FAKZ199055 TYPE B3 DRAWINGS SIGNED.pdf
PDF 20 MB Posted
- Attached to
- F-35: Engine Shop Federal contract opportunity
- Solicitation number
- W50S6N-23-B-0006
About this file
This file relates to a federal solicitation for engine shop services. The solicitation number is W50S6N-23-B-0006 and is being issued by the Department of the Army Alabama Army National Guard for F-35 engine shop services. Responses are due by the date specified in the solicitation. The solicitation seeks services for maintenance, repair, and overhaul of F-35 aircraft engines at the stated location.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF 1419 Abstract.pdf | ||
| PreBid Engine Shop .pptx | PPTX presentation | |
| Meeting Attendees.pdf | ||
| J and A for Brand Name-Sole Source Stanley Best _Redacted.pdf | ||
| EAL.pdf | ||
| J and A for Brand Name-Sole Source - Engine Shop - .pdf | ||
| FAKZ199055 TYPE B3 SPECIFICATIONS VOLUME 2 SIGNED.pdf | ||
| FAKZ199055 TYPE B3 SPECIFICATIONS VOLUME 1 SIGNED.pdf | ||
| W50S6N-23-B-0006.pdf | ||
| J and A for Brand Name-Sole Source - Engine Shop.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
T1.0
TITLE SHEET
F3 5:
E N
G
IN
E S
H O
P
D A
N N
E
LL
Y F
IE
LD
M O
N
TG
O M
E
RY
, A
LA
BA
M
A
FAKZ199055 / 18071
JANUARY 2023
ME/JP/JLJ
DCD / FEL
F-35: Engine Shop
Montgomery, AL
FAKZ 199055
187th Fighter Wing Dannelly Field -
AL ANG
ARCHITECTURALCIVIL STRUCTURAL MECHANICAL ELECTRICAL
SEAY SEAY & LITCHFIELD, P.C.
1115 SOUTH COURT STREET
MONTGOMERY, AL 36104
334-263-5162
PROFESSIONAL ENGINEERING CONSULTANTS
822 S MCDONGOUGH STREET
MONTGOMERY AL, 36104
334-262-7307
GRANT ENGINEERING, L.L.C
432 HERRON STREET
MONTGOMERY, AL 36104
334-265-4631
PETERSON ENGINEERING, INC.
75 SOUTH F STREET
PENSACOLA, FL 32502
850-434-0513
GARNER & ASSOCIATES, P.C.
903 SOUTH PERRY STREET
MONTGOMERY, AL 36104
334-647-1596
Approvals:
Title: Signature: Date:
Base Commander
Base Civil Engineer
Base Project Engineer
Bio Environmental Eng.
Safety
Security Police
Base Communications
Fire Chief
Option #3
Schedule of Bid Options:
Underslab Vapor Barrier
Option #2
Replace Existing Asphalt Paving with Concrete
Option #1
Epoxy Floor Systems
Option #4
Compressed Air Systems
No. Revision Date
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
T1.1
INDEX
F3 5:
E N
G
IN
E S
H O
P
D A
N N
E
LL
Y F
IE
LD
M O
N
TG
O M
E
RY
, A
LA
BA
M
A
FAKZ199055 / 18071
JANUARY 2023
ME/JP/JLJ
DCD / FEL
DRAWING INDEX
SHEET NO. SHEET NAME
07 MECHANICAL
M1.0 GENERAL MECHANICAL NOTES, LEGEND, AND ABBREVIATIONS
M1.1 MECHANICAL NEW WORK PLAN
M1.2 MECHANICAL NEW WORK SECTION
M2.1 MECHANICAL DETAILS
M3.1 MECHANICAL SCHEDULES
M4.1 MECHANICAL CONTROLS
08 PLUMBING
P1.1 PLUMBING PLAN - ENGINE SHOP - WASTE AND WATER, LEGEND AND DETAILS
P1.2 SCHEDULES, WASTE RISER DIAGRAM AND DETAILS
P1.3 WASTE AND VENT RISER DIAGRAM
09 ELECTRICAL
E0.1 ELECTRICAL SYMBOL LEGEND & NOTES
E0.2 LIGHTING FIXTURE SCHEDULE & DETAILS
E0.3 POWER RISER DIAGRAM & SCHEDULES
E0.4 PANELBOARD SCHEDULES
E0.5 ELECTRICAL DETAILS
E0.6 AUXILIARY RISER DIAGRAM, DETAILS & NOTES
E1.1 SITE ELECTRICAL PLAN
E2.1 LEVEL 1 LIGHTING PLAN
E3.1 LEVEL 1 POWER & AUXILIARY PLAN
E4.1 LIGHTNING PROTECTION PLAN
E4.2 LIGHTING PROTECTION DETAILS
10 FIRE ALARM
FA0.1 FIRE ALARM MATRIX AND GENERAL NOTES
FA0.2 FIRE ALARM RISER AND DETAILS
FA1.1 FIRE ALARM NEW WORK PLAN
DRAWING INDEX
SHEET NO. SHEET NAME
A3.1 FINISH SCHEDULES
A3.2 DOOR SCHEDULE
A3.3 DOOR DETAILS
A3.4 GLAZED OPENING SCHEDULE
A3.5 OPENING DETAILS
A4.1 ELEVATIONS
A5.1 BUILDING SECTION
A5.2 WALL SECTIONS
A5.3 WALL SECTIONS
A5.4 DETAILS
A6.1 RESTROOM PLANS, ELEVATIONS, AND DETAILS
A7.1 CASEWORK ELEVATIONS AND DETAILS
A8.1 REFLECTED CEILING PLAN AND DETAILS
05 STRUCTURAL
S1.0 GENERAL STRUCTURAL NOTES
S2.0 FOUNDATION PLAN
S3.0 LOW & HIGH ROOF FRAMING PLANS
S4.0 STRUCTURAL DETAILS
S5.0 STRUCTURAL DETAILS
S6.0 STRUCTURAL DETAILS
S7.0 STRUCTURAL DETAILS
06 FIRE PROTECTION
FX0.1 FIRE SPRINKLER GENERAL NOTES
FX1.1 FIRE SPRINKLER NEW WORK PLAN
FX1.2 FIRE SPRINKLER DETAILS / DIAGRAMS
DRAWING INDEX
SHEET NO. SHEET NAME
00 TITLE
T1.0 TITLE SHEET
T1.1 INDEX
T2.0 GENERAL WORK NOTES, ABBREVIATIONS & SYMBOLS
T3.0 TYPICAL MOUNTING HEIGHTS & CLEARANCES
01 LIFE SAFETY
LS1.0 LIFE SAFETY
02 LANDSCAPE
L1.0 LANDSCAPE SITE PLAN
03 CIVIL
C1.1 SITE DEMOLITION PLAN
C2.1 SITE LAYOUT PLAN
C3.1 SITE GRADING & DRAINAGE PLAN
C4.1 SITE UTILITIES PLAN
C5.1 SITE EROSION & SEDIMENT CONTROL PLAN
C6.1 SITE PAVEMENT PLAN (ALTERNATE)
C7.1 SITE DETAILS
C8.1 SITE DETAILS
C9.1 SITE DETAILS
C10.1 SITE DETAILS
04 ARCHITECTURAL
A0.1 BUILDING 1313 DEMOLITION
A2.1 FIRST FLOOR PLAN
A2.2 WALL TYPE PLAN AND DETAILS
A2.3 ROOF PLAN
A2.4 ROOF DETAILS
F-35: Engine Shop
Montgomery, AL
FAKZ 199055
187th Fighter Wing Dannelly Field - AL ANG
GENERAL NOTES APPLY TO THE ENTIRE PROJECT. SPECIFIC NOTES APPLY TO ISOLATED WORK AREAS AND ARE FOR THE CONVENIENCE OF THE CONTRACTOR. HOWEVER, ALL ISOLATED WORK AREAS ARE NOT NOTED. SHOULD A CONDITION OCCUR THAT IS NOT SPECIFICALLY NOTED, THE CONTRACTOR SHALL PROCEED WITH WORK PER GENERAL DEMOLITION NOTES OR A SPECIFIC WORK NOTE(S) USED IN OTHER SIMILAR CONDITIONS, WHICHEVER IS MORE STRINGENT, PER APPROVAL OF ARCHITECT.
1. CONTRACTOR TO NOTIFY CONTRACTING OFFICER IMMEDIATELY IF THERE ARE ANY DISCREPANCIES WITH TAGGED DETAILS, ENLARGED PLANS, ELEVATIONS, ETC.
2. CONTRACTOR TO CONFIRM ALL OSHA AND APPLICABLE STANDARDS TO ASSURE SAFETY OF ALL PERSONS ON SITE DURING
ENTIRE COURSE OF CONSTRUCTION.
3. CONTRACTOR TO VERIFY ALL FINISHED DIMENSIONS BEFORE INSTALLATION OF CABINET WORK AND TRIMWORK.
4. CONTRACTOR TO VERIFY APPLICABLE OPENINGS, DOOR SIZES, AND DIMENSIONS OF MECHANICAL ROOMS WITH EQUIPMENT. IF
DISCREPANCY OCCURS, NOTIFY ARCHITECT PRIOR TO FRAMING.
5. CONTRACTOR TO COORDINATE PLUMBING AND MECHANICAL LINES WITH CEILING HEIGHTS, ABOVE CEILING AREAS AND
STRUCTURAL ELEMENTS.
6. CONTRACTOR TO VERIFY WITH STRUCTURAL, PLUMBING, MECHANICAL, AND ELECTRICAL THE QUANTITY AND SIZES OF ALL SLEEVES REQUIRED. ALL SLEEVES TO BE ONE HOUR RATED, PROVIDE GREATER RATING IF PENETRATING INTO HIGHER RATED
ASSEMBLY.
7. COORDINATE CONDUIT, PIPING, AND DUCTWORK SO THAT THE HEAD HEIGHT IS NOT ENCUMBERED AND SERVICES ARE AS TIGHT
UP TO STRUCTURE AS POSSIBLE.
8. CONTRACTOR TO COORDINATE PLUMBING, MECHANICAL, FIRE SPRINKLER, ELECTRICAL, AND LIGHTING WITH STRUCTURAL ELEMENTS WHERE THERE IS EXPOSED STRUCTURE. CONDUIT LINES, ETC. SHALL RUN AT RIGHT ANGLES OR SEGMENTED
BETWEEN COLUMN LINES AND BE CLEAN AND NEAT IN APPEARANCE.
9. COORDINATE LOCATION OF SWITCHES, OUTLETS, THERMOSTATS, LIGHTS, ETC. W/ SHELVING, TRIM, MARKER BOARDS, AND CABINETRY. MOVE AS REQUIRED TO MISS SHELVING, STORAGE, CASEWORK, VISUAL DISPLAY BOARDS.
