This is a Contract Data Requirements List (DD Form 1423-1) specifying two data items required under AFRL contract FA9453-27-X-XXXX for the SETS BAA Call 04 program. The contract is issued by the Air Force Research Laboratory (AFRL/RJBX) with a prepared date of 26 June 2026.
Data Item A001 requires a Scientific and Technical Report (Final Report) prepared in accordance with ANSI/NISO Standard Z39.18 or current AFRL guidance. The contractor must deliver two editable electronic copies—one as an editable PDF and one in the most current version of Microsoft Word—via encrypted email or secure file transfer at https://safe.apps.mil/. The report shall include a completed SF 298 form with specified blocks completed. Distribution is limited to AFRL/RJBX (2 draft copies, 1 final copy) and includes letter of transmittal copies to AFRL/RJKB and the Administrative Contracting Officer. Upon program office acceptance notification, the contractor must submit a DD Form 250Z Receiving Report in WAWF, coded with shipment number "Z." The report will be published by DTIC through the AFRL STINFO office; contractors must not submit directly to DTIC. All technical data must be marked with Distribution Statement D (DoD and U.S. DoD contractors only) and export control warnings per DoDI 5230.24.
Data Item A002 requires Quarterly Status Reports submitted 40 days after contract start and then 10 days after each quarterly reporting period ends. Final distribution is one copy to AFRL/RJBX, with letter of transmittal copies to AFRL/RJKB and the ACO. The contractor must report all activities at the work breakdown structure level identified by the Government Program Manager. Contractor format requires government approval on initial submission, with an agreed-upon format/platform (CD-ROM or Air Force-approved file transfer system) to be defined at contract start. Reports must also be marked with Distribution Statement D and export control warnings per DoDI 5230.24, with the distribution statement added to every page.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: See Contract, Section B
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: SETS BAA Call 04
E. CONTRACT/PR NO.: FA9453-27-X-XXXX
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A001
2. TITLE OF DATA ITEM............: Scientific and Technical Reports
3. SUBTITLE..................................: Final Report
4. AUTHORITY.............................: DI-MISC-80711A (http://quicksearch.dla.mil)
5. CONTRACT
REFERENCE......: TBD
6. REQUIRING OFFICE..............: AFRL/RJBX
7. DD250 REQ................................: DD
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: See blk 16
10. FREQUENCY......................................: 1TIME
11. AS OF DATE........................................: See blk 16
12. DATE OF FIRST SUBMISSION: See blk 16
13. DATE OF SUBSEQUENT SUBM.: See blk 16
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
LT – Letter of Transmittal 1TIME – One Time
DRAFT FINAL
AFRL/RJBX 2 1
AFRL/RJKB 0 LT
ACO 0 LT
15. TOTAL: 2 1
16. REMARKS
THE REPORT WILL BE PUBLISHED WITH THE DEFENSE TECHNICAL INFORMATION CENTER (DTIC) BY AFRL STINFO OFFICE. Under no circumstances shall the contractor submit any version of the scientific and technical report to DTIC.
Blk. 4: GUIDANCE FOR PREPARATION OF THE REPORT: The Scientific and Technical Report shall be prepared I.A.W. the most current ANSI/NISO Standard Z39.18 or most current AFRL ANSI report preparation guidance. The contractor shall complete the most current SF 298: Blocks 2-5a, 6, 7, 8 and 13 (if applicable), and 14-16c, and submit it with the report. Incomplete reports will be immediately returned to the contractor. Following AFRL technical and STINFO reviews, any revisions required will be returned to the contractor. NOTE: The report preparation guidance and SF 298 are available at:
https://www.afrl.af.mil/RD/
The contractor shall deliver two editable electronic copies of the report. The electronic copies shall be editable .pdf file and the most current version of Microsoft Word. Submission via unencrypted or unsecure email is not permitted. If encrypted email is not available, please use: https://safe.apps.mil/.
Blk. 7: UPON NOTIFICATION OF ACCEPTANCE OF THE SCIENTIFIC AND TECHNICAL REPORT FROM THE PROGRAM OFFICE, the contractor shall submit the final Receiving Report (DD Form 250) in WAWF. In preparing the final DD Form 250, code the shipment number with a “Z.” Do not upload the Scientific and Technical Report into WAWF or DTIC. NOTE: SUBMITTAL OF THE DD FORM 250Z PRIOR TO ACCEPTANCE NOTIFICATION WILL RESULT
IN REJECTION OF THE DD FORM 250Z FINAL RECEIVING REPORT.
Blk. 9: All technical data (including electronic media/CD-R) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement (Distro D) and Export Control Warning, if required. (Note: Add the distribution statement in its entirety to the bottom of every page of the report except the SF298).
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 12/4/2025). Other requests for this document shall be referred to AFRL/RJBX.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.”
Blk. 10 - 13: The contractor shall deliver the Scientific and Technical Report, in final format, no later than the date specified in the Contract Schedule. The USAF will review and, if necessary, return the report with comments no later than the date specified in the Contract Schedule. If the report is returned to the contractor with comments, the contractor shall deliver the final copy of the report no later than the date specified in the Contract Schedule.
DESTRUCTION NOTICE—CUI documents may be destroyed by means approved for destroying classified information or by any other means making it unreadable, indecipherable, and unrecoverable.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: Daniel C. Fang I. APPROVED BY:
H. DATE: 26 June 2026 J. DATE:
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 2 Pages http://quicksearch.dla.mil/ https://www.afrl.af.mil/RD/ https://safe.apps.mil/
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: See Contract, Section B
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: SETS BAA Call 04
E. CONTRACT/PR NO.: FA9453-27-X-XXXX
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A002
2. TITLE OF DATA ITEM............: Status Report
3. SUBTITLE..................................: Quarterly Status Report
4. AUTHORITY.............................: DI-MGMT-80368A (http://quicksearch.dla.mil)
5. CONTRACT
REFERENCE......: TBD
6. REQUIRING OFFICE..............: AFRL/RJBX
7. DD250 REQ................................: LT
8. APP CODE.................................: N/A
9. DIST. STATEMENT REQUIRED......: See blk 16
10. FREQUENCY......................................: QTRLY
11. AS OF DATE........................................: EOM
12. DATE OF FIRST SUBMISSION: 40DAC
13. DATE OF SUBSEQUENT SUBM.: 10DARP
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
LT – Letter of Transmittal QTRLY – Quarterly EOM – End of Month 40DAC – 40 Days after contract start 10DARP – 10 Days after reporting period
DRAFT FINAL
AFRL/RJBX 0 1
AFRL/RJKB 0 LT
ACO 0 LT
15. TOTAL: 0 1
16. REMARKS
Blk 4: Tailor DID Requirements. The contractor shall report all activities at the WBS level identified by the Govt Program Manager.
Approval of contractor format is required on initial submission. An agreed upon format/platform will be defined at the start of contract as to how to deliver these data products (i.e. CD-ROM, Air Force approved file transfer system, etc.). Documentation shall be tailored per agreement between the contractor and the government.
Blk. 9: All technical data (including electronic media/CD-R) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement (Distro D) and Export Control Warning, if required. (Note: Add the distribution statement in its entirety to the bottom of every page of the report).
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 12/4/2025). Other requests for this document shall be referred to AFRL/RJBX.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.”
DESTRUCTION NOTICE—CUI documents may be destroyed by means approved for destroying classified information or by any other means making it unreadable, indecipherable, and unrecoverable.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: Daniel C. Fang I. APPROVED BY:
H. DATE: 26 June 2026 J. DATE:
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 2 Pages http://quicksearch.dla.mil/
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 |
| A. ADDRESSEES |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 |
A. ADDRESSEES
File details come from the government source that posted it. Updated .