPECTOR IS NOT AUTHORIZED TO APPROVE DEVIATIONS FROM THE DESIGN DRAWINGS OR
SPECIFICATIONS, AND ALL DEVIATIONS MUST BE APPROVED BY THE STRUCTURAL ENGINEER OF RECORD PRIOR TO PROCEEDING WITH THE WORK. ALL REQUESTS FOR DEVIATIONS SHALL BE INITIATED BY THE
CONTRACT VIA WRITTEN REQUEST FOR INFORMATION (RFI).
3. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL, AND TO THE ENGINEER OR ARCHITECT OF RECORD. ALL DISCREPANCIES ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION, THEN IF UNCORRECTED, TO THE DESIGN AUTHORITY
AND THE BUILDING OFFICIAL.
4. CONTRACTOR SHALL PROVIDE THE SPECIAL INSPECTOR ACCESS TO ALL ITEMS REQUIRING SPECIAL INSPECTION. ACCESS SHALL BE PROVIDED BY IN-PLACE LADDERS, SCAFFOLDS, LIFTS AND/OR OTHER EQUIPMENT OPERATED BY THE CONTRACTOR'S PERSONNEL AS REQUIRED FOR SAFE OBSERVATIONS.
INSPECTOR IS NOT RESPONSIBLE OR AUTHORIZED TO OPERATE CONTRACTOR'S EQUIPMENT.
5. UPON COMPLETION OF THE ASSIGNED WORK THE ENGINEER OR ARCHITECT WILL COMPLETE AND SIGN THE
APPROPRIATE FORMS CERTIFYING THAT TO THE BEST OF THEIR KNOWLEDGE THE WORK IS IN
CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS, AND THE APPLICABLE WORKMANSHIP
PROVISION OF THE CODE.
MASONRY:
GENERAL:
1. ALL CONSTRUCTION SHALL BE PER ACI 530/530.1, BUILDING CODE REQUIREMENTS AND SPECIFICATION
FOR MASONRY STRUCTURES.
2. CONCRETE MASONRY ASSEMBLY IS TO BE PLACED IN A RUNNING BOND PATTERN.
3. MASONRY NET COMPRESSIVE STRENGTH F'm IS TO BE 1500 PSI
4. MASONRY CONSTRUCTION IS TO BE OF MEDIUM WEIGHT, GRADE N HOLLOW CONCRETE MASONRY
UNITS PAR ASTM C90 WITH A NET COMPRESSIVE STRENGTH OF 1900 PSI.
5. MORTAR IS TO BE TYPE S PER ASTM C270 WITH A MINIMUM COMPRESSIVE STRENGTH OF 1800 PSI.
6. GROUT IS TO BE PER ASTM C476 WITH A MINIMUM COMPRESSIVE STRENGTH OF 2000 PSI.
7. ACCEPTABLE METHODS FOR DETERMINING COMPRESSIVE STRENGTH FOR EACH CONCRETE MASONRY
ASSEMBLY ARE THE UNIT STRENGTH METHOD OR THE PRISM METHOD PER IBC 2105.2.2.
8. MECHANICALLY VIBRATE GROUT IMMEDIATELY AFTER POURING AND AGAIN 5 TO 10 MINUTES LATER.
9. PROVIDE CLEANOUTS IF GROUT LIFT EXCEEDS 5'-0" IN BLOCK WALLS.
10. MAXIMUM GROUT LIFT IS 6'-0".
11. FILL CELLS SOLIDLY WITH GROUT IN LIFTS AND STOP POURS 1 12" BELOW THE TOP OF A COURSE TO FORM
A KEY AT POUR POINTS.
12. INSTALL CONTROL JOINTS AT 10 FEET ON CENTER. CONTROL JOINTS CANNOT OCCUR AT WALL
CORNERS, INTERSECTIONS, ENDS OR WITHIN 2 FEET OF CONCENTRATED BEARING POINTS, JAMBS, OR
OVER OPENINGS.
13. ALL MASONRY BELOW FINISHED GROUND IS TO BE GROUTED SOLID.
VERTICAL REINFORCING:
1. PLACE A #5 VERTICAL REBAR IN A FULLY GROUTED CELL AT ALL CORNERS, INTERSECTIONS, ENDS, BEARING POINTS, JAMBS AND EACH SIDE OF CONTROL JOINTS.
2. VERTICAL REBAR IS TO BE PLACED NO FURTHER APART THAN 48" ON CENTER.
3. VERTICAL REINFORCEMENT IS TO BE TIED TO FOOTING REBAR.
HORIZONTAL REINFORCING:
1. INSTALL (2) #5 HORIZONTAL REBAR IN 8" DEEP GROUTED CONTINUOUS BOND BEAMS AT TOP OF
PARAPETS AND FREESTANDING WALLS.
2. BOND BEAMS ARE TO BE PLACED AT 48" ON CENTER MEASURED VERTICALLY FROM THE TOP OF THE
FOOTING.
3. USE #9 SIZE WIRE OR EQUIVALENT LADDER MESH JOINT REINFORCEMENT AT ALL BOND BEAMS.
LAP SPLICES:
1. LAP SPLICES FOR VERTICAL AND HORIZONTAL REINFORCING ARE TO BE PER THE LAP SPLICE SCHEDULE
SHOWN ON THIS SHEET.
2. SPLICES ARE NOT TO OCCUR WITHIN 8' OF CONTROL JOINTS.
3. ALL HORIZONTAL LADDER TYPE MESH JOINT REINFORCEMENT IS TO BE LAPPED A DISTANCE OF 12" AS A
MINIMUM.