GENERAL NOTES
20. IF ANY WORK IS PERFORMED KNOWING IT TO BE CONTRARY TO SUCH CODES, LAWS, ORDINANCES, RULES AND REGULATIONS, AND WITHOUT NOTICE TO THE GOVERNMENT, THAT TRADE CONTRACTOR ASSUMES FULL RESPONSIBILITY AND BEARS COSTS ATTRIBUTED TO BRING WORK TO COMPLIANCE OF SUCH CODES, LAWS, ORDINANCES, AND RULES AND REGULATIONS.
21. EACH RESPONSIBLE CONTRACTOR SHALL SEAL ALL PENETRATIONS MADE AS PART OF THEIR WORK IN FIRE-RATED CONSTRUCTION AS REQUIRED BY ALL APPLICABLE CODES. EACH CONTRACTOR TO VERIFY WITH LOCAL FIRE MARSHAL OR BUILDING OFFICIAL HAVING JURISDICTION. EACH RESPONSIBLE CONTRACTOR WILL SEAL ALL PENETRATIONS MADE AS PART OF THEIR WORK THROUGH NON-RATED PARTITIONS. ALL FIRE CAULK TO BE THE SAME BRAND AS DETERMINED BY CONTRACTOR.
22. PLUMBING, FIRE-PROTECTION, MECHANICAL, AND ELECTRICAL WORK REQUIRED BY THIS CONTRACT IS NOTED ON CONTRACT DOCUMENTS. THE TRADE CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF THEIR WORK WITH ALL TRADES.
CHANGE ORDERS SHALL NOT BE APPROVED FOR EXTRA WORK ARISING FROM TRADE CONTRACTORS NOT COORDINATING WORK.
23. NEITHER THE ARCHITECT, NOR THE GOVERNMENT SHALL BE RESPONSIBLE FOR JOB SAFETY. EACH TRADE CONTRACTOR SHALL BE RESPONSIBLE FOR JOB SITE SAFETY AND SAFETY OF THE PUBLIC DURING CONSTRUCTION AND SHALL PROVIDE APPROPRIATE
WARNINGS, BARRICADES, ETC. AS REQUIRED PER CODES.
24. CONTRACTOR WILL BE RESPONSIBLE FOR ALL LAYOUT FOR INTERIOR/EXTERIOR WALLS AND FOUNDATION AND WILL BE RESPONSIBLE FOR MAINTAINING A BENCHMARK AND CONTROL LINES AT EACH FLOOR LEVEL. CONTRACTOR IS ALSO RESPONSIBLE FOR VERIFYING ACTUAL FLOOR HEIGHTS AND COORDINATING NEW AND EXISTING FLOORS TO ALIGN.
25. EACH TRADE CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING AND INSTALLING CEILING OR WALL-MOUNTED ACCESS DOORS AS REQUIRED TO ACCESS COMPONENTS OF ITS SYSTEM AND TO COORDINATE WITH OTHER TRADES SO ACCESS IS
MAINTAINED.
10. REFER TO MECHANICAL FOR ADDITIONAL LOUVERS NOT TAGGED.
11. COORDINATE CONDUIT, PIPING, AND DUCTWORK SO THAT HEAD HEIGHT IS NOT ENCUMBERED AND SERVICES ARE AS TIGHT UP TO STRUCTURE AS POSSIBLE, THIS WILL INCLUDE JOGGING DUCTS, SPRINKLER LINES, PLUMBING LINES, CONDUIT, ETC. UP AND DOWN OR AROUND AS REQUIRED TO ACHIEVE CEILING HEIGHTS AS INDICATED. COORDINATE INSTALLATION AND SEQUENCING
OF DISCIPLINES TO ACHIEVE.
12. THE GENERAL CONTRACTOR SHALL STAKE OUT ALL MAJOR FEATURES SHOWN ON THE SITE PLAN TO VERIFY THE SITE LAYOUT RELATIVE TO THE PROPERTY LINES AND SITE CONDITIONS PRIOR TO ANY UTILITIES OR FOOTINGS BEING INSTALLED.
13. ALL RECESSED ACCESSORIES LOCATED IN FIRE RATED WALLS SHALL BE EITHER OF FIRE RATED CONSTRUCTION OR COORDINATED WITH THE ADJACENT TRADES TO ALLOW THE GYPSUM BOARD TO BE CONTINUOUS BEHIND THE ACCESSORIES.
14. REFER TO CONTRACT DOCUMENTS FOR CONCEALED WOOD BLOCKING REQUIREMENTS.
15. COORDINATE FINAL CEILING HEIGHT WITH ALL WINDOWS. ALL TRADES SHOULD BE ABLE TO FIT WITHIN THE ALLOTTED SPACE IF COORDINATED BY THE GENERAL CONTRACTOR AND EACH TRADE. IF FURR DOWNS ARE REQUIRED TO ACCOMMODATE ABOVE CEILING ITEMS, THE CONTRACTOR IS RESPONSIBLE TO PROVIDE FURR DOWNS AND COORDINATE LOCATIONS WITH THE
ARCHITECT.
16. CONTRACTOR TO VERIFY ALL DIMENSIONS AND FIELD CONDITIONS WITH THE DRAWINGS, IN PARTICULAR: WALL DIMENSIONS, INCOMING UTILITIES, ETC. REPORT IMMEDIATELY TO THE GOVERNMENT ANY VARIANCES OR FIELD CONDITIONS THAT MAY CAUSE
CONSTRUCTION PROBLEMS PRIOR TO COMMENCING WORK.
17. ALL MATERIAL SPECIFIED IS TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND SPECIFICATIONS.
TRADE CONTRACTORS ARE TO CONSTRUCT PROJECT IN ACCORDANCE WITH THE DOCUMENTS. ANY DEVIATION FROM THE INTENT OF THE DOCUMENTS WITHOUT ARCHITECT'S APPROVAL ARE AT THE TRADE CONTRACTOR'S RISK AND MAY RESULT IN
WORK BEING REWORKED AT THE TRADE CONTRACTOR'S EXPENSE. (MATERIAL AND LABOR)
18. ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES, LAWS, AND ORDINANCES. EACH TRADE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS, INSPECTIONS, AND CERTIFICATES REQUIRED BY GOVERNING ENTITIES.
19. PROMPTLY NOTIFY THE GOVERNMENTT IN WRITING IF ANY CONTRACT DOCUMENTS ARE FOUND TO BE IN VARIANCE WITH THE APPLICABLE LAWS AND ORDINANCES. NECESSARY CHANGES WILL BE MADE BY APPROPRIATE MODIFICATIONS.
202A
A101
1Ref
Re f
1 Ref
Re f
A101
Ref
1Re f
1 Re f
Ref
ROOM NAME
150 SF
1t
1i
A101
SIM
A101
SIM
A101
SIM
Building Elevation Tag
Interior Elevation Tag
Building Section Tag
Wall Section Tag
Detail Tag
General Symbol Legend
Room Tag
ADA Approved Turning Space
Spot Elevation
Door Tag (See Door Schedule)
Window Tag (See Window Schedule)
Wall/Storefront Tag (See Wall/Storefront Schedule)
Revision Tag (See Revision Schedule)
X Specific Note Tag
Electric Water Cooler (See Plumbing)
Fire Extinguisher
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
T2.0
GENERAL WORK
NOTES,
ABBREVIATIONS &
SYMBOLS
F3 5:
E N
G
IN
E S
H O
P
D A
N N
E
LL
Y F
IE
LD
M O
N
TG
O M
E
RY
, A
LA
BA
M
A
FAKZ199055 / 18071
JANUARY 2023
ME/JP/JLJ
DCD / FEL
General Project Notes:
GENERAL NOTES APPLY TO THE ENTIRE PROJECT. SPECIFIC NOTES APPLY TO ISOLATED
WORK AREAS AND ARE FOR THE CONVENIENCE OF THE CONTRACTOR. HOWEVER, ALL
ISOLATED WORK AREAS ARE NOT NOTED. SHOULD A CONDITION OCCUR THAT IS NOT
SPECIFICALLY NOTED, THE CONTRACTOR SHALL PROCEED WITH WORK PER GENERAL
DEMOLITION NOTES OR A SPECIFIC WORK NOTE(S) USED IN OTHER SIMILAR
CONDITIONS, WHICHEVER IS MORE STRINGENT, PER APPROVAL OF ARCHITECT.
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY CONDITIONS
1. CONTRACTOR TO VISIT SITE AND TO BECOME TOTALLY FAMILIAR WITH EXTENT OF
WORK REQUIRED PRIOR TO BID.
2. CONTRACTOR TO VERIFY DIMENSIONS OF INTERIOR PARTITION WALLS. IF
DISCREPANCY OCCURS, NOTIFY ARCHITECT PRIOR TO FRAMING.
3. CONTRACTOR TO VERIFY ALL FINISHED DIMENSIONS BEFORE INSTALLATION OF
CABINET WORK AND TRIMWORK.
4. DIMENSIONS OF EXISTING STRUCTURES ARE ONLY FOR THE CONVENIENCE OF THE
CONTRACTOR, VERIFY ALL EXISTING CONDITIONS. LOCATION OF WALLS SHALL BE
AS SHOWN ON PLAN RELATIVE TO EXISTING CONDITIONS.
5. CONTRACTOR TO VERIFY ALL DIMENSIONS AND FIELD CONDITIONS WITH THE
DRAWINGS, IN PARTICULAR: WALL DIMENSIONS, INCOMING UTILITIES, ETC. REPORT
IMMEDIATELY TO THE ARCHITECT ANY VARIANCES OR FIELD CONDITIONS THAT
MAY CAUSE CONSTRUCTION PROBLEMS PRIOR TO COMMENCING WORK.
CONTRACTOR'S REPONSIBILITY TO COORDINATE THE WORK
1. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO COMMENCING.
FURNISH INFORMATION NECESSARY TO ADJUST, MOVE OR RELOCATE EXISTING
STRUCTURES, UTILITY POLES, LINES, SERVICES OF OTHER SYSTEMS LOCATED IN,
OR AFFECTED BY CONSTRUCTION. COORDINATE WITH LOCAL AUTHORITIES
HAVING JURISDICTION WITH CONSTRUCTION.
2. CONTRACTOR TO VERIFY APPLICABLE OPENINGS, DOOR SIZES, AND DIMENSIONS
OF MECHANICAL ROOMS WITH EQUIPMENT. IF DISCREPANCY OCCURS, NOTIFY
ARCHITECT PRIOR TO FRAMING.
3. CONTRACTOR TO COORDINATE PLUMBING AND MECHANICAL LINES WITH CEILING
HEIGHTS, ABOVE CEILING AREAS AND STRUCTURAL ELEMENTS.
4. CONTRACTOR TO VERIFY WITH STRUCTURAL, PLUMBING, MECHANICAL, AND
ELECTRICAL THE QUANTITY AND SIZES OF ALL SLEEVES REQUIRED. ALL SLEEVES
TO BE ONE HOUR RATED, PROVIDE GREATER RATING IF PENETRATING INTO HIGHER
RATED SPACE.
