Factor 6 Cost Proposal Breakdown.xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- Not on record
About this file
The file is a Factor 6 Cost Proposal Breakdown template for a modernization project involving the McAllen, Texas Air Traffic Control Tower (ATCT). The spreadsheet provides a detailed cost breakdown structure for various construction and renovation activities, including roofing systems replacement, foundation and framing work, HVAC modifications, exterior insulation finishing system (EIFS) installation, storefront replacements, and abatement services. The template is designed for vendors to input specific costs across categories such as equipment, materials, labor, and other expenses, with subtotals for prime contractor and subcontractor work, and includes sections for profit and overhead calculations. The related federal contract opportunity, issued by the Department of Transportation Federal Aviation Administration Southwestern Region, involves comprehensive renovation of the MFE Tower, encompassing roof membrane replacement, structural framing, exterior siding, mechanical system upgrades, and utility relocations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 01a - Drawings.pdf | ||
| Attachment 01 - Specifications.pdf | ||
| Questions and Answers.docx | DOCX document | |
| 697DCK-25-R-00461.pdf | ||
| Attachment 02 - Wage Determination_TX20230255.pdf | ||
| Attachment 01b - EOSH.pdf | ||
| Attachment 03 - Past Performance Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modernization
| Standardized Proposal Breakdown | DATE PREPARED: MMM DD - YYYY |
| PROJECT: |
| VENDOR: | |||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | ||||
| ITEM | EQUIPMENT COSTS - $ | MATERIAL COSTS - $ | LABOR COSTS - $ | OTHER COSTS - $ | TOTAL ITEM COST - $ |
| TOTAL | TOTAL | TOTAL | TOTAL | ||
| PRIME | |||||
| Replace roofing systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Construct foundation beam and metal stud framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Relocated utilizes and HVAC exterior work | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Install EIFS and new openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Entry concrete work | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Replace storefront door and windows | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Replace defogger system | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| HVAC work in bld interior | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Abatement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Scaffolding system, heavy equipment, and cranes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| SUBCONTRACTOR | |||||
| Mobilization/Demobilization | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Removal/Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Installation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Permits | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| TOTAL | $ - 0 | |||
| Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown. |