NOTES:
1. ALL REINFORCEMENT IS TO BE GRADE 60
2. LAPS APPLY TO BOTH VERTICAL AND HORIZONTAL REINFORCING.
3. PROVIDE BENT BARS TO MATCH HORIZONTAL BOND BEAM REINFORCING, AT CORNERS AND WALL
INTERSECTION TO MAINTAIN BOND BEAM CONTINUITY.
4. DO NOT SPLICE HORIZONTAL BARS WITHIN 8' OF CONTROL JOINTS.
5. LAP LENGTHS HAVE BEEN CALCULATED FOR BOTH WORKING STRESS AND ULTIMATE STRENGTH DESIGN.
THE MOST CONSERVATIVE VALUES HAVE BEEN USED.
LOADS:
1. ALL GRAVITY AND LATERAL LOADS FOR THE BUILDING ARE AS FOLLOWS:
1.1. GROUND SNOW LOAD: 35 PSF
1.2. ROOF SNOW LOAD: 26.2 PSF
1.3. ROOF DEAD LOAD: 20 PSF
1.4. LATERAL WIND LOAD: 20.8 PSF
1.5. FLOOR DEAD LOAD: 10 PSF
1.6. FLOOR LIVE LOAD: 50 PSF
1.7. EARTHQUAKE LOAD: 42'-8" WALL: 31 PSF
44'-0" WALL: 38.1 PSF
1.8. ROOF LIVE LOAD: 20 PSF
SPECIAL INSPECTION - STRUCTURAL ONLY:
FOR SPECIAL STRUCTURAL INSPECTIONS:
CONTACT CITY OFFICES FOR SPECIAL INSPECTION PRIOR TO CONSTRUCTION
1. SPECIAL INSPECTION IS TO BE PROVIDED FOR THE ITEMS LISTED BELOW IN ADDITION TO THE
INSPECTIONS CONDUCTED BY THE BUILDING JURISDICTION.
2. "SPECIAL STRUCTURAL INSPECTION" SHALL NOT RELIEVE THE OWNER OR THEIR AGENT FROM
REQUESTING THE BUILDING JURISDICTION INSPECTIONS REQUIRED BY SECTION 109 OF THE
INTERNATIONAL BUILDING CODE.
3. SPECIAL INSPECTION IS REQUIRED PER CHAPTER 17 OF THE INTERNATIONAL BUILDING CODE FOR THE
FOLLOWING: CONCRETE CONSTRUCTION, STEEL CONSTRUCTION, MASONRY CONSTRUCTION, WOOD
CONSTRUCTION, SPECIAL CASES.
STEEL CONSTRUCTION
1. WELDING
1.1. VERIFICATION OF VALID WELDER'S CERTIFICATES
1.2. PERIODIC VISUAL INSPECTION OF ALL SHOP AND FIELD WELDS.
1.3. ALL STRUCTURAL STEEL FABRICATORS SHALL EMPLOY AN AWS CERTIFIED INDEPENDENT TESTING
AGENCY TO PROVIDE SHOP WELD INSPECTIONS PER CODE. INSPECTION REPORTS AND REQUIRED DOCUMENTATION SHALL BE SUBMITTED TO ENGINEER OF RECORD PRIOR TO STEEL INSTALLATION.
1.4. CONTINUOUS INSPECTION OF ALL MULTIPASS FILLET WELDS, SINGLE PASS FILLET WELDS LARGER THAN 516", COMPLETE AND PARTIAL JOINT PENETRATION GROOVE WELDS, PLUG AND SLOT WELDS.
1.5. NON-DESTRUCTIVE TESTING OF ALL COMPLETE PENETRATION WELDS BY AN AWS CERTIFIED
INDEPENDENT TESTING AGENCY AT THE CONTRACTORS EXPENSE.
2. STEEL FRAMES: VERIFICATION OF BRACING, STIFFENING, MEMBER LOCATIONS, AND PROPER JOINT
DETAIL APPLICATION AT ALL STEEL FRAME CONNECTIONS.
3. HIGH STRENGTH BOLTING:
3.1. VERIFICATION OF SNUG TIGHT BOLT INSTALLATION FOR ASTM A325N BOLTS.
3.2. VERIFICATION OF PROPER BOLT INSTALLATION AND PRETENSIONING FOR ASTM A325SC BOLTS.
3.3. OBSERVATION OF PREINSTALLATION TESTING AND PRETENSIONING CALIBRATION PROCEDURES
FOR ASTM A325SC BOLTS.
MASONRY CONSTRUCTION
1. STRUCTURAL MASONRY
1.1. DURING PREPARATION OF PRISMS.
1.2. INSPECTION OF IN-PLACE REINFORCING FOR CONFORMANCE PRIOR TO THE DELIVERY OF GROUT
TO THE JOBSITE.
1.3. CONTINUOUS INSPECTION DURING PLACEMENT OF GROUT.
1.4. CLEANOUTS PRIOR TO CLOSING.
SPECIAL CASES
1. EXPANSION, EPOXY, ADHESIVE, AND SCREW ANCHORS: DURING THE PLACEMENT OF ALL ANCHORS
SHOWN ON STRUCTURAL DRAWINGS. ADDITIONAL INSPECTIONS REQUIRED FOR REPAIR DETAILS SHALL
BE PERFORMED AT THE CONTRACTOR'S EXPENSE.
