Facilities_and_Equipment.pdf
PDF 477 KB Posted
- Attached to
- Predictive Maintenance Program
- Solicitation number
- 25-P-00363
- Issued by
- Hillsborough County, Florida
About this file
This is a facilities and equipment inventory document for the City of Tampa Water Department, detailing eight water treatment and distribution facilities across Hillsborough County, Florida, along with the equipment located at each site that will undergo predictive maintenance testing. The primary facility is the David L. Tippin Water Treatment Plant located at 7125 N. 30th Street in Tampa, with seven additional supporting facilities including the Solids Dewatering Facility, Interbay Repump Station, Northwest Repump Station, Palma Ceia Facility, West Tampa Facility, Morris Bridge Water Treatment Facility, and Blue Sink. The document catalogues 138 pieces of equipment across these locations, consisting primarily of raw water pumps, high service pumps, low lift pumps, coagulation and maturation tank mixers, backwash pumps, jet mix pumps, sodium hypochlorite pumps, filtrate return pumps, and various repump station and specialized facility pumps. Each equipment item is assigned a unique identification number and mapped to its specific facility location for monitoring and maintenance purposes.
The equipment inventory serves as the foundation for the City of Tampa's Predictive Maintenance Program (Bid No. 25-P-00363), with a bid opening scheduled for Friday, December 5, 2025, and an estimated contract value of $25,000.00. The initial contract term is one year with three additional optional one-year renewal periods, and the City reserves the right to unilaterally extend the contract for up to three additional 30-day periods. Qualified bidders must demonstrate at least five years of vibration services experience, provide customer references, and submit certified technician credentials along with a comprehensive list of testing instruments. The scope of work includes monthly vibration analysis, quarterly spectrometric oil analysis, thermographic analysis, and provision of detailed pricing schedules for scheduled testing services, unscheduled field services, and replacement parts with specified hourly rates for vibration testing, oil sample testing, thermography, motor circuit analysis, and field service repair. The procurement encourages Small Local Business Enterprise (SLBE) participation, with prime contractors required to submit a DMI-40 Form documenting their intent to utilize SLBE subcontractors and a DMI-30 Form for tracking all subcontractor, consultant, and supplier payments.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Facilities And Equipment
1. David L. Tippin Water Treatment Plant 7125 N. 30th Street Tampa, FL 33610 Locations 1-53
2. Solids Dewatering Facility 8006 N. 30th Street Tampa, FL 33610 Location 61
3. Interbay Repump Station 3706 W. Wisconsin Ave Tampa, FL 33611 Location 63
4. Northwest Repump Station 5602 W. Sitka St.
Tampa, FL 33634 Location 64
5. Palma Ceia Facility 100 Frankland St.
Tampa, FL 33602 Location 65
6. West Tampa Facility 2001 N. Himes Ave.
Tampa, FL 33629 Location 66
7. Morris Bridge Water Treatment Facility 17101 Bruce B. Downs Blvd. (30th St) Tampa, FL 33647 Location 68
8. Blue Sink 151 W. 115th Ave.
Tampa, FL 33612 Location 59
The following equipment will be normally tested. This equipment is located at various locations throughout the Tampa Water Department System.
EQUIPMENT#
DESCRIPTION
EQUIP
MENT
LOCAT
ION
51 RAW WATER PUMP #1 1-53
52 RAW WATER PUMP #2 1-53
53 RAW WATER PUMP #3 1-53
54 RAW WATER PUMP #4 1-53
55 RAW WATER PUMP #5 1-53
254 RAW WATER PUMP #6 1-53
255 RAW WATER PUMP #7 1-53
290 RAW WATER PUMP #8 1-53
248 RAW WATER PUMP #9 1-53
242417 HIGH SERVICE PUMP # 1 2024
242416 HIGH SERVICE PUMP # 2 2024
242415 HIGH SERVICE PUMP # 3 2024
242414 HIGH SERVICE PUMP # 4 2024
242413 HIGH SERVICE PUMP # 5 2024
242412 HIGH SERVICE PUMP # 6 2024
242411 HIGH SERVICE PUMP # 7 2024
242410 HIGH SERVICE PUMP # 8 2024
11012
FLOWAY LOW LIFT PUMP
#1
1-53
11001
#2
11002
#3
11003
#4
11004
#5
1-53
11000 FLOWAY LOW LIFT PUMP
#6
1-53
10008 ACTIFLO COAGULATION TANK MIXER #1 46-1
10012 ACTIFLO MATURATION TANK MIXER # 1 46-1
10009 ACTIFLO COAGULATION TANK MIXER #2 46-2
10013 ACTIFLO MATURATION TANK MIXER # 2 46-2
23145 BACKWASH PUMP #1 2023
2051A BACKWASH PUMP #2 2023
23100 JET MIX PUMP # 1 2023
23101 JET MIX PUMP # 2 2023
23102 JET MIX PUMP # 3 2023
23103 JET MIX PUMP # 4 2023
202438 SODIUM HYPOCHLORITE PUMP # 1 BLDG 38
202439 SODIUM HYPOCHLORITE PUMP # 2 BLDG 38
#1 FILTRATE RETURN PUMP 1-53
#2 FILTRATE RETURN PUMP 1-53
#3 FILTRATE RETURN PUMP 1-53
INTERBAY REPUMP # 1 63
2493 INTERBAY REPUMP # 2 63
2494 INTERBAY REPUMP # 3 63
7086 INTERBAY REPUMP # 4 63
N.W. REPUMP STATION PUMP # 1
N.W. REPUMP STATION PUMP # 2
N.W. REPUMP STATION PUMP # 3
2609 PALMA CEIA PUMP 65
2626 WEST TAMPA PUMP 66
SULPHUR SPRINGS PUMP
#1
SULPHUR SPRINGS PUMP
#2
8000 BLUE SINK PUMP #1 TBD
8001 BLUE SINK PUMP #2 TBD
4000 MORRIS BRIDGE PUMP #1 68
4003 MORRIS BRIDGE PUMP #2 68
4006 MORRIS BRIDGE PUMP #3 68
4009 MORRIS BRIDGE PUMP #4 68
5000 MORRIS BRIDGE PUMP #5 68
5009 MORRIS BRIDGE PUMP #6 68
5010 MORRIS BRIDGE PUMP #7 68
| Facilities.pdf |
| PM Equipment.pdf |
File details come from the government source that posted it. Updated .