FAKZ199055 TYPE B3 SPECIFICATIONS VOLUME 2 SIGNED.pdf
PDF 8 MB Posted
- Attached to
- F-35: Engine Shop Federal contract opportunity
- Solicitation number
- W50S6N-23-B-0006
About this file
This solicitation is for an F-35 Engine Shop to be constructed at the 187th Fighter Wing Air National Guard Base in Montgomery, Alabama. The solicitation seeks general contracting services including site work, foundations, and construction of a single-story 4,700 square foot facility to house engine maintenance. Major building systems include a high-efficiency air-cooled heat pump HVAC system and an overhead bridge crane. Utilities work includes underground power, sanitary, gas, water and telecommunications infrastructure. The period of performance is 365 calendar days from notice to proceed. The solicitation was issued by the Department of the Army Alabama Army National Guard on January 20, 2023. The response due date is not specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF 1419 Abstract.pdf | ||
| PreBid Engine Shop .pptx | PPTX presentation | |
| Meeting Attendees.pdf | ||
| EAL.pdf | ||
| J and A for Brand Name-Sole Source - Engine Shop - .pdf | ||
| FAKZ199055 TYPE B3 SPECIFICATIONS VOLUME 1 SIGNED.pdf | ||
| J and A for Brand Name-Sole Source Stanley Best _Redacted.pdf | ||
| W50S6N-23-B-0006.pdf | ||
| J and A for Brand Name-Sole Source - Engine Shop.pdf | ||
| FAKZ199055 TYPE B3 DRAWINGS SIGNED.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
187th Fighter Wing Dannelly Field - AL ANG Montgomery, AL
F-35 ENGINE SHOP
Specifications for the
Date: JUNE 2023 Revised: NA Job No: FAKZ199055 / 18071 Set No:
Submittal: B-3
PROPERTY OF THE UNITED STATES GOVERNMENT
COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS,
OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED
Do not remove this notice Properly destroy documents when no longer needed
ARCHITECTURE & INTERIOR DESIGN
1115 South Court Street | Montgomery, AL 36104
Tel. 334. 263. 5162 | WWW.SSLARCH.COM
VOLUME II
F:35 Engine Shop FAKZ199055 / 18071 January 2023 187th Fighter Wing, Dannelly Field, ANG Type B3 (100%) Submittal
TABLE OF CONTENTS 00 0100 - 1
SECTION 00 0100 - TABLE OF CONTENTS
VOLUME I
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 0100 TABLE OF CONTENTS 5
00 0102 PROJECT INFORMATION AND SUMMARY 7
DIVISION 01 - GENERAL REQUIREMENTS
01 0450 CUTTING AND PATCHING 5
01 0500 FIELD ENGINEERING 3
01 2000 PRICE AND PAYMENT PROCEDURES 3
01 2300 BID OPTIONS 3
01 3000 ADMINISTRATIVE REQUIREMENTS 8
01 3001 SUBMITTALS 10
- SUBMITTAL REGISTER 17
01 3225 PROJECT SUSTAINABILITY SUMMARY 3
01 3329 SUSTAINABLE DESIGN REPORTING
- TPC CHECKLIST
01 3553 SECURITY PROCEDURES 2
01 4000 QUALITY REQUIREMENTS 7
01 4100 REGULATORY REQUIREMENTS 3
01 4217 DEFINITIONS AND STANDARDS 3
01 5000 TEMPORARY FACILITIES AND CONTROLS 3
01 5100 TEMPORARY UTILITIES 3
01 5213 FIELD OFFICES AND SHEDS 3
01 5460 SAFETY AND HEALTH 5
01 5500 VEHICULAR ACCESS AND PARKING 3
01 5719 TEMPORARY ENVIRONMENTAL CONTROLS 8
01 6000 PRODUCT REQUIREMENTS 9
01 6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT
RESTRICTIONS
01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS 12
01 7419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 10
01 7800 CLOSEOUT SUBMITTALS 7
01 7900 DEMONSTRATION AND TRAINING 5
01 9100 TOTAL BUILDING COMMISSIONING 17
DIVISION 02 - EXISTING CONDITIONS
02 4100 DEMOLITION 5
02 7110 FOUNDATION DRAINAGE SYSTEMS 7
187th Fighter Wing, Dannelly Field, ANG Type B3 (100%) Submittal
TABLE OF CONTENTS 00 0100 - 2
DIVISION 03 – CONCRETE
03 3000 CAST-IN-PLACE CONCRETE 30
03 3680 CONCRETE DYING AND POLISHING 8
DIVISION 04 – MASONRY
04 2000 UNIT MASONRY 13
04 7200 CAST STONE MASONRY 8
DIVISION 05 – METALS
05 1200 STRUCTURAL STEEL FRAMING 7
05 2100 STEEL JOIST FRAMING 5
05 3100 STEEL DECKING 6
05 5000 METAL FABRICATIONS 8
05 5213 PIPE AND TUBE RAILINGS 5
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 1000 ROUGH CARPENTRY 7
06 4100 ARCHITECTURAL CASEWORK 7
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 0100 SPECIAL PROJECT ROOFING WARRANTY 3
07 1300 SHEET WATERPROOFING 6
07 2100 THERMAL INSULATION 5
07 2119 SPRAY FOAM INSULATION 6
07 2500 WEATHER BARRIERS 12
07 2650 INTEGRALLY BONDED UNDERSLAB VAPOR PROTECTION 6
07 4113 METAL ROOF PANELS 14
07 4213 RIBBED METAL WALL PANELS 10
07 4293 07 4800
METAL SOFFIT PANELS
CONTINUOUS INSULATION CHANNELS
07 5400 THERMOPLASTIC MEMBRANE ROOFING 15
07 6200 SHEET METAL FLASHING AND TRIM 7
07 6500 WALL FLASHING 7
07 7100 ROOF SPECIALTIES 11
07 9005 JOINT SEALERS 12
DIVISION 08 - OPENINGS
08 1113 HOLLOW METAL DOORS AND FRAMES 13
08 3323 OVERHEAD COILING DOORS 6