1.1. INSPECTION OF HOLE DIAMETER, HOLE DEPTH AND DRILL BIT CONFORMANCE.
1.2. INSPECTION OF HOLE CLEANING WITH WIRE BRUSH AND COMPRESSED AIR.
1.3. INSPECTION OF ANCHOR INSTALLATION USING SPECIFIED PRODUCT AND MANUFACTURER'S
RECOMMENDED INSTALLATION PROCEDURES.
1.4. INSPECTION OF EXPANSION ANCHORS SHALL INCLUDE THE VERIFICATION OF THE TIGHTENING
TORQUE THAT IS SPECIFIED BY THE ANCHOR MANUFACTURER.
SPECIAL INSPECTIONS - NON STRUCTURAL (PERFORMED BY OTHERS)
GEOTECHNICAL INSPECTIONS - SOILS
1. PERIODIC VERIFICATION THAT MATERIALS BELOW GRADE ARE ADEQUATE TO ACHIEVE THE DESIGN BEARING
CAPACITY.
2. PERIODIC VERIFICATION THAT EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED
PROPER MATERIAL.
3. PERFORM PERIODIC CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS.
4. CONTINUOUS VERIFICATION THAT USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES DURING
PLACEMENT AND COMPACTION OF COMPACTED FILL.
5. PERIODIC VERIFICATION PRIOR TO PLACEMENT OF COMPACTED FILL, OBSERVE SUBGRADE AND VERIFY
THAT SITE HAS BEEN PREPARED PROPERLY.
MASONRY LAP SLICE LENGTH
VERTICAL
REINFORCEMENT AT
CENTER OF WALL
VERTICAL
REINFORCEMENT AT
FACE OF WALL & BOND
BEAMS
HORIZONTAL
REINFORCEMENT
1500 2000 2500 1500 2000 2500 1500 2000 2500
#4 14" 12" 12" 29" 25" 22 26" 26" 26"
#5 22" 19" 17" 45" 40" 36" 32" 32" 32"
#6 43" 37" 33" 54" 54" 54" 38" 38" 38"
#7 59" 51" 46" 63" 63" 63" 45" 45" 45" f'm (PSI)
SIZE
#302
#301
#303
S0 0°
'0
6" E
.9 7'
POINTS
ID
50000
50106
50107
NORTHING
163760.20
163842.19
163807.88
166293.10
161001.14
158357.98
EASTING
107765.98
107905.65
107984.26
107616.75
107627.68
107643.34
ELEVATION
4336.73
4342.55
4341.26
4440.98
4275.24
4254.75
DESCRIPTION
CP 301 RWC
CP 302 RWV
CP 303 RWC AKA 50204
WC NW CNR SEC 12
SW CNR SEC 12
E QTR SEC 14
160 S MAIN ST,
FARMINGTON, UT 84025
P: 801.451.2383
No.
11-25-20
PRETTYMAN
AARON
9637735-2202
JOSHUA
UT
-N F
:4
PM
T
UE
SD
A Y
O
C
TO
BE
R
H
PR
O
JE
C
TS
\2
1-
F
A
RM
IN
G
TO
N
-S
HE
PA
RD
C
RE
EK
W
EL
L
HO
US
E\ D
RA
W
IN
G
S\
SH
EE
TS
\4 V
1.
D W
G
CONTACT INFORMATION
4246 S RIVERBOAT RD., STE 200
SALT LAKE CITY, UT 84123
P: 801.359.5565
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE PROPERTY OF CRS
ENGINEERS AND IS NOT TO BE
REPRODUCED, MODIFIED, OR USED FOR
ANY OTHER PROJECT OR EXTENSION OF
THIS PROJECT EXCEPT BY AGREEMENT
WITH CRS ENGINEERS.
PRINCIPAL :
MANAGER:
REVIEWER :
DRAFTER :
A B C D E F G H I J K L M
A B C D E F G H I J K L M
N
N
O P
O P
LEGAL NOTICE
REVISIONS
DESIGN
PROJECT
V1
O
F
SU
RV
EY
C
O N
TR
O
L
SHEPARD CREEK
WELL HOUSE
2021-0001
29 OCTOBER 2024
1799 SOUTH MAIN ST
FARMINGTON, UT 84025
M. CHANDLER, P.E.
J. PRETTYMAN, P.E.
J. PRETTYMAN, P.E.
J. DEMANN
FEET
120600
# 50000
# 50106
# 50107
MAIN STREET
NOTES:
- SURVEY WAS PERFORMED BY CRS ENGINEERS. ORIGINAL
FIELD DATA WAS COLLECTED FEBRUARY 2022.
