MJOLNIR_Amend_02_Summary_of_Changes_20210901.pdf
PDF 96 KB Posted
- Attached to
- FA9451-21-S-0001 Call 0006 MJOLNIR Federal contract opportunity
- Solicitation number
- FA945121S0001Call0006
About this file
This document summarizes changes made in Amendment 02 to solicitation FA9451-21-S-0001 Call 0006 issued by the Air Force Research Laboratory, Directed Energy Directorate for the MJOLNIR program. The changes include extending the period of performance from 30 to 33 months, moving the proposal due date from September 20 to September 13, 2021, adjusting delivery and review dates for required data items and documentation to reflect a revised prototype delivery date of 21 months after award instead of the previously stated 21 months. Eligible vendors are sought to procure a near-production representative counter-unmanned aerial system to perform at levels equal to or greater than an existing prototype, capitalizing on previous high-power microwave systems work and enabling potential transition to a program of record.
View the file
Other files for this federal contract opportunity
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary of Changes for:
MJÖLNIR
Closed One-Step Call
Issued Under
Directed Energy Technology Experimentation Research (DETER)
Advanced Research Announcement (ARA)
FA9451-21-S-0001 Call 0006
Amendment 02
01 September 2021
Solicitation, Section II. Paragraph D is amended as follows:
The anticipated period of performance is 30 33 months technical effort with an additional 3 months allotted for final reporting.
Solicitation, Section VII. Paragraph B. 1. is amended as follows:
Proposal Due Time and Date: Full technical and business/cost proposals must be submitted in response to this Call no later than 12:00 p.m., Mountain Time, 20 13 September 2021.
Solicitation, Section VIII. Paragraph A. is amended as follows:
For a proposal to be reviewed for Ability Build Multiple Units, it must at a minimum, be deemed scientifically or and technically sound but needing additional development for Technical Merit.
Attachment 1, Statement of Work (SOW), Paragraph 3.5 is amended as follows:
Prototype Completion Delivery: The Contractor shall complete deliver the prototype and all accompanying documentation and tools required to operate and maintain the prototype 21months after contract award. (CDRL A014, A015).
Attachment 1, Statement of Work (SOW), Paragraph 3.9 is deleted in its entirety.
Attachment 1, Statement of Work (SOW), Paragraph 9.0 is amended as follows:
Prototype Completion Delivery: DOA +21 Months Functional & Physical Configuration Audit: DOA +30 34 Months
End of Technical Effort (ETE): DOA + 30 33 months Final Report: DOA + 33 36 months
Attachment 3, Data Item Deliverables, CDRL A001, Block 16 Remarks:
Block 4 second paragraph is amended as follows:
This deliverable concludes with the completion delivery of the system, estimated at 21mo after contract award as outlined in Section 3.5 of the SOW.
Block 10, 11, 12 and 13, second sentence is amended as follows:
The subsequent status reports and the line item reports (see Blk 4 above) shall be delivered within 15 business days after the end of each subsequent accounting month (monthly) thereafter through system completion delivery.
Attachment 3, Data Item Deliverables, CDRL A004, Block 16 Remarks, Block 10, 11, 12, and 13, first sentence is amended as follows:
The contractor shall deliver draft documents 60 days prior to completion delivery of prototype system as indicated by Section 3.5 in the SOW.
Attachment 3, Data Item Deliverables, CDRL A006, Block 16 Remarks, Block 10, 11, 12, and 13, first
The contractor shall deliver draft documents 30 days prior to prototype completion delivery as outlined in section 3.5 of the SOW.
Attachment 3, Data Item Deliverables, CDRL A010, Block 16 Remarks, Block 10, 11, 12, and 13, first
Test Readiness Review (TRR)– 30 days after completion delivery of prototype system as outlined in Section 3.5 of the SOW Functional & Physical Configuration Audit (FPCA) – 30 days after At completion of final field test event
Attachment 3, Data Item Deliverables, CDRL A014, Block 16 Remarks, Block 10, 11, 12, and 13, first
The contractor shall deliver draft documents 30 days prior to prototype completion delivery as outlined in section 3.5 of the SOW.
Attachment 3, Data Item Deliverables, CDRL A015, Block 16 Remarks, Block 10, 11, 12, and 13, first
The contractor shall deliver draft documents 60 days prior to the completion delivery of the prototype system as outlined in Section 3.5 of the SOW.
Attachment 3, Data Item Deliverables, CDRL A019, Block 16 Remarks, Block 10, 11, 12, and 13, first
The contractor shall submit the draft source code, executables, and associated documentation in conjunction with the completion delivery of the prototype system as indicated by Section 3.5 of the SOW
Attachment 3, Data Item Deliverables, CDRL A020, Block 16 Remarks, Block 10, 11, 12, and 13, first
The contractor shall deliver draft documents on a standalone laptop 30 days prior completion delivery of prototype system as indicated in Section 3.5 of the SOW
Attachment 3, Data Item Deliverables, CDRL A021, Block 16 Remarks, Block 10, 11, 12, and 13, first
The contractor shall deliver draft documents 30 days prior to completion delivery of prototype system as indicated in Section 3.5 of the SOW.
Attachment 3, Data Item Deliverables, CDRL A022, Block 16 Remarks, Block 10, 11, 12, and 13, third
Report shall be delivered 30 days prior to prototype completion delivery as outlined in para 3.5 of the
SOW.