187th Fighter Wing, Dannelly Field, ANG Type B3 (100%) Submittal
TABLE OF CONTENTS 00 0100 - 3
08 4313 ALUMINUM-FRAMED STOREFRONTS 9
08 4523 INSULATED TRANSLUCENT FIBERGLASS SANDWICH
PANEL WALL SYSTEM
08 7100 DOOR HARDWARE 21
08 8000 GLAZING 6
08 9100 LOUVERS 5
DIVISION 09 - FINISHES
09 2116 GYPSUM BOARD ASSEMBLIES 6
09 5100 ACOUSTICAL CEILINGS 7
09 6500 RESILIENT BASE 5
09 9113 EXTERIOR PAINTING 8
09 9123 INTERIOR PAINTING 12
09 9600 HIGH-PERFORMANCE COATINGS 9
DIVISION 10 - SPECIALTIES
10 1400 SIGNAGE 5
10 2800 TOILET, BATH, AND LAUNDRY ACCESSORIES 8
10 4400 FIRE PROTECTION SPECIALTIES 3
10 8500 SPECIALTIES 2
DIVISION 11 - EQUIPMENT
11 3013 RESIDENTIAL APPLIANCES 3
DIVISION 12 - FURNISHINGS
12 3600 COUNTERTOPS, AND WINDOW SILLS 4
12 4813 ENTRANCE FLOOR MATS AND FRAMES 2
DIVISION 14 - CONVEYING EQUIPMENT
14 4500 OVERHEAD CRANE 7
187th Fighter Wing, Dannelly Field, ANG Type B3 (100%) Submittal
TABLE OF CONTENTS 00 0100 - 4
VOLUME II
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 0100 TABLE OF CONTENTS 5
00 0102 PROJECT INFORMATION AND SUMMARY 7
DIVISION 21 – FIRE SUPPRESSION SYSTEMS
21 1313 WET-PIPE SPRINKLER SYSTEMS 23
DIVISION 22 – PLUMBING
22 0000 PLUMBING, GENERAL PURPOSE 45
DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING
23 0300 BASIC MECHANICAL MATERIALS AND METHODS 4
23 0593 TESTING, ADJUSTING, AND BALANCING 18
23 0700 THERMAL INSULATION FOR MEHCANICAL SYSTEMS 26
23 0900 INSTRUMENTATION AND CONTROL FOR HVAC 43
23 0913 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC 35
23 0923.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC 21
23 3000 HVAC AIR DISTRIBUTION 19
23 8100 UNITARY AIR CONDITIONING EQUIPMENT 12
DIVISION 25 – INTEGRATED AUTOMATION
25 0511 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS 39
25 1010 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) 55
DIVISION 26 – ELECTRICAL
26 0100 GENERAL ITEMS 9
- ATTACHMENT A 3
26 0124 MEDIUM VOLTAGE CABLES 7
26 0211 ELECTRICITY METERING 11
26 0519 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 5
26 0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 7
26 0529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 6
26 0533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 14
26 0543 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 12
26 0544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS & CABLING 5
26 0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 10
26 0923 LIGHTING CONTROL SYSTEM 35
26 2416 PANELBOARDS 7
26 2418 LOW-VOLTAGE TRANSFORMERS 5
26 2726 WIRING DEVICES 7
26 2813 FUSES 2
187th Fighter Wing, Dannelly Field, ANG Type B3 (100%) Submittal
TABLE OF CONTENTS 00 0100 - 5
26 2816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 7
26 3000 SHORT CIRCUIT COORDINATION STUDY AND ARC FLASH HAZ ANALYSIS 10
26 4113 LIGHTNING PROTECTION FOR STRUCTURES 4
26 5119 LED INTERIOR LIGHTING 7
26 5619 LED EXTERIOR LIGHTING 9
DIVISION 27 – COMMUNICATIONS
27 0500 STRUCTURED CABLING 9
27 0510 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS 2
27 0520 COMMUNICATION CABLE MANAGE AND LADDER RACK 4
27 0528 PATHWAYS FOR COMMUNICATIONS SYSTEMS 5
27 0544 SLEEVES AND SLEEVE SEALS COMMUNICATIONS PATHWAYS 5
27 0610 INDENTIFICATION FOR COMMUNICATION SYSTEMS 1
27 1300 COMMUNICATION OPTICAL FIBER BACKBONE CABLING 6
27 1500 COMMUNICATIONS COPPER HORIZONTAL CABLING 3
27 2005 COMMUNICATIONS PATCH PANELS AND FIBER OPTIC ENCLOSURES 4
27 2010 COMMUNICATION RACKS, ENCLOSURES 2
27 2015 COMMUNICATION FACEPLATES AND CONNECTORS 4
27 2020 COMMUNICATION PATCH CORDS AND WORKSTATION CORDS 3
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 3176 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE 41
DIVISION 31 - EARTHWORK
31 0010 SITE PROTECTION 4
31 0200 TEMPORARY EROSION AND SEDIMENT CONTROL 12
31 2210 EARTHWORK 14
- GEOTECHNICAL REPORT 40
31 3116 TERMITE CONTROL 3
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 0116 COLD MILLING (PLANING) OF EXISTING BITUMINOUS PAVEMENTS 3
32 1217 ASPHALT CONCRETE PAVING 4
32 1314 CEMENT CONCRETE PAVING 14
32 1720 PAVEMENT JOINT SEALANTS 5
32 1900 SIDEWALKS 3
32 3113 CHAIN LINK FENCES AND GATES 6
32 9223 SODDING 5
DIVISION 33 - UTILITIES
33 1117 OUTSIDE WATER SYSTEM 7
33 3112 SANITARY SEWERAGE 7
33 4112 STORM DRAINAGE 7
This page intentionally left blank
187th Fighter Wing, Dannelly Field, ANG Type B3 (100%) Submittal Montgomery, AL
PROJECT INFORMATION AND SUMMARY 000102 - 1
SECTION 000102 - PROJECT INFORMATION AND SUMMARY
PART 1 GENERAL
1.01 PROJECT IDENTIFICATION
A. Project Name: F:35 Engine Shop, located at 187th Fighter Wing, Air National Guard (ANG) Base at Dannelly Field, Montgomery, AL.