5. COORDINATE CONDUIT, PIPING, AND DUCTWORK SO THAT THE HEAD HEIGHT IS
NOT ENCUMBERED AND SERVICES ARE AS TIGHT UP TO STRUCTURE AS POSSIBLE.
6. CONTRACTOR TO COORDINATE PLUMBING, MECHANICAL, FIRE SPRINKLER,
ELECTRICAL, AND LIGHTING WITH STRUCTURAL ELEMENTS WHERE THERE IS
EXPOSED STRUCTURE. CONDUIT LINES, ECT. SHALL RUN AT RIGHT ANGLES OR
SEGMENTED BETWEEN COLUMN LINES AND BE CLEAN AND NEAT IN APPEARANCE.
7. COORDINATE LOCATION OF SWITCHES, OUTLETS, THERMOSTATS, LIGHTS, ETC. W/
SHELVING, TRIM, MARKER BOARDS, AND CABINETRY. MOVE AS REQUIRED TO
MISS SHELVING, STORAGE, CASEWORK, VISUAL DISPLAY BOARDS.
8. COORDINATE CONDUIT, PIPING, AND DUCTWORK SO THAT HEAD HEIGHT IS NOT
ENCUMBERED AND SERVICES ARE AS TIGHT UP TO STRUCTURE AS POSSIBLE,
THIS WILL INCLUDE JOGGING DUCTS, SPRINKLER LINES, PLUMBING LINES,
CONDUIT, ECT. UP AND DOWN OR AROUND AS REQUIRED TO ACHIEVE CEILING
HEIGHTS AS INDICATED. COORDINATE INSTALLATION AND SEQUENCING OF
DISCIPLINES TO ACHIEVE.
9. THE GENERAL CONTRACTOR SHALL STAKE OUT ALL MAJOR FEATURES SHOWN ON
THE SITE PLAN TO VERIFY THE SITE LAYOUT RELATIVE TO THE PROPERTY LINES AND
SITE CONDITIONS PRIOR TO ANY UTILITIES OR FOOTINGS BEING INSTALLED.
10. COORDINATE FINAL CEILING HEIGHT WITH ALL WINDOWS. ALL TRADES SHOULD BE
ABLE TO FIT WITHIN THE ALLOTTED SPACE IF COORDINATED BY THE GENERAL
CONTRACTOR AND EACH TRADE. IF FURR DOWNS ARE REQUIRED TO
ACCOMMODATE ABOVE CEILING ITEMS, THE CONTRACTOR IS RESPONSIBLE TO
PROVIDE FURR DOWNS AND COORDINATE LOCATIONS WITH THE ARCHITECT.
11. PLUMBING, FIRE-PROTECTION, MECHANICAL, AND ELECTRICAL WORK REQUIRED BY
THIS CONTRACT IS NOTED ON CONTRACT DOCUMENTS. THE TRADE
CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF THEIR WORK
WITH ALL TRADES. CHANGE ORDERS SHALL NOT BE APPROVED FOR EXTRA WORK
ARISING FROM TRADE CONTRACTORS NOT COORDINATING WORK.
12. CONTRACTOR WILL BE RESPONSIBLE FOR ALL LAYOUT FOR INTERIOR/EXTERIOR
WALLS AND FOUNDATION AND WILL BE RESPONSIBLE FOR MAINTAINING A
BENCHMARK AND CONTROL LINES AT EACH FLOOR LEVEL. CONTRACTOR IS ALSO
RESPONSIBLE FOR VERIFYING ACTUAL FLOOR HEIGHTS AND COORDINATING NEW
AND EXISTING FLOORS TO ALIGN.
13. EACH TRADE CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING AND
INSTALLING CEILING OR WALL-MOUNTED ACCESS DOORS AS REQUIRED TO
ACCESS COMPONENTS OF ITS SYSTEM AND TO COORDINATE WITH OTHER
TRADES SO ACCESS IS MAINTAINED
14. PLUMBING, FIRE-PROTECTION, MECHANICAL, AND ELECTRICAL WORK REQUIRED BY
THIS CONTRACT IS NOTED ON CONTRACT DOCUMENTS. THE TRADE
CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF THEIR WORK
WITH ALL TRADES. CHANGE ORDERS SHALL NOT BE APPROVED FOR EXTRA WORK
ARISING FROM TRADE CONTRACTORS NOT COORDINATING WORK.
15. CONTRACTOR SHALL COORDINATE TO ASSURE ALL EQUIPMENT CAN BE BROUGHT
INTO THE BUILDING. THIS INCLUDES MANUFACTURE COMPONENT SIZE/ASSEMBLY,
CRITICAL PATH SCHEDULING, AND COORDINATION OF OTHER TRADES.
ACT Acoustical Ceiling Tile A/C Air Conditioning AB Anchor Bolt ADA American Disabilities Act AFF Above Finish Floor BM Beam BRG Bearing BRK Brick CFCI Contractor Furnished
Contractor Installed CIP Cast In Place CJ Control Joint CL Column Line CLG Ceiling CLR Clear CMU Concrete Masonry Unit COL Column CONC Concrete CONT Continuous CONTR Contractor COORDF Coordination CORR Corridor CT Ceramic Tile CTR Center DBL Double DET Detail DIA Diameter DR Drain DN Down DS Downspout DW Dishwasher DWG Drawing DWR Drawer EA Each EF Exhaust Fan EJ Expansion Joint EL Elevation ELEC Electrical EQ Equal EX Existing EXT Exterior FF Finish Floor FIN Finish FL Floor Line FlSNG Flashing FTG Footing GA Gauge GFRC Glass Fiber Reinforced
Concrete
GWB GWB
HT Height HM Hollow Metal HOR Horizontal HR Handrail HTR Heater HVAC Heating, Ventilation & Air
Conditioning HxWxL Height, width, length IN Inches INSUL Insulation INT Interior JST Joist
JT Joint LAM Laminate LAV Lavatory LVR Louver MIN Minimum MAX Maximum MECH Mechanical MET Metal MFR Manufacturer MH Man Hole MIN Minimum MISC Miscellaneous MLDG Moulding MO Masonry Opening MTD Mounted MW Microwave NIC Not In Contract NO Number NOM Nominal NTS Not to Scale OC On Center OFCI Owner Furnished
Contractor Installed OFOI Owner Furnished
Owner Installed OPP Opposite P Paint PL Plate / Property Line PL LAM Plastic Laminate PLYWD Plywood PNL Panel PT Pressure Treated R Radius / Riser RB Rubber Base REFR Refrigerator REINF Reinforce (D) REV Revised RM Room SCHED Schedule SECT Section SHT Sheet SHW Single Hung Window SIM Similar SPECS Specifications SQ Square SS Sanitary Sewer STD Standard SVT Solid Vinyl Tile STL Steel T Tile T&G Tongue & Groove TYP Typical UNO Unless Noted
Otherwise VERT Vertical VTR Vent Thru Roof VWC Vinyl Wall Covering WD Wood WWM Welded Wire Mesh WWF Welded Wire Fabric YP Yellow Pine
Typical Abbreviation Legend:General Project Notes (Continued):
CONTRACTOR'S RESPONSIBILTY TO COMPLY WITH APPLICABLE GOVERNING
CODES/AUTHORITIES:
1. ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES, LAWS,
AND ORDINANCES. EACH TRADE CONTRACTOR IS RESPONSIBLE FOR
OBTAINING ALL PERMITS, INSPECTIONS, AND CERTIFICATES REQUIRED BY
GOVERNING ENTITIES.
2. CONTRACTOR TO CONFIRM ALL OSHA AND APPLICABLE STANDARDS TO
ASSURE SAFETY OF ALL PERSONS ON SITE DURING ENTIRE COURSE OF
CONSTRUCTION.
3. NEITHER THE ARCHITECT, NOR THE OWNER SHALL BE RESPONSIBLE FOR JOB
SAFETY. EACH TRADE CONTRACTOR SHALL BE RESPONSIBLE FOR JOB SITE
SAFETY AND SAFETY OF THE PUBLIC DURING CONSTRUCTION AND SHALL
PROVIDE APPROPRIATE WARNINGS, BARRICADES, ETC. AS REQUIRED PER
CODES.
4. PROMPTLY NOTIFY THE ARCHITECT IN WRITING IF ANY CONTRACT DOCUMENTS
ARE FOUND TO BE IN VARIANCE WITH THE APPLICABLE LAWS AND
ORDINANCES. NECESSARY CHANGES WILL BE MADE BY APPROPRIATE
MODIFICATIONS.
5. IF ANY WORK IS PERFORMED KNOWING IT TO BE CONTRARY TO SUCH CODES,
LAWS, ORDINANCES, RULES AND REGULATIONS, AND WITHOUT NOTICE TO
THE ARCHITECT, THAT TRADE CONTRACTOR ASSUMES FULL RESPONSIBILITY
AND BEARS COSTS ATTRIBUTED TO BRING WORK TO COMPLIANCE OF SUCH
CODES, LAWS, ORDINANCES, AND RULES AND REGULATIONS.
GENERAL PROVISIONS FOR FIRE RATED CONSTRUCTION
1. ALL RECESSED ACCESSORIES LOCATED IN FIRE RATED WALLS SHALL BE
EITHER OF FIRE RATED CONSTRUCTION OR COORDINATED WITH THE
ADJACENT TRADES TO ALLOW THE GYPSUM BOARD TO BE CONTINUOUS
BEHIND THE ACCESSORIES.
2. EACH RESPONSIBLE CONTRACTOR SHALL SEAL ALL PENETRATIONS MADE AS
PART OF THEIR WORK IN FIRE-RATED CONSTRUCTION AS REQUIRED BY ALL
APPLICABLE CODES. EACH CONTRACTOR TO VERIFY WITH LOCAL FIRE
MARSHAL OR BUILDING OFFICIAL HAVING JURISDICTION. EACH RESPONSIBLE
CONTRACTOR WILL SEAL ALL PENETRATIONS MADE AS PART OF THEIR WORK
THROUGH NON-RATED PARTITIONS. ALL FIRE CAULK TO BE THE SAME BRAND
AS DETERMINED BY CONTRACTOR.
3. ALL NEW AND EXISTING FIRE WALLS IN WORK AREAS ARE TO BE CARRIED TO
THE UNDERSIDE OF THE ROOF DECK AND SEALED AS REQUIRED FOR
NECESSARY FIRE RATINGS, AND LABELED PER THE AUTHORITY HAVING
JURISDICTION.
4. MATERIALS WITHIN PLENUMS. EXCEPT AS REQUIRED BY THE 2009
INTERNATIONAL MECHANICAL CODE SECTION 602.2.1.1 THROUGH
602.2.1.6, MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR
SHALL HAVE A FLAME SPEAD INDEX OF NOT MORE THAN 25 AND A SMOKE-
DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE
WITH ASTM E84 OR UL 723.
MISCELLANEOUS GENERAL PROVISIONS:
1. CONTRACTOR TO NOTIFY ARCHITECT IMMEDIATELY IF THERE ARE ANY
DISCREPANCIES WITH TAGGED DETAILS, ENLARGED PLANS, ELEVATIONS, ETC.
2. IN ROOMS WITH FLOOR DRAINS, SLOPE TO DRAIN AT 1 PERCENT SLOPE
UNLESS SPECIFICALLY NOTED OTHERWISE.
*PROVIDED FOR MOUNTING HEIGHT INFORMATION ONLY. FIXTURES SHOWN ARE NOT NECCESSARILY INCLUDED IN PROJECT*
M A X
" M
A X
" M
IN
PAPER TOWEL
DISPENSER
MIRROR
SOAP
DISPENSER
ROBE
HOOK
TO
T
O P
O F
H O
O K
" T
YP
LAVATORY. PROVIDE ADA
INSULATION KIT WHEN REQUIRED
URINAL
42" MIN
MAX
1' - 0"
" M
IN
" M
IN
" M
IN
" M
IN
WATER
CLOSET
TOILET
PAPER
DISPENSER
SANITARY
NAPKIN
DISPOSAL
HORIZONTAL
GRAB BAR
VERTICAL GRAB BAR
MIN
1' - 3"
39 MIN - 41 MAX
ALLOWABLE
MOUNTING
AREA
TO
B
O
TT
O M
O F
RE
FL
EC
TI
V E
S U
RF
AC
E
" M A X
H A
FF
M
IN
M A X
16" - 18"
M
IN
M
AX
12 MIN
36 MIN.
HORIZONTAL
GRAB BAR
TYPICAL ADA MOUNTING HEIGHTS (UNLESS OTHERWISE NOTED)
" M
IN
18" MIN
(A)
FRONT APPROACH, PULL SIDE
" M
IN
(B)
FRONT APPROACH, PUSH
SIDE
" M
IN12" MIN
(C)
FRONT APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH
CLOSER AND LATCH
36" MIN
" M
IN
(D)
HINGE APPROACH, PULL SIDE
42" MIN
" M
IN
(E)
HINGE APPROACH, PULL SIDE
" M
IN
22" MIN
(F)
HINGE APPROACH, PUSH SIDE
(G)
HINGE APPROACH, PUSH SIDE, DOOR
PROVIDED WITH BOTH CLOSER AND
LATCH
" M
IN
22" MIN
24" MIN
" M
IN
(H)
LATCH APPROACH, PULL SIDE
(I)
LATCH APPROACH, PULL SIDE,
DOOR PROVIDED WITH CLOSER
" M
IN 24" MIN
24" MIN
" M
IN
(J)
LATCH APPROACH, PUSH SIDE
(K)
LATCH APPROACH, PUSH SIDE,
DOOR PROVIDED WITH CLOSER
24" MIN
" M
IN
" M
IN
12" MIN
(C)
PUSH SIDE, DOOR PROVIDED WITH
BOTH CLOSER AND LATCH
X > 8"4
" M
IN
(B)
PUSH SIDE
" M
IN
18" MIN
X > 8"
(A)
PULL SIDE
24" MIN
" M
IN
(D)
STOP OR LATCH APPROACH
22 MIN
m in
(C)
POCKET OR HINGE APPROACH
(B)
SIDE APPROACH
M
IN
m in
(A)
FRONT APPROACH
TO
F
IR
E
EX
TI
N G
U
IS
H
ER
H
AN
D
LE
'-6
" M
AX
A D
A M
AX
" M
AX
FIRE
EXTINGUISHER
CABINET
" M
AX6
" M
IN
ADA ELECTRIC
WATER COOLER
DIRECTION INDICATOR
HALL CALL
CONTROLS
ELEVATOR DOOR
H A
FF
" M
IN
" M
A X.
M
IN
" M
IN
MIN.
8"
" M
AX
6" MAX.
11" MIN
CL
5" MAX. 15" MIN.
MIN. CLEAR DEPTH
48"
M
IN
C
LE
AR
W
ID
TH
ADA ELECTRIC
FOUNTAIN SKIRT
WHERE LOCATED IN
CIRCULATION PATH
AREA
OF
REFUG
AREA OF
REFUGE
" M
IN
" M A X
CL
18 MIN
M
IN
CENTERED ON RAISED CHARACTERS
HEIGHT OF RAISED CHARACTERS ABOVE FLOOR LOCATION OF SIGNS AT DOORS
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
T3.0
TYPICAL
MOUNTING
HEIGHTS &
CLEARANCES
F3 5:
E N
G
IN
E S
H O
P
D A
N N
E
LL
Y F
IE
LD
M O
N
TG
O M
E
RY
, A
LA
BA
M
A
FAKZ199055 / 18071
JANUARY 2023
ME/JP/JLJ
DCD / FEL
3/8" = 1'-0"T3.0
1 ADA DOOR OPENING MANEUVERING CLEARANCES
1/8" = 1'-0"T3.0
2 TYPICAL SIGNAGE MOUNTING DIAGRAMS
1. ADA STANDARDS FOR ACCESSIBLE DESIGN AND ICC/ANSI A117.1 ARE THE REFERENCE
STANDARDS USED FOR SCOOPING PROVISIONS FOR ACCESSIBILITY. THE MORE STRINGENT
PROVISIONS OF THE TWO STANDARDS ARE INDICATED.
2. DIAGRAMS SHOWN ARE FOR MOUNTING HEIGHT INFORMATION ONLY. FIXTURES SHOWN ARE NOT
NECESSARILY INCLUDED IN THE PROJECT.
3. COORDINATE ADA REQUIREMENTS WITH ALL REQUIRED CONCEALED WOOD BLOCKING.
4. REFER TO MANUFACTURER'S LITERATURE REGARDING RECOMMENDATIONS FOR MOUNTING
PRODUCTS AND MATERIALS IN COMPLIANCE WITH ADA STANDARDS.
GENERAL NOTES:
1126 SF
SPARE PART
STORAGE
1913 SF
MAINTENANCE
BAY
67 SF
MECH
48 SF
ELEC
30 SF
COMM
164 SF
ADMIN
122 SF
BREAK ROOM
52 SF
WOMENS
51 SF
MENS
102 SF
CTK
26 SF
JAN
3494 SF
STORAGE
42 SF
BUSINESS (IT)
526 SF
BUSINESS
(CONCENTRATED)
96 SF
BUSINESS
(MECHANICAL)
70 SF
BUSINESS
(MECHANICAL)
0.45
0.45
1 OCCUPANT
7 OCCUPANTS
1 OCC.1 OCC.
1 OCC.
3 OCC.
4 OCC.
1 OCC.
1 OCC.
1.8
FEB
FEB
COMMON PATH OF
EGRESS TRAVEL =
32'-0"
EGRESS ACCESS
TRAVEL DISTANCE =
48'-10"
FEB
EWC
EEW/S
LOCATION OF FIRE DEPARTMENT
CONNECTION - SEE FIRE
PROTECTION DRAWINGS
HANDICAP ACCESSIBLE EXIT LOCATION
EXIT TRAVEL PATH
ELECTRIC WATER COOLER - SEE PLUMBINGEWC
EMERGENCY EXIT SIGNAGE
LIFE SAFETY LEGEND
FIRE EXTINGUISHER ON BRACKET
(TYPE 4A:80B:C)
FEB
ROOM TAG
ROOM NAME
150 SF
BUSINESS B OCCUPANCY GROUP (IBC 2021)
50 SF PER OCCUPANT PER NFPA 101
ORIDINARY HAZARD (NFPA 101)
BUSINESS B OCCUPANCY GROUP (IBC 2021)
300 SF PER OCCUPANT PER NFPA 101
ORIDINARY HAZARD (NFPA 101)
STORAGE S-1OCCUPANCY GROUP (IBC 2021)
500 SF PER OCCUPANT PER NFPA 101
ORIDINARY HAZARD (NFPA 101)
OCCUPANT LOAD
REQUIRED DOOR WIDTH
REQUIRED STAIR WIDTH
BUSINESS B OCCUPANCY GROUP (IBC 2021)
500 SF PER OCCUPANT PER NFPA 101
ORIDINARY HAZARD (NFPA 101)
EMERGENCY EYEWASH/SHOWER -
SEE PLUMBING
EEW/S
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
LS1.0
LIFE SAFETY
F3 5:
E N
G
IN
E S
H O
P
D A
N N
E
LL
Y F
IE
LD
M O
N
TG
O M
E
RY
, A
LA
BA
M
A
FAKZ199055 / 18071
JANUARY 2023
ME/JP/JLJ
DCD / FEL
APPLICABLE CODES:
BUILDING CODE..............UFC 1-200-01 / 2021 INTERNATIONAL BUILDING CODE
STRUCTURAL CODE...........UFC 3-301-01
PLUMBING CODE............UFC 3-420-01
MECHANICAL CODE.........UFC 3-401-01
FIRE CODE..................UFC 3-600-01 / NFPA 101
ELECTRICAL CODE...........UFC 3-501-01
ENERGY CODE..............UFC 1-200-02
ACCESSIBILITY CODE......2010 ADA STANDARDS
LIFE SAFETY CODE........UFC 3-600-01
IBC CHAPTER 3 AND UFC 3-600-01 OCCUPANCY & USE:
NFPA 101 CHAPTER 6:
• BOTH NFPA 101 AND IBC OCCUPANCY CLASSIFICATIONS ARE USED AS REQUIRED PER UFC
3-600-01.
• SEE LEGEND ON LIFE SAFETY PLAN FOR OCCUPANCY CLASSIFICATIONS.
• NOTE: THE OFFICE SPACE BUSINESS OCCUPANCY IS INCIDENTAL TO THE MAINTENANCE SHOP
STORAGE OCCUPANCY. PER NFPA 101 6.1.14.1.3, THE BUSINESS OCCUPANCY IS PERMITTED
TO BE CONSIDERED PART OF THE PREDOMINANT STORAGE OCCUPANCY AND SHALL BE SUBJECT
TO THE PROVISIONS OF THE CHAPTER 42 FOR STORAGE OCCUPANCIES.
IBC CHAPTER 4 - SPECIAL DETAILED REQUIREMENTS:
• NOT APPLICABLE
IBC CHAPTER 5 - GENERAL BUILDING HEIGHTS & AREAS:
• CONSTRUCTION TYPE = II-B, SPRINKLED, GROUP B, NON-SEPARATED
• ALLOWABLE BUILDING HEIGHT (PER TABLE 504.3)
75 FEET ABOVE GRADE PLANE
• ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLANE (PER TABLE 504.4)
4 STORIES ABOVE GRADE PLANE
• TABULAR BUILDING AREA (PER TABLE 506.2)
70,000 SQUARE FEET
• FRONTAGE INCREASE FORMULA PER 506.3
I=(F/P -0.25)W/30 =0.75
• ALLOWABLE BUILDING AREA (PER SECTION 506.2)
70,000 + (17,500*.75)=83,125
• FIRE SEPARATION REQUIREMENTS NONSEPARATED OCCUPANCIES
• INCIDENTAL USE AREAS (PER TABLE 509)
SEE OCCUPANCY TABLE.
IBC CHAPTER 6 TYPES OF CONSTRUCTION:
• CONSTRUCTION TYPE: II-B
• FIRE RATINGS (PER TABLE 601) AS FOLLOWS (EXCEPT WHERE NOTED OTHERWISE)
PRIMARY STRUCTURAL FRAME.............................. 0 HOUR
BEARING WALLS (INTERIOR & EXTERIOR)...................0 HOUR
NON-BEARING WALLS AND PARITIONS (INTERIOR)........0 HOUR
FLOOR CONSTRUCTION AND SECONDARY MEMBERS...0 HOUR
ROOF CONSTRUCTION AND SECONDARY MEMBERS....0 HOUR
• REQUIRED FIRE RATING (PER TABLE 602)
OCCUPANCY FIRE SEPARATION REQ.
TYPE (ACTUAL) SEPARATION
B GREATER THAN 15'-0" 0 HR
IBC CHAPTER 7 - FIRE AND SMOKE PROTECTION FEATURES:
• MAXIMUM EXTERIOR WALL OPENINGS (PER IBC SECTION 705)
FIRE SEPARATION: DEGREE OF OPENING PROTECTION: ALLOWABLE AREA: ACTUAL AREA:
NORTH ELEVATION UNPROTECTED, SPRINKLERED , (UP, S) NO LIMIT 29%
SOUTH ELEVATION UNPROTECTED, SPRINKLERED , (UP, S) 75% 21%
EAST ELEVATION UNPROTECTED, SPRINKLERED , (UP, S) NO LIMIT 36%
WEST ELEVATION UNPROTECTED, SPRINKLERED , (UP, S) NO LIMIT 29%
• FIRE WALLS (PER NFPA 8.3.2)
NO FIRE WALLS ARE PRESENT WITHIN THE SCOPE OF THE PROJECT
• SHAFT ENCLOSURE (PER NFPA 8.3.1 / 7.3.1.2)
NO SHAFTS ARE PRESENT WITHIN THE SCOPE OF THE PROJECT
• OPENING PROTECTIVES (PER NFPA 8.3.4)
TYPE OF ASSEMBLY ASSEMBLY RATING REQUIRED OPENING
PROTECTION (DOOR/SIDELITE)
NOT APPLICABLE
• CONCEALED SPACES (PER SECTION 718)
NOT APPLICABLE
• SEE LEGEND ON LIFE SAFETY PLAN FOR APPLICABLE UL ASSEMBLIES TO BE PROVIDED.
IBC CHAPTER 8, UFC 3-600-01, NFPA 101 - INTERIOR FINISHES:
• FINISH MATERIAL RATING REQUIREMENTS (PER NFPA 101)
STORAGE (CHAPTER 42)
WALLS
EXITS AND EXIT ACCESS CORRIDORS
INTERIOR WALL AND CEILING FINISH - CLASS A OR B (7.1.4)
ALL OTHER AREAS
INTERIOR WALL AND CEILING FINISH - CLASS A, B, OR C (42.3.3.2)
FLOORS
EXITS AND EXIT ACCESS CORRIDORS
INTERIOR FLOOR FINISH IN EXIT ENCLOSURES- CLASS I OR II (42.3.3.3.1)
UFC 3-600-01(REPLACES IBC CHAPTER 9) - FIRE PROTECTION SYSTEMS:
• SECTION 9-1 - EMERGENCY VEHICLE ACCESS
1. FACILITY DOES NOT REQUIRE ALL-WEATHER EMERGENCY VEHICLE
GROUND ACCESS IN ACCORDANCE WITH 9-1.1 (FACILITY IS LESS
THAN 5000 SF), HOWEVER ALL-WEATHER EMERGENCY VEHICLE
GROUND ACCESS IS PROVIDED.
2. FACILITY DOES NOT REQUIRE AERIAL APPARATUS ACCESS IN
ACCORDANCE WITH 9-1.2
• SECTION 9-2 - FIRE FLOW FOR FACILITIES
1. FIRE FLOW FOR SPRINKLER SYSTEM IS PROVIDED IN ACCORDANCE
WITH 9-2.1
2. THE REQUIRED FIRE FLOW PER NFPA1 AND UFC 3-600-01 IS
1,000 GPM @ 20 PSI FOR 2 HOURS.
• SECTION 9-3 - SERVICE MAINS AND LATERALS
1. FIRE HYDRANTS ARE PROVIDED IN ACCORDANCE WITH 9-3.5.8.2
A. ALL PARTS OF THE FACILITY EXTERIOR ARE WITHIN 350 FT OF
A HYDRANT
2. FIRE HYDRANTS ARE PROVIDED IN ACCORDANCE WITH 9-3.5.8.4
A. ONE HYDRANT IS LOCATED WITH 150FT OF THE FIRE
DEPARTMENT CONNECTION
B. SPACE BETWEEN FIRE HYDRANTS AT EXTERIOR STORAGE
LOCATION DOES NOT EXCEED 300 FT.
• SECTION 9-5 - FIRE PUMPS
1. A FIRE PUMP IS NOT REQUIRED TO MEET FIRE PROTECTION
DEMAND
• SECTION 9-7 - AUTOMATIC SPRINKLER SYSTEMS
1. PER 9-7.2.1, AN AUTOMATIC SPRINKLER SYSTEM IS REQUIRED
• SECTION 9-10 - STANDPIPE SYSTEMS
1. PER 9-10, A STANDPIPE SYSTEM IS NOT REQUIRED
• SECTION 9-17 - PORTABLE FIRE EXTINGUISHERS
1. FIRE EXTINGUISHERS ARE PROVIDED, SEE PLANS FOR LOCATIONS
• SECTION 9-18 - FIRE ALARM SYSTEMS
1. NEW COMBINATION FIRE ALARM, DETECTION, AND MASS
NOTIFICATION SYSTEM COMPLYING WITH ANGETL15-01-03, NFPA 72,
UFC 3-600-01, AND UFC 4-021-01 WILL BE PROVIDED.
1/8" = 1'-0"LS1.0
1 LEVEL 1
FIRST FLOOR PLAN CODE CALCULATIONS
Name
Occupancy Calculations Egress Width Calculations
Area (SF)
Occupancy Factor (SF per Occupant)
Factor Type
Total Occupant
Load (Occupants)
Other Egress Component
Width
Calculated Width (Other
Egress Components)
(Inches)
Required Egress Width
(Inches)
BUSINESS
(CONCENTRATED)
526 SF 50 SF GROSS 11.00 0.2 2.20 44
BUSINESS (IT) 42 SF 300 SF GROSS 1.00 0.2 0.20 44
BUSINESS
(MECHANICAL)
96 SF 500 SF GROSS 1.00 0.2 0.20 44
BUSINESS
(MECHANICAL)
70 SF 500 SF GROSS 1.00 0.2 0.20 44
STORAGE 3494 SF 500 SF GROSS 7.00 0.2 1.40 44
4227 SF 21.00 4.20
PLUMBING FIXTURE CALCULATIONS
Name Male
Occupancy Female
Occupancy
Plumbing Fixtures Required Water Closets
Required Lavatories Required Drinking Fountains
Req.Men Women Men Women
BUSINESS 17 5 0.85 0.25 0.85 0.25 0.293333
17 5
No. Revision Date
NFPA CHAPTER 7 (REPLACES IBC CHAPTER 10) - MEANS OF EGRESS:
• OCCUPANCY LOAD (PER TABLE 7.3.1.2):
SEE OCCUPANCY TABLE
• EGRESS CAPACITY SIZING (PER TABLE 7.3.3.1)
SEE CODE CALCULATIONS TABLE(S)
SEE LIFE SAFETY PLAN FOR INDIVIDUAL ROOM EGRESS
ANALYSIS
• MINIMUM STAIR WIDTH (PER SECTION 7.3.3.1)
SEE CODE CALCULATIONS TABLE(S)
• NUMBER OF MEANS OF EGRESS (PER SECTION 7.4.1)
TOTAL NUMBER OF EXITS REQUIRED
STORAGE OCCUPANCY (CHAPTER 42)
GROUND FLOOR - 1 EXIT REQUIRED
• COMMON PATH OF EGRESS TRAVEL DISTANCE
STORAGE OCCUPANCY (CHAPTER 42)
100 FT PER TABLE 42.2.5
• EXIT ACCESS TRAVEL DISTANCE
STORAGE OCCUPANCY (CHAPTER 42)
400 FEET PER TABLE 42.2.5
• CORRIDORS
OCCUPANCY TYPE (S-1) REQUIRES:
NO FIRE RATING REQUIRED FOR CORRIDOR WALLS WHEN
SERVING LESS THAN 30 OCCUPANTS
MINIMUM CORRIDOR WIDTH
STORAGE OCCUPANCY (CHAPTER 42)
36 INCHES PER 7.3.4.1
DEAD END CORRIDORS
MAXIMUM OF 100 FEET PER TABLE 42.2.5
BLDG. 1312
VEHICLE
MAINTENANCE
FACILITY
BLDG 1406
BLDG 1407
EXISTING CANOPY TO REMAIN - SEE CIVIL FOR PAVEMENT REQUIREMENTS
ENGINE SHOP
NEW CHAIN LINK FENCE
BOLLARDS
BOLLARDS
BOLLARDS
REFER TO BID OPTIONS AND CIVIL
DRAWINGS FOR PAVEMENT
REQUIREMENTS
MECHANICAL UNIT - SEE MECHANICAL
MECHANICAL UNIT - SEE MECHANICAL
BOLLARDS
BOLLARDS
BOLLARDS
EXISTING CANOPY CONTRACTOR CLEAN, PAINT, AND
PREPARE EXISTING CANOPY COLUMNS, BEAMS,
SECONDARY ROOF FRAMING MEMBERS PER
SPECIFCATION 09 9113 EXTERIOR PAINTING
LEGEND
AREA TO RECEIVE
GRASS SOD
ASPHALT- SEE CIVIL AND
ALTERNATES
CONCRETE PAVING
- SEE CIVIL AND BID OPTIONS
NOT IN SCOPE-REFER
TO FAKZ169003
PLANTING - SEE
PLANTING SCHEDULE
DASHED LINE INDICATES
EXTENTS OF PROJECT SCOPE
Plan
Section
PAINT COLOR AS SELECTED BY GOVERNMENT
EQ EQ
1'-3"
0' -1
4' -0
0' -1
3' -6
0' -3
SOLID CONCRETE FILL.
PROVIDE STEEL CAP. WELD
ON TOP
6" DIAMETER STEEL
(GALVANIZED) POST SET
IN CONCRETE PAINT - PER
SECTION 09 9113
CONCRETE
COMPACTED
FILL
CONCRETE
SEE CIVIL
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
L1.0
LANDSCAPE SITE
PLAN
F3 5:
E N
G
IN
E S
H O
P
D A
N N
E
LL
Y F
IE
LD
M O
N
TG
O M
E
RY
, A
LA
BA
M
A
FAKZ199055 / 18071
JANUARY 2023
ME/JP/JLJ
DCD / FEL
1" = 20'-0"L1.0
1 SITE PLAN Landscape
0' 20' 50' 100' 1" = 1'-0"L1.0
2 BOLLARD DETAIL
DEMOLISH BUILDING 1313 IN IT'S ENTIRETY INCLUDING
FOUNDATION SYSTEMS. SEE DEMOLITION NOTES.
DEMOLISH BUILDING
1313 IN IT'S ENTIRETY
INCLUDING FOUNDATION
SYSTEMS. SEE
DEMOLITION NOTES.
DEMOLISH BUILDING 1313 IN IT'S ENTIRETY INCLUDING
FOUNDATION SYSTEMS. SEE DEMOLITION NOTES.
DEMOLISH BUILDING 1313 IN IT'S ENTIRETY INCLUDING
FOUNDATION SYSTEMS. SEE DEMOLITION NOTES. Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A0.1
BUILDING 1313
DEMOLITION
F3 5:
E N
G
IN
E S
H O
P
D A
N N
E
LL
Y F
IE
LD
M O
N
TG
O M
E
RY
, A
LA
BA
M
A
FAKZ199055 / 18071
JANUARY 2023
ME/JP/JLJ
DCD / FEL
No. Revision Date
1/8" = 1'-0"A0.1
1 B1313 FLOOR PLAN
1/8" = 1'-0"A0.1
2 B1313 EAST ELEVATION
1/8" = 1'-0"A0.1
3 B1313 NORTH ELEVATION
General Demolition Notes:
THE INTENT OF DEMOLITION IS TO ACCOMPLISH ALL WORK NECESSARY TO PROVIDE A FINISHED, COMPLETE BUILDING AS INDICATED IN THE PLANS AND SPECIFICATIONS. THE FOLLOWING GENERAL
NOTES ARE APPLICABLE TO ALL DEMOLITION ACTIVITIES REQUIRED BY THE SCOPE OF THE
CONTRACT DOCUMENTS.
CONTRACTOR'S RESPONSIBILTY TO VERIFY ACCURACY OF EXISTING CONDITIONS:
1. DOCUMENTATION CONTAINED IN THESE CONSTRUCTION DOCUMENTS OF EXISTING
CONDITIONS MAY NOT BE ENTIRELY ACCURATE. CONTRACTOR IS TO TAKE THE INITIATIVE TO
VISIT THE SITE PRIOR TO AND DURING THE PRE-BID MEETING TO VERIFY ACTUAL CONDITIONS, THEREFORE RENDERING THE CONTRACTOR RESPONSIBLE FOR AN ACCURATE
REPRESENTATION OF THE EXISTING CONDITIONS.
2. DIMENSIONS OF EXISTING STRUCTURES ARE ONLY FOR THE CONVENIENCE OF THE
CONTRACTOR. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS.
3. THE PLAN OF BUILDING 1313 INCLUDED ON THIS SHEET A ROOF PLAN (INTERIOR WALL
LOCATIONS ARE NOT INDICATED) WHICH REPRESENTS THE EXTENTS OF THE OVERALL FACILITY
TO BE DEMOLISHED. HOWEVER, THE CONTRACTOR SHALL DEMOLISH ALL INTERIOR
PARTITIONS, EQUIPMENT, ETC... CONTRACTOR TO VISIT SITE TO VERIFY EXISTING
CONDITIONS AND SHALL BE RESPONSIBLE FOR DETERMINING THE SCOPE OF WORK PRIOR TO
DEMOLITION . EXISTING CONDITIONS SHALL BE THOROUGHLY RESEARCHED PRIOR TO
CONSTRUCTION AND ANY DRAWINGS SHALL BE IMMEDIATELY DISCUSSED WITH GOVERNMENT
PRIOR TO BEGINNING DEMOLITION. CHANGE ORDERS WILL NOT BE APPROVED PRIOR TO
WORK TAKING PLACE FOR EXISTING CONDITIONS READILY APPARENT BY A THOROUGH
OBSERVATION.
SAFEGUARDS DURING DEMOLITION:
1. CONTRACTOR TO MAKE SURE ALL INFRASTRUCTURE (POWER, GAS, WATER, CABLING, ETC...)
IS TURNED OFF AND/OR REMOVED PRIOR TO DEMOLITION.
2. CONTRACTOR TO VERIFY ALL LOAD BEARING CONDITIONS AND IMPLEMENT SAFEGAURDS AS
NEEDED FOR THE SAFE DEMOLITION OF THE STRUCTURE INDICATED TO BE DEMOLISHED.
3. ALL CURRENT OSHA AND APPLICABLE STANDARDS SHALL BE UPHELD TO ASSURE SAFETY OF
ALL PERSONS ON SITE DURING ENTIRE COURSE OF CONSTRUCTION.
CONTRACTOR'S RESPONSIBILITY REGARDING REMOVAL AND DISPONSAL OF DEMOLISHED
MATERIALS:
1. EACH TRADE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL LAWS,
REGULATIONS, AND/OR ORDINANCES REGARDING THE METHOD OF DEMOLITION AND
DISPOSAL OF WASTE MATERIALS. THE GOVERNMENT ASSUMES NO LIABILITY FOR EXTRA
WORK OR ADDITIONAL COMPENSATION DUE TO FAILURE OF THE TRADE CONTRACTOR OR
SUBCONTRACTORS TO COMPLY WITH ANY AND ALL SUCH REGULATIONS THAT APPLY.
CONTRACTOR'S RESPONSIBILTY REGARDING HAZARDOUS MATERIALS:
1. CONTRACTOR SHALL COMPLY WITH ALL SPECIFIED REQUIREMENTS AND GOVERNING
CODES/LAWS/REGULATIONS REGARDING REMOVAL AND DISPOSAL OF HAZARDOUS
MATERIALS.
2. IF HAZARDOUS MATERIALS ARE ENCOUNTERED, NOTIFY THE GOVERNMENT PRIOR TO
PROCEEDING.
ADDITIONAL MISCELLANEOUS PROVISIONS
1. CONTRACTOR TO ASSUME ALL CONCRETE INDICATED TO BE REMOVED IS REINFORCED.
2. CONTRACTOR TO DEMOLISH BUIDING 1313 IN ITS ENTIRETY TO ALLOW FOR CONSTRUCTION
OF THE NEW ENGINE SHOP.
3. ORIGINAL CONSTRUCTION DRAWINGS ARE NOT AVILABLE FOR BUILDING 1313. HOWEVER, A
DRILLED PIER SYSTEM WITH GRADE BEAMS AND STRUCUTRAL FLOOR SLABS IS PRESENT.
4. A CONCEPTUAL LAYOUT OF DRILLED PIERS AND GRADE BEAMS IS OVERLAID ON THE ROOF
PLAN INCLUDED ABOVE. THE LAYOUT REPRESENTS THE GOVERNMENT'S BEST ASSUMPTIONS
OF THE NUMBER AND LOCATION OF PIERS BASED UPON DRAWINGS FROM A BUILDING
ADDITION CONSTRUCTED IN THE 1990S.
5. CONTRACTOR SHALL REMOVE ALL STRUCTURAL SLABS, ALL GRADE BEAMS, AND ALL DRILLED
PIERS AS REQUIRED TO ACCOMODATE THE PROPOSED NEW ENGINE SHOP AND ASSOCIATED
PAVINGS. CONTRACTOR SHALL ASSUME THE FOLLOWING IN REGARD TO FOUNDATION
DEMOLITION:
• ALL FLOOR SLABS SHALL BE ASSUMED TO BE 8" MINIMUM THICKNESS AND
REINFORCED WITH A DOUBLE MAT OF REBAR
• ALL GRADE BEAMS ARE A MINIMUM OF 24" WIDE BY 18" DEEP, REINFORCED WITH A
REBAR, AND SHALL BE REMOVED IN THIER ENTIRETY.
• ALL DRILLED PEIRS ARE 2'-0" MINIMUM DIAMETER AND REINFORCED WITH REBAR CAGES.
PIERS SHALL BE CUT OFF AND REMOVED AS REQUIRED TO ACCOMODATE NEW
BUILDING PAD AND SITE PAVING. REMOVE PIERS AS FOLLOWS:
• WHERE PIERS ARE LOCATED WITHIN THE PROPOSED ENGINEERED FILL PAD, THE
PIERS SHALL BE CUT OFF AT THE ELEVATION MATCHING THE BOTTOM OF THE
SCHEDULED BUILDING UNDERCUT ELEVATION.
• WHERE PIERS ARE LOCATED WITHIN AREAS SCHEDULED TO RECIVE NEW PAVING,
THE PIERS SHALL BE CUT OFF 2'-0" BELOW FINISHED SUBGRADE ELEVATION OF
THE SCHEDULED PAVING. CONTRACTOR SHALL BACKFILL AT REMOVED PIER
LOCATIONS WITH EITHER SECTION 230 IMPROVED ROADBED OR SECTION 825
CRUSHED AGGREGATE BASED UPON THE PROPOSED PAVEMENT BUILD UP
SELECTED BY THE CONTRACTOR (REFER TO CIVIL PAVING DETAILS). COMPACT THE
BACKFILL WHERE PIERS ARE REMOVED IN ACCORDANCE WITH THE APPLICABLE
REQUIREMENTS OF THE CIVIL PAVEMENT DETAILS FOR THE PAVEMENT BUILD UP
SELECTED.
M C J
M C J
M C J
M C J
M C J
M C J
M C J
M C J
MCJMCJ
MCJMCJ
MCJMCJ
MCJMCJ
1126 SF
SPARE PART
STORAGE
1913 SF
MAINTENANCE
BAY
67 SF
MECH
48 SF
ELEC
30 SF
COMM
164 SF
ADMIN
122 SF
BREAK ROOM
52 SF
WOMENS
52 SF
MENS
102 SF
CTK
CHAIN LINK FENCE
SEE 1/A2.2
26 SF
JAN
621 SF
TRAILER
STORAGE
DNS
A5.2
A5.2
A5.2
103102
A5.1
A5.1
B B
C C
D D
E E
F F
G G
A5.1
___________2 A5.1
A5.2
A5.2
STANLEY STAK SYSTEM TO BE PROVIDED BY THE
GOVERNMENT, INSTALLED BY THE CONTRACTOR
EYEWASH - SEE PLUMBING
A2.1
DS DS
WALK-OFF MAT
SEE 5/A2.1
A A
A5.3
94 SF
ENTRY
FEB
FEB
FEB
A7.1
1C
1B1A
A5.4
LEGEND:
DOOR - SEE DOOR SCHEDULE
101 DOOR TAG - SEE DOOR SCHEDULE
ROOM NAME
101 ROOM TAG
A101
SIM
SECTION TAG
ROOF OVERHANG
SF1 GLAZED OPENING TAG
WALK-OFF MAT
DS DOWN SPOUT
xx SPECIFIC NOTE TAG xx PROVIDE RECYCLING CONTAINERS PER
SPECIFICATION SECTION 10 8500
SPECIFIC NOTES:
FIRE EXTINGUISHER
BOLLARD
MASONRY CONTROL JOINT
A2.1
A2.1
A2.1
1/2" x 3" RAILS SPACED TO
ALLOW 24" CLEAR BETWEEN RAILS
3/4" MINIMUM DIAMETER ROUND
STEEL RUNGS - CORRUGATED,
KNURLED, OR CRIMPED - EQUAL
SPACING NOT TO EXCEED 12"
O.C. (NOT LESS THAN 10" O.C.)
LADDER BRACKET - FASTEN AS
REQUIRED TO WALL AT 6'-0" MAX.
TOP RUNG LEVEL WITH LANDING
EXPANSION BOLT TO FLOOR AND
MEZZANINE AS REQUIRED
PROVIDE REMOVABLE CHAIN
ACCROSS LADDER OPENING
ADJACENT REMOVABLE GUARDRAIL BEYOND
VERTICAL RAIL
SUPPORT BRACKET
FASTEN AS REQUIRED
11' - 10" A.F.F.
TY
PI
C A L
GUARDRAIL BRACKET (BEYOND)
2' - 0"
0' - 7"
SEE 1/A5.1 FOR ADDITIONAL REQUIREMENT
PROVIDE FULLY WELDED CONSTRUCTION
FILL JOIST SEAT SPACE WITH
SOLID CMU/GROUT
1 1/2" ⌀ METAL
PIPE GUARDRAIL
1 1/2" ⌀ METAL
GUARDRAIL
CONCRETE ON METAL
DECK - SEE STRUCTURAL
SEE STRUCTURAL FOR
STEEL ANGLE
" M
A X
" M
A X
GUARDRAIL SLEEVE
FULLY WELDED TO
STEEL ANGLE
TOE KICK - 4" TALL
WELD TO POST
REMOVEABLE 1 1/2"
⌀ VERTICAL METAL
POST 4'-0" MAX O.C.
NOTE: REMOVEABLE SECTIONS SHALL BE NO
LONGER THAN 8'-0" - SPACE BETWEEN
SECTIONS SHALL BE NOT GREATER THAN 4".
11' - 10" A.F.F.
BOND BEAM - SEE
STRUCTURAL
FILL JOIST SEAT
SPACE WITH SOLID
CMU/GROUT
WALK OFF MAT - SEE
FINISH SCHEDULE
CONCRETE SLAB - REFER
TO MANUFACTURER'S
REQUIREMENTS FOR
SLAB DEPRESSION. SEE
STRUCTURAL
M A T
M A N U
FA
C
TU
R
ER
C O
O R D
IN
A
TE
W
IT
H E
N
TR
A N C
E
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A2.1
FIRST FLOOR PLAN
F3 5:
E N
G
IN
E S
H O
P
D A
N N
E
LL
Y F
IE
LD
M O
N
TG
O M
E
RY
, A
LA
BA
M
A
FAKZ199055 / 18071
JANUARY 2023
ME/JP/JLJ
DCD / FEL
1/8" = 1'-0"A2.1
1 FIRST FLOOR PLAN
0' 4' 8' 16' 32'
1/8" = 1'-0"A2.1
2 MEZZANINE PLAN
0' 4' 8' 16' 32'
1 1/2" = 1'-0"A2.1
3 LADDER DETAIL
1 1/2" = 1'-0"A2.1
4 REMOVABLE RAILING DETAIL
3" = 1'-0"A2.1
5 WALKOFF MAT TRANSITION DETAIL (TYPICAL)
MCJMCJ
1 2
1. THE FIRST CHARACTER IN THE TAG REFERENCES THE PARTITION TYPE
2. THE SECOND CHARACTER IN THE TAG REFERENCES THE THICKNESS
OF THE STRUCTURE (CMU, METAL STUD, WOOD, ETC.)
REFER TO INTERIOR ELEVATIONS AND ASSOCIATED WALL SECTIONS
AND DETAILS FOR ADDITIONAL FURRING REQUIREMENTS AND
FINISHES NOT SHOWN ON WALL TYPE PLAN SCHEDULE.
**NOTE - REFER TO LIFE SAFETY PLAN FOR PARTITION RATINGS**
PARTITION TAG LEGEND
1. REFER TO FLOOR PLANS FOR ADDITIONAL FURRING REQUIREMENTS THAT MAY NOT BE
SHOWN ON THIS DRAWING.
2. REFER TO EXTERIOR WALL SECTIONS FOR EXTERIOR WALL ASSEMBLIES. THIS PLAN MAY
REQUIRE ADDITION FUR-OUT NOT SHOWN ON THIS DRAWING.
3. UNLESS SPECIFICALLY NOTED OTHERWISE, ALL WALLS ( INCLUDING STRUCTURE, FINISH,
AND INSULATION) SHALL EXTEND TO UNDERSIDE OF ROOF DECK ABOVE.
4. ALL WALLS TO RUN FULL HEIGHT TO STRUCTURE ABOVE. COORDINATE OPENINGS TO
ACCOMODATE MECHANICAL. SEAL ALL PLUMBING, MECHANICAL, ELECTRICAL, AND FIRE
PROTECTION PENETRATIONS.
5. FOR EXTERIOR WALL EXPANSION JOINTS SEE EXTERIOR ELEVATIONS.
DIMENSION NOTES: ALL DIMENSIONS ARE MEASURED AS FOLLOWS:
- INTERIOR STUD WALLS ARE DIMENSIONED TO THE CENTER LINE OF THE WALL
- EXTERIOR WALLS ARE DIMENSIONED TO THE OUTSIDE FACE OF THE STUDS OR CMU.
WALL TYPE PLAN LEGEND
EXTEND PARTITION WALLS TO UNDERSIDE OF ROOF
DECK OR FLOOR. SEE A2.6 FOR PARTITION HEAD
DETAILS. PROVIDE CODE COMPLIANT SEAL
WALL TAG
# SPECIFIC NOTE TAG
GYPSUM CONTROL JOINT - REFER TO DETAIL 6/A2.4
WALL TYPE PLAN GENERAL NOTES
WALL TYPE PLAN SPECIFIC NOTES
1 WALLS IN THESE AREAS TO RECEIVE ADDITIONAL FINISHES.
WALL TAGS ARE INTENDED TO IDENTIFY GENERAL WALL
ASSEMBLY REQUIREMENTS. REFER TO INTERIOR
ELEVATIONS. SUBSTITUTION OF CEMENTITIOUS BOARD FOR
GYPSUM WALL BOARD IS REQUIRED WHERE WALL IS
SCHEDULED TO RECIEVE TILE.
B B
C C
D D
E E
F F
G G
ACCESS
N8
N8
N8
N8 N8
N8
N8
N8
N8
N8
N8
N8 N8
49' - 4"
12' - 4"12' - 4"12' - 4"12' - 4"9' - 4"
/4
/4
/4
/2
/2
/2
/2
" 1
/4
7' - 4"
0' - 8"
1' - 6"
A A
CHAIN LINK CAGE ON (2) SIDES OF
STACKER SYSTEM - SEE SPECIFICATIONS
AND 1/A2.2. EXTEND TO WALLS.FEB
FEB
FEB
2' - 8 5/8" 1' - 8 5/8"
1' - 5 3/8"
EQ
EQ
0' - 6 1/8"
/8
/8
/4
/8
4' - 0 1/4"1' - 0"
/8
/8
5' - 4"
0' - 7 5/8" 0' - 8 1/2"
3' - 9 5/8" 2' - 2 7/8" 4' - 1 5/8"
1' - 2 7/8"
/8
1' - 2 5/8" 1' - 2 5/8"
A5.4
SILL
PLAN
HEAD
CONFIRM 1 " REQUIRED CLEAR
SPACE FOR DEFLECTION
PROVIDE FLEXIBLE CLOSURE
STRIPS AS REQUIRED IN DECK
FLUTES
SEE STRUCTURAL FOR TOP OF
WALL BRACING
XX
TAG INDICATES WALL TYPE
OVER CMU MASONRY
**NOTE: IF WALL IS SCHEDULED TO
RECEIVE TILE, PROVIDE
WATERPROOFING FOR TILE
INSTALLATION. REFER TO FINISH
SCHEDULE, INTERIOR ELEVATIONS,
SECTIONS, AND GYPSUM BOARD
ASSEMBLIES SPECIFICATIONS FOR
TYPES AND OTHER
SUBSTRATE/FURRING REQUIREMENTS**
TYPE N
REFER TO STRUCTURAL FOR ADDITIONAL REQUIREMENTS
EXTEND ALL WALLS TO UNDERSIDE OF ROOF DECK ABOVE AND
SEAL UNLESS OTHERWISE NOTED
SLIDE BOLT WITH
UPPER RECIEVER
CANE BOLT WITH
EPOXIED RECIEVER
2 EQUAL LEAVES
8' - 0"
PROVIDE PANEL
ABOVE DOORS
GATE - BRACE AS
REQUIRED
14 GAUGE SHEET
METAL, BOTH
SIDES. HEM EDGES
PEDESTRIAN GATE
KIT WITH PANIC BAR
AND STOREROOM
LOCKSET - SEE
HARDWARE
SCHEDULE
PANIC BAR
RECEIVER BRACKET
MOUNTED TO
OPPOSITE GATE
3" POSTS (TYPICAL)
EPOXY ANCHOR
POSTS TO FLOOR
AS REQUIRED
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A2.2
WALL TYPE PLAN
AND DETAILS
F3 5:
E N
G
IN
E S
H O
P
D A
N N
E
LL
Y F
IE
LD
M O
N
TG
O M
E
RY
, A
LA
BA
M
A
FAKZ199055 / 18071
JANUARY 2023
ME/JP/JLJ
DCD / FEL
N8 N/A 7 5/8"
TYPE STUD THICKNESS PARTITION THICKNESS
1/8" = 1'-0"A2.2
2 WALL TYPE PLAN
0' 4' 8' 16' 32'
1/4" = 1'-0"A2.2
1 CAGE DETAIL
ROOF PLAN LEGEND
STANDING SEAM METAL ROOF
(LINES FOR SEAMS ON METAL ROOF TYPES,
REFER TO SPECS FOR PANEL SIZES)
MEMBRANE ROOF
DOWNSPOUT + BOOTS (BOOTS NOT SHOWN)
(NOTE: REFER TO ELECTRICAL FOR LIGHTNING
PROTECTION - COORDINATE AS REQUIRED)
DS
VTR VENT TO ROOF - SEE MECHANICAL/ PLUMBING AND DETAIL 1/A2.4
NOTE 1 - LOCATE ALL PENETRATIONS THROUGH METAL ROOF PANELS AT MIDPOINT IN ROOF PANEL
NOTE 2 - REFER TO ELECTIRCAL FOR LIGHTNING PROTECTION - COORDINATE AS REQUIRED
GENERAL NOTES
A5.2
A5.2
A5.2
A5.1
B C D E F G
1/2" / 1'-0"
A2.3
A5.1
A5.3
A5.3
A5.2
A5.2
DS
DS
A
A2.4
Sim
A5.3
GUTTER - SEE SPECIFICATION
SECTION 07 7100
CONDUCTOR HEAD AND
DOWN SPOUT
CONDUCTOR HEAD AND
DOWN SPOUT
VTR
A5.4
A5.2
A5.2
B
A5.3
A5.2
A2.4
Sim
VTR
VTR
A
LINE OF HIGH ROOF ABOVE
1/ 4"
1'
-0
1/ 4"
1'
-0
1/4" / 1'-0"
1/4" / 1'-0"
CONDUCTOR HEAD AND
DOWN SPOUT
CONDUCTOR HEAD AND
DOWN SPOUT
A5.4
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A2.3
ROOF PLAN
F3 5:
E N
G
IN
E S
H O
P
D A
N N
E
LL
Y F
IE
LD
M O
N
TG
O M
E
RY
, A
LA
BA
M
A
FAKZ199055 / 18071
JANUARY 2023
ME/JP/JLJ
DCD / FEL
1/8" = 1'-0"A2.3
2 ROOF PLAN
1/8" = 1'-0"A2.3
1 LOW ROOF PLAN
CONTINUOUS BEAD OF TPO SEALANT
STAINLESS STEEL CLAMPING RING
TPO ROOF MEMBRANE ADHESIVE
TPO ROOF MEMBRANE
TPO FLASHING
TPO FASTENER AND SEAM PLATE
TPO FLASHING WELDED TO ROOF MEMBRANE
TPO ROOF MEMBRANE
PLUMBING VENT (SEE PLUMBING)
ROOF INSULATION
ROOF DECK - SEE STRUCTURAL
" M
IN
COVERBOARD
ES-1 RATED EDGE METAL
BOND BEAM - SEE STRUCTURAL
RIGID INSULATION
OPEN WEB JOIST - SEE STRUCTURAL
BOND BEAM - SEE STRUCTURAL
TPO ROOFING MEMBRANE
RIGID INSULATION
SEE STRUCTURAL
P.T. WOOD BLOCKING
P.T. WOOD
BLOCKING AS REQD.
TPO BASE FLASHING
COVER BOARD MECHANICALLY
ATTACHED TO CMU
TPO TERMINATION
1/2" STEEL PLATE WITH HEADED STUD
INTO BOND BEAM AT 24" O.C.
SEALANT
AIR SPACE
BRICK
AIR BARRIER
CMU - SEE STRUCTURAL
ROOF DECK - SEE STRUCTURAL
COVER BOARD
METAL CLOSURE TRIM
METAL SOFFIT PANELS
STEEL JOIST - SEE STRUCTURAL
STEEL ANGLE - SEE STRUCTURAL
ROOF DECK- SEE STRUCTURAL
STANDING SEAM METAL ROOF
RIGID INSULATION
METAL FLASHING
METAL DRIP EDGE
BACKER ROD W/ SEALANT
CONTINUOUS CLEAT
CONTINUOUS METAL CLEAT
FURRING CHANNEL
METAL WALL PANELS
CONTINUOUS INSULATION CHANNEL
RIGID INSULATION
BOND BEAM - SEE STRUCTURAL
OPEN WEB JOIST - SEE STRUCTURAL
TPO ROOFING MEMBRANE
TAPERED RIGID INSULATION
ROOF DECK- SEE STRUCTURAL
CMU
CLOSURE W / WEEPS
METAL COUNTER FLASHING
METAL FLASHING
SEALANT
TPO BASE FLASHING
COVER BOARD
'-0
" M
IN
CONTINUOUS INSULATION CHANNEL
RIGID INSULATION
AIR BARRIER
P.T. WOOD BLOCKING AS REQUIRED
STEEL ANGLE - SEE STRUCTURAL
FURRING CHANNEL
METAL SOFFIT PANELS
C SHAPE - SEE STRUCTURAL
SELF ADHERED ROOF UNDERLAYMENT
CONTINUOUS METAL CLEAT
RIGID INSULATION
STANDING SEAM METAL ROOF
G
METAL SOFFIT PANELS
METAL CLOSURE TRIM
GUTTER STRAP
SELF ADHERED ROOF UNDERLAYMENT
SHEET METAL FASCIA
CONTINUOUS CLEAT
METAL CLOSURE TRIM
SEALANT & BACKER ROD
EDGE ANGLE - SEE STRUCTURAL
P.T. WOOD BLOCKING
METAL WALL PANEL
SEALANT & BACKER ROD
P.T. WOOD BLOCKING
SEALANT
GUTTER - SEE SPECS
SELF ADHERED ROOF UNDERLAYMENT (UNDER AND OVER FASTENERS)
METAL ROOF DECKING
RIGID INSULATION
SELF ADHERED ROOF UNDERLAYMENT
STANDING SEAM METAL ROOF
STRUCTURAL
SEE
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A2.4
ROOF DETAILS
F3 5:
E N
G
IN
E S
H O
P
D A
N N
E
LL
Y F
IE
LD
M O
N
TG
O M
E
RY
, A
LA
BA
M
A
FAKZ199055 / 18071
JANUARY 2023
ME/JP/JLJ
DCD / FEL
3" = 1'-0"A2.4
1 ROOF VENT DETAIL
3" = 1'-0"A2.4
2 PARAPET ROOF DETAIL
3" = 1'-0"A2.4
3 HIGH EAVE DETAIL
3" = 1'-0"A2.4
4 ROOF TO WALL TRANSITION DETAIL
3" = 1'-0"A2.4
7 RAKE DETAIL
3" = 1'-0"A2.4
5 LOW EAVE DETAIL
PNT1: WALL COLOR
Manufacturer: Sherwin Williams Color: Samovar Silver SW 6233
PNT2: DOOR & DOOR TRIM
Manufacturer: Benjamin Moore Color: Smoke Gray 2120-40
PNT3: CEILING / DRYFALL
Manufacturer: Sherwin Williams Color: Samovar Silver SW 6233
PNT4: WALLS IN SHOP
Manufacturer: Sherwin Williams Color: Samovar Silver SW 6233
PNT5: EXTERIOR DOOR & TRIM (EXTERIOR FACE
ONLY, INTERIOR TO MATCH PNT2)
Manufacturer: Sherwin Williams Color: Tudor House Brown SW 2077
QZ1: Manufacturer: Cambria Color: Brittanicca Edge Finish: Square
PL1: Manufacturer: Formica Color: Stainless 9319-HB Finish: Brushed
RB1: Manufacturer: Roppe Color: Steel Blue P177
COUNTERTOPS/WINDOW SILLS -- SEE SPEC
SECTION 12 3600
PLASTIC LAMINATE CASEWORK -- SEE SPEC
SECTION 06 4100
RUBBER BASE -- SEE SPEC SECTION 09 6500
FINISH SCHEDULE LEGEND
ACOUSTICAL CEILING - SEE SPEC SECTION 09 5100PAINT -- SEE SPEC SECTION 09 9123
WALK OFF MAT -- SEE SPEC SECTION 12 4813
WM1: Manufacturer: Pawling Corporation Style: EM-650 Aluminum Abrasive Insert: 1 Black Maxi Tuft Long Wear Insert: 536 Black Granite Rigid Corrugated Vinyl Insert: 1 Black Rigid Back Nylon Carpet Insert: 519 Near Black
SC: Sealed Concrete See Spec Section: 09 9123
STC: Stained Concrete - (Polished) Manufacturer: Scofield Stain: Soft Gray G388 See Spec Section: 03 3680
HPC: High Performance Floor Coating See Specification Section 09 9600 Color: as selected from manufacturer's full range
CONCRETE - SEE SPEC SECTION 03 3000
ACT1: Manufacturer: Armstrong Style: Ultima Texture: Fine Color: White Size: 24" x 24" x 7/8" thick Suspension System: Type 1 Edge: Square
ACT2: Manufacturer: Armstrong Style: Clean Room VL Size: 24" x 24" x 5/8" thick Suspension System: Type II
1. ALL WALL PAINT TO EXTEND TO DECK WHEN CEILING IS
EXPOSED. PAINT EVERYTHING EXPOSED TO VIEW INCLUDING
BUT NOT LIMITED TO FIRE PROTECTION, STRUCTURAL,
MECHANICAL, ELECTRICAL. REFER TO REFLECTED CEILING
PLANS.
2. PAINT TEST AREA OF ALL PAINT COLORS FOR ARCHITECTS
APPROVAL BEFORE PROCEEDING.
3. RUBBER BASE @ CASEWORK TO MATCH RUBBER BASE IN
ROOM, UNLESS NOTED OTHERWISE.
4. PROVIDE QUARTZ. WINDOW SILL AT ALL WINDOW SILLS 7'-0"
AFF OR BELOW.
GENERAL NOTES:
1. SEE INTERIOR ELEVATIONS FOR ADDITIONAL FINISH
REQUIREMENTS.
2. PREPARE AND PAINT ALL EXPOSED DUCTWORK, STRUCTURAL
STEEL, CONDUIT, ETC IN THESE SPACES.
3. REFER TO BID OPTIONS FOR FLOOR FINISHES IN THIS AREA.
SPECIFIC NOTES:
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A3.1
FINISH
SCHEDULES
F3 5:
E N
G
IN
E S
H O
P
D A
N N
E
LL
Y F
IE
LD
M O
N
TG
O M
E
RY
, A
LA
BA
M
A
FAKZ199055 / 18071
JANUARY 2023
ME/JP/JLJ
DCD / FEL
FIRST FLOOR FINISH SCHEDULE
NO. ROOM NAME
FLOOR WALL
CEILING FINISH
DOORS MILLWORK
SPECIFIC NOTES
BASE BID
FINISH
ALTERNATE
FINISH
BASE
FINISH
FINISH
FINISH
CASING
& TRIM
CASEWORK
COUNTER
TOP
NORTH
W…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .