FARM_III_RFI_2_Atch_1_HTRO_Scoring_Matrix.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Facilities Acquisitions for Restoration and Modernization (FARM) III
Solicitation number
FA9101-25-R-FARMIII
Issued by

About this file

This is a Self-Scoring Matrix Excel file for the Facilities Acquisition for Restoration and Modernization (FARM) III Request for Information (RFI) No. 2, associated with solicitation FA9101-25-R-FARMIII. The detailed scoring matrix allows potential offerors to self-evaluate their capabilities across three primary technical domains: Mechanical Systems, Electrical Systems, and Facility Renovations. Each domain contains specific subcategories with weighted scoring potential, such as air duct systems, high-pressure piping, medium voltage switchgear, transformers, and comprehensive facility renovation capabilities.

The scoring matrix enables contractors to quantify their technical expertise by documenting work sample experiences across complex mechanical, electrical, and facility infrastructure projects. Contractors can score points for specific technical capabilities like cooling water pumps, hydraulic systems, lightning protection, HVAC components, fire protection systems, and communication infrastructure. The document also includes a section for project management evaluation and a CPARS (Contractor Performance Assessment Reporting System) bonus scoring mechanism, allowing companies to demonstrate past performance and potentially enhance their overall technical rating. The opportunity is being managed by the Department of the Air Force Materiel Command Test Center and is currently in a pre-solicitation phase.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Self Score Sheet

Facilities Acquisition for Restoration and Modernization (FARM) III, FA9101-25-R-FARMIII, Request for Information (RFI) No. 2
Attachment 1: Highest Technically Rated Offeror (HTRO) Self-Scoring Matrix
OFFEROR NAME: [FILL IN OFFEROR NAME HERE]
Atch 2: HTRO Scoring Matrix Instuctions ParagraphCategoryMaximum Self-Score PointsOfferor Proposed Self-Score PointsSelf-Score Point Multiplication FactorOfferor's Total Self-Score Initial PointsElement Weight FactorSingle Project Weighted Element ScoreMax Weighted Element ScoreOfferor's Weighted Score before Bonus
Mechanical Systems
2.1Number of Work Samples that include all labor, materials, equipment, transportation, supervision, and quality control to repair, repair by replace, or installation of the following systems:
M1Air Duct, expansion joints and control/process valves (≥ 36" Ø and 150psig)4250.0004100040000
M2High pressure duct/piping and valves (≥ 4" Ø, ≥ 4,000psig)4250.0007175070000
M3Large pressure vessels (≥ 2000psig; ≥ 10K gallons)4250.0009225090000
M4Desiccant bed air dryers (≤ 300psia and ≥ 200lb/s)4250.000375030000
M5Turning vanes for large air ducting (≥ 30ft Ø, 0.5-160psia)4250.0005125050000
M6Cooling water/raw water pumps (10,000-50,000gpm)4250.0008200080000
M7Cooling water/raw water filters/strainers, valves (control/process) and distribution lines (≥ 36” Ø)4250.0007175070000
M8Hydraulic Systems with high flow and pressure requirements (≥ 100gpm, ≥2000psig)4250.0004100040000
M9Large Steam Boilers (≥50kpph)4250.0005125050000
M10Chillers and Refrigeration equipment (≥3,000 refrigeration tons)4250.0006150060000
Electrical Systems
2.2Number of Work Samples that include all labor, materials, equipment, transportation, supervision, and quality control to repair, repair by replace, or installation of the following systems:
E1Medium Voltage gas insulated switchgear (≥ 1kV and ≤ 35kV)4250.0006150060000
E2Medium Voltage unit substations (≥ 1kV and ≤ 35kV)4250.0006150060000
E3Medium Voltage ducting/vaults/cables (≥ 1kV and ≤ 35kV), more than 500 linear feet4250.0006150060000
E4High Voltage transformers (≥ 35kV)4250.0008200080000
E5Oil circuit breakers (≥ 1000 amp and ≥ 500kV)4250.0008200080000
E6Variable frequency drives for motors (≥ 1000V)4250.0005125050000
E7Facility Wide Lightning Protection Systems (Facility ≥ 5,000SF)4250.0004100040000
Facility Renovations
2.3Number of Work Samples that include all labor, materials, equipment, transportation, supervision, and quality control to execute a construction service contract by repairing, repair by replacing, or installing at least 5 of 7 categories listed below:

-Facility HVAC will include at least 4 of the following items: chillers, Air Handler Units, ducting, boilers, refrigerant/refrigerant lines, condensers, and compressors -Facility Fire protection will include at least 3 of the following items: sprinkler systems, heat/smoke detectors, pull stations, fire alarm control panels, notification systems -Facility Electrical systems will include at least 4 of the following items: facility transformers, power panels, bus bars, circuit breakers/fuses, conduit/conductors, lights/wall plugs, and grounding systems -Facility Exterior components will include at least 2 of the following items: roofing systems, exterior cladding, windows/doors, and insulation -Facility Plumbing systems will include at least 2 of the following items: potable water piping/fittings, sewage piping/fittings, venting, and fixtures -Facility Communications Systems will include at least 2 of the following items: hardware replacement withing telecommunication rooms/closets, cabling within the facility, wireless network systems, public address systems, and uninterruptible power supplies (UPS) -Interior Finishes will include at least 3 of the following items: finished flooring, drywall (or other typical wall material) installation/repair, painting, wall paper/coverings, suspended ceiling systems, and systems furniture 5 250.00 0 7 1750 8750 0

Total Sum of Self-Score Points Selected for Mechanical Systems, Electrical Systems, and Facility Renovation can not be greater than 20 Total Self-Score Points 0

Project Management, Development, and Design
2.4Total dollar value of construction services projects supporting DoD Installations.6016.67035030000
2.5Total number of contracts/TO supporting both design and construction efforts2050.00015010000

Offeror is only to input data into the yellow cells.

Offeror's Weighted Score Before CPARS Bonus (Column I Sum)0
Offeror's Bonus Score based off CPARS Data (CPARS Sections Below)0
Did Offeror Receive "CPAR For All Categories" Bonus, Points AwardedNo0
Offeror's Final Self Score0
Government-Validated Score

2.6 CPARS and CPARS Equivalent Data Submission

Project 1Contract TitleSubsection Associated with ProjectQualityManagementCost ControlSmall Business SubcontractingRegulatory ComplianceScheduleTotal Score from Provided Ratings
YearWS Number/Project TitleSelect from Dropdown
0.00
0.00
0.00
0.00
0.00
Average0.00
Project Details from Above SubsectionsUnweighted ScoreWeighted ScoreBonus Awarded0%0
Project 2Contract TitleSubsection Associated with ProjectQualityManagementCost ControlSmall Business SubcontractingRegulatory ComplianceScheduleTotal Score from Provided Ratings
YearWS Number/Project TitleSelect from Dropdown
0.00
0.00
0.00
0.00
0.00
Average0.00
Project Details from Above SubsectionsUnweighted ScoreWeighted ScoreBonus Awarded0%0
Project 3Contract TitleSubsection Associated with ProjectQualityManagementCost ControlSmall Business SubcontractingRegulatory ComplianceScheduleTotal Score from Provided Ratings
YearWS Number/Project TitleSelect from Dropdown
0.00
0.00
0.00
0.00
0.00
Average0.00
Project Details from Above SubsectionsUnweighted ScoreWeighted ScoreBonus Awarded0%0
Project 4Contract TitleSubsection Associated with ProjectQualityManagementCost ControlSmall Business SubcontractingRegulatory ComplianceScheduleTotal Score from Provided Ratings
YearWS Number/Project TitleSelect from Dropdown
0.00
0.00
0.00
0.00
0.00
Average0.00
Project Details from Above SubsectionsUnweighted ScoreWeighted ScoreBonus Awarded0%0
Project 5Contract TitleSubsection Associated with ProjectQualityManagementCost ControlSmall Business SubcontractingRegulatory ComplianceScheduleTotal Score from Provided Ratings
YearWS Number/Project TitleSelect from Dropdown
0.00
0.00
0.00
0.00
0.00
Average0.00
Project Details from Above SubsectionsUnweighted ScoreWeighted ScoreBonus Awarded0%0

Sheet1

CPAR RatingsAssociated ScoreSubsectionsCPAR Criteria Selected
Exceptional50M1
Very Good40M2
Satisfactory20M3
Marginal0M4
Unsatisfactory-5M5
N/A0M6
""0M7
M8
M9
M10
E1
E2
E3
E4
E5
E6
E7
2.3

File details come from the government source that posted it. Updated .