- HORIZONTAL DATUM: DAVIS COUNTY LOCAL
COORDINATE SYSTEM
- VERTICAL DATUM: NAVD88
.2 1'
S0 0°
'2
2" E
MH
SS
SD SD
PP
4337 4338
31 43
-2 .0
0%
-2.00%
-29.71%
.3
3%
4337 4338
.3
3%7+50
0+
1+00
2+00
3+
4+00
5+
6+00 7+00
STA=2+23.91 =
STA 7+50.00
FF EL=4334.50
TOC=4334.00
TOC=4333.88 TOC=4333.88
TOC=4334.00
TOC=4333.88
TOC=4334.00
TOC=4333.88
TOC=4334.00
FG=4333.69 TOA=4333.69
FG=4333.69 TOA=4333.69
FF EL=4334.19
TOA=4333.39
TOA=4333.98
TOA=4343.25
TOA=4343.74
TOA=4335.37
TOA=4335.05
TOA=4334.31
TOA=4333.01TOA=4333.01
TOA=4335.18
TOA=4337.56
TOA=4337.81
TOA=4346.55
TOA=4346.89
-2 .0
0%
SS
SD SD
-2 .0
0%
SS
EL
EV
A
TIO
N
EL
EV
A
TIO
N
STATION
STATION
0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+25 2+50 2+75 3+00 3+25 3+50 3+75 4+00 4+25 4+50 4+75 5+00 5+25 5+50 5+75 6+00 6+25 6+50 6+75 7+00 7+25 7+507+50
CUT/FILL
EG FG
-0.00 0.00 - -0.00 0.00 -0.00 0.00 -0.00 0.00 - - -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00-0.00 0.00
0+25
.0
.0
0+50
.9
.9
0+75 1+00
.2
.2
.7
.7
1+25 1+50 1+75 2+00
.9
.9
.9
.9
2+25
.9
.9
2+50
.2
.2
2+75 3+00
.6
.6
.1
.1
3+25
.2
.2
3+50
.2
.2
3+75 4+00
.3
.3
.0
.0
4+25
.3
.3
4+50
.5
.5
4+75 5+00
.0
.0
.9
.9
5+25
.8
.8
5+50
.8
.8
5+75 6+00
.3
.3
.3
.3
6+25
.3
.3
6+50
.1
.1
6+75 7+00
.9
.9
.0
.0
7+25
.9
.9
7+507+50
.9
.9
R=1892.78'
PV
T
EL
=4
8.
PV
T
ST
A
=2 +1
2.
PV
C
E L=
.2 1'
PV
C
S
TA
=1 +6
2.
-0.99% -1.91% 1.73% 1.97% 3.61%
0.03% -0.00%0.52% 1.38% -4.54%
-3.91%
ST
A
=2 +2
5.
EL
=4
7.
ST
A
=3 +0
9.
EL
=4
4.
ST
A
=3 +9
6.
EL
=4
3.
ST
A
=6 +7
5.
EL
=4
6.
ST
A
=7 +3
8.
EL
=4
7.
ST
A
=7 +5
0.
EL
=4
7.
ST
A
=4 +4
9.
EL
=4
3.
ST
A
=5 +4
0.
EL
=4
3.
ST
A
=5 +0
0.
EL
=4
3.
ST
A
=5 +1
8.
EL
=4
3.
ST
A
=2 +8
8.
EL
=4
5.
ST
A
=2 +6
6.
EL
=4
6.
-5.64%
-3.00%
160 S MAIN ST,
FARMINGTON, UT 84025
P: 801.451.2383
No.
11-25-20
PRETTYMAN
AARON
9637735-2202
JOSHUA
UT
-N F
:4
PM
T
UE
SD
A Y
O
C
TO
BE
R
H
PR
O
JE
C
TS
\2
1-
F
A
RM
IN
G
TO
N
-S
HE
PA
RD
C
RE
EK
W
EL
L
HO
US
E\ D
RA
W
IN
G
S\
SH
EE
TS
\5 C
G
1.
D
W G
CONTACT INFORMATION
4246 S RIVERBOAT RD., STE 200
SALT LAKE CITY, UT 84123
P: 801.359.5565
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE PROPERTY OF CRS
ENGINEERS AND IS NOT TO BE
REPRODUCED, MODIFIED, OR USED FOR
ANY OTHER PROJECT OR EXTENSION OF
THIS PROJECT EXCEPT BY AGREEMENT
WITH CRS ENGINEERS.
PRINCIPAL :
MANAGER:
REVIEWER :
DRAFTER :
A B C D E F G H I J K L M
A B C D E F G H I J K L M
N
N
O P
O P
LEGAL NOTICE
REVISIONS
DESIGN
PROJECT
C G
O
F
SI
TE
P
LA
N
SHEPARD CREEK
WELL HOUSE
2021-0001
29 OCTOBER 2024
1799 SOUTH MAIN ST
FARMINGTON, UT 84025
M. CHANDLER, P.E.
J. PRETTYMAN, P.E.
J. PRETTYMAN, P.E.
J. DEMANN
FEET
20100
PROPERTY LINE
UNDERGROUND
BACKWASH TANK
GENERATOR PAD & SIDEWALK
PER DETAIL 1/CU508
ROADBASE/RECYCLED ASPHALT
(PROVIDED BY FARMINGTON CITY)
BLOW OFF DISCHARGE BOX
BLOW OFF DISCHARGE BOX
TIE INTO EXISTING ASPHALT
ASPHALT PAVEMENT PER DETAIL 1/CU509
55.5' RADIUS
55.5' RADIUS
42.5' RADIUS
42.5' RADIUS
42.5' RADIUS
42.5' RADIUS
42.5' RADIUS
SHEET NOTES:
1. WB-40 HAS A OUTSIDE TURN RADIUS OF 41'
FEET
60300
SD
M
MH
SS
SD
SD
INSTALL FIRE HYDRANT
PER DETAIL 2/CU502
STA=1+65.84
8" 90° D.I. BEND (MJ×MJ)
WITH THRUST BLOCK
STA=1+00.06
8" 22.5° D.I. BEND (MJ×MJ)
WITH THRUST BLOCK
STA=0+67.71
0+00
1+00
2+ 00 2+
SS
CONNECT TO EXISTING 12" HDPE
WATERLINE WITH TAPPING SLEEVE
(FIELD VERIFY WALL THICKNESS IS DR17 OR GREATER).
FLANGE 8" D.I. GATE VALVE TO TAPPING SLEEVE. (MJ×FL)
INSTALL THRUST BLOCKING PER DETAIL 2/CU501.
STA=2+02.73
BEGIN 8" ROMAC DOUBLE BALL FLEXIBLE
EXPANSION JOINT OR EQUIVALENT (MJ×FL)
PER DETAIL 1/CU503
8" D.I. GATE VALVE (FL×MJ)
STA=0+14.60
EL
EV
A
TIO
N
EL
EV
A
TIO
N
STATION
STATION
-0+25 0+00 0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+25
CUT/FILL
EG FG IN
V
- - -6.83 -6.46 -5.46 -4.82 -6.28 -7.00 -7.10 -7.24 -
-0+25 0+00
.6
.5
.4
.8
0+25
.5
.6
0+50
.8
0+75 1+00
.2
.9
1+25
.0
1+50
.8
1+75 2+00
.7
2+25
.6
.0
.3
.3
.6
.0
.7
.5
8" C900 DR-18 PVC
4'-3"
HEIGHT TO MATCH
INSIDE PIPING
8 INCH DUCTILE IRON PIPE
15" RCP - STORM DRAIN
UT
-N F
:4
PM
T
UE
SD
A Y
O
C
TO
BE
R
H
PR
O
JE
C
TS
\2
1-
F
A
RM
IN
G
TO
N
-S
HE
PA
RD
C
RE
EK
W
EL
L
HO
US
E\ D
RA
W
IN
G
S\
SH
EE
TS
\6 C
U1
.D W
G
CONTACT INFORMATION
4246 S RIVERBOAT RD., STE 200
SALT LAKE CITY, UT 84123
P: 801.359.5565
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE PROPERTY OF CRS
ENGINEERS AND IS NOT TO BE
REPRODUCED, MODIFIED, OR USED FOR
ANY OTHER PROJECT OR EXTENSION OF
THIS PROJECT EXCEPT BY AGREEMENT
WITH CRS ENGINEERS.
PRINCIPAL :
MANAGER:
REVIEWER :
DRAFTER :
A B C D E F G H I J K L M
A B C D E F G H I J K L M
N
N
O P
O P
LEGAL NOTICE
REVISIONS
DESIGN
PROJECT
C U1
O F
UT
IL
ITY
P
LA
N
P
RO
FI
LE
SHEPARD CREEK
WELL HOUSE
2021-0001
29 OCTOBER 2024
1799 SOUTH MAIN ST
FARMINGTON, UT 84025
M. CHANDLER, P.E.
J. PRETTYMAN, P.E.
J. PRETTYMAN, P.E.
J. DEMANN
FEET
40200
160 S MAIN ST,
FARMINGTON, UT 84025
P: 801.451.2383
No.
11-25-20
PRETTYMAN
AARON
9637735-2202
JOSHUA
BEGIN 8" ROMAC DOUBLE BALL FLEXIBLE
EXPANSION JOINT OR EQUIVALENT (MJ×FL)
8"D.I. GATE VALVE (FL×MJ)
8" 90°
D.I. BEND
1" POLY SERVICE LINE
& WATER METER PER
DETAIL 1/CU502
CONNECT TO EXISTING 12" HDPE
WATERLINE WITH TAPPING SADDLE. INSTALL
THRUST BLOCKING PER DETAIL 2/CU501.
INSTALL 8" D.I. GATE VALVE (MJ×FL)
RESTRAIN 77'-4"
O
F PIPE
8" 22.5° D.I. BEND (MJ×MJ)
WITH THRUST BLOCK
8" 90° D.I. BEND (MJ×MJ)
WITH THRUST BLOCK
FIRE HYDRANT ASSEMBLY
8" DUCTILE IRON PIPE 2D LENGTH = 15 LF
8" C900 DR-18 PVC 2D LENGTH = 192 LF
SHEET NOTES:
1. PLACE FLOWABLE FILL BETWEEN PIPES WITH
LESS THAN 18" OF VERTICAL DISTANCE.
2. CONTRACTOR TO VERIFY DIMENSION
RATIO (DR) OF EXISTING 12" HDPE
WATERLINE BEFORE PURCHASING
REDUCERS, GATE VALVE AND TAPPING
SADDLE TEE.
CHEMICAL SPILL CONTAINMENT
1" POLY PIPE TO CHILLER UNIT
1" POLY PIPE TO SHOWER
1" POLY PIPE TO SHOWER
SEE SHEET CU102
BEGIN 8" C900 DR-18 PVC
M
SS
SD
SD
SD
10+00
+6
10" 11.25° BEND
WITH THRUST BLOCK
STA=10+44.55
10" 11.25° VERTICAL BEND
WITH THRUST BLOCK
STA=10+36.26
10" 11.25° VERTICAL BEND
WITH THRUST BLOCK
STA=10+52.00
SS
SS
10" DUCTILE IRON PIPE
BEGIN 10" ROMAC DOUBLE BALL FLEXIBLE
EXPANSION JOINT OR EQUIVALENT (MJ×MJ)
PER DETAIL 1/CU503
STA=10+19.18
BEGIN 10" C900 DR-18 PVC
STA=10+21.86
EL
EV
A
TI
O N
EL
EV
A
TI
O N
STATION
STATION
9+50 9+75 10+00 10+25 10+50 10+75 10+90
CUT/FILL
EG FG IN
V
- - - -5.04 -5.06 - -
9+50 9+75 10+00
.2
.5
.8
.1
10+25
.6
10+50 10+75 10+90
.8
.5
10" DUCTILE IRON PIPE
10" C900 DR-18 PVC
160 S MAIN ST,
FARMINGTON, UT 84025
P: 801.451.2383
No.
11-25-20
PRETTYMAN
AARON
9637735-2202
JOSHUA
UT
-N F
:4
PM
T
UE
SD
A Y
O
C
TO
BE
R
H
PR
O
JE
C
TS
\2
1-
F
A
RM
IN
G
TO
N
-S
HE
PA
RD
C
RE
EK
W
EL
L
HO
US
E\ D
RA
W
IN
G
S\
SH
EE
TS
\7 C
U1
.D W
G
CONTACT INFORMATION
4246 S RIVERBOAT RD., STE 200
SALT LAKE CITY, UT 84123
P: 801.359.5565
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE PROPERTY OF CRS
ENGINEERS AND IS NOT TO BE
REPRODUCED, MODIFIED, OR USED FOR
ANY OTHER PROJECT OR EXTENSION OF
THIS PROJECT EXCEPT BY AGREEMENT
WITH CRS ENGINEERS.
PRINCIPAL :
MANAGER:
REVIEWER :
DRAFTER :
A B C D E F G H I J K L M
A B C D E F G H I J K L M
N
N
O P
O P
LEGAL NOTICE
REVISIONS
DESIGN
PROJECT
C U1
O F
UT
IL
ITY
P
LA
N
P
RO
FI
LE
SHEPARD CREEK
WELL HOUSE
2021-0001
29 OCTOBER 2024
1799 SOUTH MAIN ST
FARMINGTON, UT 84025
M. CHANDLER, P.E.
J. PRETTYMAN, P.E.
J. PRETTYMAN, P.E.
J. DEMANN
FEET
20100
SHEET NOTES:
1. INSTALL ALL PIPE BENDS AND FITTINGS WITH
THRUST BLOCKS PER DETAIL 2/CU501.
2. PLACE FLOWABLE FILL BETWEEN PIPES WITH
LESS THAN 18" OF VERTICAL DISTANCE.
CONNECT TO EXISTING 12" HDPE WATERLINE
WITH 12"x10" TAPPING SLEEVE (FIELD VERIFY
WALL THICKNESS IS DR17 OR GEATER).
FLANGE 10" GATE VALVE TO TAPPING SLEEVE.
INSTALL THRUST BLOCKING PER DETAIL 2/CU501.
CONNECT TO EXISTING 12"
HDPE WATERLINE WITH 12"x10"
TAPPING SLEEVE. FLANGE 10"
GATE VALVE TO TAPPING
SLEEVE. FIELD VERIFY DEPTH
AND PIPE DIMENSION RATIO.
10" DUCTILE IRON
HEIGHT TO BE DETERMINED BY
FILTER DESIGN
(2) 10" 11.25° VERTICAL BEND
WELL HOUSE BUILDING
10" 90° VERTICAL BEND
10" C900 DR-18 PVC 2D LENGTH = 39 LF
10" 11.25° BEND
10" DUCTILE IRON PIPE 2D LENGTH = 11 LF
8.14' OF 8" DUCTILE IRON PIPE
17.43' OF 8" DUCTILE IRON PIPE
SS
SD
SD
SD
SS
20+00
21+00
22+00
22+70
4' SDMH PER DETAIL 2/CU506 & 1/CU507
STA=20+50.07
RIM=4333.40'
INV NW IN=4327.73'
INV SW OUT=4327.73'
4' SDMH PER DETAIL C/CU506 & 1/CU507
STA=20+98.91
RIM=4333.40'
INV NE IN=4326.75'
INV NW IN=4327.40'
INV SW OUT=4326.75'
SS
25+00
25+75
EL
EV
A
TIO
N
EL
EV
A
TIO
N
STATION
STATION
19+75 20+00 20+25 20+50 20+75 21+00 21+25 21+50 21+75 22+00 22+25 22+50 22+75
CUT/FILL
EG FG
EL
EV
A
TIO
N
EL
EV
A
TIO
N
STATION
STATION
24+75 25+00 25+25 25+50 25+75
CUT/FILL
EG FG
16" GAS - HOLLY ENERGY
UNKNOWN DEPTH - FIELD VERIFY
- -0.22 -0.22 - 1.58 - 0.02 - 0.34 - +0.93 - 0.57 - - - - - -
19+75 20+00
.1
.9
.3
.9
20+25
.2
.3
20+50
.9
.2
20+75 21+00
.3
.2
.4
.9
21+25
.3
21+50
.3
21+75 22+00
.4
.7
22+25
.1
22+50 22+75
15" RCP AT 1.00%
4' SDMH
STA=20+50.07
RIM=4333.40'
INV NW IN=4327.73'
INV SW OUT=4327.73'
15" RCP AT 2.00%
3'-4" 1'-1"
15" RCP AT 1.00%
4' SDMH
STA=20+98.91
RIM=4333.40'
INV NE IN=4326.75'
INV NW IN=4327.40'
INV SW OUT=4326.75'
- -0.00 0.00 -0.00 0.00 -0.00 0.00 -0.00 0.00
24+75 25+00
.7
.7
.1
.1
25+25
.4
.4
25+50 25+75
.3
.3
8"
4' SDMH
STA=20+98.91
RIM=4333.40'
INV NE IN=4326.75'
INV NW IN=4327.40'
INV SW OUT=4326.75'
15" RCP AT 2.00%
CONTACT INFORMATION
4246 S RIVERBOAT RD., STE 200
SALT LAKE CITY, UT 84123
P: 801.359.5565
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE PROPERTY OF CRS
ENGINEERS AND IS NOT TO BE
REPRODUCED, MODIFIED, OR USED FOR
ANY OTHER PROJECT OR EXTENSION OF
THIS PROJECT EXCEPT BY AGREEMENT
WITH CRS ENGINEERS.
PRINCIPAL :
MANAGER:
REVIEWER :
DRAFTER :
A B C D E F G H I J K L M
A B C D E F G H I J K L M
N
N
O P
O P
LEGAL NOTICE
REVISIONS
DESIGN
PROJECT
C U1
O F
UT
IL
ITY
P
LA
N
P
RO
FI
LE
SHEPARD CREEK
WELL HOUSE
2021-0001
29 OCTOBER 2024
1799 SOUTH MAIN ST
FARMINGTON, UT 84025
M. CHANDLER, P.E.
J. PRETTYMAN, P.E.
J. PRETTYMAN, P.E.
J. DEMANN
FEET
40200
160 S MAIN ST,
FARMINGTON, UT 84025
P: 801.451.2383
No.
11-25-20
PRETTYMAN
AARON
9637735-2202
JOSHUA
UT
-N F
:4
PM
T
UE
SD
A Y
O
C
TO
BE
R
H
PR
O
JE
C
TS
\2
1-
F
A
RM
IN
G
TO
N
-S
HE
PA
RD
C
RE
EK
W
EL
L
HO
US
E\ D
RA
W
IN
G
S\
SH
EE
TS
\8 C
U1
.D W
G
2'-6"×4' BLOW-OFF DISCHARGE BOX
2'-6"×4' BLOW-OFF
DISCHARGE BOX
PER DETAIL 4/P502
15" INV SE OUT = 4328.21'
2'-6"×4' BLOW-OFF
DISCHARGE BOX
PER DETAIL 4/P502
15" INV SE OUT = 4328.21'
15" RCP 2D LENGTH = 251 LF
2'-6"×4' BLOW-OFF DISCHARGE BOX
15" RCP 2D LENGTH = 46 LF
SHEET NOTES:
1. PLACE FLOWABLE FILL BETWEEN PIPES WITH
LESS THAN 18" OF VERTICAL DISTANCE.
INSTALL GRATE ON
STORM DRAIN OUTFALL
INSTALL GRATE ON
STORM DRAIN OUTFALL
SS
SD SD
SD
2" HDPE DR11 TEE
CLEAN OUT PER 4/CU503
LOCATOR BALL
STA=30+58.81
2" HDPE DR11 TEE
CLEAN OUT PER 4/CU503
LOCATOR BALL
STA=30+95.75
30+00
31+00 32+00
+00
+00
35+00
35+38
2" 45° HDPE DR11 BEND
CLEAN OUT PER 3/CU503
LOCATOR BALL
STA=32+51.26
SS
SS
CLEAN OUT PER 3/CU503
STA=32+10.75
9.52' OF 10" PVC AT 1.00%
CONNECT TO BACKWASH TANK
PER DETAILS ON SHEET CU504
STA=30+28.73
SS
SS
PP
PP
PP
4' SSMH
STA=30+38.25
RIM=4333.80'
INV SW IN=4322.81'
INV NE OUT=4322.08'
4' SSMH
STA=34+28.70
RIM=4352.21'
INV S IN=4344.21'
INV E OUT=4343.21' STA=35+32.96
CONNECT TO TOP OF
EXISTING 10" SEWER
104.26' OF 4" PVC AT 4.34%
EL
EV
A
TI
O N
EL
EV
A
TI
O N
STATION
STATION
29+75 30+00 30+25 30+50 30+75 31+00 31+25 31+50 31+75 32+00 32+25 32+50 32+75 33+00 33+25 33+50 33+75 34+00 34+25 34+50 34+75 35+00 35+25 35+50 35+75 36+00
EG FG
29+75 30+00
.2
.8
.8
.8
30+25
.5
.8
30+50
.4
.1
30+75 31+00
.2
.2
.7
.9
31+25
.2
31+50
.3
31+75 32+00
.4
.2
32+25
.1
32+50
.3
32+75 33+00
.1
.4
.9
33+25
.4
33+50
.9
33+75 34+00
.7
.0
34+25
.0
34+50
.4
34+75 35+00
.9
.3
35+25 35+50 35+75 36+00
15" RCP
STA=30+44.81
1 1/2" HDPE DR11 (IPS) SEWER FORCE MAIN
12'-6"
IN
V
N E
O
UT
=4
2.
IN
V S
W
IN
=4
2.
4' S
SM
H
ST
A
=3 0+
.2
RI
M =4
3.
SU
M
P=
.0
0'
5'-3"
10" PVC AT 1.00%
IN
V
E O
UT
=4
3.
IN
V
S
IN
=4
4.
4' S
SM
H
ST
A
=3 4+
.7
RI
M =4
2.
SU
M
P=
.2
1'
160 S MAIN ST,
FARMINGTON, UT 84025
P: 801.451.2383
No.
11-25-20
PRETTYMAN
AARON
9637735-2202
JOSHUA
UT
-N F
:4
PM
T
UE
SD
A Y
O
C
TO
BE
R
H
PR
O
JE
C
TS
\2
1-
F
A
RM
IN
G
TO
N
-S
HE
PA
RD
C
RE
EK
W
EL
L
HO
US
E\ D
RA
W
IN
G
S\
SH
EE
TS
\9 C
U1
.D W
G
CONTACT INFORMATION
4246 S RIVERBOAT RD., STE 200
SALT LAKE CITY, UT 84123
P: 801.359.5565
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE PROPERTY OF CRS
ENGINEERS AND IS NOT TO BE
REPRODUCED, MODIFIED, OR USED FOR
ANY OTHER PROJECT OR EXTENSION OF
THIS PROJECT EXCEPT BY AGREEMENT
WITH CRS ENGINEERS.
PRINCIPAL :
MANAGER:
REVIEWER :
DRAFTER :
A B C D E F G H I J K L M
A B C D E F G H I J K L M
N
N
O P
O P
LEGAL NOTICE
REVISIONS
DESIGN
PROJECT
C U1
O F
UT
IL
ITY
P
LA
N
P
RO
FI
LE
SHEPARD CREEK
WELL HOUSE
2021-0001
29 OCTOBER 2024
1799 SOUTH MAIN ST
FARMINGTON, UT 84025
M. CHANDLER, P.E.
J. PRETTYMAN, P.E.
J. PRETTYMAN, P.E.
J. DEMANN
FEET
60300
EXISTING GROUND
SEWER LINE SHEET NOTES
1. ALL PIPING SHALL CONSIST OF 11
2" HDPE DR11 PIPE
(IPS) UNLESS INDICATED.
2. PROVIDE LOCATOR BALLS AT LOCATIONS
INDICATED AND PER 2/CU504
3. INLET AND OUTLET SEWER PIPES SHALL BE JOINED TO
THE MANHOLE WITH A FLEXIBLE, WATERTIGHT
GASKET CONNECTION.
4. MANHOLE SHALL BE CONSTRUCTED OF
REINFORCED CONCRETE.
5. MANHOLE BASE AND WALLS UP TO AT LEAST 12
INCHES ABOVE THE TOP OF THE UPPER MOST SEWER
PIPE ENTERING THE MANHOLE, SHALL BE
FABRICATED IN A SINGLE POUR WITHOUT JOINTS.
6. MANHOLE SHALL BE AIR PRESSURE TESTED AFTER
INSTALLATION.
7. IMPERMEABLE CUT-OFF WALLS TO BE INSTALLED IN
SEWER TRENCHES ON THE EAST AND SOUTH WALLS
FROM STATION 30+28.73 TO STATION 32+00.
8. PLACE FLOWABLE FILL BETWEEN PIPES WITH LESS
THAN 18" OF VERTICAL DISTANCE.
9. THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO
LOCATE ALL EXISTING UTILITY LINES FROM RECORDS
PROVIDED BY OTHERS AND EVIDENCE IN THE FIELD.
CONTRACTOR TO POTHOLE ALL EXISTING UTILITY
LOCATIONS TO VERIFY LOCATIONS PRIOR TO
COMMENCING WORK.
10. INSTALL SUBMERSIBLE PUMP IN 48" MANHOLE
LOCATED AT STATION 30+38.25.
SEWER PIPE TO BE FLAT OR SLOPED
UPWARD TOWARDS MANHOLE.
HIGH SPOTS ARE NOT ALLOWED.
EXISTING WATERLINE
(ASSUMED 4 FT COVER)
MINIMUM 1.5 FT VERTICAL
CLEARANCE TO SEWER
EXISTING PRESSURIZED IRRIGATION
(ASSUMED 4FT COVER)
MINIMUM 1.5 FT VERTICAL
CLEARANCE TO SEWER
M A
IN
STREET
2" HDPE DR-11 (IPS) 2D LENGTH = 400 LF
CONNECT TO TOP OF
EXISTING 10" SEWER LINE
10" C900 DR-21PVC 2D LENGTH = 10 LF
BACKWASH TANK
4" C900 DR-21 PVC 2D LENGTH = 105 LF
EXISTING STORM DRAIN
(ASSUMED 4FT COVER)
MINIMUM 1.5 FT VERTICAL
CLEARANCE TO SEWER EXISTING COMMUNICATION
LINE (ASSUMED DEPTH)
MINIMUM 1.5 FT VERTICAL
CLEARANCE TO SEWER
CU504
AutoCAD SHX Text
CM
AutoCAD SHX Text
CONTACT INFORMATION
4246 S RIVERBOAT RD., STE 200
SALT LAKE CITY, UT 84123
P: 801.359.5565
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE PROPERTY OF CRS
ENGINEERS AND IS NOT TO BE
REPRODUCED, MODIFIED, OR USED FOR
ANY OTHER PROJECT OR EXTENSION OF
THIS PROJECT EXCEPT BY AGREEMENT
WITH CRS ENGINEERS.
PRINCIPAL :
MANAGER:
REVIEWER :
DRAFTER :
A B C D E F G H I J K L M
A B C D E F G H I J K L M
N
N
O P
O P
LEGAL NOTICE
REVISIONS
DESIGN
PROJECT
C U5
O F
C
IV
IL
D
ET
A
IL
S
SHEPARD CREEK
WELL HOUSE
2021-0001
29 OCTOBER 2024
1799 SOUTH MAIN ST
FARMINGTON, UT 84025
M. CHANDLER, P.E.
J. PRETTYMAN, P.E.
J. PRETTYMAN, P.E.
J. DEMANN
UT
-C F
:4
PM
T
UE
SD
A Y
O
C
TO
BE
R
H
PR
O
JE
C
TS
\2
1-
F
A
RM
IN
G
TO
N
-S
HE
PA
RD
C
RE
EK
W
EL
L
HO
US
E\ D
RA
W
IN
G
S\
SH
EE
TS
\1
C U5
.D
W G
1 FARMINGTON CITY CULINARY WATER TRENCH SECTION
NOT TO SCALE 2 FARMINGTON CITY THRUST BLOCK DETAIL
NOT TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .