Factor 4 - Division Cost Breakdown.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Z2DZ--Replace Elevators Throughout Mather VA Medical Center | 612A4-22-001
Solicitation number
36C26123R0015
Issued by

About this file

This document contains a pricing schedule and statement of work for replacing elevators throughout the Mather Medical Center for the Department of Veterans Affairs. The contractor will replace a total of seven elevators across three clinical line items in priority order. The pricing schedule provides material and labor cost breakdowns by division for each elevator. The statement of work requires the contractor to furnish all labor, materials, and equipment for construction. The contractor must provide new, fully functional elevator systems in accordance with attached drawings and specifications over a 360-day period of performance. No more than one elevator per building may be nonoperational at a time. The contractor is responsible for safety inspections, commissioning, records management, and permitting and must follow federal regulations and VA policies.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRICING SCHEDULE
Elevator Replacement Throughout Mather Medical Center
DESCRIPTIONMATERIALLABORTOTAL
CLIN 1 - Mather Building 650 (Elevator 1 and 2)
SLIN 1 - Mather Building 650 Elevator 1
Division 01 - General Requirements$$$
Division 02 - Existing Conditions$$$
Division 07 - Thermal Moisture Protection$$$
Division 09 - Finishes$$$
Division 13 - Special Construction$$$
Division 14 - Conveying Equipment$$$
Division 21 - Fire Suppression$$$
Division 23 - HVAC$$$
Division 26 - Electrical$$$
$$$
$$$
$$$
SLIN 1 Total - Mather Building 650 Elevator 1$$$
SLIN 2 - Mather Building 650 Elevator 2
Division 01 - General Requirements$$$
Division 02 - Existing Conditions$$$
Division 07 - Thermal Moisture Protection$$$
Division 09 - Finishes$$$
Division 13 - Special Construction$$$
Division 14 - Conveying Equipment$$$
Division 21 - Fire Suppression$$$
Division 23 - HVAC$$$
Division 26 - Electrical$$$
$$$
$$$
$$$
SLIN 2 Total - Mather Building 650 Elevator 2$$$
CLIN 2 - Mather Building 700 (Elevator 3, 4, and 5)
SLIN 1 - Mather Building 700 Elevator 3
Division 01 - General Requirements$$$
Division 02 - Existing Conditions$$$
Division 07 - Thermal Moisture Protection$$$
Division 09 - Finishes$$$
Division 13 - Special Construction$$$
Division 14 - Conveying Equipment$$$
Division 21 - Fire Suppression$$$
Division 23 - HVAC$$$
Division 26 - Electrical$$$
$$$
$$$
$$$
SLIN 1 Total - Mather Building 700 Elevator 3$$$
SLIN 2 - Mather Building 700 Elevator 4
Division 01 - General Requirements$$$
Division 02 - Existing Conditions$$$
Division 07 - Thermal Moisture Protection$$$
Division 09 - Finishes$$$
Division 13 - Special Construction$$$
Division 14 - Conveying Equipment$$$
Division 21 - Fire Suppression$$$
Division 23 - HVAC$$$
Division 26 - Electrical$$$
$$$
$$$
$$$
SLIN 2 Total - Mather Building 700 Elevator 4$$$
SLIN 3 - Mather Building 700 Elevator 5
Division 01 - General Requirements$$$
Division 02 - Existing Conditions$$$
Division 07 - Thermal Moisture Protection$$$
Division 09 - Finishes$$$
Division 13 - Special Construction$$$
Division 14 - Conveying Equipment$$$
Division 21 - Fire Suppression$$$
Division 23 - HVAC$$$
Division 26 - Electrical$$$
$$$
$$$
$$$
SLIN 3 Total - Mather Building 700 Elevator 5$$$
CLIN 3 - Mather Building 700 (Elevator 1 and 2)
SLIN 1 - Mather Building 700 Elevator 1
Division 01 - General Requirements$$$
Division 02 - Existing Conditions$$$
Division 07 - Thermal Moisture Protection$$$
Division 09 - Finishes$$$
Division 13 - Special Construction$$$
Division 14 - Conveying Equipment$$$
Division 21 - Fire Suppression$$$
Division 23 - HVAC$$$
Division 26 - Electrical$$$
$$$
$$$
$$$
SLIN 1 Total - Mather Building 700 Elevator 1$$$
SLIN 2 - Mather Building 700 Elevator 2
Division 01 - General Requirements$$$
Division 02 - Existing Conditions$$$
Division 07 - Thermal Moisture Protection$$$
Division 09 - Finishes$$$
Division 13 - Special Construction$$$
Division 14 - Conveying Equipment$$$
Division 21 - Fire Suppression$$$
Division 23 - HVAC$$$
Division 26 - Electrical$$$
$$$
$$$
$$$
SLIN 2 Total - Mather Building 700 Elevator 2$$$
Other
Bonds$$$
Insurance$$$
Other Total$$$
GRAND TOTAL$$$
NOTE: If a division is not accounted for please insert in the extra space provided.