MJOLNIR_Amend_02_Summary_of_Changes_20210901.pdf

PDF 96 KB Posted

Attached to
FA9451-21-S-0001 Call 0006 MJOLNIR Federal contract opportunity
Solicitation number
FA945121S0001Call0006
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

This document summarizes changes made in Amendment 02 to solicitation FA9451-21-S-0001 Call 0006 issued by the Air Force Research Laboratory, Directed Energy Directorate for the MJOLNIR program. The changes include extending the period of performance from 30 to 33 months, moving the proposal due date from September 20 to September 13, 2021, adjusting delivery and review dates for required data items and documentation to reflect a revised prototype delivery date of 21 months after award instead of the previously stated 21 months. Eligible vendors are sought to procure a near-production representative counter-unmanned aerial system to perform at levels equal to or greater than an existing prototype, capitalizing on previous high-power microwave systems work and enabling potential transition to a program of record.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary of Changes for:

MJÖLNIR

Closed One-Step Call

Issued Under

Directed Energy Technology Experimentation Research (DETER)

Advanced Research Announcement (ARA)

FA9451-21-S-0001 Call 0006

Amendment 02

01 September 2021

Solicitation, Section II. Paragraph D is amended as follows:

The anticipated period of performance is 30 33 months technical effort with an additional 3 months allotted for final reporting.

Solicitation, Section VII. Paragraph B. 1. is amended as follows:

Proposal Due Time and Date: Full technical and business/cost proposals must be submitted in response to this Call no later than 12:00 p.m., Mountain Time, 20 13 September 2021.

Solicitation, Section VIII. Paragraph A. is amended as follows:

For a proposal to be reviewed for Ability Build Multiple Units, it must at a minimum, be deemed scientifically or and technically sound but needing additional development for Technical Merit.

Attachment 1, Statement of Work (SOW), Paragraph 3.5 is amended as follows:

Prototype Completion Delivery: The Contractor shall complete deliver the prototype and all accompanying documentation and tools required to operate and maintain the prototype 21months after contract award. (CDRL A014, A015).

Attachment 1, Statement of Work (SOW), Paragraph 3.9 is deleted in its entirety.

Attachment 1, Statement of Work (SOW), Paragraph 9.0 is amended as follows:

Prototype Completion Delivery: DOA +21 Months Functional & Physical Configuration Audit: DOA +30 34 Months

End of Technical Effort (ETE): DOA + 30 33 months Final Report: DOA + 33 36 months

Attachment 3, Data Item Deliverables, CDRL A001, Block 16 Remarks:

Block 4 second paragraph is amended as follows:

This deliverable concludes with the completion delivery of the system, estimated at 21mo after contract award as outlined in Section 3.5 of the SOW.

Block 10, 11, 12 and 13, second sentence is amended as follows:

The subsequent status reports and the line item reports (see Blk 4 above) shall be delivered within 15 business days after the end of each subsequent accounting month (monthly) thereafter through system completion delivery.

Attachment 3, Data Item Deliverables, CDRL A004, Block 16 Remarks, Block 10, 11, 12, and 13, first sentence is amended as follows:

The contractor shall deliver draft documents 60 days prior to completion delivery of prototype system as indicated by Section 3.5 in the SOW.

Attachment 3, Data Item Deliverables, CDRL A006, Block 16 Remarks, Block 10, 11, 12, and 13, first

The contractor shall deliver draft documents 30 days prior to prototype completion delivery as outlined in section 3.5 of the SOW.

Attachment 3, Data Item Deliverables, CDRL A010, Block 16 Remarks, Block 10, 11, 12, and 13, first

Test Readiness Review (TRR)– 30 days after completion delivery of prototype system as outlined in Section 3.5 of the SOW Functional & Physical Configuration Audit (FPCA) – 30 days after At completion of final field test event

Attachment 3, Data Item Deliverables, CDRL A014, Block 16 Remarks, Block 10, 11, 12, and 13, first

The contractor shall deliver draft documents 30 days prior to prototype completion delivery as outlined in section 3.5 of the SOW.

Attachment 3, Data Item Deliverables, CDRL A015, Block 16 Remarks, Block 10, 11, 12, and 13, first

The contractor shall deliver draft documents 60 days prior to the completion delivery of the prototype system as outlined in Section 3.5 of the SOW.

Attachment 3, Data Item Deliverables, CDRL A019, Block 16 Remarks, Block 10, 11, 12, and 13, first

The contractor shall submit the draft source code, executables, and associated documentation in conjunction with the completion delivery of the prototype system as indicated by Section 3.5 of the SOW

Attachment 3, Data Item Deliverables, CDRL A020, Block 16 Remarks, Block 10, 11, 12, and 13, first

The contractor shall deliver draft documents on a standalone laptop 30 days prior completion delivery of prototype system as indicated in Section 3.5 of the SOW

Attachment 3, Data Item Deliverables, CDRL A021, Block 16 Remarks, Block 10, 11, 12, and 13, first

The contractor shall deliver draft documents 30 days prior to completion delivery of prototype system as indicated in Section 3.5 of the SOW.

Attachment 3, Data Item Deliverables, CDRL A022, Block 16 Remarks, Block 10, 11, 12, and 13, third

Report shall be delivered 30 days prior to prototype completion delivery as outlined in para 3.5 of the

SOW.

The above changes have been incorporated into FA9451-21-S-0001 Call 0006 Amendment 02

File details come from the government source that posted it. Updated .