B. Government Project Number: FAKZ199055
C. Architect's Project Number: 18071
D. The Owner, hereinafter referred to as the Government: Alabama Air National Guard.
E. Owner's Representatives:
1. Contracting Officer: Mr. Craig Kast
2. Contracting Specialist: Mr. Stephen Shanks
3. Contracting Officer Representative: Major Adam Sanders, Base Civil Engineer
4. Alternate Contracting Officer Representative: Major Nathan Brock, Deputy Base Civil Engineer
1.02 CONTRACT DURATION
A. 365 calendar days from notice to proceed to Beneficial Occupancy. The listed duration shall include completion of all punch list activities identified in the project final inspection. The Government intends to occupy the building upon Beneficial Occupancy.
1.03 PROJECT DESCRIPTION
A. Project scope includes sitework, subgrade excavation, building foundations, structural, architectural, plumbing, mechanical, electrical and relocation of existing utilities for a single story facility and associated sitework per the contract documents. The proposed project includes the following:
1. Vertical construction will consist of work on one facility. The F35 Engine Shop will be an approximate 4,700 square foot building housing the Base's Engine Maintenance Unit function.
Montgomery, AL
PROJECT INFORMATION AND SUMMARY 000102 - 2
2. Special attention will need to be paid to layout, erosion control, and laydown operations due to the limitations of the site and existing utilities on site. Scope of work will include the rerouting of underground utilities.
3. The new building’s structural system includes slab on grade with engineered fill soil stabilization, structural steel framing as well as load bearing masonry, open web joists, and metal roof decking. The roof will have both low slope components with tapered insulation and thermoplastic roofing, sloped standing seam roofing.
The exterior walls include veneer brick, aluminum storefronts, translucent wall assemblies, and metal wall panels.
4. Major building systems include a high efficiency air-cooled heat pump system for HVAC systems.
5. Specialty equipment included in the project includes an omni-directional bridge crane.
6. Underground utility work will include all building necessary power, sanitary, gas, water, and telecommunications infrastructure. Coordination will be required with existing utilities to maintain operation through and around the site and will include power, sanitary, gas, water, and data.
7. Site work will comprise of on-site access driveways and parking. Combination of asphalt paving and concrete paving will be utilized.
B. Antiterrorism and Building Standoff Requirements:
1. The project is considered "Low Occupancy" in accordance with the Department of Defense (DoD) Unified Facilities Criteria (UFC) 4-010-01 DoD Minimum Antiterrorism Standards for Buildings. As such, compliance with UFC 4-010-01 is not required. The design incorporates strategies from UFC 4-010-01 where practical and cost effective.
C. Sustainability Design and Energy Conservation:
1. The project design incorporates Sustainability Concepts to achieve optimum resource efficiency, constructability, sustainability, and energy conservation.
2. This project has been registered with the USGBCI for guiding principles assessment recognition process.
Montgomery, AL
PROJECT INFORMATION AND SUMMARY 000102 - 3
3. The Contractor is responsible for ensuring all specified sustainable and energy conservation goals are achieved and fully implemented. Refer to section 01 3329 for sustainability reporting requirements. Refer to technical specifications for specific product requirements.
D. Building Systems Commissioning:
1. Refer to specification section 01 9100 - Total Building Commissioning, and other individual specifications sections for Contractor's responsibilities related to Building Systems Commissioning.
E. Government Furnished Furniture, furnishings and Equipment (FF&E):
1. Contractor's base bid shall include rough-ins for plumbing, mechanical, and electrical; including installation and final connection of all items indicated on the drawings as Government Furnished Contractor Installed (GFCI).
F. Contractor's Qualified Fire Protection Engineer (QFPE) Services
1. The Contractor shall employ a Qualified Fire Protection Engineer (QFPE) meeting the requirements of UFC 3-600-01.
2. The QFPE shall review, sign, and certify all fire protection and life safety systems including; but, not limited to fire alarm, mass notification, and sprinkler systems included within the proposed project.
3. All shop drawing / calculations / material submittals for applicable life safety systems must be reviewed and stamped by the Contractor’ QFPE in accordance with section 9-6.3 of UFC 3-600-01.
4. Waterflow testing shall be performed under the direction of the Contractor’s QFPE in accordance with section 9-6.4 of UFC 3-600-01. Waterflow testing shall be performed by the Contractor in order to develop required hydraulic calculations.
Use of waterflow testing performed by the Architect during design cannot be utilized by the Contractor for preparation of project submittals.
Montgomery, AL
PROJECT INFORMATION AND SUMMARY 000102 - 4
5. During Construction the Contractor’s QFPE must visit the site in intervals/quantities required to certify that the system has been installed in accordance with the project requirements. At a minimum, the QFPE shall attend/witness the above ceiling inspection and attend/witness final acceptance testing for all fire protection and life safety systems. Additional site inspections are at the discretion of the Contractor’s QFPE. The Contractor’s QFPE shall certify, in writing, that the system has been installed in accordance with project requirements.
The Contractor’s QFPR certification shall be in writing, on company letterhead, and include the QFPE’s registration stamp.
1.04 PERMITS, FEES AND NOTICES
A. Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building permit and other permits and governmental fees, licenses, and inspections necessary for proper execution and completion of the Work which are customarily secured after award of the Construction Contract and which are in effect on the date of receipt of bids.
1. City of Montgomery Building Permit will not be required.
B. The Contractor shall comply with and give notices required by all laws, ordinances, rules, regulations, and lawful orders of public authorities applicable to performance of the Work.
1.05 USE OF SITE AND MISC. REQUIREMENTS
A. The space available to the contractor for the performance of the work, either exclusively or in conjunction with others performing other construction as part of the project, is as per the Government's approval.
1. Other areas are off limits to all construction personnel.
B. Access to site will be limited; obtain Government's approval of proposed routes of access.
C. Keep existing sidewalks, roads, parking lots and drives on site clear and available at all times. Promptly remove mud, dirt, debris, etc. from sidewalks, streets, and public right-of-way during construction as it occurs.
D. Storage areas on site are very minimal and will be limited to materials that are to be immediately used in the progress of the work. If additional storage is required, then Contractor shall secure and be responsible to pay for such off site storage in a fully bonded and insured facility acceptable to the Government, with all items clearly identified as being assigned to this project.
Montgomery, AL
PROJECT INFORMATION AND SUMMARY 000102 - 5
1. Contractor will be limited to the areas included within the project limits shown on the civil drawings.
E. Provide secure temporary barricades, fencing, etc. as required to separate the public from construction operations. Compliant safety and/or warning signage is to be provided as well in conjunction with fencing and barricades.
1. Site safety and security is the General Contractor's responsibility. Fencing shall be provided as deemed necessary to protect the site from theft and damage and to prevent access to the site by the public. A fence along the project limits is anticipated at a minimum. However, exact location/extents of fencing is at the discretion of the Contractor.
F. Construction operations are not to affect any of the ongoing operations throughout the site and/or adjacent sites. Construction equipment is not to be attached to, or swing over existing buildings to remain, public areas, occupied buildings or parking lots, right-of-ways, etc.
G. Comply with the Government's security requirements - refer to specification section 01 3553.
H. The contractor shall provide all testing, inspections, and similar services; these services also include those specified to be performed by an independent agency.
1.06 UTILITY OUTAGES AND SHUTDOWN
A. All electrical and communication shut downs shall be performed on a non-working day for the Government(Saturday, Sunday, Monday, or Holidays) unless specifically approved by the base Contracting Officer Representative.
B. Limit shutdown of utility services to 8 hours at a time, arranged at least 72 hours in advance with the Government.
C. Prevent accidental disruption of utility services to other facilities.
1.07 PHASING OF WORK
A. The work of this project shall be completed in one phase. However, the Contractor shall coordinate the work as required to ensure all existing roadways and facilities adjacent to the project site remain open and accessible for use by the Government.
1.08 WORK SEQUENCE
A. Coordinate construction schedule and operations with Contracting Officer Representative.
Montgomery, AL
PROJECT INFORMATION AND SUMMARY 000102 - 6
B. Rerouting of existing utilities shown on the drawings must be properly sequenced with work associated with undercutting of the building pad so that shutdown of utility services is limited. Rerouting of existing utilities shall take place prior to the undercutting of the building pad. Rerouting of waterlines shall take place prior to the rerouting of the sanitary sewer. Storm water may be partially rerouted prior to starting the work associated with undercutting the building pad and commence again after undercutting is complete. Order and schedule of sequencing of this work shall be determined by the Contractor and coordinated with the Government.
1. Do not remove from service existing utilities serving adjacent facilities until new service can be established. Provide temporary service if necessary to allow construction to proceed prior to establishing new permanent service(s).
C. The contractor shall be responsible for all means, methods, sequencing of work, demolition, and reparations to the property and facilities as required to accomplish the work. This shall include but is not limited to the installation of all equipment furnishings, and materials.
1.09 PROJECT CONSULTANTS
A. The Architect, hereinafter referred to as Architect: Seay Seay & Litchfield P.C..
1. Address: 1115 South Court Street.
2. City, State, Zip: Montgomery AL 36104.
3. Phone/Fax: 334-263-5162 334-263-5170.
4. Project Manager: Jake Johnson, AIA
5. Principal-in-Charge: Wes R. Osmer, AIA, LEED AP
B. Architect's Consultants:
1. Civil Engineering:
a. Professional Engineering Consultants
b. Address: 822 South McDonough St..
c. City, State, Zip: Montgomery, AL, 36104.
d. Phone: 334-262-7307
e. Contact: Steve Green - Pat Moseley
Montgomery, AL
PROJECT INFORMATION AND SUMMARY 000102 - 7
2. Structural Engineering:
a. Grant Engineering, Inc.
b. Address: 432 Herron Street
c. City, State, Zip: Montgomery, AL 36104
d. Phone: 334-265-4631
e. Contact: Terry Grant, P.E.
3. Plumbing, Mechanical & Fire Suppression Engineering:
a. Peterson Engineering, Inc.
b. Address: 75 South F Street
c. City, State, Zip: Pensacola, FL 32502
d. Phone: 850-434-0513
e. Contact: Steve Johnson, P.E.
4. Electrical Engineering:
a. Garner & Associates Engineering, PC
b. Address: 903 South Perry Street
c. City, State, Zip: Montgomery, AL 36104
d. Phone: 334-269-0329
e. Contact: Morgan Garner, P.E.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
END OF SECTION
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 1
SECTION 21 1313 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B16.3 (2016) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.4 (2016) Standard for Gray Iron Threaded Fittings;
Classes 125 and 250
AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)
ASSE 1013 (2021) Performance Requirements for Reduced Pressure
Principle Backflow Prevention Assemblies
ASSE 1015 (2011) Performance Requirements for Double Check Backflow Prevention Assemblies and Double Check Fire Protection Backflow Prevention Assemblies - (ANSI approved 2010)
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C104/A21.4 (2016) Cement-Mortar Lining for Ductile-Iron Pipe and
Fittings for Water
AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings for Water
AWWA C111/A21.11 (2017) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings
AWWA C203 (2020) Coal-Tar Protective Coatings and Linings for
Steel Water Pipelines - Enamel and Tape - Hot-Applied
AWWA M14 (2015) Manual: Recommended Practice for Backflow Prevention and Cross-Connection Control
ASTM INTERNATIONAL (ASTM)
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 2
ASTM A47/A47M (1999; R 2018; E 2018) Standard Specification for Ferritic Malleable Iron Castings
ASTM A53/A53M (2020) Standard Specification for Pipe, Steel, Black and
Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A135/A135M (2021) Standard Specification for Electric-Resistance- Welded Steel Pipe
ASTM A153/A153M (2016a) Standard Specification for Zinc Coating (Hot-
Dip) on Iron and Steel Hardware
ASTM A183 (2014; R 2020) Standard Specification for Carbon Steel Track Bolts and Nuts
ASTM A536 (1984; R 2019; E 2019) Standard Specification for
Ductile Iron Castings
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND
FITTINGS INDUSTRY (MSS)
MSS SP-71 (2018) Gray Iron Swing Check Valves, Flanged and
Threaded Ends
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 13 (2019; Errata 19-1; Errata 19-2; TIA 19-1; TIA 19-2;
TIA 19-3; TIA 19-4; Errata 19-3; Errata 20-4; TIA 19-5;
TIA 19-6) Standard for the Installation of Sprinkler Systems
NFPA 24 (2019; TIA 19-1) Standard for the Installation of Private
Fire Service Mains and Their Appurtenances
NFPA 101 (2018; TIA 18-1; TIA 18-2; TIA 18-3) Life Safety Code
NFPA 291 (2016) Recommended Practice for Fire Flow Testing and Marking of Hydrants
NFPA 1963 (2019) Standard for Fire Hose Connections
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 3
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING
TECHNOLOGIES (NICET)
NICET 1014-7 (2012) Program Detail Manual for Certification in the
Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler System Layout
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-600-01 (2016; with Change 6, 2021) Fire Protection
Engineering for Facilities
UNDERWRITERS LABORATORIES (UL)
UL 193 (2016) UL Standard for Safety Alarm Valves for Fire- Protection Service
UL 199 (2020) UL Standard for Safety Automatic Sprinklers for
Fire-Protection Service
UL 312 (2010; Reprint Mar 2018) UL Standard for Safety Check Valves for Fire-Protection Service
UL 405 (2013; Bul. 2020) UL Standard for Safety Fire
Department Connection Devices
UL 668 (2004; Reprint Jul 2016) UL Standard for Safety Hose Valves for Fire-Protection Service
UL Fire Prot Dir (2012) Fire Protection Equipment Directory
1.2 SYSTEM DESCRIPTION
Provide wet pipe sprinkler system(s) in all areas of the building. Except as modified herein, the system must meet the requirements of NFPA 13 and UFC 3-600-01. Pipe sizes which are not indicated on the Contract drawings must be determined by hydraulic calculations.
1.2.1 Hydraulic Design
1.2.1.1 Basis for Calculations
Perform a fire hydrant flow test prior to shop drawing submittal in accordance with NFPA
291. Results must include hydrant elevations relative to the building and hydrant
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 4
number/identifiers for the tested hydrants, including which were flowed, which had a gauge.
This information must be presented in a tabular form if multiple hydrants were flowed. The results must be included with the hydraulic calculations. Hydraulic calculations must be based upon the Hazen-Williams formula with a "C" value noted in NFPA 13 for piping. The minimum residual pressure in a service lateral (lead-in) at the design flow rate must be 20 psi at the inlet to the backflow preventer.
1.2.1.2 Hydraulic Calculations
a. Water supply curves and system requirements must be plotted on semi-logarithmic graph (N^1.85) paper so as to present a summary of the complete hydraulic calculation.
b. Provide a summary sheet listing sprinklers in the design area and their respective hydraulic reference points, elevations, minimum discharge pressures and minimum flows.
Elevations of hydraulic reference points (nodes) must be indicated.
c. Documentation must identify each pipe individually and the nodes connected thereto.
Indicate the diameter, length, flow, velocity, friction loss, number and type fittings, total friction loss in the pipe, equivalent pipe length and Hazen-Williams coefficient for each pipe.
d. All calculations must include the backflow preventer manufacturer's stated friction loss at the design flow or 8 psi for double check backflow preventer, whichever is greater.
e. All calculations must be performed back to the actual location of the flow test, taking into account the direction of flow in the service main at the test location.
f. For gridded systems, calculations must show peaking of demand area friction loss to verify that the hydraulically most demanding area is being used. A flow diagram indicating the quantity and direction of flows must be included.
1.2.1.3 Design Criteria
Hydraulically design the system to discharge a minimum density as indicated on the drawings.
Hydraulic calculations must be in accordance with the Area/Density Method of NFPA 13.
Add an allowance for exterior hose streams of 250 gpm to the sprinkler system demand at the fire hydrant shown on the drawings closest to the point where the water service enters the building.
1.2.2 Sprinkler Coverage
Sprinklers must be uniformly spaced on branch lines. Provide coverage throughout 100 percent of the building. This includes, but is not limited to, telephone rooms, electrical equipment rooms (regardless of the fire resistance rating of the enclosure), boiler rooms, switchgear rooms, transformer rooms, attached electrical vaults and other electrical and
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 5
mechanical spaces. Coverage per sprinkler must be in accordance with NFPA 13. Provide sprinklers below all obstructions in accordance with NFPA 13. Exceptions are as follows:
a. Sprinklers may be omitted from small rooms which are exempted for specific occupancies in accordance with NFPA 101.
1.2.3 Qualified Fire Protection Engineer (QFPE)
An individual who is a licensed professional engineer (P.E.) who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveying (NCEES) and has relevant fire protection engineering experience.
The general contractor shall hire the QFPE for the construction project. The QFPE shall be responsible for the QFPE services as outlined in specification sections 21 13 13 and 28 31
76. Services of the QFPE must include:
a. Reviewing SD-02, SD-03, and SD-05 submittal packages for completeness and compliance with the provisions of this specification. Working (shop) drawings and calculations must be prepared by, or prepared under the immediate supervision of, the QFPE. The QFPE must affix their professional engineering stamp with signature to the shop drawings, calculations, and material data sheets, indicating approval prior to submitting the shop drawings to the DFPE.
b. Provide a letter documenting that the SD-02, SD-03, and SD-05 submittal package has been reviewed and noting all outstanding comments.
c. Performing in-progress construction surveillance prior to installation of ceilings (rough-in inspection).
d. Witnessing pre-Government and final Government functional performance testing and performing a final installation review.
e. Signing applicable certificates under SD-07.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Partial submittals and submittals not fully complying with NFPA 13 and this specification section must be returned disapproved without review. SD-02, SD-03 and SD-05 must be submitted simultaneously.
Shop drawings (SD-02), product data (SD-03) and calculations (SD-05) must be prepared by the designer and combined and submitted as one complete package. The QFPE must review the SD-02/SD-03/SD-05 submittal package for completeness and compliance with the
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 6
Contract provisions prior to submission to the Government. The QFPE must provide a Letter of Confirmation that they have reviewed the submittal package for compliance with the contract provisions. This letter must include their professional engineer stamp and signature.
Partial submittals and submittals not reviewed by the QFPE must be returned disapproved without review.
Submit the following in accordance with Section 01 3001 SUBMITTALS:
SD-01 Preconstruction Submittals
Qualified Fire Protection Engineer (QFPE); G
Sprinkler System Designer; G
Sprinkler System Installer; G
SD-02 Shop Drawings
Shop Drawing; G
SD-03 Product Data
Pipe; G
Fittings; G
Valves, including gate, check, butterfly, and globe; G
Alarm Valves; G
Relief Valves; G
Sprinklers; G
Pipe Hangers and Supports; G
Sprinkler Alarm Switch; G
Valve Supervisory (Tamper) Switch; G
Fire Department Connection; G
Backflow Prevention Assembly; G
Air Vent; G
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 7
Hose Valve; G
Nameplates; G
SD-05 Design Data
Hydraulic Calculations; G
SD-06 Test Reports
Test Procedures; G
SD-07 Certificates
Verification of Compliant Installation; G
Request for Government Final Test; G
SD-10 Operation and Maintenance Data
Operating and Maintenance (O&M) Instructions; G
Spare Parts Data; G
SD-11 Closeout Submittals
As-built drawings
1.4 QUALITY ASSURANCE
1.4.1 Preconstruction Submittals
Within 36 days of contract award but no less than 14 days prior to commencing work on site, the prime Contractor must submit the following for review and approval. SD-02, SD-03 and SD-05 submittals received prior to the review and approval of the qualifications will be returned Disapproved Without Review.
1.4.1.1 Shop Drawing
Three copies of the shop drawings, no later than 28 days prior to the start of system installation. Working drawings conforming to the requirements prescribed in NFPA 13 and must be no smaller than the Contract Drawings. Each set of drawings must include the following:
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 8
a. A descriptive index with drawings listed in sequence by number. A legend sheet identifying device symbols, nomenclature, and conventions used in the package.
b. Floor plans drawn to a scale not less than 1/8-inch equals 1-foot clearly showing locations of devices, equipment, risers, and other details required to clearly describe the proposed arrangement.
c. Actual center-to-center dimensions between sprinklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler feed mains, cross mains and branch lines to finished floor and roof or ceiling. A detail must show the dimension from the sprinkler and sprinkler deflector to the ceiling in finished areas.
d. Longitudinal and transverse building sections showing typical branch line and cross main pipe routing, elevation of each typical sprinkler above finished floor and elevation of "cloud" or false ceilings in relation to the building ceilings.
e. Plan and elevation views which establish that the equipment will fit the allotted spaces with clearance for installation and maintenance.
f. Riser layout drawings drawn to a scale of not less than 1/2-inch equals 1-foot to show details of each system component, clearances between each other and from other equipment and construction in the room.
g. Details of each type of riser assembly, pipe hanger, and restraint of underground water main at point-of-entry into the building, and electrical devices and interconnecting wiring. The dimension from the edge of vertical piping to the nearest adjacent wall(s) must be indicated on the drawings when vertical piping is located in stairs or other portions of the means of egress.
h. Details of each type of pipe hanger and related components.
1.4.1.2 Product Data
Three copies of annotated catalog data to show the specific model, type, and size of each item.
Catalog cuts must also indicate the NRTL listing. The data must be highlighted to show model, size, options, and other pertinent information, that are intended for consideration. Data must be adequate to demonstrate compliance with all contract requirements. Product data for all equipment must be combined into a single submittal.
1.4.1.3 Hydraulic Calculations
Calculations must be as outlined in NFPA 13 except that calculations must be performed by computer using software intended specifically for fire protection system design using the design data shown on the drawings.
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 9
1.4.1.4 Operating and Maintenance (O&M) Instructions
Submit in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA as supplemented and modified by this specification section.
Provide six manuals and one pdf version on electronic media. The manuals must include the manufacturer's name, model number, parts list, list of parts and tools that should be kept in stock by the owner for routine maintenance, troubleshooting guide, and recommended service organization (including address and telephone number) for each item of equipment.
Submit spare parts data for each different item of material and equipment specified. The data must include a complete list of parts and supplies, and a list of parts recommended by the manufacturer to be replaced after 1-year and 3 years of service. Include a list of special tools and test equipment required for maintenance and testing of the products supplied.
1.4.2 Qualifications
1.4.2.1 Sprinkler System Designer
The sprinkler system designer must be certified as a Level III Technician by National Institute for Certification in Engineering Technologies (NICET) in the Water-Based Systems Layout subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7.
1.4.2.2 Sprinkler System Installer
The sprinkler system installer must be regularly engaged in the installation of the type and complexity of system specified in the contract documents, and must have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.
1.4.3 Regulatory Requirements
Equipment and material must be listed or approved. Listed or approved, as used in this Section, means listed, labeled or approved by a Nationally Recognized Testing Laboratory (NRTL) such as UL Fire Prot Dir or FM APP GUIDE. The omission of these terms under the description of an item or equipment described must not be construed as waiving this requirement. All listings or approvals by testing laboratories must be from an existing ANSI or UL published standard. The recommended practices stated in the manufacturer's literature or documentation are mandatory requirements.
1.5 DELIVERY, STORAGE, AND HANDLING
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 10
Protect all equipment delivered and placed in storage from the weather, excessive humidity and temperature variations, dirt and dust, or other contaminants. All pipes must be either capped or plugged until installed.
1.6 EXTRA MATERIALS
Spare sprinklers and wrench(es) must be provided as spare parts in accordance with NFPA 13.
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
2.1.1 Standard Products
Provide materials, equipment, and devices listed for fire protection service when so required by NFPA 13 or this specification. Select material from one manufacturer, where possible, and not a combination of manufacturers, for a classification of material. Material and equipment must be standard products of a manufacturer regularly engaged in the manufacture of the products for at least 2 years prior to bid.
2.1.2 Nameplates
Major components of equipment must have the manufacturer's name, address, type or style, model or serial number, catalog number, date of installation, installing Contractor's name and address, and the contract number provided on a new name plate permanently affixed to the item or equipment. Nameplates must be etched metal or plastic, permanently attached by screws to control units, panels or adjacent walls.
2.1.3 Identification and Marking
Pipe and fitting markings must include name or identifying symbol of manufacturer and nominal size. Pipe must be marked with ASTM designation. Valves and equipment markings must have name or identifying symbol of manufacturer, specific model number, nominal size, name of device, arrow indicating direction of flow, and position of installation (horizontal or vertical), except if valve can be installed in either position. Markings must be included on the body casting or on an etched or stamped metal nameplate permanently on the valve or cover plate.
2.1.4 Pressure Ratings
Valves, fittings, couplings, alarm switches, and similar devices must be rated for the maximum working pressures that can be experienced in the system, but in no case less than 175 psi.
2.2 UNDERGROUND PIPING COMPONENTS
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 11
2.2.1 Pipe
Pipe must comply with NFPA 24. Minimum pipe size is 6 inches. Piping more than 5 feet outside the building walls must comply with Section 33 1117 OUTSIDE WATER SYSTEM.
A continuous section of welded stainless steel fire water service piping from a point outside the building perimeter to a fitting at least 12-inches above the finished floor within the building shall be used.
2.2.2 Fittings and Gaskets
Fittings must be ductile-iron conforming to AWWA C110/A21.10 with cement mortar lining conforming to AWWA C104/A21.4. Gaskets must be suitable in design and size for the pipe with which such gaskets are to be used. Gaskets for ductile-iron pipe joints must conform to
AWWA C111/A21.11.
2.2.3 Buried Utility Warning and Identification Tape
Provide detectable aluminum foil plastic backed tape or detectable magnetic plastic tape manufactured specifically for warning and identification of buried piping. Tape must be detectable by an electronic detection instrument. Provide tape, 3 inches minimum width, color coded for the utility involved with warning and identification imprinted in bold block letters continuously and repeatedly over the entire tape length. Warning and identification must read "CAUTION BURIED WATER PIPING BELOW" or similar wording. Use permanent code and letter coloring unaffected by moisture and other substances contained in trench backfill material.
2.3 ABOVEGROUND PIPING COMPONENTS
2.3.1 Steel Piping Components
2.3.1.1 Steel Pipe
Except as modified herein, steel pipe must be black as permitted by NFPA 13 and conform to the applicable provisions of ASTM A53/A53M, ASTM A135/A135M or ASTM A153/A153M.
Steel pipe must be Schedule 40 only.
2.3.1.2 Fittings
Fittings must be welded, threaded, or grooved-end type. Threaded fittings must be cast-iron conforming to ASME B16.4, malleable-iron conforming to ASME B16.3 or ductile-iron conforming to ASTM A536. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe, steel press fittings and field welded fittings are not permitted. Fittings, mechanical couplings, and rubber gaskets must be supplied by the same
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 12
manufacturer. Threaded fittings must use Teflon tape or manufacturer's approved joint compound. Reducing couplings are not permitted except as allowed by NFPA 13.
2.3.1.3 Grooved Mechanical Joints and Fittings
Joints and fittings must be designed for not less than 175 psi service and the product of the same manufacturer. Field welded fittings must not be used. Fitting and coupling housing must be malleable-iron conforming to ASTM A47/A47M, Grade 32510; ductile-iron conforming to ASTM A536, Grade 65-45-12. Rubber gasketed grooved-end pipe and fittings with mechanical couplings are permitted in pipe sizes 2 inches and larger. Gasket must be the flush type that fills the entire cavity between the fitting and the pipe. Nuts and bolts must be heat-treated steel conforming to ASTM A183 and must be cadmium-plated or zinc-electroplated.
2.3.2 Pipe Hangers and Supports
Provide galvanized pipe hangers and supports in accordance with NFPA 13.
2.3.3 Valves
Provide valves of types approved for fire service. Valves must open by counterclockwise rotation.
2.3.3.1 Control Valve
Manually operated sprinkler control/gate valve must be outside stem and yoke (OS&Y) type and must be listed.
2.3.3.2 Check Valves
Check valves must comply with UL 312. Check valves 4 inches and larger must be of the swing type, have a clear waterway and meet the requirements of MSS SP-71, for Type 3 or 4.
Inspection plate must be provided on valves larger than 6 inches.
2.3.3.3 Hose Valve
Valve must comply with UL 668.
2.3.4 Alarm Valves
Provide variable pressure type alarm check valve, standard trim piping, pressure gauges, bypass, retarding chamber, testing valves, and main drain, and other components as required for a fully operational system. Alarm valves must comply with UL 193.
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 13
2.4 ALARM INITIATING AND SUPERVISORY DEVICES
2.4.1 Sprinkler Alarm Switch
Vane -type flow switch shall be used. Connection of switch must be by the fire alarm installer. Vane type alarm actuating devices must have mechanical diaphragm controlled retard device adjustable from 10 to 60 seconds and must instantly recycle.
2.4.2 Valve Supervisory (Tamper) Switch
Switch must be integral to the control valve or suitable for mounting to the type of control valve to be supervised open. The switch must be tamper resistant and contain SPDT (Form C) contacts arranged to transfer upon removal of the housing cover or closure of the valve of more than two rotations of the valve stem.
2.5 BACKFLOW PREVENTION ASSEMBLY
Double-check valve assembly backflow preventer complying with ASSE 1013, ASSE 1015 and AWWA M14. Each check valve must have a drain. Backflow prevention assemblies must have current "Certificate of Approval from the Foundation for Cross-Connection Control and Hydraulic Research, FCCCHR List" and be listed for fire protection use. Listing of the specific make, model, design, and size in the FCCCHR List is acceptable as the required documentation.
2.5.1 Backflow Preventer Test Connection
Test connection must consist of a series of listed hose valves with 2 1/2-inch National Standard male hose threads with cap and chain.
2.6 FIRE DEPARTMENT CONNECTION
Fire department connection must be projecting type with cast-brass body, matching wall escutcheon lettered "Auto Spkr" with a polished-brass finish. The connection must have individual self-closing clappers, caps with drip drains and chains. Female inlets must have 2 1/2-inch diameter American National Fire Hose Connection Screw Threads (NH) per NFPA 1963. Comply with UL 405.
2.7 SPRINKLERS
Sprinklers must comply with UL 199 and NFPA 13. Sprinklers with internal O-rings are not acceptable. Sprinklers in high heat areas including attic spaces or in close proximity to unit heaters must have temperature classification in accordance with NFPA 13. Extended coverage sprinklers are permitted for loading docks, residential occupancies and high-piled storage applications only.
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 14
2.7.1 Pendent Sprinkler
Pendent sprinkler must be quick-response type with nominal K-factor of 5.6. Pendent sprinklers must have a polished chrome finish. Assembly must include an integral escutcheon.
2.7.2 Upright Sprinkler
Upright sprinkler must be brass quick-response type and have a nominal K-factor of 5.6 for light hazard areas and 8.0 for ordinary hazard areas.
2.7.3 Sidewall Sprinkler
Sidewall sprinkler must be the dry sidewall type. Sidewall sprinkler must have a nominal K-factor of 8.0. Sidewall sprinkler must have a stainless steel finish.
2.7.4 Concealed Sprinkler
Concealed sprinkler must be chrome-plated quick-response type and have a nominal K-factor of 5.6. Coverplate must be chrome.
2.8 ACCESSORIES
2.8.1 Sprinkler Cabinet
Provide spare sprinklers in accordance with NFPA 13 and must be placed in a suitable metal or plastic cabinet of sufficient size to accommodate all the spare sprinklers and wrenches in designated locations. Spare sprinklers must be representative of, and in proportion to, the number of each type and temperature rating of the sprinklers installed as required by NFPA
13. At least one wrench of each type required must be provided.
2.8.2 Pendent Sprinkler Escutcheon
Escutcheon must be one-piece metallic type with a depth of less than 3/4-inch and suitable for installation on pendent sprinklers. The escutcheon must have a factory finish that matches the pendent sprinkler.
2.8.3 Pipe Escutcheon
Provide split hinge metal plates for piping entering walls, floors, and ceilings in exposed spaces. Provide polished stainless steel plates or chromium-plated finish on copper alloy plates in finished spaces. Provide paint finish on metal plates in unfinished spaces.
2.8.4 Sprinkler Guard
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 15
Listed guard must be a steel wire cage designed to encase the sprinkler and protect it from mechanical damage. Guards must be provided on sprinklers located in communications, mechanical rooms, and janitor closets.
2.8.5 Relief Valve
Relief valves must be listed and installed at the riser in accordance with NFPA 13.
2.8.6 Air Vent
Air vents must be of the automatic type and piped to drain to the building exterior.
2.8.7 Identification Sign
Valve identification sign must be minimum 6 inches wide by 2 inches high with enamel baked finish on minimum 18 gage steel or 0.024-inch aluminum with red letters on a white background or white letters on red background. Wording of sign must include, but not be limited to "main drain", "auxiliary drain", "inspector's test", "alarm test", "alarm line", and similar wording as required to identify operational components. Where there is more than one sprinkler system, signage must include specific details as to the respective system.
PART 3 EXECUTION
3.1 VERIFYING ACTUAL FIELD CONDITIONS
Before commencing work, examine all adjoining work on which the contractor's work that is dependent for perfect workmanship according to the intent of this specification section, and report to the Contracting Officer's Representative a condition that prevents performance of first class work. No "waiver of responsibility" for incomplete, inadequate or defective adjoining work will be considered unless notice has been filed before submittal of a proposal.
3.2 INSTALLATION
The installation must be in accordance with the applicable provisions of NFPA 13, NFPA 24 and publications referenced therein. Locate sprinklers in a consistent pattern with ceiling grid, lights, and air supply diffusers. Install sprinkler system over and under ducts, piping and platforms when such equipment can negatively affect or disrupt the sprinkler discharge pattern and coverage.
a. Piping offsets, fittings, and other accessories required must be furnished to provide a complete installation and to eliminate interference with other construction.
b. Wherever the contractor's work interconnects with work of other trades the Contractor must coordinate with other Contractors to insure all Contractors have the information necessary so that they may properly install all necessary connections and equipment.
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 16
Identify all work items needing access (dampers and similar equipment) that are concealed above hung ceilings by permanent color coded pins/tabs in the ceiling directly below the item.
c. Provide required supports and hangers for piping, conduit, and equipment so that loading will not exceed allowable loadings of structure. Submittal of a bid must be a deemed representation that the contractor submitting such bid has ascertained allowable loadings and has included in his estimates the costs associated in furnishing required supports.
3.2.1 Waste Removal
At the conclusion of each day's work, clean up and stockpile on site all waste, debris, and trash which may have accumulated during the day as a result of work by the contractor and of his presence on the job. Sidewalks and streets adjoining the property must be kept broom clean and free of waste, debris, trash and obstructions caused by work of the contractor, which will affect the condition and safety of streets, walks, utilities, and property.
3.3 UNDERGROUND PIPING INSTALLATION
The fire protection water main must be laid, and joints anchored, in accordance with NFPA
24. Minimum depth of cover must be 3 feet or the frost line, whichever is deeper. The supply line must terminate inside the building with a flanged piece, the bottom of which must be set not less than 1-foot above the finished floor. A blind flange must be installed temporarily on top of the flanged piece to prevent the entrance of foreign matter into the supply line. A concrete thrust block must be provided at the elbow where the pipe turns up toward the floor.
In addition, joints must be anchored in accordance with NFPA 24. Buried steel components must be provided with a corrosion protective coating in accordance with AWWA C203.
Piping more than 5 feet outside the building walls must meet the requirements of Section 33
1117 OUTSIDE WATER SYSTEM.
3.4 ABOVEGROUND PIPING INSTALLATION
The methods of fabrication and installation of the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .